McGuire Units 1 and 2 B 3.7.4-1 Revision No. 115 SG PORVs B 3.7.4 B 3.7 PLANT SYSTEMS B 3.7.4 Steam Generator Power Operated Relief Valves (SG PORVs)
BASES BACKGROUND The SG PORVs provide a method for cooling the unit to residual heat removal (RHR) entry conditions should the preferred heat sink via the Steam Dump System to the condenser not be available, as discussed in the UFSAR, Section 10.3 (Ref. 1). This is done in conjunction with the Auxiliary Feedwater System providing cooling water from the condensate storage system (CSS). The SG PORVs may also be required to meet the design cooldown rate during a normal cooldown when steam pressure drops too low for maintenance of a vacuum in the condenser to permit use of the Steam Dump System.
One SG PORV line for each of the four steam generators is provided.
Each SG PORV line consists of one SG PORV and an associated block valve.
The SG PORVs are provided with upstream block valves to permit their being tested at power, and to provide an alternate means of isolation.
The SG PORVs are equipped with pneumatic controllers to permit control of the cooldown rate.
A description of the SG PORVs is found in Reference 1. The SG PORVs are OPERABLE when they are capable of fully opening and closing manually using the handwheel.
APPLICABLE The design basis of the SG PORVs is established by the capability to SAFETY ANALYSES cool the unit to RHR entry conditions. The PORVs were sized to achieve a 50° F/hr cooldown rate. At cooldown inception, the PORVs will slowly open to maintain the desired cooldown rate. As S/G pressure decreases, the PORVs will eventually be wide open and the cooldown rate will gradually decrease. Therefore, the cooldown time from hot standby to RHR initiation is a function of the chosen maximum cooldown rate, the number of PORVs operating, and the time spent at MODE 3.
In the accident analysis presented in Reference 2, the SG PORVs are assumed to be used by the operator to cool down the unit to RHR entry conditions for accidents accompanied by a loss of offsite power. Prior to operator actions to cool down the unit, the SG PORVs and main steam safety valves (MSSVs) are assumed to operate automatically to relieve steam and maintain the steam generator pressure below the design
SG PORVs B 3.7.4 BASES McGuire Units 1 and 2 B 3.7.4-2 Revision No. 115 APPLICABLE SAFETY ANALYSES (continued) value. For the recovery from a steam generator tube rupture (SGTR) event, the operator is also required to perform a limited cooldown to establish adequate subcooling as a necessary step to terminate the primary to secondary break flow into the ruptured steam generator. The time required to terminate the primary to secondary break flow for an SGTR is more critical than the time required to cool down to RHR conditions for this event and also for other accidents. Thus, the SGTR is the limiting event for the SG PORVs. The number of SG PORVs required to be OPERABLE to satisfy the SGTR accident analysis requirements depends upon the number of unit loops and consideration of any single failure assumptions regarding the failure of one SG PORV to open on demand. SG PORVs are credited to be operated manually using the handwheel for safety analysis assumptions.
The SG PORVs are equipped with block valves in the event an SG PORV spuriously fails to close during use.
The SG PORVs satisfy Criterion 3 of 10 CFR 50.36 (Ref. 3).
LCO Three SG PORV lines are required to be OPERABLE. One SG PORV line is required from each of three steam generators to ensure that at least one SG PORV line is available to conduct a unit cooldown following an SGTR, in which one steam generator becomes unavailable, accompanied by a single, active failure of a second SG PORV line on an unaffected steam generator. The block valves must be OPERABLE to isolate a failed open SG PORV line. A closed block valve does not render it or its SG PORV line inoperable if operator action time to open the block valve is supported in the accident analysis.
Failure to meet the LCO can result in the inability to cool the unit to RHR entry conditions following an event in which the condenser is unavailable for use with the Steam Dump System.
An SG PORV line is considered OPERABLE when the SG PORV and its associated block valve are capable of fully opening and closing manually using the handwheel.
APPLICABILITY In MODES 1, 2, and 3, and in MODE 4, when a steam generator is being relied upon for heat removal, the SG PORVs are required to be OPERABLE.
In MODE 5 or 6, an SGTR is not a credible event.
SG PORVs B 3.7.4 BASES McGuire Units 1 and 2 B 3.7.4-3 Revision No. 115 ACTIONS A.1 With one required SG PORV line inoperable, action must be taken to restore OPERABLE status within 7 days. The 7 day Completion Time allows for the redundant capability afforded by the remaining OPERABLE SG PORV lines, a nonsafety grade backup in the Steam Dump System, and MSSVs.
B.1 With two or more SG PORV lines inoperable, action must be taken to restore all but one SG PORV line to OPERABLE status. Since the block valve can be closed to isolate an SG PORV, some repairs may be possible with the unit at power. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is reasonable to repair inoperable SG PORV lines, based on the availability of the Steam Dump System and MSSVs, and the low probability of an event occurring during this period that would require the SG PORV lines.
C.1 and C.2 If the SG PORV lines cannot be restored to OPERABLE status within the associated Completion Time, the unit must be placed in a MODE in which the LCO does not apply. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 4, without reliance upon steam generator for heat removal, within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
SURVEILLANCE SR 3.7.4.1 REQUIREMENTS To perform a controlled cooldown of the RCS, the SG PORVs must be able to be opened manually using the handwheel and throttled through their full range. This SR ensures that the SG PORVs are tested through a full cycle at least once per fuel cycle. Performance of inservice testing or use of an SG PORV during a unit cooldown may satisfy this requirement. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
SG PORVs B 3.7.4 BASES McGuire Units 1 and 2 B 3.7.4-4 Revision No. 115 SURVEILLANCE REQUIREMENTS (continued)
SR 3.7.4.2 The function of the block valve is to isolate a failed open SG PORV.
Cycling the block valve manually using the handwheel both closed and open demonstrates its capability to perform this function. Performance of inservice testing or use of the block valve during unit cooldown may satisfy this requirement. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
REFERENCES
- 1.
UFSAR, Section 10.3.
- 2.
UFSAR, Chapter 15.
- 3.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).