33QPTR B 3.2.4 McGuire Units 1 and 2 B 3.2.4-1 Revision No. 115 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.4 QUADRANT POWER TILT RATIO (QPTR)
BASES BACKGROUND The QPTR limit ensures that the gross radial power distribution remains consistent with the design values used in the safety analyses. Precise radial power distribution measurements are made during startup testing, after refueling, and periodically during power operation.
The power density at any point in the core must be limited so that the fuel design criteria are maintained. Together, LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)," LCO 3.2.4, and LCO 3.1.6, "Control Rod Insertion Limits," provide limits on process variables that characterize and control the three dimensional power distribution of the reactor core. Control of these variables ensures that the core operates within the fuel design criteria and that the power distribution remains within the bounds used in the safety analyses.
APPLICABLE This LCO precludes core power distributions that violate the following SAFETY ANALYSES fuel design criteria:
- a.
During a large break loss of coolant accident (LOCA), there must be a high level of probability that the peak cladding temperature does not exceed 2200°F (Ref. 1);
- b.
The DNBR calculated for the hottest fuel rod in the core must be above the approved DNBR limit. (The LCO alone is not sufficient to preclude DNB criteria violations for certain accidents, i.e., accidents in which the event itself changes the core power distribution. For these events, additional checks are made in the core reload design process against the permissible statepoint power distributions.);
- c.
During an ejected rod accident, the energy deposition to the fuel must not exceed 280 cal/gm (Ref. 2); and
- d.
The control rods must be capable of shutting down the reactor with a minimum required SDM with the highest worth control rod stuck fully withdrawn (Ref. 3).
The LCO limits on the AFD, the QPTR, the Heat Flux Hot Channel Factor (FQ(X,Y,Z)), the Nuclear Enthalpy Rise Hot Channel Factor (FH(X,Y)),
and control bank insertion are established to preclude core power distributions that exceed the safety analyses limits.
QPTR B 3.2.4 BASES McGuire Units 1 and 2 B 3.2.4-2 Revision No. 115 APPLICABLE SAFETY ANALYSES (continued)
The QPTR limits ensure that FH(X,Y) and FQ(X,Y,Z) remain below their limiting values by preventing an undetected change in the gross radial power distribution.
In MODE 1, the FH(X,Y) and FQ(X,Y,Z) limits must be maintained to preclude core power distributions from exceeding design limits assumed in the safety analyses.
The QPTR satisfies Criterion 2 of 10 CFR 50.36 (Ref. 4).
LCO The QPTR limit of 1.02, at which corrective action is required, provides a margin of protection for both the DNB ratio and linear heat generation rate contributing to excessive power peaks resulting from X-Y plane power tilts. A limiting QPTR of 1.02 can be tolerated before the margin for uncertainty in FQ(X,Y,Z) and FH(X,Y), or safety analysis peaking assumptions are possibly challenged.
APPLICABILITY The QPTR limit must be maintained in MODE 1 with THERMAL POWER
> 50% RTP to prevent core power distributions from exceeding the design limits.
Applicability in MODE 1 50% RTP and in other MODES is not required because there is either insufficient stored energy in the fuel or insufficient energy being transferred to the reactor coolant to require the implementation of a QPTR limit on the distribution of core power. The QPTR limit in these conditions is, therefore, not important. Note that the FH(X,Y) and FQ(X,Y,Z) LCOs still apply, but allow progressively higher peaking factors at 50% RTP or lower.
The Applicability is modified by a Note which states that the LCO is not applicable until the excore nuclear instrumentation is calibrated subsequent to a refueling.
ACTIONS A.1 With the QPTR exceeding its limit, a power level reduction of 3% from RTP for each 1% by which the QPTR exceeds 1.02 is a conservative tradeoff of total core power with peak linear power. The Completion Time
QPTR B 3.2.4 BASES McGuire Units 1 and 2 B 3.2.4-3 Revision No. 115 ACTIONS (continued) of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> allows sufficient time to identify the cause and correct the tilt.
Note that the power reduction itself may cause a change in the tilted condition.
A.2 After completion of Required Action A.1, the QPTR alarm may still be in its alarmed state. As such, any additional changes in the QPTR are detected by requiring a check of the QPTR once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
If the QPTR continues to increase, THERMAL POWER has to be reduced accordingly. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is sufficient because any additional change in QPTR would be relatively slow.
A.3 The peaking factors FH(X,Y) and FQ(X,Y,Z) are of primary importance in ensuring that the power distribution remains consistent with the initial conditions used in the safety analyses. Performing SRs on FH(X,Y) and FQ(X,Y,Z) within the Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ensures that these primary indicators of power distribution are within their respective limits.
A Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> takes into consideration the rate at which peaking factors are likely to change, and the time required to stabilize the plant and perform a flux map. If these peaking factors are not within their limits, the Required Actions of these Surveillances provide an appropriate response for the abnormal condition. If the QPTR remains above its specified limit, the peaking factor surveillances are required each 7 days thereafter to evaluate FH(X,Y) and FQ(X,Y,Z) with changes in power distribution. Relatively small changes are expected due to either burnup and xenon redistribution or correction of the cause for exceeding the QPTR limit.
A.4 If QPTR exceeds a value of 1.02, the Power Range Neutron Flux-High trip setpoint is reduced by 3% for each 1% QPTR exceeds 1.02.
Lowering this setpoint maintains the same margin to trip by limiting the transient response of the core. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is sufficient for this activity to be performed and is acceptable based on the low probability of a transient occurring in this time frame.
QPTR B 3.2.4 BASES McGuire Units 1 and 2 B 3.2.4-4 Revision No. 115 ACTIONS (continued)
A.5 Although FH(X,Y) and FQ(X,Y,Z) are of primary importance as initial conditions in the safety analyses, other changes in the power distribution may occur as the QPTR limit is exceeded and may have an impact on the validity of the safety analysis. A change in the power distribution can affect such reactor parameters as bank worths and peaking factors for rod malfunction accidents. When the QPTR exceeds its limit, it does not necessarily mean a safety concern exists. It does mean that there is an indication of a change in the gross radial power distribution that requires an investigation and evaluation that is accomplished by examining the incore power distribution. Specifically, the core peaking factors and the quadrant tilt must be evaluated because they are the factors that best characterize the core power distribution. This re-evaluation is required to ensure that, before increasing THERMAL POWER to above the more restrictive limit of Required Action A.1 or A.2, the reactor core conditions are consistent with the assumptions in the safety analyses.
A.6 If the QPTR has exceeded the 1.02 limit and a re-evaluation of the safety analysis is completed and shows that safety requirements are met, the excore detectors are recalibrated to show a zero QPT prior to increasing THERMAL POWER to above the more restrictive limit of Required Action A.1 or A.2. This is done to detect any subsequent significant changes in QPTR.
Required Action A.6 is modified by a Note that states that the QPT is not zeroed out until after the re-evaluation of the safety analysis has determined that core conditions at RTP are within the safety analysis assumptions (i.e., Required Action A.5). This Note is intended to prevent any ambiguity about the required sequence of actions.
A.7 Once the flux tilt is zeroed out (i.e., Required Action A.6 is performed), it is acceptable to return to full power operation. However, as an added check that the core power distribution at RTP is consistent with the safety analysis assumptions, Required Action A.7 requires verification that FQ(X,Y,Z) and FH(X,Y) are within their specified limits within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of
QPTR B 3.2.4 BASES McGuire Units 1 and 2 B 3.2.4-5 Revision No. 115 ACTIONS (continued) reaching RTP. As an added precaution, if the core power does not reach RTP within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, but is increased slowly, then the peaking factor surveillances must be performed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of the time when the more restrictive of the power level limit determined by Required Action A.1 or A.2 is exceeded. These Completion Times are intended to allow adequate time to increase THERMAL POWER to above the more restrictive limit of Required Action A.1 or A.2, while not permitting the core to remain with unconfirmed power distributions for extended periods of time.
Required Action A.7 is modified by a Note that states that the peaking factor surveillances must be done after the excore detectors have been calibrated to show zero tilt (i.e., Required Action A.6). The intent of this Note is to have the peaking factor surveillances performed at operating power levels, which can only be accomplished after the excore detectors are calibrated to show zero tilt and the core returned to power.
B.1 If Required Actions A.1 through A.7 are not completed within their associated Completion Times, the unit must be brought to a MODE or condition in which the requirements do not apply. To achieve this status, THERMAL POWER must be reduced to 50% RTP within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable, based on operating experience regarding the amount of time required to reach the reduced power level without challenging plant systems.
SURVEILLANCE SR 3.2.4.1 REQUIREMENTS SR 3.2.4.1 is modified by two Notes. Note 1 allows QPTR to be calculated with three power range channels if THERMAL POWER is <
75% RTP and the input from one Power Range Neutron Flux channel is inoperable. Note 2 allows performance of SR 3.2.4.2 in lieu of SR 3.2.4.1 if more than one input from Power Range Neutron Flux channels are inoperable.
This Surveillance verifies that the QPTR, as indicated by the Nuclear Instrumentation System (NIS) excore channels, is within its limits. When the QPTR alarm is OPERABLE, the Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
QPTR B 3.2.4 BASES McGuire Units 1 and 2 B 3.2.4-6 Revision No. 115 SURVEILLANCE REQUIREMENTS (continued)
When the QPTR alarm is inoperable, the Frequency is increased to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This Frequency is adequate to detect any relatively slow changes in QPTR, because for those causes of QPT that occur quickly (e.g., a dropped rod), there typically are other indications of abnormality that prompt a verification of core power tilt.
SR 3.2.4.2 This Surveillance is modified by a Note, which states that it is required only when the input from one or more Power Range Neutron Flux channels are inoperable and the THERMAL POWER is 75% RTP.
With an NIS power range channel inoperable, tilt monitoring for a portion of the reactor core becomes degraded. Large tilts are likely detected with the remaining channels, but the capability for detection of small power tilts in some quadrants is decreased. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
For purposes of monitoring the QPTR when one power range channel is inoperable, the moveable incore detectors are used to confirm that the normalized symmetric power distribution is consistent with the indicated QPTR and any previous data indicating a tilt. The incore detector monitoring is performed with a full incore flux map or two sets of four thimble locations with quarter core symmetry. The two sets of four symmetric thimbles is a set of eight unique detector locations. These locations are C-8, E-5, E-11, H-3, H-13, L-5, L-11, and N-8.
The symmetric thimble flux map can be used to generate symmetric thimble "tilt." This can be compared to a reference symmetric thimble tilt, from the most recent full core flux map, to generate an incore tilt.
Therefore, incore tilt can be used to confirm that QPTR is within limits.
With one or more NIS channel inputs to QPTR inoperable, the indicated tilt may be changed from the value indicated with all four channels OPERABLE. To confirm that no change in tilt has actually occurred, which might cause the QPTR limit to be exceeded, the incore result may be compared against previous flux maps either using the symmetric thimbles as described above or a complete flux map. Nominally, quadrant tilt from the Surveillance should be within 2% of the tilt shown by the most recent flux map data.
QPTR B 3.2.4 BASES McGuire Units 1 and 2 B 3.2.4-7 Revision No. 115 REFERENCES
- 1.
- 2.
UFSAR Section 15.4.8.
- 3.
10 CFR 50, Appendix A, GDC 26.
- 4.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).