Technical Specification Bases 3-7-10
ML14342A107
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/04/2014
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML14339A712 List: ... further results
References
MNS-14-088
Download: ML14342A107 (4)


Text

McGuire Units 1 and 2 B 3.7.10-1 Revision No. 115 B 3.7 PLANT SYSTEMS B 3.7.10 Control Room Area Chilled Water System (CRACWS)

BASES BACKGROUND The CRACWS provides temperature control for the control room following isolation of the control room.

The CRACWS consists of two independent and redundant trains that provide cooling of recirculated control room air. Each train consists of cooling coils, instrumentation, and controls to provide for control room temperature control. The CRACWS is a subsystem providing air temperature control for the control room.

The CRACWS is an emergency system, parts of which may also operate during normal unit operations. A single train will provide the required temperature control to maintain the control room at approximately 75°F.

The CRACWS operation in maintaining the control room temperature is discussed in the UFSAR, Section 6.4 (Ref. 1).

There are components that are part of the CRACWS but do not affect the CRAVS. These components are associated with the Control Room Area Air Handling units, the Switchgear Air Handling units. LCO 3.7.10 does not apply if a CRAVS component does not directly impact the CRACWS.

APPLICABLE The design basis of the CRACWS is to maintain the control room SAFETY ANALYSES temperature for 30 days of continuous occupancy.

The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the temperature between 75°F and 90°F. A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function. Redundant detectors and controls are provided for control room temperature control.

The CRACWS is designed in accordance with Seismic Category I requirements. The CRACWS is capable of removing sensible and latent heat loads from the control room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment OPERABILITY.

The CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).

CRACWS B 3.7.10 BASES McGuire Units 1 and 2 B 3.7.10-2 Revision No. 115 LCO Two independent and redundant trains of the CRACWS are required to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total system failure could result in the equipment operating temperature exceeding limits in the event of an accident.

The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature are OPERABLE in both trains. These components include the cooling coils and associated temperature control instrumentation. In addition, the CRACWS must be operable to the extent that air circulation can be maintained.

The CRACWS is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability. Additionally, both normal and emergency power must also be OPERABLE because the system is shared. If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.

APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of irradiated fuel assemblies and during CORE ALTERATIONS, the CRACWS must be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following isolation of the control room.

ACTIONS A.1 With one CRACWS train inoperable, action must be taken to restore OPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control room temperature within limits. However, the overall reliability is reduced because a single failure in the OPERABLE CRACWS train could result in loss of CRACWS function. The 30 day Completion Time is based on the low probability of an event requiring control room isolation, the consideration that the remaining train can provide the required protection, and that alternate safety or nonsafety related cooling means are available.

CRACWS B 3.7.10 BASES McGuire Units 1 and 2 B 3.7.10-3 Revision No. 115 ACTIONS (continued)

B.1 and B.2 In MODE 1, 2, 3, or 4, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the unit must be placed in a MODE that minimizes the risk.

To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.

C.1, C.2.1, and C.2.2 In MODE 5 or 6, or during movement of irradiated fuel, or during CORE ALTERATIONS, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately. This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that active failures will be readily detected.

An alternative to Required Action C.1 is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room. This places the unit in a condition that minimizes accident risk. This does not preclude the movement of fuel to a safe position.

D.1 and D.2 In MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS, with two CRACWS trains inoperable, action must be taken immediately to suspend activities that could result in a release of radioactivity that might require isolation of the control room. This places the unit in a condition that minimizes risk. This does not preclude the movement of fuel to a safe position.

E.1 If both CRACWS trains are inoperable in MODE 1, 2, 3, or 4, the control room CRACWS may not be capable of performing its intended function. Therefore, LCO 3.0.3 must be entered immediately.

CRACWS B 3.7.10 BASES McGuire Units 1 and 2 B 3.7.10-4 Revision No. 115 SURVEILLANCE SR 3.7.10.1 REQUIREMENTS This SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90°F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.

REFERENCES

1.

UFSAR, Section 6.4.

2.

10 CFR 50.36, Technical Specifications, (c)(2)(ii).