Text
Duke Energy McGuire Nuclear Station Units 1 and 2 FOURTH INSPECTION INTERVAL INSERV ICE INSPECTION PRESSURE TEST PLAN Revision 0 Plant Location: 12700 1-lagers FerTy Road 1-lunterwille. North Carolina 28078-9340 Commercial Service Date: December 1. 1981 (Unit I)
March I. 1984 (1Unit 2)
Fourth Interval Start Dale: December I. 2011 (Unit I)
July 15. 2014 (Unit 2)
Owner: Duke Energy 526 South Church St.
Mail Code ECO0A Charlotte, N. C. 28202 Prepared By: D~ate: 1:-;12;1X1 Reviewed By: Date:
U Approved By: Date:
Dttke E-nergy McGuire Uitits I & 2 - 401Ten-Year Intlerval Revision 0 Inservice Inspection Pressme Test Plan Page I of 10 Doctment Itdex Number: MISI-1462.20-0040 U I and U2 P'I'II.AN TABLE OF CONTENTS SECTION TITLE I Applicable Codes and Standards for Inservice Inspection Pressure Testing 2 Inspection Methods and Procedures to be Used for Inservice Inspection Pressure Testing 3 Description of Inservice Inspection Pressure Testing Plan for ISl Class A Items 4 Description of Inservice Inspection Pressure Testing Plan for IS] Class B Items 5 Description of Inservice Inspection Pressure Testing Plan for ISI Class C Items 6 System Boundaries Subject to Examination 7 Components Exempt From Pressure Test Examination 8 Section XI System Pressure Testing Scheduling 9 Requests for Relief From ASME Code Requirements 10 Examination Zone Listing and Associated Pressure Testing Boundary Drawiing II Pressure Testing Boundary Drawing and System Listing 12 Buried Components Attachments Attachment A - McGuire Unit I - 4I 0-Ye_"ar Interval Pressure r'esting Extxamination Zone Report Attachment B - McGuire Unit 2 -4"' 10-Year Interval Pressure Testing Examination Zone Rel)orl Attachment C - Flow Chart for Determining the Required Hold Time Prior to the VT-2 Visual Examination Attachment D - Pressure. Test Boundary Drawing Listing Attachment 1E- Interval and Period Start and End dates for McGuire Unit I and McGuire Unit 2 Duke Energy McGuire Units I & 2 - 41' Ten-Year Interval Revision 0 Inservice Inspection Pressure Test Plan Page 2 of 10 Document Index Number: MISI- 1462.20-0040 U I and 1!2 PTPLAN
1 1Applicable Codes and Standards for Inservice Inspection Pressure Testing This document constitutes the inservice inspection pressure testing plan and schedules for the fourth inspection interval, Periods 2 and 3 for McGuire Unit I and the entire fourth inspection interval for McGuire Unit 2.
McGuire Unit I fourth interval. Period I inser'ice inspection pressure testin.e plan and schedule is documented in Document Index Number M ISI- 1462.20-(0040-PTPLAN.
All further references to McGuire in this document are understood to include McGuire 1 (MNS 1) and McGuire 2 (MNS2). All pressure retaining components classified as Classes A. B, and C have been reviewed to determine the inservice inspection pressure test examination requirements. Unless otherwise noted, systems designated as Class A are equivalent to ASME Class I: those designated as Class B are equivalent to ASME Class 2, and those designated as Class C are equivalent to ASME Class 3.
The Section XI requirements for MNSI inservice inspection pressure testing are based on Relief Request 10-MN-001, which was approved by the NRC on March 3.2011. see ADAMS MLI 10550770. This Relief Request allowed Duke Energy to implement the requirements of Section XI, 1998 Edition with the 2000 Addenda for Period I of the fourth interval, sec document MISI-1462.20-004(0 -PTPLAN for implementation details. This Relief Request also requires that the Code of Record for Unit I be updated to match that used for Unit 2 no later than the end of Period I of the fourth interval. As discussed in the next paragraph. MNS2 will implement the 2007 Edition with the 2008 Addenda for Interval 4 and therefore this version of the Code will be implemented at MNSI for Periods 2 and 3 of Interval 4, as modified by the Code Cases and Relief Requests included in this Pressure Testing Plan.
Based on a foul'h interval start date of July 15. 2014 for MNS2 and the requirements of IOCFR50.55a(g)(4)(ii).
inservice inspection pressure testing activities for McGuire shall be performed in accordance with the 2007 Edition of ASME Section XI with the 2(008 Addenda. as modilied by the Code Cases and Relief Requests included in this Pressure Testing Plan.
When performing system leakage tests in accordance with IWA-5213(a), no holding time is required after attaining test pressure for Class I components. a 10-minute holding time after attainin'g test pressure is required for Class 2 and Class 3 components that are not required to operate during normal operating conditions, and no hold time is required for the remaining Class 2 and Class 3 components provided that the system has been in operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for insulated components or 10 minutes for uninsulated components.
If leakage is detected on either of the MNS I Residual Heat Removal Heat Exchangers (IA or 113) or either of the MNS2 Residual Heat Removal Heat Exchangers (2A or 2B) during Pressure Testing and VT-2 examinations, tile ISI NDE Plan manager for Mc(auire shall be notified of the leakage so that an evaluation can be performed to determine the continued use of Code Ca,;e N-706- I for summary numbers M I .C 1.1 0.(X0001 and l
M .1.20.0011 (Heat Exchanger IA), M I .C 1.I0.0005 and M I .C 1.20.(X)06 (Heat Exchanger I B), or M2.CI. 10.0009 and M2.C 1.20.00 i8 (Heat Exchanger 2A) and M2.C 1.10.0008 and M2.C 1.20.0014 (Heat Exchanger 2B). respectively.
The Section XI Code Cases which were applied to the McGuire 4O' Interval Pressture Testing Program were identified in document DUKE-008-002. Revision 0 and included Code Cases published through the 2010 Edition of Code Cases: Nuclear Component.%. Supplement II. Implementation of these Code Cases was based on the requirements in Regulatory Guide 1.147. Revision 16. and Regulatory Guide 1.193. Revision 3.
Identification of additional Section X] Code Cases for the 4"' Interval will be in accordance with the ASME Section XI Functional Area Manual Sections 1.5.3 and 4.2 beginning with the 2013 Edition of Code Cases:
Nuclear Component.s. No Supplements. These Code Cases are listed in Table I. I below.
The specific applicability of the Code Cases listed in,Trable I- I is ilncluded tinder the heading "'inplementation of ASME Section XI Code Cases" in Sections 3.4 and 5 for Classes A. It and C components. respectively.
Duke Energy McGuire Units I & 2 - 41' Ten-Year Interval Revision 0 Inservice Inspection Pressure Test Plan Page 3 of' 10 Document Index Number: MISI- 1462.20-0040 U1I and 112 PTPLAN
Table 1-1: Section XI Code Cases Applicable to the McGuire Pressure Testing Program Code Code Case Title Applicability NRC Conditions for Use of Code Case Case (as slated in Regulatory Guide 1.147 Revision 16)
No.
N-706-t Alternative Examination From the 1977 Unconditional Requirements to Table Edition up to and IWB-2500-1 and Table including the 2010 IWC-2500-1 for PWR Edition with the Stainless Steel Residual and 2011 Addenda Regenerative Heat Exchangers From the 1989 N-731 Altemalive Class I System Edition up to and Unconditional Leakage Test Pressure including the 2013 Requirements Edition 2 Inspection Methods and Procedures to he used for Inservice Inspection Pressure Testing VT-2 visual examinations shall be conducted to locate evidence of leakage from pressure retaining components during the conduct of a system pressure test.
Pressure testing anti associated VT-2 visual examinations shall be performed using the latest revision of procedure NDE-68 "Inservice Inspection (ISI) Visual Examination, VT-2, Pressure Test".
The Duke Energy procedures and directives listed in Table 2-1 shall be used to control pressure testing itservice inspection activities, Inservice Inspection Pressure Testing Plans, Pressure Test Database Management System. and liservice Inspection Pressure Test Reports:
Table 2-1: Duke Energy Procedures and Directives Applicable to the McGuire Pressure Testing Program Document No: [ Title MP/OIA176501076 Controlling Procedure For System Pressure Testing Of ASME Piping Systems PT/lI(2)/A/4403/0071(8) RN Flow Balance Tests NDE-68 Inservice Inspection (ISI) Visual Examination. VT-2, Pressure Test NDE-94 NDE Program Manual- Volume I - NDE-94 Evaluation of Indications and Relevant Conditions Detected by Nondestntctive Examination and System Pressure 'resting NSD-300 ASME Section XI Programn NSD-701 Records Manaewrnent NSD-702 Documnent Management NSD-800 Software and Data Quality Assurance (SDQA) Program ASME FAM. Appendix G Preparation and Distribution of Inservice Inspection Reports ASME FAM. Appendix I-1 Preparation and Implementation of the Inservice Inspection Pressure Tesmint Plans ASME FAM. Appendix 3 ISI Pressure Testing Process ASME FAM. Appendix E Control Of Preservice And Inservice Inspection Activities ASME FAM ASME Section XI Programn Functional Area Manual Duke Energy McGuire Units I & 2 - 4 t Ten-Year Interval Revision 0 lntsevice Inspection Pressure Test Plan Page 4 of 10 Document Index Number: MIS1-1462.20-0040) I. and L12 PTPLAN
3 Description of Inservice Inspection Pressure Testing Plan for ISI Class A Items Pressure testing of ISI Class A components shall be performed in accordance with the requirements of Articles IWA-5000. IWB-2000. and IWB-5000 of Section XI. ISI Class A systems that ,are required to be pressure tested shall be divided into isolable areas. to the extent practical. These areas represent specific pressure testing zones, hereafter referred to as examination zones. Note that ISI Class A at McGuire is equivalent to ASME Section XI Class !.
ASME Section Xl Examination Categories and Requirements The pressure testing requirements for ISI Class A components are listed in Table IWB-2500- 1. Category B-P of Section XI and include the following:
Category B-P, All Pressure Retaining Components In accordance with IWB-5221, the ISI Class A System Leakage Test shall be conducted at a pressure not less than the pressure corresponding to 100% rated reactor power. The test pressure and temperature shall be attained at a rate in accordance with the heat-up limitations specified for the system.
In accordance with Examination Category B-P. Item Number B 15.10? the ISI Class A System Leakage Test is required to be perfonned prior to plant starttp following each reactor refuieling and is performed with all valves in the position required for normal reactor operation startup. The visual examination shall, however, extend to and include the second closed valve at the boundary extremity.
In accordance with Examination Category B-P. Item Number B 15.20, the pressure-retaining botmndary during the ISI Class A System Leakage Test conducted at or near the end of each inspection interval shall extend to all ISI Class A pressure-retaining components within the system boundary. This tcsl is required only once during the ten-year interval.
Table 3-1: Summary of Category B-P Requirements Table IWB-2500-1 Components To Be Examined Requirements Item No. u B 15. 10 Pressure Retaining Components per VT-2 examination IWB-5222(a) each refueling outage B 15.20 Pressure Retaining Components per V'--2 examination IWB-5222(b) once per interval Implementation of ASME Section XI Code Cases McGuire is implementing Code Case N-731. Alternative Class I System Leakage Test Pressure Requirements for Interval 4. This Code Case allows portions of Class I systems that are continuously pressurized during an operating cycle by a statically-pressurized passive safety injection system of a pressurized water reactor to be examined at the pressure associated with a statically-pressurized passive safety injection system in lien of the requirements of IWB-522 I(a). This Code Case will be applied during each System Leakage Test during Interval 4.
Duke Energy McGuire Unils I & 2 - 4" 'Ten-Year Interval Revision 0 Inservice Inspection Pressure "est Plan Page 5 of 10 Do)cument Index Number: MISI- 1462.20-0040 U I and U2 PITILAN
4 Description of Inservice Inspection Pressure Testing Plan for ISI Class B Items Pressure testing of ISI Class B items shall be performed in accordance with the requirements of Articles IWA-5000. IWC-2000. and IWC-5000. ISI Class B systems that are required to be pressure tested shall bc divided into isolable areas. to the extent practical. These areas represent specific pressure testing zones. hereafter referred to as examination zones. Note that ISI Class B at McGuire is equivalent to ASME Section XI Class 2.
Examination Categories and Requirements The pressure testing requirements for ISI Class B components are listed in Table IWC-2500-1. Categories C-B and C-Il of Section XI and include the following:
Category C-B, Pressure Retaining Nozzle Welds In Vessels When nozzle-to-shell (nozzle to head or nozzle to nozzle) welds (to be examined by NDEnmethods) are inaccessihle. the telltale hole in the reinforcing plates shall receive a VT-2 visual examination for evidence of leakage while the vessel is undergoing the System Leakage Test as required by Category C-H. The ISI Class B leakage test is required once in each inspection period.
Table 4-1: Summary of Category C-B Requirements Table I WC-2500-1 Components To Ile Examined Requirements Item No.
C2.33 Nozzles With Reinforcing Plate in Vessels VT-2 examination of
> 1/2 in. Nominal Thickness - Nozzle-to- tell talc hole in the Shell (Nozzle to Head or Nozzle to Nozzle) reinforcing plale during Welds When Inside of Vessel is system leakage test
_ Inaccessible Category C-H, All Pressure Retaining Components In accordance with IWC-5221. the Class B System Leakage Test is conducted at the system pressure obtained while the system, or portion of the system. is in service performing its normal operating function or at the system pressure developed during a test conducted to verify system operability. The Class B leakage test is required once in each inspection period.
Table 4-2: Summary of Category C-H Requirements Table IWC-2500-1 Components To Be Examined Requirements Item No. 1 C7. 10 Pressure Retaining Components VT-2 examination once per period Implementation of ASME Section XI Code Cases McGuire is implementing Code Case N-706-l, which allows Category C-A and C-B welds in PWR stainless steel residual heat exchangers to be VT-2 examined in lieu of the volumetric and surface examinations specified in Table IWC-250t-l. The Residual Heat Removal (RHR) I-eat Exchangers at McGuirc are being VT-2 examined during Interval 4 per Code Case N-706- 1, Item Nos. C 14 and C 15 in lieu of the requirements of Category C-A. Itemi Nos. Cl. 10 and Cl .20 (volumetric examination) and Category C-B, Iteni No. C2.31 (surface examination).
D)uke Fnergy McGuire Units I & 2 - 4 Teu-Year Interval Revision 0 Inservice Inspection Pressure Test Plan Pae 6 of 10 Document Index Nnmber: MISI-1462.20-004( U I and (12 PTPLAN
5 Description of Inservice Inspection Pressure Testing Plan for ISI Class C Items Pressure testing of ISI Class C items shall be performed in accordance with the requirements of Articles IWA-5000. IWD-2000. and IWD-5000 of Section XI. ISI Class C systems that are required to be pressure tested shall be divided into isolable areas. to the extent practical. These areas reprcsent specific examination zones.
Examination Categories and Requirements:
The examination categories and item numbers shall be those listed in Table IWD-2500-1 of Section XI.
Category D-B, All Pressure Retaining Components The pressure testing requirements for ISI Class 3 components are listed in Table IWD-2500- I, Category D-B of Section XI and include the following:
In accordance with IWD-5221, the ISI Class 3 System Leakage Test is conducted at the system pressure obtained while the system, or portion of the system. is in service performing its normal operating function or at the system pressure developed during a test conducted to verify system operability. The ISI Class 3 leakage test is required once in each inspection period.
Table 5-1: Summary of Category D-B Requirement%
Table IWC-2500-1 Components to be Examined Requirements Item No.
D2.10 Pressure Retaining Components VT-2 examination once per period 6 Components Subject to Section Xl Pressure Testing The components subject to Section XI Pressure Testing requirements are identified on tile ISI Pressure Testing Boundary drawiugs listed in Attachment D. These drawinxgs have been color coded to identify the applicable systems and components as follows:
Red ISI Class A Yellow ISI Class B Green ISI Class C Blue Components exempt from pressure testing requirements Magenta Boundary line showing the extremities of pressure testing examination zones Black Non ISI Class components Unless otherwise noted. systems designated as ISI Class A are equivalent to ASME Class I, those designated as ISI Class B are equivalent to ASME Class 2. and those designated as ISI Class C are equivalent to ASME Class 3.
All instrumentation taps within the examination boundary shall be examined up to the first isolation valve off the process pipe.
The ISI Pressure Testing Boundary Drawings are included in fhe Nuclear Electronic Document Library (NEDL). Changes to the examination boundaries will be shown on the latest ISI Pressure Testing Boundary Drawing revision in NEDL.
Section XI requirements for the boundaries of System Pressure Tcsting are included in IWB-5222. IWC-5222 and IWD-5222 and are reflected on the ISI Pressure Testing Boundary Drawings.
Duke Energy McGuire Units I & 2 - 4" *Ten-YearInterval Revision 0t Inservice Inspection Pressure Test Plan Page 7 of 10 Document Index Number: MISI-1462.20-0040 (1I and U2 PTPLAN
7 1 Components Exempt or Excluded From Section XI Pressure Testing Components exempted or excluded from Section XI Pressure Testing requirements are listed in IWA-51 10.
IWC-5222 and IWD-5222. Specific application of these exemptions and exclusions are shown on the ISI Pressure Testing Boundary drawings. which are described in Section II of this document and listed in Attachments A, B and C. The following are examples of pressure test exemptions and exclusions:
- Non pressure retaining portions of the Reactor Coolant Pumps.
this does not apply to repair/replacement activities related to prlessure testing.
- Containment Sump suction per Interpretation XI-1 13.
- ISI Class B and ISI Class C portions of systems that do not support thie system safety finction beyond the first normally closed valve (including relief valves or valves capable of automatic closure) per IWC-5222(b) and IWD-5222(b).
" Containment penetrations where the piping and isolation valves perform a containment function and the balance of the piping system is outside the scope of Section XI per IWA-5 110(c).
- Systenms/comnponents determined to be optionally owner classified as ISI Class B or ISI Class C per Section XI. IWA- 1320(c).
8_8 1Section X! System Pressure Testing Scheduling Section XI System Pressure Testing is scheduled in accordance with requirements of the Section X[ Tables for Categories B-P. C-H and D-B. Note that (he Section XI scheduling requirements in IWB-241 I. IWC-2411 and IWD-241 I do not apply to Categories B-P, C-IH and D-B.
Section Xl System Pressure Testing of Class A systems and components shall be completed at each refueling outage per Table IWB-2500-1. Calegory B-P. ISI Class A Pressure Testing is not. sclheduled on an outage-by-outage basis because the examinations are required to be completed each retueling outage.
Section XI System Pressure Testing of ISI Class B and C systems and components shall be completed once each inspection period per Table IWC-2500-1. Category C-I-I and Table IWD-2500-1, Category D-B. IS[ Class 2 and 3 Pressure Testing is not scheduled on an outage-by-outage basis because the examinations are required to be 100 percent complete by the end of the inspection period rather than a minimum/maximum percentage each inspection period.
Attachment E includes Tables for McGuire Unit I and McGuire Unit 2 listing the interval and period start and end dates as well as the planned outages for each unit, based on an eighteen month refueling cycle.
9 Requests tor Relief from ASME Code Requirements Each Request for Relief (RIR) from a requirement of Section XI specified in this Plan shall be submitted by the McGuire Nuclear Station to the Nuclear Regulatory Commission for approval.
Table 9-1 is a listing of the Requests for Relief submitted for use at McGuire:
Table 9-1: McGuire Pressure Testing Program Requests for Relief Serial Number Description Date RFR Date SER Comments LýLISubmitted IA rve No Relief Requests have been submitted for use at McGuire for the 4 "' Interval per ASME Section XI 2007 Edition with the 2008 Addenda I
Duke Energy Mc(iuire Units I & 2 - 4"t Ten-Year Interval Revision 0 Inservice Inspection Pressure Test Plan Page 9 of It0 Document Index Number: MISI-1462.20-0040 UI and U2 PTPLAN iii
10 Examination Zone Listing and IS[ Pressure Testing Boundary Drawings The Examination Zones shown on ISI Pressure Testing Boundary Drawings represent an area of a system that shall receive a VT-2 visual examination or an alternative to the VT-2 examination. Typically, an Examination Zone terminates at a boundary valve. building interface. or component interface and may include components shown on several boundary drawings. The Examination Zone includes all pressure retaining components within the scope of the boundary valves/extremity interfaces. Only the Red. Yellow, or Green color-coded portion of a zone shown on pressure test boundary drawings require a VT-2 visual examination. See Section 6 for additional information regarding boundary drawing color-coding.
All McGuire Examination Zone numbers have the same format. The following example is for an ISI Class A Leakage Test Zone:
- - Class A, B, or C (L) = Leakage Test Seq9uentIial Numbe 00 I1U~
'JU System Being Examined (1) = Unit 1, (2) = Unit 2 I Pressure Testing Examination Zone Reports A listing of the Pressure Testing Zone numbers., examination frequency. and associated inspection information is included in Attachment A for McGuire Unit I and in Attachment B for McGuire Unit 2.
Duke Energy McGuire Units I & 2 - 4'F Ten-Year Interval Revision 0 Inservice Inspection Pressure Test Plan Pame 9 of 10 Document Index Number: MISI-1462.2t)-0040 U I and U2 P'rPLAN
11 1 System, Boundary Drawing, and IS] Classification Listing The pressure testing examination boundaries are identified on color coded electronic drawings (modified system flow diagrams) and stored in the Nuclear Electronic Document Library (NEDI.). "As Built" system flow diagram revisions are reviewed to determine if the revision had any impact on the pressure testing boundaries.
These flow diagram revisions are incorporated into the Inservice Inspection pressure testing boundary drawings as necessary. Some flow diagram revisions do not affect the pressure testing boundaries: therefore, the pressure testing boundary drawings are not required to be revised. For this reason, there may be a difference between the numeric revision level listed on the flow diagram versus the revision level of the flow diagram referenced on the pressure testing boundary drawing. The latest revision of the pressure testing boundary drawing can be retrieved from NEDL.
See Attachment D for a listing of the Pressure Testing Boundary Drawings applicable to McGuire Units I and 2.
12 Buried Components Unless otherwise specified (i.e., deviation cited in a Relief Request). pressure testing for ISI classified buried components will be performed in accordance with ASME Section XI. IWA-5244. The permanent record must confirm the applicable IWA-5244 test was acceptable. The following testing of buried components is being conducted at McGuire Nuclear Station:
Nuclear Service Water (RN)- An acceptable RN Flow Balance 'rest conducted per procedures PT/1 (2)1A144031007(8) demonstrates unimpaired flow in accord a nic e with IWA-5244(b)(2).
Duke E-inergy McGtuire Units I & 2 - 4" Ten-Year Interval Revision 0 Inservice Inspection Pressure Test Plan Page I0 of 10 Doctument Index Number: MISt- 1462.20-0(A4o U! and (12 PTPi.AN
Attachment A Reserved for McGuire Unif I - 40' 10-Year Interval 2"" and 3rd Periods Pressure Testing Examination Zone Report.
Refer to Document MISI-1462.20-0040-PTPL.AN Rev. 0 for McGuire Unit 1 -4"' 10-Year ilnerval, I" Period Pressure Tesling Examination Zone Report.
Duke Energy McGuire I Inits I & 2 - 4'h Ten-Year Inmerval Revision 0 Inservice Inspection Pressure Test Plan Attachment A Document Index Numher: MISI- 1462.20-0040 UjI a:td 1U2 PTPI.AN Page I of I
AR2567 PressureTesi - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 Ul and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zone S 1
Zoe 2BB-040L-B B'udar MC-ISIL4-2580-01.00 Class B C-H ystem BB - Steam Generator Periodic
-uir Im.
Leakage Test VT-2 NDE-68 C7.10 I
Blowdown Recycle 2 2BB-074L-B MC-ISIL4-2572-03.00 Class B C-H BB - Steam Generator Periodic Leakage Test V17-2 NDE-68 C7.10 Blowdown Recycle MC-ISIL4-2580-01.00 MC-ISIL4-2584-01.00 3 2CA-033L-C MC-ISIL4-1574-01.00 Class C D-B CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 D2.10 MC-ISIL4-2574-02.00 MC-ISIL4-2574-03.00 MC-ISIL4-2592-01.01 4 2CA-034L-C MC-ISIL4-2592-01.01 Class C D-B CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 D2.10 5 2CA-035L-C MC-ISIL4-2592-01.01 Class C D-B CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 D2.10 6 2CA-036L-C MC-ISIL4-2592-01.00 Class C D-B CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 D2.10 MC-ISIL4-2592-01.01 7 2CA-037L-C MC-ISIL4-2592-01.00 Class C D-B CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 D2.10 6 /20/2014 3:01:44 PM SDQA Category C Rev. 0 Attachment B Page 1 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 Ul and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones MC-ISIL4-2592-01.01 8 2CA-038L-C MC-ISIL4-2592-01.00 Class C D-B CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 D2.10 MC-ISIL4-2592-01.01 9 2CA-039L-C MC-ISIL4-2592-01.00 Class C D-B CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 D2.10 10 2CA-040L-B MC-ISIL4-2592-01.00 Class B C-H CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2584-01.00 11 2CA-041L-C MC-ISIL4-2592-01.00 Class C D-B CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 D2.10 12 2CA-042L-C MC-ISIL4-2592-01.00 Class C D-B CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 D2.10 13 2CA-043L-B MC-ISIL4-2584-01.00 Class B C-H CA - Auxiliary Feedwater Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2591-01.01 MC-ISIL4-2592-01.00 MC-ISIL4-2617-01.00 14 2FW-001L-B MC-ISIL4-2571-01.00 Class B C-H FW - Refueling Water Periodic Leakage Test VT-2 NDE-68 C7.10 15 2FW-007L-B MC-ISIL4-2554-03.00 Class B C-H FW - Refueling Water Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2554-03.01 MC-T';Tl 4-2;1 -011. nn 6/20/2014 3:01:44 PM SDQA Category C Rev. 0 Attachment B Page 2 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 U1 and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones MC-ISIL4-2562-03.00 MC-ISIL4-2563-01.00 MC-ISIL4-2571-01.00 16 2GN-OOIL-B MC-ISIL4-2602-01.00 Class B C-H GN - Nitrogen Periodic Leakage Test VT-2 NDE-68 C7.10 17 2KC-OO1L-B MC-ISIL4-2573-03.01 Class B C-H KC - Component Cooling Periodic Leakage Test VT-2 NDE-68 C7.10 18 2KC-028L-C MC-ISIL4-1573-02.02 Class C D-B KC - Component Cooling Periodic Leakage Test VT-2 NDE-68 D2.10 MC-ISIL4-1573-04.00 MC-ISIL4-2573-01.00 MC-ISIL4-2573-01.01 MC-ISIL4-2573-02.00 MC-ISIL4-2573-02.01 MC-ISIL4-2573-04.00 19 2KC-029L-C MC-ISIL4-2573-01.00 Class C D-B KC - Component Cooling Periodic Leakage Test VT-2 NDE-68 D2.10 MC-ISIL4-2573-01.01 20 2KF-022L-C MC-ISIL4-2570-01.00 Class C D-B KF - Spent Fuel Cooling Periodic Leakage Test VT-2 NDE-68 D2.10 MC-ISIL4-2570-01.01 6/20/2014 3:01:44 PM SDOQA Category C Rev. 0 Attachment B Page 3 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 U1 and U2 PTPLAN ri 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones 21 2KF-023L-C MC-ISIL4-2570-01.00 Class C D-B KF - Spent Fuel Cooling Periodic Leakage Test VT-2 NDE-68 D2.10 MC-ISIL4-2570-01.01 22 2NC-001L-A MC-ISIL4-2553-01.00 Class A B-P NC - Reactor Coolant Outage Leakage Test VT-2 NDE-68 B15.10, B15.20 MC-ISIL4-2553-02.00 MC-ISIL4-2553-02.01 MC-ISIL4-2554-01.00 MC-ISIL4-2554-01,01 MC-ISIL4-2554-01.02 MC-ISIL4-2561-01.00 MC-ISIL4-2562-01 .00 MC-ISIL4-2562-02.00 MC-ISIL4-2562-02.O1 MC-ISIL4-2562-03.00 MC-ISIL4-2562-03.01 Class B C-H C7.10 23 2NC-001L-B MC-ISIL4-2553-02.01 Class B C-H NC - Reactor Coolant Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2554-03.01 6/20/2014 3:01:44 PM SDQA Category C Rev. 0 Attachment B Page 4 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 Ul and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones MC-ISIL4-2561-01.00 MC-ISIL4-2562-03.00 MC-ISIL4-2562-03.01 MC-ISIL4-2563-01.00 24 2NC-002L-B MC-ISIL4-2553-02.01 Class B C-H NC - Reactor Coolant Periodic Leakage Test VT-2 NDE-68 C7.10 25 2ND-009L-B MC-ISIL4-2554-01.02 Class B C-H ND - Residual Heat Periodic Leakage Test VT-2 NDE-68 C7.10 Removal MC-ISIL4-2561-01.00 MC-ISIL4-2562-03.00 MC-ISIL4-2562-03.01 MC-ISIL4-2563-01.00 MC-ISIL4-2571-01.00 MC-ISIL4-2572-01.00 26 2ND-O1OL-B MC-ISIL4-2561-01.00 Class B C-H ND - Residual Heat Periodic Leakage Test VT-2 NDE-68 C7.10 Removal MC-ISIL4-2562-03.01 MC-ISIL4-2563-01.00 27 2NI-012L-B MC-ISIL4-2562-02.00 Class B C-H NI - Safety Injection Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2572-01.01
?R ?NT-01 31 -R MC.-ISTI 4-75F7-0f.l21 ci;mc R C-H NT - Safp.tv Tniprfinn Pp.rindic IPakan. T04i Vr- NDF-6R C.7.1f 6/20/2014 3:01:44 PM SDOQA Category C Rev. 0 Attachment B Page 5 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 Ul and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones MC-ISIL4-2572-01.01 29 2NI-014L-B MC-ISIL4-2562-02.01 Class B C-H NI - Safety Injection Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2562-03.00 30 2NI-015L-B MC-ISIL4-2562-03.00 Class B C-H NI - Safety Injection Periodic Leakage Test VT-2 NDE-68 C7.10 31 2N1-O1 6L-B MC-ISIL4-2562-03.00 Class 8 C-H NI - Safety Injection Periodic Leakage Test Vr-2 NDE-68 C7.10 32 2NI-017L-B MC-ISIL4-2562-03.00 Class B C-H NI - Safety Injection Periodic Leakage Test Vr-2 NDE-68 C7.10 MC-ISIL4-2562-03.01 33 2NI-018L-B MC-ISIL4-2562-03.01 Class B C-H NI - Safety Injection Periodic Leakage Test VT-2 NDE-68 C7.10 34 2NI-060L-B MC-ISIL4-2562-03.00 Class B C-H NI - Safety Injection Periodic Leakage Test V17-2 NDE-68 C7.10 35 2NI-061L-B MC-ISIL4-2562-01.00 Class B C-H NI - Safety Injection Periodic Leakage Test VT-2 NDE-68 C7.10 36 2NI-062L-B MC-ISIL4-2562-01.00 Class B C-H NI - Safety Injection Periodic Leakage Test Vr-2 NDE-68 C7.10 37 2NM-026L-B MC-ISIL4-2572-01.01 Class B C-H NM - Nuclear Sampling Periodic Leakage Test VT-2 NDE-68 C7.10 6/20/2014 3:01:44 PM SDQA Category C Rev. 0 Attachment B Page 6 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 U1 and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones 38 2NM-027L-B MC-ISIL4-2572-03.00 Class B C-H NM - Nuclear Sampling Periodic Leakage Test VT-2 NDE-68 C7.10 39 2NM-044L-B MC-ISIL4-2553-02.00 Class B C-H NM - Nuclear Sampling Periodic Leakage Test V-r-2 NDE-68 C7.10 MC-ISIL4-2572-01.00 40 2NM-045L-B MC-ISIL4-2553-01.00 Class B C-H NM - Nuclear Sampling Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2572-01.00 41 2NS-019L-B MC-ISIL4-2563-01.00 Class B C-H NS - Containment Spray Periodic Leakage Test VT-2 NDE-68 C7.10 42 2NS-020L-B MC-ISIL4-2563-01.00 Class B C-H NS - Containment Spray Periodic Leakage Test V-r-2 NDE-68 C7.10 43 2NV-00 iL-B MC-ISIL4-2554-01.00 Class B C-H NV - Chemical & Volume Periodic Leakage Test VT-2 NDE-68 C7.10 Control MC-ISIL4-2554-01.01 MC-ISIL4-2554-01.02 MC-ISIL4-2554-02.01 44 2NV-002L-B MC-ISIL4-2554-01.02 Class B C-H NV - Chemical & Volume Periodic Leakage Test V`17-2 NDE-68 C7.10 Control MC-ISIL4-2554-02.00 MC-ISIL4-2554-02.01 6/20/2014 3:01:44 PM SDOQA Category C Rev. 0 Attachment B Page 7 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 U1 and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones MC-ISIL4-2554-03.00 MC-ISIL4-2554-03.01 MC-ISIL4-2554-04.00 MC-ISIL4-2572-02. 00 MC-ISIL4-1567-01.0O MC-ISIL4-1567-02.01 45 2NV-003L-B MC-ISIL4-2554-01.00 Class B C-H NV - Chemical & Volume Periodic Leakage Test VT-2 NDE-68 C7.10 Control MC-ISIL4-2554-01.01 MC-ISIL4-2554-Ol.02 MC-ISIL4-2554-01.03 46 2NV-004L-B MC-ISIL4-1554-05.00 Class B C-H NV - Chemical & Volume Periodic Leakage Test V-T-2 NDE-68 C7.10 Control MC-ISIL4-2554-01.00 MC-TqTI 4-71;S4-A1 .A1 6/20/2014 3:01:44 PM SDOA Category C Rev. 0 Attachment B Page 8 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 U1 and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones MC-ISIL4-2554-01.02 MC-ISIL4-2554-02.00 MC-ISIL4-2554-02.01 MC-ISIL4-2554-03.00 MC-ISIL4-2554-03.01 MC-ISIL4-2561-O01.00 MC-ISIL4-2562-01.00 MC-ISIL4-2562-03.00 47 2NV-004L-C MC-ISIL4-1554-05.00 Class C D-B NV - Chemical & Volume Periodic Leakage Test VT-2 NDE-68 D2.10 Control MC-ISIL4-2554-02.00 MC-ISIL4-2554-03.01 MC-ISIL4-2554-05.00 48 2NV-005L-B MC-ISIL4-2554-01.02 Class B C-H NV - Chemical & Volume Periodic Leakage Test VT-2 NDE-68 C7.10 Control 49 2NV-006L-B MC-ISIL4-2554-03.00 Class B C-H NV - Chemical & Volume Periodic Leakage Test VT-2 NDE-68 C7.10 Control 50 2NV-007L-B MC-ISIL4-2554-02.00 Class B C-H NV - Chemical & Volume Periodic Leakage Test VT-2 NDE-68 C7.10 Control MC-TS;Tl 4-?E;14-fl?.11 6/20/2014 3:01:44 PM SDQA Category C Rev. 0 Attachment B Page 9 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-0040 U1 and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones MC-ISIL4-1556-01.01 51 2NV-008L-B MC-ISIL4-2554-01.02 Class B C-H NV - Chemical & Volume Periodic Leakage Test VT-2 NDE-68 C7.10 Control 52 2NV-011L-B MC-ISIL4-2554-03.01 Class B C-H NV - Chemical & Volume Periodic Leakage Test V`T-2 NDE-68 C7.10 Control 53 2RN-003L-B MC-ISIL4-2574-04.00 Class B C-H RN - Nuclear Service Periodic Leakage Test VT-2 NDE-68 C7.10 Water 54 2RN-030L-C MC-ISIL4-1574-01.01 Class C D-B RN - Nuclear Service Periodic Leakage Test VT-2 NDE-68 D2.10 Water MC-ISIL4-1574-02.00 MC-ISIL4-2573-01.01 MC-ISIL4-2574-01.01 MC-ISIL4-2574-02.00 MC-ISIL4-2574-02.01 MC-ISIL4-2609-01.00 55 2RN-031L-C MC-ISIL4-1574-01.01 Class C D-B RN - Nuclear Service Periodic Leakage Test VT-2 NDE-68 D2.10 Water MC-ISIL4-1574-03.00 MC-ISIL4-2573-01.01 6/20/2014 3:01:44 PM SDOA Category C Rev. 0 Attachment B Page 10 of 12
AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MISI-1462.20-( )040 U1 and U2 PTPLAN 4th 10-Year Interval Attenchment B Interval Pressure Testing Examination Zones MC-ISIL4-2574-01.01 MC-ISIL4-2574-03.00 MC-ISIL4-2574-03.01 MC-ISIL4-2609-01.01 MC-ISIL4-2574-05.00 56 2RN-044L-B MC-ISIL4-2574-04.00 Class B C-H RN - Nuclear Serv'ice Periodic Leakage Test VT-2 NDE-68 C7.10 Water 57 2RV-048L-B MC-ISIL4-2604-03.00 Class B C-H RV - Containment Periodic Leakage Test VT-2 NDE-68 C7.10 Ventilation Coolin g Water 58 2SA-047L-B MC-ISIL4-2593-01.02 Class B C-H SA - Main Stm To Aux Periodic Leakage Test VT-2 NDE-68 C7.10 Equip 59 2SA-047L-C MC-ISIL4-2593-01.02 Class C D-B SA - Main Stm To Aux Periodic Leakage Test VT--2 NDE-68 D2.10 Equip 60 2SM-040L-B MC-ISIL4-2591-01.01 Class B C-H SM - Main Steam Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2593-01.00 MC-ISIL4-2593-01.03 61 2SM-045L-B MC-ISIL4-2593-01.00 Class B C-H SM - Main Steam Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2593-01.02 MC-TSg1l 4-21AI*-01.0"3 6/20/2014 3:01:44 PM SDQA Category C Rev. 0 Attachment B Page 11 of 12
Fl AR2567 PressureTest - 10 Year Test Plan Report McGuire Unit: 2 MIS1-1462.20-0040 U1 and U2 PTPLAN 4th 10-Year Interval Attachment B Interval Pressure Testing Examination Zones 62 2SM-046L-B MC-lSIL4-2593-01.00 Class B C-H SM - Main Steam Periodic Leakage Test VT-2 NDE-68 C7.10 MC-ISIL4-2593-01.03 End of Report 6/20/2014 3:01:44 PM SDOA Category C Rev. 0 Attachment B Page 12 of 12
Attachment C The following Flow Chart is for dctermining the required hold lime prior to the VT-2 Visual Examination.
-NO f
Time \\ 10 Minute Holding Time
/
YESRequired Holding 4 HourAfter Test ! Required After Attaining Test
' *,Pressure and Atta Ter aining
- nperature/ *,Pressure and Temperature./)
No Holding Time)
Required N
-- NO
/,
Comp
- YES The T Component YES Ilnsulated? N'O NoHOlding lime Required--- No Holding Time Req uired-'
Poied The System Has Been! Provided The System Has Bee iknOperation for at Least. 4 ,in Operation for at Least 10 Hours MinutesT Duke Energy McGuire Units I & 2 - 4"' Ten-Year Inlerval Revision 0 Inservice Inspeciion Pressure Test Plan Attachnient C Document Index Number: MISI- 1462.20-(1040-UJ I &2PTPLAN Page I of I
--73
Attachment D The following table provides a list of the McGuire Unit 2 Pressure Testing Boundary D)rawings which were developed from system flow diagrams that contain ASME Section Xl Class I. 2. or 3 components. Each Pressure Testing Boundary Drawing has been reviewed for applicable system pressure testing requirements. In addition to the ISI Class. the listing contains those Pressure Testing Boundary Drawings that include components that are completely exempted from pressure lesting requirements for McGuire. The last column indicates the McGuire Unit(s) to which the applicable drawing pertains based on the Unit(s) listed in thc title hlock and/or the Unit applicability of the Pressure Testing Zones included.
System (as listed in Drawing title block) Boundary Drawing ISI Class ISI Class IS Class All Unit(s)
,_ ,A B C Exempt Chemical & Volume Control (NV) MC-ISI114-1554-05.00 X X I &2 Horon Recycle (NH) MC-ISII,4-1556-01.01 ,.X . .X I &2 Boron Recycle (NH) MC-ISIL4-1556-02.00 X X I&2 Boron Recycle (NH) MC-ISII,4-1556-02.01 X X I &2 Ice Condenser Refrigeration (NF) MC-ISII4-1558-01.01 x X I &2 Liquid Waste RCcycle (WI.) MC-ISII.4-1565-02.00 X I_....XX I &2 Liquid Waste Recycle (W.) MC-ISII,4-1565-02.01 X X I &2 Liquid Waste Recycle (M.) MC-ISII,4-1565-06.00 X X I &2 Nuclear Solid Waste I)isposal (WS) MC-ISII.4-1566-01.00 X X I &2 Waste Gas (WG) MC-ISIL4-1567-01.00 X X I &2 Waste Gas (WG) MC-ISIIA-1567-02.01 X X I &2 Waste Gas (WG) MC-ISII.4-1567-03.00 X X I&2 Wastc Gas tWG) MC-ISI1..4-1567-03.01 X X I&2 D)uke Energy McGuire Units I & 2- 4" Ten-Year Interval Revision 0 Inservice Inspection Pressure Test Plan Attachment 1)
Document Index Number: MISI-1462.20-0040 UI and U2 tPFPLAN Page I of 7
System (as listed in Drawing title block) Boundary Drawing ISI Class ISI Class ISI Class All Unit(s)
A B C Exempt WasteGas (WG) MC-ISIL4-1567-04.0, ,_X X I&2 Nuclear Samplin. (NM) MC-ISII.4-1572-01.01 X I&2 Component Cooling (KC) MC-ISII.4-1573-02.02 X I&2 Component Cooling (KC) MC-ISII4-1573-04.00 X X I&2 Nuclear Service Water (RN) MC-ISIIA-1574-01.00 X I&2 Nuclcar Service Waler (RN) MC-ISII.4-1574-01.01 X I&2 Nuclear Service Watcr (RN) MC-ISII.4-1574-02.00 X I& 2 Nuclear Service Walr _ _1N_ MC-ISII.4-1574-03.00 X I&2 Makeup l)emincralized Water (YM) MC-ISI1.4-1601-02.04 X X I&2 Control Area Chilled Water (YC) MC-ISIL4-1618-01.00 X I&2 Control Area Chilled Water(YC) MC-ISIIA-1618-02.00 X I &2 Control Area Chilled Water (YC) MC-ISIL4-1618-04.00 X I &2 Reactor Coolant (NC) MC-ISRLA-2553-01.00 X X 2 Reactor Coolant (NC) MC-ISIIA-2553-02.00 X X 2 Reactor Coolant (NC) MC-ISIIA-2553-02.01 X X X 2 Reactor Coolant (NC) MC-ISI1.4-2553-04.00 X 2 2X Chemical & Volumne Control (NVI MC-ISII.4-2554-01.00 I X X 2 Chemical & Volume Control (NV) MC-ISIIA-2554-01.01 X X 2 I)ukc Energy McGuire Units I & 2 - 4"' Ten-Year Ilnterlal Revision 0 Inservice Inspection Pressure Test Plan Attachment D Document Index Number: MISI-1462.20-01040 UI and U2 PTPLAN Page 2 o1"7
System (as listed in Drawing title block) Boundary Drawing ISI Class ISI Class IS Class All Unit(s)
A B C Exempt Chemical & Volume Control (NV) MC-ISII.4-2554-01.02 x X 2 Chemical & Volume Control (NV) MC-IS.IIA-2554-01.03 X 2 Chemical & Volumc Control (NV) MC-ISII14-2554-02.00 X X 2 Chenmical & Volume Ctmirol (NV) MC-ISIIA-2554-02.01 X 2 Chemical & Volume Control (NV) MC-ISI.,4-2554-03.00 X 2 Chemical & Volume Control (NV) MC-ISII.4-2554-03.01 X X "_
Chemical & Volume Conitol (NV) MC-ISIL4-2554-04.00 X X 2 Chemical & Volume Control (NV) MC-ISII.4-2554-05.00 X 2 Hormn Tliernal Regenciation (NR) MC-ISII.4-2555-01.00 X X 2 Boron Thernal,,lgenewfion (NR) MC-ISII,4-2555-02.00 X X .... 2 Boron Recycc (NH) MC-ISIIA-2556-03.0) X X X 2 Containment Air Return Kxchange & Hydrogen Skimier (VX) MC-ISII.4-2557-01.00 X .. ........ X 2 Ice Condenser Refrigenation (NF) MC-ISII,4-2558-04.00 X X 2 Residual Heat Removal (NI)) MC-ISII4-2561-01.00 x X 2 Safety Injection (NI) MC-ISII4-2562-O.O0 . X X 2 Safety Injection (NI) MC-ISII.4-2562-02.00 X X 2 Safety Injection (NI) MC-ISII.4-2562-02.01 X X 2 Safety Injection (NI) MC-ISIIA.-2562-03.00 X X 1 2 D)uke Energy McGuire Units I & 2 - 4"' Ten-Year Interval Revision 0 Inservice Inspection Pressure Test Plan Attachment D I)ocunietl Indcx Number: MISI-1462.20-0040 U I and U2 PTPLAN Page 3 of 7
System (as listed in Drawing title block) Boundary Drawing ISI Class IS1 Clas ISi Class All Unit(s)
A B C Exempt SaetIyjection (NI) MC-ISIL4-2562-03.01 X X 2_..
Safely lnjection (NI) MC-ISIIA-2562-04.00 X X 2 ContainnmeniSpray (NS) MC-ISII.4-2563-01.00 X 2 Annulus Ventilation (VF.) MC-ISIIA-2564-01.00 X X 2 I.iquid Waste Recycle (WI.) MC-ISII,4-2565-01.00 X X 2 ILiqtuid Waste Recycle (WI.) MC-ISII4-2565-01.01 X X 2 u a Rcycle (WI MC-IS II4-2565-07.00 X X 2 Spent Fuel Cooling (KF- MC-ISII.4-2570-01.00 X 2 Spent Fuel Cooling.tKF) MC-ISII,4-2570-01.01 X 2 Refueling Water (FW) MC-ISIL4-2571-01.00 X X 2 Nuclear Sanmpling (NM) MC-ISII.4-2572-01.00 X 2 Nuclear Sampling (NM) MC-ISII.4-2572-01.01 X X 2 Nuclear Sampling (NM) MC-ISII..4-2572-02.00 X 2 Nuclear Sampling (NM) MC-ISII,4-2572-03.00 X 2 Comnponent Cooling (KC) MC-ISII,4-2573-01.00 _.._X 2 Comrpoteni Cooling. (KC) MC-ISII.4-2573-01.01 X 2 Cornponeni Cooling (KC) MC-ISII.4-2573-02.0 ., X Coniponent Cooling (KC) MC-ISII,4-2573-02.01 X,-
Duke Energy McGuire Units I & 2 - 4"' Ten-Year Interval Revision 0 Inservice Inspection Pressure Test Plan Atachrment D) l)ocumcnt Index Number: MISI-1462.20-0040 UI and U2 PTPLAN Page 4 of 7
r1 System (as listed in Drawing title block) Boundary Drawing ISI Class IS Class IS Class All Unit(s)
A B C Exempt Component Cooling! (KC) MC-ISII.4-2573-03.00 X X X 2 Coipoient Cooling (..KC) MC-ISIIA-2573-03.01 X X 2 Component Cooling (KC) MC-ISII.4-2573-04.00 X X 2 Nucle'r Service Water (RN) MC-ISII.4-2574-01.01 X I&2 Nuclear Service Water (RN) MC-ISIIA-2574-02.00 X Nuclear Service Water (RN) MC-ISII,4-2574-02.01 X Nuclear Service Water (RN) MC-ISII.4-2574-03.00 X I&2 Nuclear Service Water (RN) MC-ISII4-2574-03.01 X "_
Nuclear Service Water (RN) MC-ISIL4-2574-04.00 X X I&2 Nuclear Service Water (RN) MC-ISII4-2574-05.00, .......... X 2_
Containment Purge Ventilation (VP) MC-ISII.4-2576-01.00 X X 2 Stcam Geierator Blowdown Recycle (8b) MC-IS11,4-2580-01.00 . X 2 Stcain Generator Wet Lavup Rccirculafion (BW) MC-ISIIo4-2584-01.00 X 2 Containment Air Release and Addition (VQ) MC-ISII.4-2585-01.00 X X 2 Feedwatcr -CF) MC-ISII4-2591-01.01 X 2 Au-ifiary Fecdwater (CA) MC-ISII4-2592-01..0 X X 2 Auxiliary Feedwater (CA) MC-ISll4-2592-01.01 X 2 Main Steam (SM) & Venti To Atmosphere (SV) MC-ISII.4-2593-01.00 X .1.- 2 D)uke Energy McGuire Units I & 2 - 4 ' Tcn-Ycar Interval Revision 0 Inservicc Inspection Pressure Test Plan Attachment D l)ocument Index Nurnher: MISI-1462.20-00)4() U I and U2 PTPLAN Page 5 of 7
System (as listed in Drawing title block) Boundary Drawing ISI Class IS[ Class ISI Class All Unit(s)
A B C Exempt Main Stiti To Aux Eqtuip (SA) & Turb Exh (TE) MC-ISIL4-2593-01.02 X X 2 Main Steam (SM) & Vent To Atmosphere (SV) MC-ISII.4-2593-01.03 X 2 Nitrogen (GN) MC-ISII4-2602-01.00 X 2 Containment Ventilation Cooling Water (RV) MC-ISII.4-2604-03.00 X X I &2 Instrument Air (VI) MC-ISl1.4-2605-01.02 X X 2 Instrunieni Air (VI) MC-ISIL4-2605-Ot.03 X X 2 Instrument Air (VI) MC-ISIIA-2605-01.13 X X 2 Instrument Air (VI) MC-ISIIA-2605-01.18 X X 2 Instrument Air MVI) MC-ISII.4-2605-01.19 X X 2 Station Air (VS) MC-ISI.4-2605-02.02 X X 2 Breathing Air (V1) MC-ISIIA-2605-03.01 X X 2 Diesel Generator Engime Cooling Water (KID) MC-ISIIA-2609-01.00 X D)iesel Generator Engine Cooling Water (KD) MC-ISIIo4-2609-01.01 X 2 Diesel Generator Engine Lube Oil (I0)) MC-ISIL4-2609-02.00 X X 2 D)iesel Geierator Engine L.ube Oil (I.I)) MC-ISII,4-2609-02.01 X X 2 Diesel Generator Engine Iuel Oil (FD) MC-ISII.A-2609-03.00 X X 2 I)iesel Generator Engine IFuel Oil (W)) MC-ISII.4-2609-03.01 X X 2 Diesel Generator Engine Staning Air (VG) MC-ISIL4-2609-04.00 I X X 2 Duke Energy McGuire Units I & 2 - 4"' Ten-Year Interval Revision ()
Inserviec Inspection Pressure Test Plan Attachment D D)ocunicnt Index Number: MISI-1462.20-(0040 U I and U2 PTPLAN Page 6 of 7
System (as listed in Drawing title block) Boundary Drawing ISI Class ISI Class ISI Class All Unit(s)
A B C Exempt IDiesel Generator Roo~m Sump Pump (WN) ... MC-ISIIA-2609-07.00 X . , 2 Convcntionul Chenical Addition (YA) MC-ISIIA-2617-01.00 I X 2 I)ukc Energy McGuire Units I & 2- 4"' Tcn-Ycar Interval Revision 0 Inservice Inspection Pressure Test Plan Attachmcnt D Document Index Number: MISI-1462.20-0040 U I and U2 PTPLAN Page 7 of"7 j~
Attachment E The following Tables provide the Interval and Period start and end dates for McGuire Units I & 2. In addition, the planned Refueling Outages are also listed. The abbreviation -EOC" indicates -End Of Cycle".
Table E-1: McGuire I Interval and Period Dates Interval 4: December 1,2011 to November 30, 2021 1st Period 2nd Period 3rd Period 12/01/2011 to I 1/30/2014 12/01/2014 to 11/3012018 12/01/2018 to I1/30/2021 0 Refueling Outage I Refueling Outage 3 Refueling Outage 5 U (EOC 22)' (EOC 24) (EOC 26)
T A Refuieling Outage 2 Refueling Outage 4 Refueling Outage 6 G (EOC 23)* (EOC 25) (EOC 27)
E S
- = Examinations and testing performed in accordance with Section XI. 1998 Edition with the 2000 Addenda per Relief Request 10-MN-001.
= McGuire Unit I may seek relief, prior to end of Fourth interval, to continue to use the same Code during the lifth interval as McGuire Unit 2 until McGuire Unit 2 updates its Code Edilion and Addenda for the fifllh interval.
Table E-2: McGuire 2 Interval and Period Dates Interval 4: July 15, 2014 to December 14, 2024 Ist Period 2nd Period* 3rd Period*
7/15/2014 to 7/14/2017 7/15/2017 to 7/14/2022 7/15/2022 to 12/14/2024 O Refueling Outage I Refueling Outage 3 Refueling Outage 6 U (EOC 23) (EOC 25) (EOC 28)
T A Refieling Outage 2 Refueling Outage 4 Refueling Outage 7 G (EOC 24) (EOC 26) (EOC 29)
E S Refueling Outage 5 (EOC 27)
- = Second Period. Third Period and Interval dates are extended per IWA-2430. which allows the interval and period dates to he reduced or extended by 1 year.
Duke Energy McGuire Units I & 2 - 4 th Ten-Year Interval Revision 0
[nservice Inspection Pressure Tesl Plan Atachment 1F Document Index Number: MISI- 1462.20-0040 U land U2 PTPLAN Page Iofll