Amend 64 to License DPR-23,changing Reactor Cooling, Emergency Core Cooling & Refueling Tech Specs to Ensure Decay Heat Removal Capability
ML14175A713
Person / Time
Site: Robinson 
Issue date: 03/08/1982
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML14175A715 List:
References
DPR-23-A-064 NUDOCS 8204130022
Download: ML14175A713 (17)


Text

DISTRIBUTION Docket File V NRC PDR March 8, 1982Local PDR ORB 1 File D. Eisenhut C. Parrish W. Ross Docket No. 50-261 OELD f>

SECY (w/transmittal form)

OI&E (1)

Mr. J. A. Jones

t. Barnhart (4)

Senior Executive Vice President L. Schneider (1)

Carolina Power and Light Company D. Brinkman 9

1 336 Fayetteville Street ACRS (10)

Raleigh, North Carolina 27602 OPA (Clare Miles) t s

R. Diggs

Dear Mr. Jones:

NSIC ASLAB Io The Commission has issued the enclosed Amendment No. 64 to Facility Operating License No. DPR-23 for the H. 80 Robinson Steam Electric Plant, Unit No. 2. The amendment consists of changes to the Technical Specifications in response to your application transmitted by letter dated September 26, 1980.

The amendment revises the Technical Specifications related to reactor cooling, emergency core cooling, and refueling to ensure sufficient redundancy in decay heat removal capability is maintained during all modes of plant operation.

Copies of the Safety Evaluation and the Notice of Issuance are also enclosed.

Sincerely, William J. Ross, Project Manager Operating Reactors Branch No. 1 Division of Licensing

Enclosures:

1. Amendment No. 64 to DPR-23
2. Safety Evaluation
3. Notice of Issuance cc w/enclosures:

See next page ORB 1l ORB.. 1.

B 1 OELD OFFICE)

ORB WRoss/r CParri ag ov SURNAM E DATE

.20 a.........

....2/..82......

2.........

2

/-3 /-82....

NRC FORM 318 (10-80) NRCM 0o ICIAL RECORD COPY USGPO: 1981-335-960

Or. J. A. Jones Carolina Power and Light Company cc: G. F. Trowbridge, Esquire James P. O'Reilly Shaw, Pittman, Potts and Trowbridge Regional Administrator -

Region II 1800 M Street, N.W.

101 Marietta Street Suite 3100 Washington, D. C. 20036 Atlanta, Georgia 30303 Hartsville Memorial Library Home and Fifth Avenues Hartsville, South Carolina 29550 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors County Courthouse Darlington, South Carolina 29535 State Clearinghouse Division of Policy Development 116 West Jones Street Raleigh, North Carolina 27603 Attorney General Department of Justice Justice Building Raleigh, North Carolina 27602 U. S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 266-1A Hartsville, South Carolina 29550 Michael C. Farrar, Chairman Atomic Safety and Licensing Appeal Board Panel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Richard S. Salzman Atomic Safety and Licensing Appeal Board Panel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. W. Reed Johnson Atomic Safety and Licensing Appeal Board Panel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Regional Radiation Representatives EPA Region IV 345 Courtland Street, N.E.

Atlanta, Georgia 30308

A C-UNITED STATES 0

NUCLEAR REGULATORY COMMISSION 00 WASHINGTON, D. C. 20555 CAROLINA POWER AND LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 64 License No. DPR-23

1. The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Carolina Power and Light Company (the licensee) dated September 26, 1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8204130022 820308 PDR ADOCK 05000261 P

PDR

0

-2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-23 is hereby amended to read as follows:

(B) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 64, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance.

F THE NUCL R RE LATORY COMMISSION S ehi e

perating Reactors Br n h No. 1 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: March 8, 1982

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 64 TO FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO.

50-261 Revise Appendix A as follows:

Remove Pages Insert Pages 3.1-1 3.1-1 3.1-3 3.1-3 3.1-3a 3.1-3a 3.3-2 3.3-2 3.3-5 3.3-5 3.3-5a 3.3-12a 3.8-2 3.8-2 3.8-3 3.8-3 3.8-4 3.8-4 3.8-4a 6.9-8 6.9-8

3.Q LIMITING CONDONS FOR OPERATION 3.1 REACTOR COOLANT SYSTEM Applicability Applies to the operating status of the Reactor Coolant System.

Objective To specify those Reactor Coolant System conditions which must be met to assure safe reactor operation.

Specification 3.1.1 Operational Components 3.1.1.1 Coolant Pumps

a.

At least one reactor coolant pump or the Residual Reat Removal System shall be in operation when a reduction is made in the boron concentration of the reactor coolant.

b.

When the reactor is critical, at least one reactor coolant pump shall be in operation.

c.

Power operation with less than three loops in service is prohibited.

d.

Deleted.

e. A reactor coolant pump may be started (or jogged) only if there is a steam bubble in the pressurizer or the steam generator temperature is no higher than 50.F higher than the temperature of the reactor coolant system.

Amendment No. 64 3.1-1

Basis When the boron concentration of the Reactor Coolant System is to be reduced, the process must be uniform to prevent sudden reactivity changes in the reactor.

Mixing of the reactor coolant will be sufficient to maintain a uniform boron concentration if at least one reactor coolant pump or one residual heat removal pump is running-while the change is taking place.

The residual heat removal pump will circulate the primary system volume in approximately one-half hours.

The pressuriter, is of no concern because of the low pressurizer volume and because the pressurizer boron concentration will be higher than that of the rest of the reactor coolant.

Specification 3.1.1.1.c requires that all three reactor coolant pumps be operat ing during power operation to provide core cooling in the event that a loss of flow occurs. The flow provided will keep DNB well above 1.30. Therefore, cladding damage and release of fission products to the reactor coolant will not occur. Specification 3.1.1.1.b will allow special low power physics testing to be conducted following refueling under adequately controlled conditions.

The pressurizer is necessary to maintain acceptable system pressure during normal plant operation, including surges that may result following anticipated transients.

Each of the pressurizer code safety valves is designed to relieve 288,000 lbs.

per hr. of saturated steam at the valve setpoint.(2)

Below 3500F and 450 psig in the Reactor Coolant System (RCS), the Residual Heat Removal System can re move decay heat and thereby control system temperature.

If no residual heat Amendment No.< 64 3.1-3

were removed by any of the means available, the amount of steam which could be generated at safety valve relief pressure would be less than the capacity of a single valve.

One valve therefore provides adequate defense against over pressurization of the RCS for primary coolant temperatures less than 350oF and two valves provide protection for any temperature.

The combined capacity of the three pressurizer safety valves is greater than the maximum surge rate resulting from the complete loss of load(3) without a direct reactor trip or any other control.

ASME Section III of the Code allows a maxi mum variation in the setpoint of 3 percent above thedesign set pressure.

The requirement that 125 kw of pressurizer heaters and their associated controls be capable of being supplied electrical power from an emergency power source provides assurance that these heaters can be energized during a loss of offsite power condition to maintain natural circulation at hot shutdown.

One steam generator capable of performing its heat transfer function will pro vide sufficient beat removal capability to remove core decay heat after a normal reactor shutdown.

The reactor cannot be made critical without water in all three steam generators, since the low-low steam generator water level trip prevents this mode of operation.

Two operable steam generators are therefore adequate.

References (1)

FSAR Section 14.1.12 (2) FSAR Table 4.1-3 (3) FSAR Section 14.1.10 Amendment No.X5 64 3.1-3a

F

-g

b.

The boron injection tank contains not less than 900 gallons of 20,000 to 22,500 ppm boron solution at a temperature of at least 145*F. Two channels of heat tracing shall be available for the flow path.

c.

Each accumulator is pressurized to at least 600 psig and 3

3 contains at least 825 ft and no more than 841 ft of water with a borop concentration of at least 1950 ppm.

No accumulator may be isolated.

d.

Three safety injection pumps are operable.

e.

Two residual heat removal pumps are operable.

f.

Two residual heat exchangers are operable.

g.

All essential features including valves, interlocks, and piping associated with the above components are operable.

h.

During conditions of operation with reactor coolant pressure in excess of 1000 psig the A.C. control power shall be removed from the following motor operated valves with the valve in the specified position:

Valves Position MOV 862 A&B Open MOV 864 A&B Open MDV 865 A,B,&C Open MOV 878 A&B Open MOV 863 A&B Closed MOV 866 A&B' Closed Amendment No. 64 3.3-2

3.3.1.3 -When thaactor'is in the hot.shutdown(

dition, the require ments of 3.3.1.1 and 3.3.1.2 shall be met. Except that the

.accumulators may be isolated, and in addition, any one component as defined in 3.3.1.2 may be inoperable for a period equal to the time period specified in the subparagraphs of 3.3.1.2 plus 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, after which the plant shall be placed in the cold shutdown condition utilizing normal operating procedures. The safety injection pump power supply breakers must be racked out when the reactor coolant system temperature is below 350*F and the system is not vented to containment atmosphere.

3.3.1.4 When the reactor is in the cold shutdown condition (except refuel ing operation when Specification 3.8.1.e applies), both residual heat removal loops must be operable. Except that either the normal or emergency power source to both residual heat removal loops may be inoperable.

a. If one residual heat removal loop becomes inoperable during cold shutdown operation, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> verify the exist ance of a method to add make-up water to the reactor coolant system such as charging pumps, safety injection pumps (under adequate operator control to prevent system overpressuriza tion), or primary water (if the reactor coolant system is open for maintenance) as back-up decay heat removal method, or prepare and submit a thirty-day written report pursuant to 6.9.2.b.
b.

Restore the inoperable RHR loop to operable status within 14 days or prepare and submit a special report to the Commission pursuant to Specification 6.9.3.1 within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the Amendment No. 64

loop to operable status.

c. If both residual heat removal loops become inoperable during cold shutdown operation, close all containment penetrations providing direct access from the contain ment atmosphere to the outside atmosphere prior to the reactor coolant average temperature exceeding 200*F, restore at least one residual heat removal loop to operable status within one hour or prepare and submit a thirty-day written report pursuant.to 6.9.2.b. If the reactor coolant average temperature exceeds 200*F with both RHR loops inoperable and, the reactor coolant system open for maintenance, provide prompt notification to the Commission pursuant to 6.9.2.a.

3.3.2 Containment Cooling and Iodine Removal Systems 3.3.2.1 The reactor shall not be made critical, except for low temperature physics tests, unless the following conditions are met:

a.

The spray additive tank contains not less than 2505 gallons of solution with a sodium hydroxide concentration of not less than 30% by weight.

b.

Two containment spray pumps are operable.

c. Four fan cooler units are operable.
d. All essential features, including valves, controls, dampers, and piping associated with the above components are operable.
e.

The system which automatically initiates the sodium hydroxide addition to the containment spray simultaneously to the actuation of the containment spray is operable.

Amehdment No. 64 3.3-5a

Specification 3.3.1.4 xequires that two residual heat removal loops be operable when the reactor is in cold shutdown. One RNR loop will normally be in operation in cold shutdown to remove decay heat, maintain the reactor coolant system temperature required for maintenance, ensure even mixing, and produce gradual reactivity changes well within the capability of the operator to control.

However, single failure considerations require that two loops be operable.

The limiting conditions for operation associated with specification 3.3.1.4 will allow routine cold shutdown maintenance to be performed, ensure core cooling capability is maintained, and ensure the NRC is kept informed of significant problems with plant cold shutdown temperature control.

Specification 3.3.1.1.h requires control power be removed from the listed valves to prevent inadertent operation caused by control power wiring failures (inadvertent mispositioning of these valves could violate the single failure criteria of the accident analysis).

Removal of the control power only will allow these valves to be restored to an operable status quickly when required for recovery from a loss of coolant accident.

Amendment No. 64 3.3-12a

indi ion available in the conta When core geometry is noi being changed at least one source range neutron flux monitor shall be in service.

e.

At least one residual heat removal loop shall be opera ble, refueling cavity water level > Plant elevation 272 ft. -.2 in. whenever fuel assemblies are being moved within the reactor pressure vessel, and Tave < 1400F.

f.

During reactor yessel head removal and while loading and unloading fuel from the reactor, the minimum boron concen tration of 1950 ppm shall be maintained in the primary

'coolant system and verified by sampling once each shift.

.g.

Direct communication between the control room and the re fueling cavity manipulator crane shall be available whenever changes in core geometry are taking place.

h.

Movement of fuel within the core shall not be initiated prior to 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> after shutdown.

i.

The Spent Fuel Building ventilation system shall be operating when handling irradiated fuel.in this area.

Prior to moving irradiated fuel assemblies in the spent fuel pool, the ventilation system exhaust shall be aligned to discharge through HEPA and impregnated char coal filters. When in operation, the exhaust flow of the Containment Purge System shall discharge through HEPA and impregnated charcoal filters.

When the Containment Purge System is not in operation at least one automatic containment isolation valve shall be secured in each line penetrating the containment which provides a direct path from the containment atmosphere to the outside atmosphere.

3.8-2 Amendment No. 64

J.

If anf the specified limiiting condions for refueling are not met, refueling of the reactor shall cease; work shall be initiated to correct the conditions so that the specified limits are met; and no operations which may increase the reactivity of the core shall be made.

k.

The reactor shall be subcritical as required by 3.10.8.3.

3.8.2 The Spent Fuel Building filter system and the Containment Purge filter system shall satisfy.the following conditions:

a.

The results of the in-place cold DOP and halogenated hydrocarbon tests at greater than 20 percent design flows

-on EPA filters and charcoal adsorber banks shall show

> 99 percent DOP removal and 1 99 percent halogenated hydrocarbon removal.

b.

Verification by way of a laboratory carbon sample analysis from the Spent Fuel Building filter.system carbon and the Containment Purge filter system carbon to show > 90 percent radioactive methyl iodine removal in accordance with test 5.b of Table 5-1 of ANSI/ASME N509 except that > 70 percent relative humidity air is required.

c.

All filter system fans shall be shown to operate within

+ 10% of design flow.

d.

During fuel handling operations, the relative humidity (R.1.) of the air processed by the refueling filter systems shall be < 70 percent.

e.

From and after the date that the Spent Fuel Building filter system is made or found to be inoperable for any reason, fuel handling operations in the Spent Fuel Build ing shall be terminated immediately.

3.8-3 Amendment No. 64

Basis The equipment and general procedures to be utilized during refueling are discussed in the Final Facility Description and Safety Analysis Report.

Detailed instructions,.the above specified precautions, and the design of the fuel handling equipment incorporating built-in interlocks and safety features, provide assurance that no incident could occur during the refueling operations that would result in a hazard to public health and safety.(1)

Whenever changes are not being made in core geometry one flux monitor is sufficient. This permits maintenance of the instrumentation. Continuous monitoring of radiation levels and neutron flux provides immediate indication of an unsafe condition.

One residual heat removal loop will normally be in operation during refueling operations to remove decay heat, maintain Tave < 140oF, minimize the effect of a boron dilution event, and maintain a uniform boron concentration.

The require ment to have one loop operable will allow the loop to be secured for brief periods of time to facilitate fuel movement. The refueling cavity water level specified ensures that there will be at least 23 feet of water above the reactor pressure vessel flange whenever fuel assemblies are being moved within the reactor pressure vessel.

This prevents a fuel assembly from becoming partially uncovered while being transported over the vessel flange. This cavity level requirement also provides a large heat sink to ensure adequate time is avail able to initiate emergency methods to cool the core should the operable RER loop fail.

The boron concentration of 1950 ppm will keep the core subcritical even if all control rods were withdrawn from the core. During refueling, the reactor refueling cavity is filled with approximately 285,000 gallons of borated water.

3.8-4 Amendment No. 64

.The boron concentration of this water at 1950 ppm boron is sufficient to maintain the reactor subcritical by at least 10% Ak/k in the refueling condi tion with all rods inserted, and will also maintain the core subcritical even if no control rods were inserted into the reactor.(2)

Weekly checks of refueling water storage tank boron concentration ensure the proper shutdown margin.(3) Direct communications allow the control room operator to inform the manipulator operator of any impending unsafe condition detected from the control board indicators during fuel movement.

In addition to the above safety features, interlocks are utilized during refueling to ensure safe handling. An excess weight 'interlock is provided on the lifting hoist to prevent movement 'of more than one fuel assembly at a time. The spent fuel transfer mechanism can accommodate only one fuel assembly at a time.

Amendment No. 64

3.

8-4a

c. Deleted
d.

Inservice Inspection 4.2 After five years of operation

e.

Containment Sample 4.4 Upon completion of the inspection Tendon Surveillance at 5 and 25 years of operation

f.

Post-operational Contain-4.4 Upon completion of the test at ment Structural Test 3 and-20 years of operation

8.

Fire Protection System 3.14 As specified by limiting condition for operation

h.

Overpressure Protection 3.1.2.l.e Within 30 days of operation System Operation

i.

Cold Shutdown RHR Loop 3.3.1.4 As specified by limiting Operability Requirements condition for operation Amendment No. 64 6.9-8