Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14
ML14139A427
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/15/2014
From: Kanavos M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW140050
Download: ML14139A427 (5)


Text

_11 WExelon (jencration Company, L.LC Eo erBraidwood Nuclear Power Station ExeAo en r to G 35 100 South Route 53. Suite 84 Braceville. ff. 60407-9619 SAFEGUARDS INFORMATION www.exeoncotpxonl May 15, 2014 10 CFR 50.54(p)(2)

BW140050 10 CFR 50.4(b)(4)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457 and 72-73

Subject:

Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting Revision 14 to the Braidwood Station Security Plan. Changes to this document were implemented on March 31, 2014. In accordance with 10 CFR 50.54(p)(2),

EGC is submitting these changes within 60 days of implementation.

The Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan has been revised as follows:

1. Adjusted associated page numbers in the index
2. Describe early warning system (EWS) illumination, alarms, and back-up power indication
3. Addressed unattended openings
4. Added 24 month review of EWS by nuclear oversight (NOS)
5. Added EWS lighting and compensatory measure detail
6. Described closed circuit television (CCTV) equipment capabilities at protected area (PA) perimeter
7. Added detail for lighting back-up capabilities
8. Described owner controlled area (OCA) patrol method used at Braidwood
9. Described chain of command for Command and Control
10. Added a statement for Operations training to ensure readiness for loss of ultimate heat sink SAFEGUARDS INFORMATION Security Marking Does Not Apply When This Page Is Separate From The Document

SAFEGUARDS INFORMATION May 15, 2014 U. S. Nuclear Regulatory Commission Page 2

11. Described OCA Checkpoint over watch
12. Added the new location of the local law enforcement agency (LLEA) room EGC has concluded that the changes do not decrease the safeguards effectiveness of the Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.

Attachments 1 and 2 contain Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," paragraph (a)(1)(i).

There are no commitments in this letter.

Should you have any questions concerning this letter, please contact Mr. Brian Finlay, Security Manager, at (815) 417-2900 Respectfully, Mark Kanavos Site Vice President Braidwood Station Attachments:

1. Braidwood Station, Description of Changes Report, Revision 14 (Contains Safeguards Information)
2. Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 (Contains Safeguards Information) cc: Regional Administrator - NRC Region III SAFEGUARDS INFORMATION Security Marking Does Not ApDIv When This Page Is Separate From The Document

SAFEGUARDS INFORMATION bcc: NRC Project Manager, NRR - Braidwood Station (without attachments)

Illinois Emergency Management Agency - Division of Nuclear Safety (without attachments)

Site Vice President - Braidwood Station (without attachments)

Regulatory Assurance Manager - Braidwood Station (without attachments)

Director - Licensing and Regulatory Affairs - West (without attachments)

Braidwood Nuclear Licensing Administrator (without attachments)

Exelon Document Control Desk - Licensing (Hard Copy)

Exelon Nuclear Security Director SAFEGUARDS INFORMATION Security Markinc Does Not Apply When This Paqe Is Separate From The Document

SAFEGUARDS INFORMATION ATTACHMENT 1 Braidwood Station Description of Changes Report, Revision 14 (Contains Safeguards Information)

SAFEGUARDS INFORMATION Security Marking Does Not Apply When This Page Is Separate From The Document

SAFEGUARDS INFORMATION ATTACHMENT 2 Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 (Contains Safeguards Information)

SAFEGUARDS INFORMATION Security Marking Does Not Apply When This Page Is Separate From The Document