MONTHYEARLR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0013, In-Service Inspection Activities - 90-Day Report2022-02-10010 February 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0061, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2021-12-0909 December 2021 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N21-0083, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion2021-11-24024 November 2021 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0066, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2021-11-10010 November 2021 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations 2023-09-08
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 PSEG Nurlear I Technical Specification 6.9.1.10 LR-N14;.01 07 APR 2A 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555-001 Salem Nuclear Generating Station Unit 1 Facility Operating License No. DPR-70 NRC Docket No. 50-272
Subject:
RAI Response to the Steam Generator Tube Inspection Report- Twenty second Refueling Outage (1 R22)
By letter dated November 04, 2013 (Agencywide Documents Access System (ADAMS)
Accession No. ML1331 OA885), PSEG Nuclear, L.L.C., submitted information summarizing the results of the 2013 steam generator (SG) inspections performed at Salem Nuclear Generating Station, Unit 1 during the refueling outage 1R22. The NRC staff has reviewed the information provided and determined that additional information is needed in order to complete our review as follows.
- 1. The description of the scope of array probe inspections indicates that you inspected 50 percent of the hot-leg population of internal tubesheet over expansions, which were greater than 0.25 inches. Please confirm the number and the units.
- 2. Please discuss the scope and results of any secondary side inspections, other than foreign object search and retrieval, performed during the outage (e.g.,
results of inspections in the steam drum and upper bundle).
- 3. Please discuss the scope and results of any tube plug inspections (e.g., was there any degradation and were all plugs in their proper locations).
- 4. Please discuss the scope and results of any inspections performed in the SG primary channel heads.
APR 2.4 2014 Document Control Desk Page 2 LR-N14-0107 The NRC staff requests a response to the above questions by April 25, 2014.
There are no commitments contained in this letter.
Should you have any questions regarding this submittal, please contact Mr. C. Dahms at (856) 339-5456.
Sincerely, Site Vice President- Salem Attachments (1) cc: Mr. W. Dean, Administrator, Region I, NRC Mr. John Lamb, Project Manager, NRC NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Manager IV, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator Mr. Milton Washington, Chief Inspector- Occupational Safety and Health Bureau of Boiler and Pressure Vessel Compliance
Ap K
.. , ... .. 4 '. **4 UJi.
LR-N14-0107 RAI Response to the Steam Generator Tube Inspection Report TS 6.9.1.10 Page 1 Document Control Desk LR-N:14-d1 07 APR 2,<4 2014 PSEG Nuclear LLC RAI Response to the Steam Generator Tube I nspection Report- Twenty-second Refueling Outage (1 R22)
- 1. The description of the scope of array probe inspections indicates that you inspected 50 percent of the hot-leg population of internal tubesheet over expansions, which were greater than 0.25 inches. Please confirm the number and the units.
PSEG Response:
An internal tubesheet overexpansion (OEX) is defined as a profile deviation equal to 1.5 mils (0.0015 inches) or greater from the average of the expanded tubesheet region profile and has an axial extent greater than 0.25 inch. The definition of internal tubesheet overexpansion is consistent with industry guidance provided in the 2005 timeframe, in response to operating experience including NRC Information Notice 2005-09. 50% of the Hot Leg (HL) population of OEX that exist within the tubesheet, down to a depth of 15.21 inches below the top of the tubesheet (TTS) were inspected with array probe.
- 2. Please discuss the scope and results of any secondary side inspections, other than foreign object search and retrieval, performed during the outage (e.g., results of inspections in the steam drum and upper bundle).
PSEG Response:
Secondary side upper internal inspections were performed in all four (4) steam generators.
These inspections consisted of both visual inspections and ultrasonic testing (UT). This was accomplished by inspection personnel entering the SG via the upper secondary manways. The visual inspections were performed to identify the general condition of the components; including the feedwater ring components and supports, drain pipes, primary and secondary separators.
The feedwater ring visual inspections include all external surfaces, and some internal surface inspections. The internal feedwater ring visual inspection is completed using a small video probe delivered through the J-nozzle itself, and articulated back to view the area near the entrance way of the J-nozzle (internal to the feedring). The primary purpose of this inspection is to check for erosion of the carbon steel in the area near the J-nozzle connection to the feedwater ring (carbon steel). Note that all the J-nozzles were replaced with an improved design prior to the replacement Model F SGs operating at Salem Unit 1. The new design is made with inconel alloy 600 J-nozzles, with carbon steel sleeve buttered with 82/182 cladding and weld. This improved design eliminated flow accelerated corrosion (FAG) concerns with the J-nozzles. The visual inspections performed for the J-nozzles are defense in-depth inspections to validate resistance to FAG.
UT was performed on all four (4) steam generator feedwater rings (including tee, elbows, reducers) to evaluate for FAG. UT was also performed on several of the primary moisture separator (PMS) riser barrels for impingement erosion from J-nozzle overspray, on those locations identified from the visual inspections.
Page 2 Document Control Desk LR-N14-0107 APR 2;4 2014 The results of the visual inspections identified several primary moisture separator riser barrels with signs of impingement erosion from J-nozzle overspray. The UT inspections of the feedwater rings identified minor (or no) signs of FAC. No FAC was identified with the J-nozzles, confirming the improved design resistance to FAC. In summary, all the visual and UT inspections identified some minor conditions that were evaluated and did not require any further corrective actions at this time.
Other secondary side inspections performed in all four (4) steam generators included visual inspections of the upper tube support plates (TSP). These visual inspections were accomplished by removing small inspection ports located at the uppermost tube support plate and inserting a camera probe. The visual inspections were performed to identify the general conditions of the TSPs and tubing areas (as-possible), including the deposit loading on and within the TSP broach flow hole areas. The visual inspections did not identify conditions adverse to quality, and the TSP broached holes had relatively minor deposits.
- 3. Please discuss the scope and results of any tube plug inspections (e.g., was there any degradation and were all plugs in their proper locations).
PSEG Response:
Visual inspections during outage 1R22 of all previously installed tube plugs did not detect degradation or conditions adverse to quality. All tube plugs were in their proper locations.
- 4. Please discuss the scope and results of any inspections performed in the SG primary channel heads.
PSEG Response:
PSEG performed visual inspection of the steam generator channel head internal (primary side) cladding surfaces in all four steam generators, both on the hot leg and cold leg. The entire channel head internal surfaces were inspected, including the channel head cladding, tubesheet cladding, divider plate and associated welds. No degradation was identified.