ML14051A676

From kanterella
Jump to navigation Jump to search
Reply to Notices of Violation
ML14051A676
Person / Time
Site: Pilgrim
Issue date: 02/18/2014
From: Burke D
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.14.016, IR-13-403
Download: ML14051A676 (2)


Text

SEntergy Entergy Nuclear Operations, Inc.

600 Rocky Hill Road Plymouth, MA 02360 Pilgrim Nuclear Power Station February 18, 2014 WITHHOLD FROM PUBLIC DISCLOSURE PER 10 CFR 2.390 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Reply to Notices of Violation Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35

REFERENCE:

NRC Letter to Entergy, "Pilgrim Nuclear Power Station - NRC Baseline Security Inspection Report 05000293/2013403 and Notices of Violation",

dated January 17, 2014 (PNPS Letter 1.14.003)

LETTER NUMBER: 2.14.016

Dear Sir or Madam,

This letter provides the information requested in the two (2) Notices of Violation received at Pilgrim Nuclear Power Station (PNPS) in the above referenced letter. The requested information is provided in the Attachment to this letter.

Entergy requests that the Attachment which contains security-related information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.

This letter contains no commitments.

Should you have any questions concerning the content of this letter or require-additional information, please contact me at (508) 830-8320.

Sincerely, David Burke-"-

Manager, Security 9 K_ f, DB/mew Attachment contains Sensitive Unclassified Non-Safeguards Information. When separated from the attachment, the transmittal document is decontrolled.

Attachment:

Pilgrim Nuclear Power Station's Reply to Notices of Violation This letter contains security-related information.

Attachment is withheld from public disclosure per 10 CFR 2.390

WITHHOLD FROM PUBLIC DISCLOSURE PER 10 CFR 2.390 PNPS Letter 2.14.016 Page 2 of 2 cc:

Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-1415 Ms. Nadiyah Morgan, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Mr. John Giarrusso Jr.

Planning, Preparedness & Nuclear Section Chief Mass. Emergency Management Agency 400 Worcester Road Framingham, MA 01702 This letter contains security-related information.

Attachment is withheld from public disclosure per 10 CFR 2.390