Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM A 2013 Systems Control Room JPM A (Rev_071213)

- NUREG 1021, Revision 9

Appendix C Page 2 of 10 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

CA Suction Source Realignment JPM No.: 2013 Systems Control Room JPM A (Alternate Path)

K/A

Reference:

007 EA1 .08 (4.4/4.3)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Unit 1 has just tripped from 100% power, due to seismic activity.
  • The crew is now implementing EP/1/N5000/ES-0.i (Reactor Trip Response).
  • The CAST has developed a leak, and level has lowered to 1.5 feet.

Initiating Cue: The CRS has directed you to perform EP/1/N5000/G-i, Generic Enclosure 20 (CA Suction Source Realignment), while the crew continues with ES-0.i.

Task Standard: The operator will realign the suction of the CA Pumps from the non safety related to the safety-related source (RN). During the course of this action, the operator will recognize that RN Supply to the 1 B MDCA Pump cannot be established, and stop the pump.

Required Materials: None General

References:

EP/1/A/5000/E-0 (Reactor Trip or Safety Injection), Rev 33 2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 3 of 10 Form ES-C-i Job Performance Measure Worksheet EP/i/A15000/ES-0.i (Reactor Trip Response), Rev 36 EP/1/A15000/G-1 (Generic Enclosures), Rev 34 Handouts: Handout 1: Enclosure 20 (CA Suction Source realignment) of EPI1/A15000/G-1 (Generic Enclosures).

Time Criticai Task: NO Validation Time: 8 minutes 2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 4 of 10 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to lC-39 (100%).
2. Place Simulator in RUN.
3. Ensure that the B Train of RN is in operation.
4. Insert REM-CAOO1 8B=0 to ensure that 1 CA-i 8B (1 B CA Pump Suction from 1 B RN lsol) will not OPEN.
5. Insert (CA) PLP-078 = 1.48 (Simulates Leak in CAST).
6. Override ON OBE Exceeded Annunciator (1AD-i3 E-7). (iADi3_E07 ON)
7. Manually trip the reactor and perform the actions of EP/1/A15000/E-0, and transition to EP/i/N5000/ES-Oi.
8. Ensure both MDCA Pumps are running, acknowledge and silence all annunciators, and Freeze the Simulator.

OR

1. Reset to IC-250 (May, 2013)
2. Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
3. Leave Simulator in FREEZE until operator is ready to begin.

NOTE: The Booth/Floor Instructor will need to control BOP during the performance of this JPM.

2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 5 of 10 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Note prior to Step 1) If The operator reads the control room indication of Note and proceeds.

CA storage tank (water tower) has failed, local indication is available in turbine bldg, 760, 1B-24.

2 (Step 1) Align A train RN to The operator observes the CA suction as follows: 1A RN Pump Red status light LIT, Green status light (Step 1 .a) Start 1 A RN OFF; and motor amps at pump. 88 amps, and determines the iA RN Pump is running.

  • 3 (Step 1 .b) OPEN i RN-69A The operator presses the (iA RN Assured Supply To 1 RN-69A OPEN pushbutton Ui CA Isol). and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on 1AD-5.

  • 4 (Step 1 .c) OPEN 1 CA-i 5A The operator presses the (iA CA Pump Suction From 1CA-i5A OPEN pushbutton 1A RN Isol) and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on 1AD-5.

2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 6 of 10 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 5 (Step 1 .d) OPEN 1 CA-86A The operator presses the (Ui TD CA Pump Suction 1CA-86A OPEN pushbutton From 1A RN Isol). and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on 1AD-5.

6 (Step 2) Align B train RN to CA suction as follows:

(Step 2.a) OPEN 1 RN-i 62B The operator presses the (1 B RN Assured Supply To 1 RN-i 62B OPEN Ui CA Isol). pushbutton and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on lAD-S.

(Step 2.b) OPEN 1CA-i8B The operator presses the (lB CA Pump Suction From 1CA-i8B OPEN pushbutton 1 B RN Isol). and observes the Green status light remains LIT, Red status light OFF (Alternate Path).

The operator proceeds to the RNO.

8 (Step 2.b RNO) IF 1 B CA The operator presses the pump is on, THEN stop 1 B RESET Pushbuttons and MD CA pump as follows: observes RESET status lights LIT for both Train A (Step 2.a RNO i) Reset S/I. and B SI. (Already RESET)

(Step 2.a RNO 2) Reset 1 B The operator presses the Sequencer. Sequencer RESET and observes RESET status lights LIT Pushbuttons for both Train A and B.

(Already RESET) 2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 7 of 10 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 10 (Step 2.a RNO 3) Stop 1 B The operator presses the CA pump. STOP pushbutton for the lB MDCA Pump and observes the Green status light LIT, Red status light OFF; and that motor amps drop to 0.

ii (Step 2.a RNO 4) IF 1 B CA The operator observes that pump still on the lB MDCA Pump is OFF, and proceeds.

12 (Step 2.c) OPEN 1CA-i 16B The operator presses the (Ui TD CA Pump Suction 1 CA-il 6B OPEN From 1 B RN Isol). pushbutton and observes the Red status light LIT, Green status light OFF.

The operator will acknowledge alarm on 1AD-5.

-13 (Note prior to Step 3) The The operator reads the next step isolates non- NOTE and proceeds.

safety CA suction sources from 1A CA Pump.

  • 14 (Step 3) CLOSE 1CA-i 1A The operator presses the (1A CA Pump Suction Isol). 1CA-i 1A CLOSE pushbutton and observes the Green status light LIT, Red status light OFF.

15 (Step 4) Isolate non-safety CA suction sources from 1 B The operator presses the CA pump as follows: 1 CA-9B CLOSE pushbutton and observes the Green (Step 4.a) CLOSE 1 CA-9B status light LIT, Red status (1 B CA Pump Suction light OFF.

Isol).

16 (Step 4.b) IF 1CA-9B stays The operator recognizes in intermediate position for that 1 CA-9B is CLOSED more than 15 seconds, and proceeds.

THEN 2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 8 of 10 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

-17 (Step 5) Isolate non-safety CA suction sources from TD CA pump as follows:

(Step 5.a) Check the following valves OPEN:

1 RN-69A (iA RN Assured The operator observes the Supply To Ui CA Isol) 1 RN-69A Red status light LIT, Green status light OFF.

iCA-86A (Ui TD CA Pump The operator observes the Suction From iA RN IsoI). iCA-86A Red status light LIT, Green status light OFF.

i8 (Step 5.b) GO TO Step 5.d. The operator proceeds to Step 5.d.

  • 19 (Step 5.d) CLOSE i CA- The operator presses the 7AC (Ui TD CA Pump iCA-7AC CLOSE Suction Isol). pushbutton and observes the Green status light LIT, Red status light OFF.

20 (Step 6) WHEN time allows, THEN.... Cue:

Another operator will complete the remaining steps.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM A

- NUREG iO2i, Revision 9

Appendix C Page 9 of 10 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM A Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 1 has just tripped from 100% power, due to seismic activity.
  • The crew is now implementing EPI1IA/5000/ES-0.i (Reactor Trip Response).
  • The CAST has developed a leak, and level has lowered to 1.5 feet.

INITIATING CUE: The CRS has directed you to perform EP/i/A15000/G-i, Generic Enclosure 20 (CA Suction Source Realignment), while the crew continues with ES-0.1.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM B 2013 Systems Control Room JPM B (Rev_071213)

- NUREG 1021, Revision 9

Appendix C Page 2 of 12 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Isolate the NV S/I Flowrath While JPM No.: 2013 Systems Control Terminatinci Safety Iniection Room JPM B (Alternate Path)

K/A

Reference:

E02 EA1.i (4.0/3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • Safety Injection Termination criteria has been met and the crew is implementing EP/1/A15000/ES-1 .1 (Safety Injection Termination).

Initiating Cue: The CRS has directed you to isolate the NV S/I flowpath in accordance with Step 6 of EP/i/A15000/ES-i.i (Safety Injection Termination).

Task Standard: The operator will attempt to isolate NV S/I flow per EP/i/A1500/ES-i .1, recognize that this cannot be accomplished and complete Generic Enclosure 18 to isolate NV S/I flow.

Required Materials: Control Room copy (CRS Desk) of EP/1/A/5000/ES-1.i marked up through Step 5 (See Attached Markup).

General

References:

EP/i/A/5000/ES-i .1 (Safety Injection Termination), Rev 26 EP/1/A/5000/G-i (Generic Enclosures) Rev 34 2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-i Job Performance Measure Worksheet Handouts: Handout 1: Blank Copy of EPI1IN5000IG-i (Generic Enclosures),

Generic Enclosure 18.

Time Critical Task: NO Validation Time: 12 minutes 2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-i Job Pertormance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset the Simulator to IC-39 (100%)
2. Insert MAL-ISEOO6A = BLK_BOTH (Failure of MSI Signal Train A)

Insert MAL-ISEOO6B = BLK_BOTH (Failure of MSI Signal Train B)

Insert MAL-SMOO9 (Main Steam Header Break)

(Event requiring SI initially, but as transient progresses will lead to implementation of SI Termination).

3. Manually close MSIVs when NC pressure decreases to less than 2000 psig.
4. Ensure that 1NV-i5OB and 1NV-151A are CLOSED (Simulating closure of valves on E-0 Foldout Page requirement to close. NOT re-opened per Foldout Page as of yet)
5. Insert REM-NVO151A = 0 (1NV-151A (Ui NV Pump Recirc Isol) is stuck CLOSED).
6. Pertorm all EP actions up to through step 5 of EP/1/A15000/ES-i .1.
7. Ensure that NC System pressure is 2000 psig and rising.
8. Stabilize plant conditions and Freeze the Simulator OR
1. Reset Simulator to Temporary Snap IC-25i (May, 2013)
2. Momentarily place Simulator in Run to acknowledge alarms.
3. Leave Simulator in FREEZE until operator is ready to begin.

NOTE: During the performance of this JPM, the Simulator Instructor will need to monitor unrelated alarms and silence as needed.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Step 6) Isolate NV S/I The operator observes the flowpath as follows: 1NV-221A Red status light is LIT, and Green status (Step 6.a) Check the light is OFF.

following valves OPEN:

1NV-221A (Ui NV Pump The operator observes the Suct From FWST Isol) 1 NV-222B Red status light is LIT, and Green status 1 NV-222B (Ui NV Pump light is OFF.

Suct From FWST Isol).

2 (Step 6.b) Check the The operator observes the following valves OPEN:

1NV-i5OB Green status 1NV-i5OB (Ui NV Pump light is LIT, and Red status Recirc Isol) light is OFF.

1 NV-i 5iA (Ui NV Pump The operator observes the Recirc Isol).

1NV-i5iA Green status light is LIT, and Red status light is OFF.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 6 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 6.b RNO b) Perform The operator presses the the following: 1 NV-i 50B OPEN pushbutton and observes (Step 6.b RNO b.i) OPEN valves. the Red status light is LIT, and Green status light is OFF.

The operator presses the 1NV-151A OPEN pushbutton and observes the Green status light remains LIT, and Red status light remains OFF.

(Alternate Path) 4 (Step 6.b RNO b.2) IF both The operator recognizes valves open, THEN ....... that both valves are NOT open and continues.

(Step 6.b RNO b.3) The operator contacts an Dispatch operator to OPEN AO and directs that they affected valve(s),

open 1 NV-i 51 A locally.

1NV-i5OB (aux bldg, 71 6+8, HH-55, room 627, Cue:

NV pump room 1A, west of pump motor) The AO acknowledges.

1NV-151A (aux bldg, 71 6+9, HH-55, room 627, NV pump room 1A, west of pump motor).

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 7 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6 (Step 6.b RNO b.4) Realign The operator proceeds to charging PER Generic Enclosure 18.

EPI1IAI5000/G-1 (Generic Enclosures), Enclosure 18 Examiner Note:

(Aligning Normal Charging With NV Recirc Path When the operator Isolated). locates the G-1 Notebook, provide the operator with Handout 1.

7 (Enclosure 18, Step 1) The operator observes Check VI header pressure OVIP-5090 and determines GREATER THAN 60 PSIG. that VI header pressure is 115 psig.

8 (Step 2) Check NC pump The operator observes seal injection flow - 1 NVP-5300, 5310, 5320 GREATER THAN OR and 5330 and determines EQUAL TO 6 GPM TO that Seal Injection flow to EACH NC PUMP. each NCP is greater than 6 gpm.

9 (Step 3) GO TO Step 8. The operator proceeds to Step 8.

  • 10 (Step 8) CLOSE 1 NV-24i The operator adjusts the (Ui Seal Water Inj Flow 1 NV-241 Manual Loader Control). counter-clockwise until the Manual Loader output equals 0%.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 9) Check one of the The operator observes the following valves OPEN:

INV-i3B Red status light is 1NV-13B (Ui NV Supply To LIT, and the Green status IA NC Loop Isol) light is OFF.

OR 1NV-i6A (Ui NV Supply To Examiner NOTE:

1D NC Loop Isol).

1NV-16A is CLOSED.

12 (Step 10) Check 1 NV-2i A The operator observes the (Ui NV Supply to Ui Aux 1NV-2iA Green status light PZR Spray Isol) CLOSED.

- is LIT, and the Red status light is OFF.

  • 13 (Step ii) OPEN the The operator presses the following valves: 1 NV-244A OPEN pushbutton and observes 1NV-244A (Ui Charging Hdr Cont Outside Isol) the Red status light is LIT, Green status light OFF.

1NV-245B (Ui Charging The operator presses the Hdr Cont Outside Isol). 1 NV-245B OPEN pushbutton and observes the Red status light is LIT, Green status light OFF.

  • 14 (Step 12) Establish The operator presses the charging pump minimum Blue M pushbutton on the flow as follows: 1 NV-238 SLIMS.

(Step i2.a) Place iNV-238 (Ui Charging Hdr Control) controller in manual.

15 (Step 1 2.b) Check NC The operator observes NC pressure LESS THAN

- System pressure is greater 1800 PSIG. than 1800 psig.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 16 (Step 12.b RNO b) Perform The operator presses the the following: 1 NV-238 SLIMS OUTPUT (Step i2.b RNO b.i) Fully Raise pushbutton until OPEN 1NV-238 (Ui SLIMS output is at 100%.

Charging Hdr Control).

17 (Step 12.b RNO b.2) IF The operator recognizes 1 NV-238 cannot be that this step is NOT operated from the Control applicable and continues.

Room 18 (Step i2.b RNO b.3) IF NC The operator observes NC pressure less than 2000 System pressure is greater 2000 psig.

  • 19 (Step i2.b RNO b.4) The operator adjusts the THROTTLE 1NV-241 (Ui 1NV-24i Manual Loader Seal Water Inj Flow Control) clockwise until the Manual to 50% OPEN. Loader output equals 50 0i.

20 (Step i2.b RNO b.5) IF The operator recognizes 1 NV-241 cannot be that this step is NOT operated from the Control applicable and continues.

Room 21 (Step 12.b RNO b.6) GO The operator proceeds to TO Step 13. Step 13.

  • 22 (Step 13) CLOSE the The operator presses the following valves:

- NI-9A CLOSE pushbutton 1 NI-9A (NC Cold Leg Inj and observes the Green From NV) status light is LIT, Red status light is OFF.

1 NI-i OB (NC Cold Leg Inj The operator presses the From NV). iNIiOB CLOSE pushbutton and observes the Green status light is LIT, Red status light is OFF.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STAN DARD S/U COMMENTS REQUIRED FOR UNSAT 23 (Caution prior to Step 14) The operator reads the Failure to maintain charging Caution and proceeds.

flow above 80 GPM will result in inadequate NV pump miniflow protection.

This limit applies to all subsequent EPs.

  • 24 (Step 14) THROTTLE . The operator observes charging nd seal injction Charging flow to be to maintain the following:

between 80-200 gpm.

Charging flow between 80 GPM and 200 GPM The operator observes Seal injection flow 6-10 1 NVP-5300, 5310, 5320 GPM per NC pump. and 5330 and determines that Seal Injection flow to each NCP is between 6-10 gpm.

Examiner Note:

The operator may make the necessary adjustments.

25 (Step 15) RETURN TO The operator reports that procedure and step in NV S/I Flow has been effect. isolated per Generic Enclosure 18.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page ii of 12 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM B Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

Safety Injection Termination criteria has been met and the crew is implementing EP/i/A/5000/ES-1 .1 (Safety Injection Termination).

INITIATING CUE: The CRS has directed you to isolate the NV S/I flowpath in accordance with Step 6 of EP/1/A/5000/ES-i .1 (Safety Injection Termination).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM C 2013 Systems Control Room JPM C (Rev071213)

- NUREG 1021, Revision 9

Appendix C Page 2 of 12 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Establish Charging Flow Using the JPM No.: 2013 Systems Control PD Pump Room JPMC (Alternate Path)

K/A

Reference:

022 AA1 .04 (3.3/3.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • Unit 1 is at 100% power when 1 B NV Pump breaker trips on Overcu rrent.

AP/i/A15500/12 (Loss of Letdown, Charging, or Seal Injection) is implemented and completed through step 16.

Initiating Cue: The CRS has directed you to re-establish charging and seal injection flow, beginning with step 20 of AP/1/A/5500/12 (Loss of Letdown, Charging, or Seal Injection).

Task Standard: The operator will attempt to start the 1A NV Pump, recognize that it will not start, and place the PD Pump in service and establish Charging and Seal Injection flow.

Required Materials: Control Room copy of AP/1/A/5500/12 marked up through Step 16 (See Attached Markup).

General

References:

AP/1/A/5500/12 (Loss of Letdown Charging or Seal Injection), Rev 24 2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-i Job Performance Measure Worksheet Handouts: None Time Critical Task: NO Validation Time: 20 minutes 2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset the Simulator to IC-39
2. Insert OVR Xi0_249_2 = 1 (1A NV fails to start when manually started)
3. Insert Malfunction NVO29B NV Pump B Trips due to Overcurrent
4. Insure the PD Pump is available for operation
5. Implement AP/12 through subsequent step 16
6. Freeze the Simulator OR
1. Reset to IC-252 (May, 2013)
2. Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
3. Leave Simulator in FREEZE until operator is ready to begin.

NOTE: During the performance of this JPM, the Simulator Instructor will need to monitor un-related alarms and silence as needed.

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Step 20) Check any of the The operator observes the following charging pumps status lights and/or ON ammeters for each pump and determines that all 1ANV Pump three pumps are OFF.

lB NV Pump OR PD Pump 2 (Step 20 RNO) IF all pumps off, THEN perform the following:

Fully OPEN 1NV-241 (Ui Seal Water Inj Flow The operator rotates the Control). 1 NV-241 Manual Loader clockwise until needle CLOSE 1NV-238 (Ui indication is 100%.

Charging Hdr Control).

The operator places the 1NV-238 SLIMS in MANUAL, and presses the Lower Output pushbutton until output is 0%. (NOTE:

1AD-7/F2, CHARGING LINE DEMAND LO FLOW, is expected) 2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 6 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 21) Check both of the following valves OPEN:

1 NV-244A (Ui Charging The operator observes the Hdr Cont Outside Isol) 1 NV-244A Red status light LIT, Green status light OFF.

1NV-245B (Ui Charging The operator observes the Hdr Cont Outside Isol) 1 NV-245B Red status light LIT, Green status light OFF.

(Step 22) Check one of the following OPEN:

1 NV-i 3B (NV Supply to A The operator observes the NC Loop Isol) 1NV-i3B Red status light LIT, Green status light OFF.

OR 1 NV-i 6A (NV Supply to D The operator observes the NC Loop Isol) 1NV16A Green status light LIT, Red status light OFF.

(Step 23) Check all NC The operator observes the PumpsON iA, iB, 1C and iD NCP Red status lights LIT, Green status lights OFF; and/or the ammeters for each pump and concludes that the NCPs are all ON.

6 (Step 24) Check any of the The operator observes the following charging pumps status lights and/or ON ammeters for each pump and determines that all 1A NV Pump three pumps are OFF.

OR lB NV Pump OR PD Pump 2013 Systems Control Room JPM C

- NUREG iO2i, Revision 9

Appendix C Page 7 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 24 RNO) IF all pumps off, The operator proceeds to THEN GO TO step 26.

Step 26.

8 (Step 26) Start 1 A or 1 B NV The operator depresses the Pump as follows: 1 A NV Lube Oil Pump START pushbutton, and (Step 26.a) Start associated NV Lube Oil Pump observes Red status light LIT, Green status light OFF.

(Step 26.b) Start 1A or lB The operator presses the NV Pump 1A NV Pump START pushbutton and observes that the Green status light remains LIT and the Red status light is OFF, and proceeds to the RNO.

(Alternate Path) 10 (Step 26.b RNO) IF PD The operator observes plant Pump is available, THEN power level (or equivalent) start PD pump as follows:

and determines that no SI (Step 26.b RNO 1) IF SI present.

has occurred OR 1 ETA is The operator observes de-energized, THEN GO 1 ETA voltage and TO step 27. determines that 1 ETA is energized, and proceeds.

11 (Step 26.b RNO 2) Ensure The operator observes the 1 RN-42A (AB Non Ess 1 RN-42A Red status light Supply Isol) is OPEN.

LIT, Green status light OFF.

  • 12 (Step 26.b RNO 3) Open The operator presses the the following valves: 1 RN-64A OPEN pushbutton and observes the Red 1 RN-64A (AB Non Ess status light LIT, Green Return Isol) status light OFF.

1 RN-63B (AB Non Ess The operator observes the Return Isol) 1 RN-63B Red status light LIT, Green status light OFF.

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 13 (Step 26.b RNO 4) Ensure The operator observes the PD pump speed controller PD Pump SLIMS to be at output set to 0%. 0%.

  • 14 (Step 26.b RNO 5) OPEN The operator presses the 1NV-1047A(U1 NVPD 1NV-1047A OPEN Pump Recirc Isol).

pushbutton and observes the Red status light LIT, Green status light OFF.

  • 15 (Step 26.b RNO 6) Start the The operator presses the PD Pump. PD Pump START pushbutton and observes Red status light LIT, Green status light OFF.

16 (Step 26.b RNO 7) Ensure After a minimum of 2 1 NV-i 047A CLOSES after minutes of PD Pump 2 minutes.

operation, the operator observes the 1 NV-i 047A Green status light LIT, Red status light OFF. (NOTE:

When 1NV-1047A starts to close, charging flow will rise and 1AD-7/L4 will alarm and clear) 17 (Step 26.c) Place The operator recognizes associated NV Lube Oil that this Step is NA, and Pump in AUTO.

proceeds.

18 (Step 27) Check any of the The operator observes the following charging pumps PD Pump Red status light ON LIT, Green status light OFF, and determines that the PD iA NV Pump Pump is ON.

OR lB NV Pump OR PD Pump 2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 19 (Step 28) Check seal The operator observes injection flow to any NC 1 NVP-5300, 5310, 5320 Pump LESS THAN 6 and 5330; and determines GPM Seal Injection to each NC Pump is less than 6 gpm.

20 (NOTE prior to Step 29) In The operator reads the the following step, if NOTE and proceeds.

charging flow fluctuates above and then below 20 GPM, PZR LO LVL/LO CHGING FLOW HTRS OFF

& LID SECURED annunciator (1AD-6, D-7) may come into alarm. If this occurs, a subsequent step will reenergize Pzr heaters.

  • 21 (Step 29) Slowly restore The operator calls up OAC seal injection flow to limit Screen NCPMPALL.

cooldown of NC Pump lower bearing temperature The operator presses the to 1°F per minute by Output Raise pushbutton on performing the following the PD Pump SLIMS, and steps concurrently: rotates the 1 NV241 Manual Loader counter-clockwise (Step 29.a) Monitor NC until needle indication starts Pump lower bearing temperatures. to lower from 100%.

The operator will observe the LWR RADIAL BRG TEMP RATE on NCPM PALL to be less than 1°F/minute for each NCP.

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 22 (Step 29.b) Slowly establish charging flow by performing one of the following:

The operator presses the Throttle open 1NV-238 PD Pump RAISE (Charging Line Flow pushbutton, and observes a Control) rising output on the PD Pump Speed Controller.

OR The operator will observe WHEN 1NV1047A (PD the LWR RADIAL BRG Pump Recirculation) is TEMP RATE on closed, THEN raise PD NCPMPALL to be less than Pump speed 1°F/minute for each NCP.

  • 23 (Step 29.c) Slowly raise The operator ROTATES seal injection flow by THE 1 NV-241 Control Knob THROTTLING CLOSE 1NV-241 (Ui Seal Water lnj counterclockwise and Flow Control). observes Seal Injection flow (1NVP-5300, 5310, 5320, 5330) is rising.

Cue:

Another operator will place letdown in service and complete this procedure.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page ii of 12 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM C Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

20i3 Systems Control Room JPM C

- NUREG iO2i, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 1 is at 100% power when 1 B NV Pump breaker trips on Overcurrent.
  • AP/1/A15500/12 (Loss of Letdown, Charging, or Seal Injection) is implemented and completed through step 16.

INITIATING CUE: The CRS has directed you to re-establish charging and seal injection flow, beginning with step 20 of AP/1/N5500/12 (Loss of Letdown, Charging, or Seal Injection).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM D 2013 Systems Control Room JPM D (Rev_073013)

- NUREG 1021, Revision 9

Appendix C Page 2 of 11 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Start and Stor the 1 B NCP for NCS JPM No.: 2013 Systems Control Venting Room JPM D K/A

Reference:

003 A4.Oi (3.3/3.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • A plant startup is in progress per OP/i/N6i00/001 (Controlling Procedure For Unit Startup).
  • The crew is implementing Enclosure 4.2 (Venting the NC System (Control Room Activities)) of OP/i/A16i00/SU-6 (Venting the NC System).
  • The NC System is water solid.
  • NC System pressure is being maintained between 330-370 psig.
  • During the NC System pressure increase to the current system pressure, it was noted that the 1 B NCP Seal Leakoff flow increased 0.2 gpm.
  • The crew is ready to conduct a 60 second run of the lB NC Pump.
  • Enclosure 4.1 (Startup and Operation) of OP/1/A/6150/002 A (Reactor Coolant Pump Operation) has been marked up for place keeping through step 3.3 to support NC Pump operation.
  • Another operator has been assigned to control and maintain NCS pressure during the NCP run.

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 3 of ii Form ES-C-i Job Performance Measure Worksheet Initiating Cue: The CRS has directed you to start the 1 B NCP per Section 3.5 of Enclosure 4.1 (Startup and Operation) of OP/11N61501002 A (Reactor Coolant Pump Operation); and then stop the 1 B NCP under either of the following conditions:

  • The LOWEST NC Tcold lowers to 74°F.
  • The 1 B NCP has operated for 60 seconds.

Task Standard: The operator will conduct a 60 second run of the 1 B NC Pump in accordance with Enclosure 4.1 of OPI1/A16i501002 A.

Required Materials: None General

References:

OP/1/A/6i00/001 (Controlling Procedure For Unit Startup), Rev 185 OPIi/A/6100ISU-6 (Venting the NC System), Rev 30 OP/i/A16150/002 A (Reactor Coolant Pump Operation), Rev 57 OP/1/A/6100/022 (Unit 1 Data Book Cycle 23), Rev 480 Handouts: Handout 1: Enclosure 4.1 (Startup and Operation) of OP/i/A16150/002 A (Reactor Coolant Pump Operation) marked up for place-keeping.

Time Critical Task: NO Validation Time: 15 minutes NOTE: This JPM is designed such that the operator is provided with the Initial Conditions and Cue; all General References and Handout 1 in a pre brief setting prior to entering the Simulator.

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 4 of 1 1 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-5 (Mode 5, water solid).
2. Place Simulator in RUN.
3. Take actions through Step 3.12.10.1 of Enclosure 4.2 (Venting the NC System (Control Room Activities)) of OP/11A16100/SU-6 (Venting the NC System)
4. Ensure NC System pressure adjusted between 330-370 psig.
5. Ensure that Seal Water Injection flow to each NCP is 8-12 gpm.
6. Ensure that 1NV-127A is aligned to the VCT.
7. Ensure that plant conditions permit the startup of the 1 B NC Pump per Enclosure 4.1 of OP/1IN6i50I002 A (Reactor Coolant Pump Operation).
8. Allow plant conditions to stabilize.
9. Freeze the Simulator.

OR

1. Reset to IC-253 (May, 2013)
2. Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
3. Leave Simulator in FREEZE until operator is ready to begin.

NOTE: During the performance of this JPM, the Simulator Instructor will need to control NCS pressure between 325-370 psig, and monitor unrelated alarms and silence as needed.

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 5 of 11 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk9 Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Step 3.5.1) Check the The operator observes the associated 6900 V supply 1 B NC Pump supply breaker closed, breaker Red status light lit, Green status light OFF.

2 (Step 3.5.2) Check reactor The operator observes that power less than 25%. the Reactor Trip Breakers are OPEN (or equivalent).

(Step 3.5.3) Check 1 B NC The operator observes 1 B Pump No. 1 Seal D/P is NC Seal AP, 1 NVP-5220, greater than 200 psi, and notes AP is 250-275 psid.

(Step 3.5.4) Check VCT The operator observes VCT pressure equal to or greater Pressure, 1 NVP-5500, and than 15 psig.

notes pressure is approximately 60 psig.

(Step 3.5.5) Check 8 gpm The operator observes 1 B seal injection flow NC Pump Seal Flow, 1 NVP established to 1 B NC 5320, and notes flow is 8 Pump.

gpm.

6 (Step 3.5.6) Check upper The operator uses OAC, and lower oil pot levels NCPMPALL (or equivalent),

satisfactory via computer or and notes that lower and by visual inspection of 1 B NC Pump. upper oil levels all green.

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 6of ii Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 3.5.7) Check i NC-29 The operator observes the (B Loop Pzr Spray Control) B Loop Pzr Spray SLIMS closed.

Red closed light is LIT.

8 (Caution prior to Step 3.5.8) The operator reads the Starting an NC Pump with Caution and proceeds.

either Pressurizer Spray Valve open will increase spray flow and affect NC System pressure.

(Note prior to Step 3.5.8) The operator reads the Effective spray flow can be Note and proceeds.

achieved with any of the following:

. i B NC Pump using 1 NC-29 (B Loop Spray Control)

. 1A,iCandiDNC Pumps using 1NC-27 (A Loop Pzr Spray Control)

. NDSysteminRHR Mode using 1 NV-840A (ND to Pzr Aux Spray Control)

. NDSystemNOTin RHR Mode using i NV 2iA (NV Spray to Pzr Isol)

(Step 3.5.8) IF iA NC Pump The operator observes the is off, ensure 1NC-27 (A A Loop Pzr Spray SLIMS Loop Pzr Spray Control)

Red closed light is LIT.

closed.

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 7 of 11 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 3.5.9) IF lB NC Pump The operator recognizes No. 1 seal leakoff NOT that a 0.2 gpm increase on greater than or equal to the the 1 B NC Pump seal minimum leakoff required leakoff flow occurred during per Unit 1 Data Book, pressurization; and perform one of the continues.

following:

(Step 3.5.10.1) Check that a 0.2 gpm increase occurred during pressurization.

OR (Step 3.5.10.2) Perform Enclosure 4.4 (Operator Action for Low No.1 Seal Leakoff Flow) to locally measure flow.

12 (Step 3.5.10) IF either lB The operator observes that NC Pump Standpipe alarm AD-7/A-2, NC Pump B No.

lit 2 Seal S-Pipe Hi Level, and AD-7/B-2, NC Pump B No.

2 Seal S-Pipe Lo Level, annunciators are DARK.

13 (Step 3.5.11) Ensure all The operator contacts the personnel are clear of 1 B Field Supervisor and directs NCP Safety Breaker by at that they ensure that all least 10 feet.

personnel are clear of the lB NC Pump Safety Breaker by at least 10 feet.

Cue:

The Field Supervisor reports that all personnel are clear of the 1 B NC Pump Safety Breaker by at least 10 feet.

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 8 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 14 (Note prior to Step 3.5.12) The operator reads the The following OAC points Note and proceeds.

have been Deleted From Processing due to their respective oil lift pressure switches being isolated:

. M1D3056 (lB NC Pump Oil Lift Pmp 1 Press)

. Mi D3057 (1 B NC Pump Oil Lift Pmp 2 Press)

  • 15 (Step 3.5.13) Two minutes The operator presses the prior to starting 1 B NC START pushbutton for Pump, start one of the either 1 Bi or 1 B2 Oil Lift associated oil lift pumps.

Pumps, and observes Red status light LIT, Green status light OFF.

16 (Step 3.5.13) Announce The operator announces starting of 1 B NC Pump. that the 1 B NC Pump will be started.

17 (Caution prior Step 3.5.14) The operator reads the In Low Pressure Mode, Caution and proceeds.

PORVs will open on NC Narrow Range Pressure of 378 382 psig.

  • 18 (Step 3.5.14) Start lB NC The operator presses the Pump. 1 B NC Pump START pushbutton and observes Red status light LIT, Green status light OFF.

The operator observes Motor amps increase, spike high, and then stabilize lower.

The operator observes NC System flow for the 1 B NC Loop increases to 100%.

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 9 of 11 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 19 (Step 3.5.15) Perform one of the following:

(Step 3.5.15.1) IF desired to The operator observes that stop 1 B NC Pump in less the green status light is lit than two minutes after start, on the B Loop Pzr Spray perform the following: controller.

(Step 3.5.15.1.A) Close 1 NC-29 (B Loop Pzr Spray Control).

  • 20 (Step 3.5.15.1.B) Stop lB 60 seconds after pump NC Pump. start, the operator presses the 1 B NC Pump STOP pushbutton and observes Green status light LIT, Red status light OFF.

The operator observes Motor amps lower to 0.

The operator observes NC System flow for the 1 B NC Loop decreaseto 0%.

21 (Step 3.5.15.1.C) Ensure The operator presses the associated oil lift pumps are STOP pushbutton for the off.

running Oil Lift Pump and observes the Green status light is LIT, Red status light

  • is OFF.

22 (Step 3.5.15.1.D) Release The operator presses the

°STOP pushbutton for STOP OFF pushbutton for associated oil lift pumps.

the Oil Lift Pump just stopped, and observes the Green status light is LIT, Red status light is OFF.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 10 of 1 1 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM D Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • A plant startup is in progress per OP/i/A16100/0Oi (Controlling Procedure For Unit Startup).
  • The crew is implementing Enclosure 4.2 (Venting the NC System (Control Room Activities)) of OP/i/N61 OOISU-6 (Venting the NC System).
  • The NC System is water solid.
  • NC System pressure is being maintained between 330-370 psig.
  • During the NC System pressure increase to the current system pressure, it was noted that the 1 B NCP Seal Leakoff flow increased 0.2 gpm.
  • The crew is ready to conduct a 60 second run of the 1 B NC Pump.
  • Enclosure 4.1 (Startup and Operalion) of OP/1/N6150/002 A (Reactor Coolant Pump Operation) has been marked up for place-keeping through step 3.3 to support NC Pump operation.
  • Another operator has been assigned to control and maintain NCS pressure during the NCP run.

INITIATING CUE: The CRS has directed you to start the 1 B NCP per Section 3.5 of Enclosure 4.1 (Startup and Operation) of OP/1/N6150/002 A (Reactor Coolant Pump Operation); and then stop the 1 B NCP under either of the following conditions:

  • The LOWEST NC Tcold lowers to 74°F.
  • The 1 B NCP has operated for 60 seconds.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM E 2013 Systems Control Room JPM E (Rev_071 21 3)

- NUREG 1021, Revision 9

Appendix C Page 2 of 12 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Perform the iA Annulus Ventilation JPM No.: 2013 Systems Control Operablity Test Room JPM E K/A

Reference:

027 A4.01 (3.3/3.3)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Unit 1 is operating at 100% power and the Unit 1 VE System is aligned for Engineered Safeguards Operation.
  • PT/i /N4450/003 A (Annulus Ventilation System Train A Operability Test) is on the Operations schedule for today.
  • AC John has been briefed on the performance of this Surveillance, and is standing by to assist in the operation.

Initiating Cue: The CRS has directed you to perform PT/i /N4450/003 A (Annulus Ventilation System Train A Operability Test).

Task Standard: The operator will place the 1 A VE Fan in Recirculation Mode with the cross connect from B Train closed. The 1 A VE Fan will be shut down after flow verification and returned to normal alignment.

Required Materials: None General

References:

PT/1/A/4450/003 A (Annulus Ventilation System Train A Operability Test) Rev 26 2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-i Job Performance Measure Worksheet Handouts: Handout 1: PTI1IA/44501003 A (Annulus Ventilation System Train A Operability Test)

Time Critical Task: NO Validation Time: 13 minutes 2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset the Simulator to IC-39 (100% Power)
2. Allow conditions to stabilize.
3. Freeze the Simulator OR
1. Reset Simulator to Temporary Snap IC-254 (May, 2013).
2. Momentarily place Simulator in Run to acknowledge alarms.

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 1 (Note prior to Step 12.1) The operator reads the Placing VE Dampers in Note and proceeds.

MAN makes 1A VE Train inoperable.

2 (Step 12.1) IF in Modes 1, The operator determines 2, 3 or 4, declare iA VE from the Initial Conditions inoperable, that 1A VE has been declared inoperable.

Cue:

If requested, as the CRS, initial Step 12.1.

  • 3 (Step 12.2) Place iAVS-D- The operator rotates the 3 Mode Select in MAN. 1AVS-D-3 Mode Select switch clockwise to MAN.
  • 4 (Step 12.3) Close 1AVS-D- The operator presses the 3 (iA VE Disch Damper to 1AVS-D-3 CLOSE Unit Vent). pushbutton and observes Green status light is LIT, Red status light is OFF.
  • 5 (Step 12.4) Place iAVS-D- The operator rotates the 2 Mode Select in MAN. 1AVS-D-2 Mode Select switch clockwise to MAN.
  • 6 (Step 12.5) Open 1AVS-D- The operator presses the 2 (1A VE Disch Damper to 1AVS-D-2 OPEN Annulus). pushbutton and observes Red status light is LIT, Green status light is OFF.

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 6 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 7 (Step 12.6) Ensure lAyS- The operator observes the D-9 (lB VE Fan Suct X- 1AVS-D-9 Green status Connect) closed, light is LIT, Red status light is OFF.

  • 8 (Step 12.7) Start 1A VE The operator rotates the 1A Fan. VE Fan Control Switch clockwise to ON and observes Red status light is LIT, Green status light is OFF.

9 (Step 12.8) Check The operator observes the RESET lit for iA VE Train Yellow 1A VE Train Preheat Preheat Hi Temp Reset. Hi Temp Reset light is LIT.

10 (Note prior to Step 12.9) The operator reads the Heater operability and Note and proceeds.

compliance with McGuire Tech Spec requirements (Reference 2.1) is determined by PTI1/A144501003 D (Annulus Filter 1A Heater Dissipation Test).

11 (Step 12.9) Check: The operator observes the White 1A A VE Preheater

. A VE Preheater No. 1 No. 1 On light is LIT.

On

. A VE Preheater No. 2 The operator observes the On White 1A A VE Preheater

. Positive D/P across any No. 2 On light is LIT.

filter within Filter Package The operator observes the four DP gages indicate approximately 0.5 inches O.

2 H

12 (Step 12.10) Record date The operator records the and time of test start: current date and time.

Date:

Time:

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 7 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD SIU COMMENTS REQUIRED FOR UNSAT 13 (Step 12.11) HOLD until The operator identifies that test is run for at least 10 the test must continue for hours. the next ten hours.

Cue:

Using Time Compression, ten hours have elapsed.

14 (Note prior to Step 12.12) The operator reads the Heater operability and Note and proceeds.

compliance with McGuire Tech Spec requirements (Reference 2.1) is determined by PT/1/N44501003 D (Annulus Filter 1A Heater Dissipation Test).

15 (Step 12.12) Check the The operator observes the following: White 1A A VE Preheater No. 1 On light is LIT.

  • A VE Preheater No. 1 On The operator observes the
  • A VE Preheater No. 2 White 1A A VE Preheater On No. 2 On light is LIT.
  • Positive DIP across any filter within Filter The operator observes the Package four DP gages indicate approximately 0.5 inches 0.

2 H

16 (Note prior to Step 12.13) The operator reads the Heaters may cause an Note and proceeds.

HVAC OAD12 annunciator to alarm and Carbon Bed Temp >190°F status light to actuate after the 1A VE Fan is stopped.

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 17 (Step 12.13) Stop 1A VE The operator rotates the iA Fan by rotating iA VE Fan VE Fan Control Switch to RESET. counter-clockwise to RESET and observes Green status light is LIT, Red status light is OFF.

18 (Step 12.14) Check lA VE The operator releases the Fan returns to AUTO. 1A VE Fan Control Switch and observes that the switch spring-returns to AUTO.

19 (Step 12.15) Record date The operator records the and time of test completion: current date and time.

Date:

Time:

20 (Note prior to Step 12.16) The operator reads the Train 1A VE Dampers will Note and proceeds.

reposition when damper mode select switches are positioned to AUTO.

  • 21 (Step 12.16) Place lAyS- The operator rotates the D-3 Mode Select in 1AVS-D-3 Mode Select AUTO. switch counter-clockwise to AUTO.

22 (Step 12.17) Check lAyS- The operator observes the D-3 (lA VE Disch Damper 1AVS-D-3 Red status light to Unit Vent) OPEN. is LIT, Green status light is OFF.

  • 23 (Step 12.18) Place lAyS- The operator rotates the D-2 Mode Select in 1AVS-D-2 Mode Select AUTO. switch counter-clockwise to AUTO.

24 (Step 12.19) Check 1AVS- The operator observes the D-2 (1A VE Disch Damper 1AVS-D-2 Green status to Annulus) CLOSED. light is LIT, Red status light is OFF.

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 25 (Step 12.20) Ensure 1AVS- The operator observes the D-9 (1 B VE Fan Suct X- 1AVS-D-9 Green status Connect) closed, light is LIT, Red status light is OFF.

26 (Notes prior to Step 12.21) The operator reads the 5 to 10 minutes may need Notes and proceeds.

to pass after 1A VE Fan is stopped to obtain the RESET indication for iA VE Train Preheat Hi Temp Reset.

RESET indication for iA VE Train Preheat Hi Temp Reset must be obtained to ensure VE operability.

27 (Step 12.21) Depress The operator presses the RESET for lA VE Train 1A VE Train Preheat Hi Preheat Hi Temp Reset. Temp Reset pushbutton.

28 (Step 12.22) Check The operator observes the RESET lit for lA VE Train 1A VE Train RESET status Preheat Hi Temp Reset. light is LIT.

29 (Note prior to Step 12.23) The operator reads the Annulus doors must be Note and proceeds.

closed to ensure Reactor Building operability.

(McGuire Tech Spec.

3.6.16) 30 (Step 12.23) Evaluate 1 A The operator notifies the VE operability. CRS to evaluate 1A VE operability.

Cue:

The CRS acknowledges and will evaluate 1A VE operability.

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 31 (Step 12.24) Open 1YM- The operator contacts a AO 274 (VE Filter Unit 1A Drain to open 1YM-274 and close Trap M/U) for makeup to after 1 minute.

traps. (750+1 0, Unit 1 spiral stairway above 1 RN-89)

Cue:

Acknowledge as AO.

The AO reports that 1YM-274 was opened and close 1 minute later.

32 (Step 12.25) AFTER 1 The operator recognizes minute elapsed, close 1YM- that 1YM-274 is closed.

274 (VE Filter Unit 1A Drain Trap M/U).

33 (Step 12.26) Acceptance The operator evaluates the Criteria met. Acceptance Criteria, recognizes that it has been met, and checks the YES checkbox.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 11 of 12 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM E Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 1 is operating at 100% power and the Unit 1 VE System is aligned for Engineered Safeguards Operation.
  • PT/iIAI445O/003 A (Annulus Ventilation System Train A Operability Test) is on the Operations schedule for today.
  • AO John has been briefed on the performance of this Surveillance, and is standing by to assist in the operation.

INITIATING CUE: The CRS has directed you to perform PT/i/N4450/003 A (Annulus Ventilation System Train A Operability Test).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM F 2013 Systems Control Room JPM F (Rev_071213)

- NUREG 1021, Revision 9

Appendix C Page 2 of 11 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Restore from a Fire in the Unit 1 JPM No.: 2013 Systems Control Cable Sreadincj Room Room JPM F (Alternate Path)

K/A

Reference:

067 AA2.04 (3.1/4.3)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions: Unit 1 and 2 are at 100% power.

A fire has been reported in the Unit 1 Cable Spreading Room.

The crew has implemented AP/0/A/5500/45 (Plant Fire) and is presently in Enclosure 17 (AB 750 Unit 1 Cable Spreading Room Fire Unit 1 and 2 Actions).

The following actions have been taken in response:

  • The breaker for 1CA-7AC has been OPENED.
  • The Pzr PORV Isolation Valves have been CLOSED.
  • The Main Steamline PORV Manual Loaders have been closed.

The Fire Brigade has reported that the fire is no longer active.

The SSF has NOT been activated.

Station Management has indicated that the crew may return Control Room controls to normal as identified within Enclosure 17.

AO (John) is standing by to assist.

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 3 of ii Form ES-C-i Job Performance Measure Worksheet Initiating Cue: The CRS has directed you to restore the Control Room controls to normal by performing Step 21 .a through e of Enclosure 17 (AB 750 Unit 1 Cable Spreading Room Fire Unit 1 and 2 Actions) of APIO/A15500145 (Plant Fire).

Task Standard: The operator will determine that one Pzr PORV has inadvertently opened, and take action to isolate it by ensuring that its isolation valves is closed, and by directing that its motor breaker be opened. The operator will then open the remaining Pzr PORV isolation valves, direct that the motor breaker for 1 CA-7A be closed, and open the manual loaders for the Main Steam Line PORV5 while the valves remain closed.

Required Materials: Control Room copy of AP/0/A15500/45 marked up through Step 20 (See Attached Markup).

General

References:

AP/0/A/5500/45 (Plant Fire), Rev. 15 PT/1/AJ4600/003D (Monthly Surveillance Items), Rev. 85 Handouts: None Time Critical Task: NO Validation Time: 12 minutes 2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 4 of 11 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset to IC # 39, 100% Power, MOL. Go to RUN.
2. Take all actions required by AP/0/N5500/45 (Plant Fire), Enclosure 17 (AB 750 Unit 1 Cable Spreading Room Fire Unit 1 Actions), Steps 1-17 as follows:

LOA-CAO15 = Racked Out (Step 5)

Close 1 NC-31 B, 33A and 35B (Step 6)

Close the 1SV-19AB, 13AB, 7ABC, and lAB Manual Loaders (Step 17)

3. Insert REM-NCOO32B = 0.05 (Fail 1NC-32B to intermediate).
4. Place LOA-NC033 = Racked Out on Trigger #1.
5. Place LOA-CAO15 = Racked IN on Trigger #3.
6. Allow plant time to stabilize and then Freeze Simulator.

OR

1. Reset Simulator to Temporary Snap 10-255 (May, 2013).
2. Momentarily place Simulator in Run to acknowledge alarms/Reset SLIMS.
3. Leave Simulator in FREEZE until operator is ready to begin.

NOTE: The Simulator Operator will need to operate Trigger #1 at Step 5 of this JPM, and Trigger #3 at Step 8 of this JPM.

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 5 of ii Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR U N SAT (Caution prior to Step 21) The operator reads the Energizing equipment with Caution and proceeds.

fire damaged cables may cause a re-flash in the fire area.

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 6 of ii Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 2 (Step 21) WHEN the fire is reduced to a non active status, THEN have station management evaluate returning controls to normal as follows:

(Caution prior to Step 21 .a) The operator recognizes that If the SSF has been the SSF has NOT been activated activated and proceeds.

(Step 2i .a) Check the following Pzr PORVs Closed:

  • 1 NC-34A (PZR PORV) The operator observes the 1 NC-34A Green status light LIT, Red status light OFF.
  • 1 NC-32B (PZR PORV) The operator observes the iNC-32B Green and Red status lights LIT.

(ALTERNATE PATH)

NOTE:

The Operator will likely address the RNO before checking the status of 1 NC-36B.

The operator observes the

  • i NC-36B (PZR PORV) i NC-36B Green status light LIT, Red status light OFF.

The operator determines that one PORV is OPEN (1NC-32B), and implements the Step 21 .a RNO.

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 7 of ii Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 3 (Step 21 .a RNO) Perform The operator rotates the the following: 1 NC-32B Control Switch counter-clockwise to the (Step 21.a RNO 1) Close CLOSE position, and Pzr PORV(s) observes the 1 NC-32B Green and Red status lights LIT.

4 (Step 21 .a RNO 2) IF a Pzr PORV will not close, THEN perform the following:

(Step 1 5.a RNO 2.a) The operator observes the CLOSE the associated Pzr 1 NC-31 B Green status light PORV isolation valve. LIT, Red status light OFF.

  • 5 (Step 21 .a RNO 2.b) The operator contacts AO Dispatch operator to open and directs that the breaker breaker for the closed Pzr for 1 NC-31 B be opened.

PORV isolation valve.

NOTE: Simulator Driver Operate Trigger #1.

Within 3D seconds report back as the AO that the breaker for 1 NC-31 B has been opened.

Examiner NOTE: (Alternate Path) It is expected that the operator will NOT re-open 1 NC-31 B in the subsequent Step. If the operator attempts to open the valve before the AO reports that the breaker is open, the JPM is failed. IF the operator attempts to open 1 NC-31 B after the breaker has been opened, 1 NC-31 B will NOT open, and the operator will NOT necessarily fail the JPM.

  • 6 (Step 21 .b) Open Pzr The operator rotates the (See PORV isolation valves for 1 NC-33A Control Switch to Above PORVs that are verified OPEN, and observes the Note) closed. Red status light LIT, Green status light OFF.

The operator rotates the 1 NC-35B Control Switch to OPEN, and observes the Red status light LIT, Green status light OFF.

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 8 of ii Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 7 (Caution prior to Step 21 .c) The operator reads the A fire induced hot short may Caution, and proceeds.

cause valve in next step to operate when power is restored.

  • 8 (Step 21 .c) Dispatch The operator contacts AO operator to close breaker and directs that the breaker 1 EMXA4-2A (Unit 1 TD CA for 1 CA-7A be closed.

Pump Suction Isol Motor (1 CA-7A) (north wall 1 ETA room).

NOTE: Simulator Driver Operate Trigger #3.

Within 30 seconds report back as the AO that the breaker for 1 CA-7A has been closed.

9 (Step 21 .d) Ensure 1 CA- After the report of the 1 CA 7AC (Ui TD CA Pump 7AC Breaker being closed, Suction Isol) is in proper the operator observes the position. 1CA-7AC Red status light is LIT, Green status light is OFF.

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 9 of ii Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR U N SAT

  • 10 (Step 21 .e) Slowly open the following manual loaders while ensuring that the valves remain closed:

The operator rotates the Slowly OPEN iSV-i 9AB iSV-i 9AB adjust knob (iA Main Steam Line clockwise until the Manual PORV) Loader indicates 100%, the Green status light is LIT, and the Red status light is OFF.

The operator rotates the Slowly OPEN 1SV-13AB iSV-i 3AB adjust knob (1 B Main Steam Line clockwise until the Manual PORV) Loader indicates 100%, the Green status light is LIT, and the Red status light is OFF.

The operator rotates the Slowly OPEN 1 SV-7ABC 1 SV-7ABC adjust knob (iC Main Steam Line clockwise until the Manual PORV) Loader indicates 100%, the Green status light is LIT, and the Red status light is OFF.

The operator rotates the Slowly OPEN iSV-lAB (1D iSV-lAB adjust knob Main Steam Line PORV) clockwise until the Manual Loader indicates 100%, the Green status light is LIT, and the Red status light is OFF.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 10 of 11 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM F Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS: Unit 1 and 2 are at 100% power.

A fire has been reported in the Unit 1 Cable Spreading Room.

The crew has implemented AP/O/N5500/45 (Plant Fire) and is presently in Enclosure 17 (AB 750 Unit 1 Cable Spreading Room Fire Unit 1 and 2 Actions).

The following actions have been taken in response:

  • The breaker for 1CA-7AC has been OPENED.
  • The Pzr PORV Isolation Valves have been CLOSED.
  • The Main Steamline PORV Manual Loaders have been closed.

The Fire Brigade has reported that the fire is no longer active.

The SSF has NOT been activated.

Station Management has indicated that the crew may return Control Room controls to normal as identified within Enclosure 17.

AO (John) is standing by to assist.

INITIATING CUE: The CRS has directed you to restore the Control Room controls to normal by performing Step 21 .a through e of Enclosure 17 (AB 750 Unit 1 Cable Spreading Room Fire Unit 1 and 2 Actions) of AP/0/A15500/45 (Plant Fire).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM G 2013 Systems Control Room JPM G (Rev_071213)

- NUREG 1021, Revision 9

Appendix C Page 2 of 13 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Respond to a Source Rancie JPM No.: 2013 Systems Control Nuclear Instrumentation Failure Room JPM G (Alternate Path)

K/A

Reference:

015 A2.01 (3.5/3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Unit 1 is in the process of performing a Unit Start-Up.
  • Mode 2 has just been declared.
  • Control Bank A has been pulled to 50 steps withdrawn.
  • Source Range count rate is approximately 60 CPS.
  • SR channel N-31 has failed low.
  • AP/i/A/5500/16 Case I (Source Range Malfunctions) has been entered.

Initiating Cue: The CRS has directed you to remove the failed SR channel (N-31) from service by performing AP/1/A/5500/16 (Malfunction of Nuclear Instrumentation), Case I (Source Range Malfunctions).

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 3 of 13 Form ES-C-i Job Performance Measure Worksheet Task Standard: The operator will place the Source Range N31 Level Trip Bypass Switch to Bypass, and ensure that Source Range N32 is selected on the NIS Recorder. When the only other channel of SR Nuclear Instrumentation fails high and the reactor does not trip, the operator will recognize that a reactor trip is required and then manually trip the Reactor.

Required Materials: None General

References:

AP/1/A/5500116 (Malfunction of Nuclear Instrumentation), Rev 13 OP/1/N6100/O1OA (Annunciator Response For Panel lEO-i) Rev 13, ARP1 FOi/A-6, S/R HI Flux Rx Trip EP/1INA/5000/E-O (Reactor Trip or Safety Injection), Rev 33 McGuire Technical Specifications, LCO 3.3.1 (RTS Instrumentation),

Amendment 184/1 66 Handouts: Handout 1: AP/i/A/5500/1 6 Malfunction of Nuclear Instrumentation, Case I Time Critical Task: NO Validation Time: 7 minutes 2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 4 of 13 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset Simulator to IC-26 (Mode 2, Normal operating temp/press, CBA at 50 steps withdrawn.)
2. Insert Mal ENB-2A (SR Channel 31 Failure); Select = 0, Activate
3. Insert Mal IPEOO1A (Failure of Auto Reactor Trip A train)
4. Insert Mal IPEO01 B (Failure of Auto Reactor Trip B train)
5. Insert Mal ENB-002B (SR Channel 32 Failure); Set = 1 e+006, Set to Trigger 1.
6. Freeze Simulator.
7. GotoRUN.
8. Place Audio Count Rate and Startup Rate selectors to SR N-32 prior to implementing this JPM.

OR

1. Reset Simulator to Temporary Snap IC-256 (May, 2013).

NOTE: During the performance of the JPM, the Simulator Driver will be required to activate Trigger #1 when the operator checks the SIR HI FLUX ALM BLOCKED annunciator in AP16 Case I, step 13.c.

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 5 of 13 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Caution prior to Step 1) The operator reads Caution Pulling S/R control power and proceeds.

fuses anytime the S/R is energized will result in a reactor trip unless the affected channel is blocked in SSPS (SIR TRAIN (A/B)

TRIP BLKD HI VOLTAGE OFF status Hght on iSl-i8 is lit).

2 (Caution prior to Step 1) The operator reads Caution Pulling S/R instrument and proceeds.

power fuses with the S/R energized will result in a reactor trip unless:

. Affected channel LEVEL TRIP switch is in BYPASS OR

. Affected channel is blocked in SSPS (S/R TRAIN (A/B) TRIP BLKD HI VOLTAGE OFF status light on 1SI-i8 is lit).

3 (Note prior to Step 1) Audio The operator reads Note count rate is only supplied and proceeds.

from S/R channels N-3i or N-32.

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 6 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 4 (Note prior to Step 1) In The operator reads Note Mode 6, the W/R Neutron and proceeds.

Flux Monitors can be used as S/R neutron flux indication.

5 (Step 1) Check at least one The operator recognizes that of the following S/R SR Channel N32 is Channels OPERABLE

- OPERABLE as identified in the initial conditions.

N-31 OR N-32 6 (Step 2) Announce The operator makes a page occurrence on paging announcement indicating system. that SR Channel N31 has failed.

Cue:

If asked, the U2 RO makes the page announcement.

7 (Step 3) Check unit status - The operator recognizes IN MODE 6. from initial conditions that the plant is in Mode 2 and proceeds to the RNO.

8 (Step 3 RNO) GO TO Step The operator proceeds to

6. Step 6.

9 (Step 6) Check S/R The operator determines detector(s) HIGH

- from initial conditions that VOLTAGE the plant is in Mode 2 and INADVERTENTLY proceeds to the RNO.

APPLIED AT POWER (ABOVE P-i 0).

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 7 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR U N SAT 10 (Step 6 RNO) GO TO Step The operator proceeds to

7. Step 7.

11 (Step 7) Check SIR HI The operator observes MCB FLUX AT SHUTDOWN Annunciator 1AD2ID3 and alarm (1AD-2, D-3) DARK

- determines that the window is DARK.

12 (Step 8) Monitor available The operator observes hR Channels and W/R Neutron Flux is below the Neutron Flux Monitors hR Channels scale.

The operator observes that W/R Monitor indications are stable.

13 (Step 9) Check if failure has The operator determines occurred on any of the from initial conditions that N-following S/R Channels: 31 has failed.

N-31 The operator observes SR OR Channel N31 indication at N-32 0.

14 (Step 10) Check at least The operator recognizes that one of the following S/R SR Channel N32 is channels OPERABLE OPERABLE as identified in the initial conditions.

N-31 OR The operator observes SR N-32 Channel N32 is reading 60 CPS.

15 (Step ii) Check unit status The operator determines

- IN MODE 3, 4, 5, 6 OR from initial conditions that NO MODE the plant is in Mode 2 and proceeds to the RNO.

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 8 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 16 (Step 11 RNO) IF in Mode 2 The operator determines below P-6, THEN suspend unit is in Mode 2 and below operations involving positive P-6 (10 ° IR amps), and reactivity additions. observes rod withdrawal has stopped.

Cue:

Rx Startup has been suspended.

17 (Step 12) Perform the following actions on the failed S/R drawer:

(Step 12.a) Place the The operator places the N31 LEVEL TRIP switch to Level Trip switch to BYPASS BYPASS and observes Level Trip light is LIT.

(Step 12.b) Check LEVEL TRIP BYPASS light LIT-(Step 12.c) Place the HIGH The operator recognizes that FLUX AT SHUTDOWN the High Flux at Shutdown switch to BLOCK. Switch is in the BLOCK position.

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 9 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 18 (Step 13) Check the following -LIT:

(Step 13.a) SIR OR hR The operator observes MCB TRIP BYPASS alarm Annunciator 1AD2/E2 and (1AD-2, E-2). determines that the window is LIT.

(Step 13.b) The failed channels status light on lSl-19:

  • i/N-31B S/R The operator observes the CHANNEL I N31 Trip Bypass status light TRIP BYPASS is LIT.

OR

  • 1/N-32BS/R CHANNEL II TRIP BYPASS.

(Step 13.c) S/R HI The operator observes MCB FLUX ALM BLOCKED Annunciator 1 AD2/D2 and alarm (1AD-2, D-2). determines that the window is LIT.

  • 19 (Step 14) Place operable The operator places Source S/R channel to record on Range Instrument N32 on NIS Recorder. the NIS Recorder.

NOTE: Simulator Driver Operate Trigger #1.

This will cause the S/R HI FLUX RX TRIP alarm on 1 FO-1/A5 (An automatic Reactor Trip should occur, however, the RPS has failed. The Operator may address the Annunciator Response Procedure, however, it is expected that the reactor will be manually tripped)

Examiner NOTE: (Alternate Path) It is expected that the operator will Trip the Reactor.

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 10 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR U N SAT

  • 20 (Step 2) Check Reactor The operator manually trips Trip the reactor.

. All rod bottom lights LIT NOTE: The remainder of the operator actions will be performed from memory

. Reactor trip and bypass breakers OPEN The operator observes all Rod Bottom lights are LIT

. hR amps GOING (green).

DOWN The operator observes Reactor Trip Breaker green status lights are LIT.

The operator observes that both hR SUR indications are trending down 21 (Step 3) Check Turbine Trip

- The operator observes the

. All throttle valves Four STAT lights for throttle CLOSED valves are LIT.

22 (Step 4) Check 1 ETA and The operator observes that 1 ETB ENERGIZED UV STAT lights for 1 ETA and 1 ETB are DARK.

23 (Step 5) Check if S/I is actuated:

(Step 5.a) SAFETY INJECTION ACTUATED The operator observes that status light (1 SI-i 8)- LIT. S/I actuate light is DARK.

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page ii of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 24 (Step 5.a RNO) Perform the following:

(Step 5.a RNO 1)

Check if S/I is required: Operator observes that Pzr pressure is greater than Pzr pressure less than 2200 and stable and that 1845 Containment pressure is .15 OR PSIG and stable; and Containment pressure reports that Safety Injection greater than 1 PSIG is NOT required.

Cue:

The CRS acknowledges the report.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 12 of 13 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM G Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit i is in the process of performing a Unit Start-Up.
  • Mode 2 has just been declared.
  • Control Bank A has been pulled to 50 steps withdrawn.
  • Source Range count rate is approximately 60 CPS.
  • SR channel N-3i has failed low.
  • AP/iIA/5500116 Case I (Source Range Malfunctions) has been entered.

INITIATING CUE: The CRS has directed you to remove the failed SR channel (N-3i) from service by performing AP/i/N5500/i6 (Malfunction of Nuclear Instrumentation), Case I (Source Range Malfunctions).

NUREG iO2i, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM H 2013 Systems Control Room JPM H (Rev_071213)

- NUREG 1021, Revision 9

Appendix C Page 2 of 12 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Restore Normal Power to 1 ETB and JPM No.: 2013 Systems Control Unload the lB EDG Room JPM H K/A

Reference:

056 AA1 .02 (4.0/3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The station experienced a Loss of Off-Site Power 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> ago, resulting in a Unit 1 Reactor Trip from 100% power (Unit 2 is in No Mode during a full core off-load).
  • Both the 1 A and 1 B, as well as the 2A and 2B Standby Diesel Generators automatically started and re-powered their respective essential busses.
  • The Unit 1 Control Room staff entered E-0, Reactor Trip or Safety Injection, and after verifying that Safety Injection was NOT necessary, transitioned to ES-0.i, Reactor Trip Response.
  • U-2 Off-Site Power was restored within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and the Unit 2 Control Room staff has restored normal power to the essential 4160 volt busses, and shutdown the Diesel Generators.
  • The Unit 1 Control Room has responded per AP/1/A/5500/07 (Loss of Electrical Power) Case I (Loss of Normal Power to Both 1ETA and 1ETB).
  • Normal power will not be restored to 1 ETA due to an electrical fault on the 1 ATC Transformer.

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-i Job Performance Measure Worksheet

  • The Emergency Coordinator has indicated that 1 ETB can now be restored to normal power via the 1 ATD Transformer from the Control Room.

Initiating Cue:

  • The CRS has directed you to restore 1 ETB to normal power and separate the lB DIG from the Grid from the Control Room per OP/11N63501002 (Diesel Generator), Enclosure 4.4 (1 B DIG Shutdown).

Task Standard: While 1 ETB is being powered by the DG, the operator will parallel 1 ETB, with 1ATD, and then unload the DG.

Required Materials: None General

References:

EPI1IN5000IE-O (Reactor Trip or Safety Injection), Rev 33 EPI1/AI5000IES-O.i (Reactor Trip Response), Rev 36 AP/1/A/5500107 (Loss of Electrical Power), Rev 32 OP/i /A/6350/002 (Diesel Generator), Rev 117 Handouts: Handout 1: Enclosure 4.4 of OP/i /A/6350/002 (Diesel Generator)

Time Critical Task: NO Validation Time: 10 minutes 2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-39, 100% Power
2. Place in RUN and allow time to stabilize
3. Insert Malfunction EPOO1, Station Blackout
4. Insert Malfunction OVR-i 1X_i 85_i = 0, 1ATC 4KV Xfer FDR Bkr Close PB = OFF
5. Remove EPOOi and insert:
  • LOA-EP172 (Zone Lockout Reset)
  • LOA-EP173 (In-Plant Lockout Reset)
6. Perform the actions of EP/i/A15000/E-0 up through step 5 and transition to ES-0.i.
7. Perform the actions of EP/i/A/5000/ES-0.i up through step 18.a, and transition to AP/i /A15500/07.
8. Perform the actions of AP/i/N5500/07 Case I up through step 54.j.
9. Freeze the Simulator OR
1. Reset to IC-257 (May, 2013) 2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 1 (Step 3.2) Place Control The operator rotates the Room 1 B DIG Mode lB D/G Mode Select Select switch to the switch counter-clockwise applicable position: to C/R for the 1 B DIG.

LOCAL to operate D/G from local panel.

OR CIR to operate D/G from Control Room.

(Step 3.3) If DIG is The operator observes operating Unloaded Emergency Breaker status (Red light LIT) and determines that the DIG is not running unloaded.

3 (Step 3.4) IF DIG is The operator observes carrying 1 ETB separated Normal and Emergency from the Duke Grid, Breaker status and parallel D/G to Grid as determines that the DIG is follows: separated from the Duke Grid.

(Step 3.4.1) Check Line The operator observes Volts 3960-4360 V. Line Volts Meter at 41 23V.

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 6 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 4 (Step 3.4.2) Match D/G The operator rotates lB with line voltage using 1 B D/G Volt Adjust switch D/G Volt Adjust. clockwise and/or counterclockwise as necessary and voltage meters indicate the same.
  • 5 (Step 3.4.3) Place the 1 B The operator rotates the DIG Sync Switch to 1 B D/G Sync Scope D j\j Switch to ON.

The operator observes synch scope meter dial is NOT moving or moving slowly in the SLOW direction.

(Note prior to Step 3.4.4) The operator reads the As a guide, have NOTE and proceeds.

synchroscope traveling no faster than one revolution in 20 seconds.

(Step 3.4.4) Using lB The operator depresses D/G Gov Control, adjust the RAISE/LOWER D/G speed to allow pushbutton causing the synchroscope to move synchroscope to move slowly and smoothly in slowly in the FAST FAST direction. direction.

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 7 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 8 (Step 3.4.5) IF desired to The operator determines align 1 ETB to normal from initial conditions that supply (1ATD), perform it is desired to align 1 ETB the following: to 1ATD.

(Notes prior to Step 3.4.5.1): The operator reads the

  • DIG load will drop to 0 NOTES and proceeds.

amps when bus is paralleled to Duke Grid.

  • D/G load shall be quickly raised after breaker closed to prevent reverse power condition. IF a reverse power condition occurs, the D/G Emergency Breaker will trip after a short time delay.
  • Steps 3.4.5.1 and 3.4.5.2 may be completed and then signed off as time allows.

The operator observes (Step 3.4.5.1) HOLD until pointer is 3 minutes before synchroscope pointer is vertical, then pushes within 3 minutes before Pushbutton and observes the 12 oclock position, Red Status light is LIT.

THEN firmly depress and release CLOSE on lETB Normal Breaker.

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 3.4.5.2) Perform concurrently:

Quickly raise DIG load to The operator presses 800- 1000 KW using lB Raise pushbutton and D/G Gov Control. observes KW meter indicates 800-1000KW.

Adjust power factor to 0.9 The operator rotates 0.92 lagging using lB Voltage Adjust handle and D/G Voltage Adjust. observes meter indication reads 0.9 Lagging.

10 (Step 3.4.5.3) Place 1 B The operator turns the 1 B D/G Sync Switch to D/G Sync scope to OFF.

OFF.

11 (Step 3.4.5.4) Evaluate The operator has the CRS offsite power operability, sign for offsite power operability.

Cue:

As CRS, initial Step 3.4.5.4.

12 (Step 3.4.5.5) Go to Step The operator proceeds to 3.5.9. Step 3.5.9.

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 13 (Step 3.5.9) HOLD for 10 The operator waits for 10 minutes minutes.

Cue:

Using TIME COMPRESSION the 1 B DIG has been at 800-1000 KW for 10 minutes.

  • 14 (Step 3.5.10) Perform the following:

The operator depresses (Step 3.5.10.1) Lower LOWER pushbutton until D/G load to less than 200 load meter indicates <

KW using 1 B D/G Gov 200 KW.

Control.

The operator observes that meter indicates 200KW.

15 (Step 3.5.10.2) Open The operator presses the 1 ETB Emergency OPEN pushbutton and Breaker. observes the Green Status light is LIT.

16 (Note prior to Step 3.6) IF The operator reads the DIG has been loaded less Note and proceeds.

than full load (3600 4000 kW) for an extended event, performing a full load run for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> essentially reconfirms McGuire Tech Spec SR 3.8.1.3 AND conforms to industry practices.

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 17 (Step 3.6) IF DIG started The operator raises this due to EP/AP actions and issue to the CRS.

remains unloaded, notify Station Management that Cue:

loading D/G at full load (3600-4000 KW) for greater The CRS acknowledges than one hour at a later time and will address this should be performed to notification.

clean injector tips.

18 (Step 3.7) Ensure D/G operates unloaded for 1 5 Cue.

minutes.

Another operator will continue with this procedure.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 11 of 12 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM H Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • The station experienced a Loss of Off-Site Power 1 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> ago, resulting in a Unit 1 Reactor Trip from 100% power (Unit 2 is in No Mode during a full core off-load).
  • Both the 1 A and 1 B, as well as the 2A and 2B Standby Diesel Generators automatically started and re-powered their respective essential busses.
  • The Unit 1 Control Room staff entered E-0, Reactor Trip or Safety Injection, and after verifying that Safety Injection was NOT necessary, transitioned to ES-0.i, Reactor Trip Response.
  • U-2 Off-Site Power was restored within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and the Unit 2 Control Room staff has restored normal power to the essential 4160 volt busses, and shutdown the Diesel Generators.
  • The Unit 1 Control Room has responded per AP/1/A/5500/07 (Loss of Electrical Power) Case I (Loss of Normal Power to Both 1 ETA and 1 ETB).
  • Normal power will not be restored to 1 ETA due to an electrical fault on the 1ATC Transformer.
  • The Emergency Coordinator has indicated that 1 ETB can now be restored to normal power via the 1 ATD Transformer from the Control Room.

INITIATING CUE:

  • The CRS has directed you to restore 1 ETB to normal power and separate the 1 B D/G from the Grid from the Control Room per OP/i/A/6350/002 (Diesel Generator), Enclosure 4.4 (1 B D/G Shutdown).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet In-Plant JPM I 2013 Systems In-Plant JPM I (Rev_052713) NUREG 1021, Revision 9

Appendix C Page 2 of 8 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Reset Unit 2 Turbine Driven CA JPM No.: 2013 Systems In-Pump Stop Valve Plant JPM I K/A

Reference:

054 AA1 .02 (4.4/4.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Unit 2 has tripped from 100% power due to a loss of Main Feedwater.
  • The crew has entered EP/2/A/5000/FR-H.i (Response to Loss of Secondary Heat Sink).
  • While performing Step 7.d, the RO notices the TD CA PUMP STOP VLV NOT OPEN alarm (2AD-5, F-3) is lit.

Initiating Cue: The CRS dispatches you to reset the U-2 TD CA stop valve PER EP/2/A/5000/G-1 (Generic Enclosures), Enclosure 24 (Resetting TD CA Stop Valve).

Task Standard: The operator will reset and open 2SA-3 (Unit 2 TD CA Pump Turb Stop Valve).

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

General

References:

EP/2/N5000/FR-H.1 (Response to Loss of Secondary Heat Sink), Rev 20 2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-i Job Performance Measure Worksheet EPI2IA/5000/G-i (Generic Enclosures), Rev 38 Handouts: Handout 1: Enclosure 24 (Resetting TD CA Stop Valve) of EPI2IN5000/G-i (Generic Enclosures)

Time Critical Task: NO Validation Time: 10 minutes NOTE: A picture of the Valve Trip Mechanism and Overspeed Trip Mechanism is located on Page 7 of 8 of this JPM.

2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 1 (Step i) Turn handwheel The operator turns clockwise to allow handwheel clockwise.

mechanical linkage to reconnect. Cue:

Handwheel rotated clockwise, stem is in.

  • 2 (Step 2) Reconnect The operator looks at the mechanical linkage by mechanical Linkage.

pulling mechanical linkage toward Valve Trip Cue:

Mechanism and slowly release while ensuring The Linkage is NOT the following connections: connected.

The operator pulls the mechanical linkage toward the Valve Trip Mechanism and slowly releases.

Cue:

The mechanical linkage pulled toward Valve Trip Mechanism and is slowly released.

The operator observes the (Step 2.a) At Valve Trip Valve Trip Mechanism figure.

Mechanism: (See Figure below) Cue:

Trip Hook is fully engaged Trip Hook is fully engaged with Latch-up Lever, with Latch-up Lever.

2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 3 (Step 2.b) At Overspeed The operator observes the Trip Mechanism: (See Overspeed Trip Mechanism Figure below) figure.

Tappet nut lays flat against CueS Overspeed Trip Mechanism housing. Tappet nut is laying flat against Overspeed Trip Head Lever is vertical. Mechanism housing, AND the Head lever is vertical.

  • 4 (Step 3) Slowly turn The operator rotates the handwheel handwheel in the counter-counterclockwise to open clockwise direction.

stop valve while it is reset.

Cue:

The handwheel rotates, and then stops.

  • 5 Step 4) WHEN handwheel The operator rotates the reaches full open, position handwheel in the clockwise valve 1/4 turn from open direction 1% turn.

backseat to prevent thermal binding. Cue:

The handwheel rotates until stopped.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems In-Plant JPM I Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-i VERIFICATION OF COMPLETION Valve Trip Mechanism Overspeed Trip Mechanism 2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 2 has tripped from 100% power due to a loss of Main Feedwater.
  • The crew has entered EP/2/A15000/FR-H.i (Response to Loss of Secondary Heat Sink).
  • While performing Step 7.d, the RO notices the TD CA PUMP STOP VLV NOT OPEN alarm (2AD-5, F-3) is lit.

INITIATING CUE: The CRS dispatches you to reset the U-2 TD CA stop valve PER EP/2/A15000/G-i (Generic Enclosures), Enclosure 24 (Resetting TD CA Stop Valve).

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG iO2i, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet In-Plant JPM J 2013 Systems In-Plant JPM J (Rev_080813) NUREG 1021, Revision 9

Appendix C Page 2 of ii Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Start the Hydrogen Analyzers JPM No.: 2013 Systems In-Plant JPM J K/A

Reference:

069 AA1 .03 (2.8/3.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), Key 172 and Handout 1.

Initial Conditions:

  • Unit 1 has tripped from 100% power due to an accident.
  • The crew is currently in EP/1/A/5000/FR-Z.1 (Response to High Containment Pressure).
  • The crew is currenfly checking Containment Hydrogen Concentration.

Initiating Cue: The CRS has directed you to place the Hydrogen Analyzers in service in accordance with Enclosure 5 (Placing H 2 Analyzers In Service) of EP/1/N5000/G-1 (Generic Enclosures).

Task Standard: The operator will place the 1A Hydrogen Analyzer in service, direct IAE to investigate the COMMON ALARM, and direct the Control Room to disregard 1A H2 analyzer readings until IAE clears COMMON ALARM.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

KEY #172 (Key 178 will be Simulated) 2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 3 of 1 1 Form ES-C-i Job Performance Measure Worksheet General

References:

EP/1/A/5000/FR-Z.i (Response to High Containment Pressure), Rev 19 EP/1IN5000IG-1 (Generic Enclosures), Rev 34 Handouts: Handout 1: Enclosure 5 (Placing H 2 Analyzers In Service) of EP/1/N5000IG-1 (Generic Enclosures).

Time Critical Task: NO Validation Time: 20 minutes NOTE: The Examiner will need to sign out Key 172 from the WCC ahead of time.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 4 of 11 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), Key 172 and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUI RED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

1 (Step 1) Obtain one key 172 The operator recognizes and two keys 178 from Unit that the required Keys have 1 EP/AP Keys on Unit 1 been obtained and BOP desk.

proceeds.

Cue:

The Use of the 178 Keys will be simulated during this JPM.

  • 2 (Step 2) Start 1A H 2 The operator proceeds to Analyzer as follows: cabinet.

(Step 2.a) Proceed to 1MICA 6851 1AVX HYDROGEN ANALYZER REMOTE CABINET (750 elevation in cable spreading room).

(Step 2.b) Use key 172 to The operator uses Key 172 access remote panel. to Open Cabinet.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 5 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 4 (Step 2.c) Inside remote The operator places Key panel, use key 178 to place 178 in the ISOLATION ISOLATION VALVES VALVES OPEN switch, OPEN switch to ON. and rotates the switch clockwise (Simulates).

Cue:

The Switch is in the ON position.

5 (Step 2.d) Check POWER The operator observes the ON light above POWER ON light.

ISOLATION VALVES OPEN switch LIT.

Cue:

The POWER ON light is LIT.

  • 6 (Step 2.e) Place The operator rotates the HYDROG EN ANALYZER HYDROG EN ANALYZER SAMPLE ENABLE SAMPLE ENABLE SWITCH to SAMPLE. SWITCH clockwise.

Cue:

The Switch is in SAMPLE.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 6 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 7 (Step 2.f) Select sample The operator rotates the location as follows: HYDROGEN ANALYZER SAMPLE SELECT switch (Step 2.f.i) Place counter-clockwise.

HYDROGEN ANALYZER SAMPLE SELECT switch Cue:

to UPPER CONT The Switch is in UPPER (Step 2.f.2) Check POWER CONT.

ON light for selected location OFF The operator observes the POWER ON light.

Cue:

The POWER ON light is OFF.

  • 8 (Step 2.g) Depress OFF The operator presses the pushbutton on SAMPLE OFF PB for SAMPLE ROUTED TO PAMS ROUTED TO PAMS PANEL switch. PANEL switch.
  • 9 (Step 2.h) Place OFF- The operator rotates the STANDBY/ANALYZE OFF-STANDBY switch to ANALYZE /ANALYZE switch clockwise.

Cue:

The Switch is in Analyze.

2013 SystemsIn-Plant JPMJ NUREG 1021, Revision 9

Appendix C Page 7 of 11 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 10 (Step 2.1) Depress The operator presses the LOCAL/REMOTE LOCAL/REMOTE SELECTOR pushbutton. SELECTOR pushbutton.

11 (Step 2.j) Ensure H2 DUAL The operator observes the RANGE SW is in 0-30% position of the H2 DUAL range. RANGE SW.

Cue:

The Switch is in the 0-30%

range.

  • 12 (Step 2.k) Place The operator rotates the FUNCTION SELECTOR FUNCTION SELECTOR to SAMPLE. counterclockwise.

Cue:

The Function Selector is in the SAMPLE position.

13 (Step 2.1) Do not continue The operator waits for five until 5 minutes have minutes.

elapsed.

Cue:

Using Time Compression, five minutes have elapsed.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 8 of ii Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 14 (Step 2.m) IF COMMON The operator observes the ALARM lit, THEN perform COMMON ALARM.

the following:

. Cue:

(Note prior to Step 2.m.i) A low gas flow condition may The COMMON ALARM be causing the COMMON light is LIT.

ALARM and may clear itself once condensation is removed from the sample line. The operator reads the NOTE and proceeds.

(Step 2.m.i) Depress ALARM RESET.

The operator presses the ALARM RESET pushbutton and observes the COMMON ALARM.

Cue:

The COMMON ALARM light is LIT.

15 (Step 2.m.2) IF COMMON The operator recognizes ALARM clears, THEN that the COMMON ALARM has NOT cleared and continues.

  • i6 (Step 2.m.3) IF COMMON The operator contacts IAE ALARM will not clear, and directs them to THEN perform the investigate the alarm.

following:

(Step 2.m.3.a) Notify IAE to Cue:

investigate alarm.

IAE will investigate.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 9 of 11 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 17 (Step 2.m.3.b) Notify control The operator contacts the room to disregard 1A H2 Control Room and directs Analyzer reading until IAE them to disregard 1A H2 clears alarm. Analyzer reading until IAE clears alarm until IAE reports that the alarm is cleared.

Cue The OATC acknowledges 18 (Step 2.m.3.c) GO TO Step The operator proceeds to

3. Step 3.

19 (Step 3) Start 1 B H2 The operator starts to place Analyzer as follows the 1 B Hydrogen Analyzer in service.

Cue:

Another Operator will start 1 B H2 Analyzer and complete the Enclosure.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 10 of 11 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems In-Plant JPM J Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 1 has tripped from 100% power due to an accident.
  • The crew is currently in EP/i/A/5000/FR-Z.i (Response to High Containment Pressure).
  • The crew is currently checking Containment Hydrogen Concentration.

INITIATING CUE: The CRS has directed you to place the Hydrogen Analyzers in 2 Analyzers In service in accordance with Enclosure 5 (Placing H Service) of EP/i /AI5000IG-i (Generic Enclosures).

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet In-Plant JPM K 2013 Systems In-Plant JPM K (Rev_080813) NUREG 1021, Revision 9

Appendix C Page 2 of 14 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Establish NC Pumo Seal Iniection JPM No.: 2013 Systems In-From the SSF Plant JPM K K/A

Reference:

EPE 055 EK3.02 4.3/4.6 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinQ:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and WHEN the operator locates the Brown Folder at the SSF, provide Handout 1.

Initial Conditions:

  • A Loss of All AC has occurred on Unit 1.
  • EP/1/A/5000/ECA-0.0 (Loss of All AC Power) has been implemented.
  • The SRO has dispatched one (1) operator to 1 ETA to swap 1 EMXA4.

Initiating Cue: The CRS has directed you to obtain the Brown Folder at SSF and complete Enclosure 1 (Unit 1 SSF-ECA-0.0 Actions).

Task Standard: The operator will place the SSF Diesel in operation and supply power to 1 SLXG, start the Standby Makeup Pump and ensure that it is supplying NCP seal injection within 7 minutes, ensure that 1 SLXG is supplying power to SMXG and SMXG-i, and that Battery Chargers SDSP-1 and SDSP-2 supply breakers are closed.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 3 of 14 Form ES-C-i Job Performance Measure Worksheet General

References:

EP/1IA/5000/ECA-0.0 (Loss of All AC Power), Rev 33 PTIOIAI4600I1 13 (Operator Time Critical Task Verification), Rev 19 Handouts: Handout 1: Enclosure 1 (Unit 1 SSF ECA-0.0 Actions) of EPI1IAI5000/ECA-0.O (Loss of All AC Power)

Time Critical Task: YES According to PT/0/A/4600/i 13 (Operator Time Critical Task Verification), Enclosure 13.11 (Initiate SSF NCP Seal Injection and Swap to the SSF):

Expectation: Seal injection from standby makeup pump can be initiated within 10 minutes of a loss of all AC power event or an App R fire event.

This requires completion of actions at SSF within 7 minutes of dispatch, and completion of actions in ETA room to swap EMXA-4 within 4 minutes of dispatch. To support the local actions, the following dispatches must be initiated:

Operator dispatched to SSF within 3 minutes of loss of all NCP seal cooling. (Total time = 7 mm + 3 mm = 10 mm to initiate NCP seal injection from SBMUP).

This JPM should be timed starting from the OPS Kitchen. Once flow from the standby makeup pump is verified, the critical time stops.

Validation Time: 15 minutes 2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 4 of 14 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and WHEN the operator locates the Brown Folder at the SSF, provide Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Note prior to Step 1) The The operator reads the following steps are NOTE and proceeds.

performed at SSF Control Panel until stated otherwise.

2 (Step 1) Check LINE The operator observes the VOLTAGE line voltage meter.

APPROXIMATELY 600V.

Cue:

Meter reads 0 Volts.

3 (Step 1 RNO) GO TO Step Operator goes to Step 3.

3.

  • 4 (Step 3) Place SSF The operator rotates SSF DIESEL DIESEL TEST/EMERG TEST/EMERGENCY switch clockwise to EMER switch to EMER (Simulated)

Cue:

Switch rotated clockwise to EMER position.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 5 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 5 (Step 4) Check SSF The operator observes the DIESEL START SSF DIESEL START CONTROL switch OFF CONTROL.

Cue:

Switch is in OFF position.

  • 6 (Step 5) Place SSF The operator places SSF DIESEL START DIESEL START CONTROL switch to ON CONTROL switch to ON.

(Simulated)

Cue:

Switch is rotated clockwise to ON position.

7 (Step 6) Check DIG The operator observes STARTS WITHIN 30 Diesel condition.

SECONDS Cue:

Background noise level has increased, various gage indications are up.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 6 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 8 (Step 7) Depress TRIP on For the two breakers on the the following breakers with top row right and all the yellow Time Critical labels: breakers on the bottom row the operator presses TRIP for NORMAL INCOMING BREAKER CONTROL.

Two breakers on top row

. (Simulated)

(right)

All breakers on bottom row Cue Pushbutton depressed, green light is LIT

  • g (Step 8) Depress CLOSE The operator presses on GENERATOR CLOSE for GENERATOR BREAKER CONTROL. BREAKER CONTROL.

(Simulated)

Cue:

Pushbutton depressed, red light is LIT.

0 (Step 9) Depress CLOSE The operator presses on 1 SLXG-5C CTRL SW. CLOSE for 1 SLXG-5C CTRL SW. (Simulated)

Cue:

Pushbutton depressed, red light is LIT.

i1 (Step 10) Wait 10 seconds. The operator waits 10 seconds.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 7 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS FOR UNSAT 12 (Step ii) Depress CLOSE The operator presses on 1SLXG-4C CTRL SW. CLOSE for 1SLXG-4C CTRL SW. (Simulated)

Cue:

Pushbutton depressed, red light is LIT.

  • 13 (Step 12) Open the The operator opens valves following valves: by depressing OPEN pushbutton, observes Red 1NV-842AC (Ui Standby status light LIT. (Simulated)

Makeup Pump Suction Isol)

Cue:

1 NV-849AC (Ui Standby Makeup Pump Cont As each valve is Outside Isol) repositioned, Pushbutton depressed, red light is LIT.

14 (Step 13) Check 1 NV- The operator observes Red 1013C (Standby M/U Pump status light LIT.

to NC Pmp Seals Isol)

OPEN Cue:

Red light is LIT.

  • 15 (Step 14) CLOSE 1 NV- The operator presses the 94AC (Ui NC Pumps Seal CLOSE pushbutton, and Water Return Cont Inside observes Green status light Isol) LIT. (Simulated)

Cue:

Pushbutton depressed, Green light is LIT.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 8 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 16 (Step 15) Start Unit 1 The operator presses the Standby Makeup Pump. START pushbutton, observes Red status light LIT. (Simulated)

Cue:

Pushbutton depressed, Red light is LIT.

17 (Step 16) Check Unit 1 The operator observes Standby Makeup Pump flow meter (1NVP6420) GREATER THAN OR EQUAL TO 26 Cue:

GPM.

Meter indicates 28 gpm.

Stop Time for Time Critical Task:

18 (Note prior to Step 17) The operator reads the Remaining steps in this NOTE and proceeds.

enclosure are not time critical, but must be completed in a timely manner.

19 (Step 17) Check 1 NV- The operator observes 1012C (Standby M/U Pump Green status light LIT.

Disch to Cont Sump) -

CLOSED Cue:

Green light is LIT.

2013 SystemsIn-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 9 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 20 (Step 18) Check SSF DIG - The operator observes RUNNING Diesel condition.

Cue Background noise level is heard, various gage indications are up 21 (Step 19) Check SSF D/G The operator observes FREQUENCY AT 60 Hz.

frequency meter.

Cue Meter indicates 60 Hz 22 (Step 20) Check SSF D/G The operator observes VOLTAGE AT 600V.

meter.

Cue Meter indicates 600 Volts 23 (Note prior to Step 21) If The operator reads the SMXG1-FAE and SMXG1- NOTE and proceeds.

RAD were previously shunt tripped from the SSF Control Panel, they will be in their intermediate position.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 10 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 24 (Step 21) At SMXG-1: The operator observes breaker SMXG1-FAE.

(Step 21.a) Check breaker SMXG1-FAE (SDSP1 BATTERY CHARGER) IN Cue:

INTERMEDIATE POSITION. Breaker is in the Tripped/Intermediate position.

25 (Step 21 .a RNO) Perform The operator proceeds to the following: Step 21.b.

IF breaker is open, THEN GO TO Step 21.b.

  • 26 (Step 21 .b) Reset shunt trip The operator resets the and close breaker SMXG1- shunt trip by sliding the FAE as follows: breaker down to the fully Open position.

Slide breaker fully to open position. Cue:

Close breaker.

Breaker is down in full Open position.

The operator closes the breaker by pushing the breaker up into the Closed position.

Cue:

Breaker is up in the Closed position.

27 (Step 21 .c) Wait 10 The operator waits 10 seconds. seconds.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 11 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 28 (Step 21 .d) Reset shunt trip The operator resets the and close breaker SMXG1- shunt trip by sliding the RAD (SDSP2 BATTERY breaker down to the fully CHARGER) as follows: Open position.

Slide breaker fully to open Cue position.

Close breaker. Breaker is down in full Open position.

The operator closes the breaker by pushing the breaker up into the Closed position.

Cue:

Breaker is up in the Closed position.

29 (Step 22) At SMXG: The operator observes breaker position.

(Step 22.a) Ensure SMXG F5A (Unit 1 Pzr Heaters Cue:

28/55/56 Feeder) is closed.

Breaker is closed.

  • 30 (Step 23) At SSF Control The operator presses the Panel: CLOSE pushbutton and observes the Red status (Step 23.a) Depress light.

CLOSEs on 1SLXG-5D CTRLSW(SDSS Cue:

BATTERY CHARGER FDR BKR CONTROL). Red light is LIT.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 12 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 31 (Step 23.b) Check SSF DIG The operator observes SSF FREQUENCY AT 60 HZ D/G Frequency Meter.

Cue:

Meter indicates 60 Hz.

32 (Step 23.c) Check SSF D/G The operator observes SSF VOLTAGE AT 600V.

DIG Voltage Meter.

Cue Meter indicates 600 volts (Step 23.c) Check SSF The operator observes SSF Generator Load LESS Generator Load Meter.

THAN OR EQUAL TO 700 K\N. Cue:

Meter indicates 500 KW.

34 (Step 24) Ensure SSF D/G The operator observes SSF room intake louvers are D/G room intake louvers open (located above rollup position.

doors in D/G room).

Cue Intake louvers are open Terminating Cue: Another operator will complete this procedure.

STOP TIME: CRITICAL TIME:

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 13 of 14 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems In-Plant JPM K Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • A Loss of All AC has occurred on Unit 1.
  • EP/1/A/5000/ECA-O.O (Loss of All AC Power) has been implemented.
  • The SRO has dispatched one (i) operator to 1 ETA to swap iEMXA4.

INITIATING CUE: The CRS has directed you to obtain the Brown Folder at SSF and complete Enclosure 1 (Unit 1 SSF-ECA-O.O Actions).

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

Note: A portion of the JPM is TIME CRITICAL.

NUREG 1021, Revision 9