MONTHYEARL-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2022-10-0404 October 2022 10 CFR 50.59 Evaluation and Commitment Change Summary Report L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-022022-07-29029 July 2022 Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 ML22140A1432022-05-20020 May 2022 Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA Models ML22140A1362022-05-20020 May 2022 Containment Isolation Valves ML22140A1382022-05-20020 May 2022 Containment Isolation Valves ML22140A1392022-05-20020 May 2022 Attachment 4 - Cross-Reference of TSTF-505, Revision 2, and Point Beach Proposed Changes ML22140A1402022-05-20020 May 2022 Attachment 5 - Evaluation of Plant-Specific Variations ML22140A1412022-05-20020 May 2022 Attachment 6 - Point Beach RICT Program Pre-Implementation Items ML22140A1352022-05-20020 May 2022 RPS Instrumentation ML22140A1422022-05-20020 May 2022 Enclosure 1 - List of Revised Required Actions to Corresponding PRA Functions and Additional Supporting Information ML22140A1332022-05-20020 May 2022 Attachment 1 - Evaluation of the Proposed Changes NRC 2022-0007, Enclosure 11 - Monitoring Program2022-05-20020 May 2022 Enclosure 11 - Monitoring Program ML22140A1442022-05-20020 May 2022 Enclosure 8 - Attributes of the Configuration Risk Management Model ML21214A0432021-08-0202 August 2021 SLRA June 30, 2021, Public Meeting Discussion Questions ML21126A2392021-05-0606 May 2021 Subsequent License Renewal Application, Aging Management Supplement 2 ML21040A4842021-02-0909 February 2021 Fws to NRC, Point Beach Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location And/Or May Be Affected by Your Project ML21040A4852021-02-0909 February 2021 Fws to NRC, Verification Letter for Point Beach SLR Under Programmatic Biological Opinion for Northern Long-eared Bat NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report ML21008A0172020-10-25025 October 2020 Revised ANS Design Report NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure2019-08-29029 August 2019 Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds NRC 2019-0002, Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2019-01-24024 January 2019 Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2018-0017, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2018-05-0202 May 2018 10 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2017-0045, Updated Final Response to NRC Generic Letter 2004-022017-12-29029 December 2017 Updated Final Response to NRC Generic Letter 2004-02 NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report2017-08-0202 August 2017 High Frequency Seismic Evaluation Confirmation Report NRC 2017-0032, Focused Evaluation for Local Intense Precipitation2017-06-22022 June 2017 Focused Evaluation for Local Intense Precipitation ML17136A3222017-05-19019 May 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request - Flood-Causing Mechanism Reevaluation L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 20162017-04-17017 April 2017 Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 ML17018A2712017-02-0909 February 2017 Flood Hazard Mitigation Strategies Assessment NRC 2016-0041, Submittal of 10 CFR 50.59 Summary Report for 20152016-08-31031 August 2016 Submittal of 10 CFR 50.59 Summary Report for 2015 NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan2015-12-16016 December 2015 Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan ML15300A1402015-11-0303 November 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15211A5932015-08-0303 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force NRC 2015-0043, Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 10072015-07-20020 July 2015 Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 1007 NRC 2014-0041, 10 CFR 50.59 Summary Report for 20132014-08-27027 August 2014 10 CFR 50.59 Summary Report for 2013 ML14147A0342014-06-0606 June 2014 Review of the 2013 Steam Generator Tube Inspections NRC 2014-0024, NextEra Energy Point Beach, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the F2014-03-31031 March 2014 NextEra Energy Point Beach, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukush ML13338A5102014-01-27027 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML14006A1872014-01-10010 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Point Beach Station, Units 1 and 2, TAC Nos.: MF0725 and MF0726 NRC 2013-0069, Supporting Documentation for July 22, 2013, Regulatory Conference to Discuss Inspection Report 05000266/2013011 and 05000301/2013011, Preliminary Yellow Finding2013-07-15015 July 2013 Supporting Documentation for July 22, 2013, Regulatory Conference to Discuss Inspection Report 05000266/2013011 and 05000301/2013011, Preliminary Yellow Finding ML13193A0322013-07-11011 July 2013 Additional Equipment Height Information with Vulnerability to Flood Waters NRC 2013-0057, Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R342013-07-0303 July 2013 Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R34 NRC 2013-0061, CFR 50.59 Summary Report for 20122013-06-28028 June 2013 CFR 50.59 Summary Report for 2012 NRC 2012-0101, NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic2012-11-26026 November 2012 NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic NRC 2011-0059, 10 CFR 50.59 Summary Report for 20102011-07-0101 July 2011 10 CFR 50.59 Summary Report for 2010 2023-07-24
[Table view] Category:Technical
MONTHYEARL-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2022-10-0404 October 2022 10 CFR 50.59 Evaluation and Commitment Change Summary Report L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-022022-07-29029 July 2022 Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 ML22140A1432022-05-20020 May 2022 Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA Models ML22140A1422022-05-20020 May 2022 Enclosure 1 - List of Revised Required Actions to Corresponding PRA Functions and Additional Supporting Information ML22140A1412022-05-20020 May 2022 Attachment 6 - Point Beach RICT Program Pre-Implementation Items ML22140A1352022-05-20020 May 2022 RPS Instrumentation ML22140A1382022-05-20020 May 2022 Containment Isolation Valves ML22140A1332022-05-20020 May 2022 Attachment 1 - Evaluation of the Proposed Changes NRC 2022-0007, Enclosure 11 - Monitoring Program2022-05-20020 May 2022 Enclosure 11 - Monitoring Program ML22140A1442022-05-20020 May 2022 Enclosure 8 - Attributes of the Configuration Risk Management Model ML22140A1362022-05-20020 May 2022 Containment Isolation Valves ML22140A1392022-05-20020 May 2022 Attachment 4 - Cross-Reference of TSTF-505, Revision 2, and Point Beach Proposed Changes ML22140A1402022-05-20020 May 2022 Attachment 5 - Evaluation of Plant-Specific Variations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report ML21008A0172020-10-25025 October 2020 Revised ANS Design Report NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure2019-08-29029 August 2019 Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds NRC 2018-0017, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2018-05-0202 May 2018 10 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report2017-08-0202 August 2017 High Frequency Seismic Evaluation Confirmation Report NRC 2017-0032, Focused Evaluation for Local Intense Precipitation2017-06-22022 June 2017 Focused Evaluation for Local Intense Precipitation ML13338A5102014-01-27027 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML14006A1872014-01-10010 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Point Beach Station, Units 1 and 2, TAC Nos.: MF0725 and MF0726 ML13193A0322013-07-11011 July 2013 Additional Equipment Height Information with Vulnerability to Flood Waters NRC 2013-0057, Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R342013-07-0303 July 2013 Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R34 NRC 2012-0101, NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic2012-11-26026 November 2012 NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic ML14006A3192010-03-31031 March 2010 LTR-PAFM-10-50-NP, Rev. 0, Section XI Flaw Evaluation of Indication Recorded on RC-32-MRCL-ALL-03 of the Point Beach Unit 1 Inlet Nozzle to Pipe Weld. NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation ML0935704152009-12-31031 December 2009 WEP-09-133 Np, Point Beach Unit 1 & Unit 2 (Wep/Wis) Extended Power Uprate License Amendment Request Responses to Request for Additional Information. ML0912505662009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Introduction Through Chapter 2, Section 2.5.7 ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0822406862008-06-30030 June 2008 WCAP-16541-NP, Revision 2, Spent Fuel Pool Criticality Safety Analysis. NRC 2008-0029, Pressure and Temperature Limits Report2008-05-30030 May 2008 Pressure and Temperature Limits Report NRC 2008-0034, License Amendment Request 257, Technical Specifications 5.5.8 and 5.6.8, Steam Generator Program & Steam Generator Tube Inspection Report, Interim Alternate Repair Criteria (Iarc) for Steam Generator Tube Repair2008-05-28028 May 2008 License Amendment Request 257, Technical Specifications 5.5.8 and 5.6.8, Steam Generator Program & Steam Generator Tube Inspection Report, Interim Alternate Repair Criteria (Iarc) for Steam Generator Tube Repair NRC 2007-0049, Supplement to License Amendment Request 251; Technical Specification 5.6.5., Reactor Coolant System Pressure and Temperature Limits Report2007-06-13013 June 2007 Supplement to License Amendment Request 251; Technical Specification 5.6.5., Reactor Coolant System Pressure and Temperature Limits Report NRC 2006-0061, LAR Public Version, License Amendment Request 248; Technical Specification 5.5.8, Steam Generator Program2006-07-11011 July 2006 LAR Public Version, License Amendment Request 248; Technical Specification 5.5.8, Steam Generator Program NRC 2006-0054, Public Version, Request for Review of Reactor Vessel Toughness Fracture Mechanics Analysis2006-06-0606 June 2006 Public Version, Request for Review of Reactor Vessel Toughness Fracture Mechanics Analysis ML0600400192005-12-14014 December 2005 Westinghouse LTR-RCDA-873-NP Attachment Point Beach, Unit 1 - Reactor Vessel Upper Closure Head Volume Best-Estimate Mean Fluid Temperature (Non-Proprietary) ML0533203122005-11-18018 November 2005 Reactor Vessel CMTRs (Non-Proprietary) NRC 2005-0117, Request for Withholding of Proprietary Information from Public Disclosure2005-09-0707 September 2005 Request for Withholding of Proprietary Information from Public Disclosure NRC 2005-0068, Submittal of Supporting Analyses Regarding Control of Heavy Loads2005-06-0303 June 2005 Submittal of Supporting Analyses Regarding Control of Heavy Loads ML0435700172004-12-14014 December 2004 from NMC Re Technical Evaluation of Proposed Method of Class 3 Pipe Leak Operability Determinations ML0514002682004-10-0808 October 2004 Enclosures V & VI Point Beach Revised EAL Submittal, Justification Matrix Reference Material NRC 2004-0004, Fitness-For-Duty (FFD) Program for Six Month Period Ending June 30, 20042004-08-30030 August 2004 Fitness-For-Duty (FFD) Program for Six Month Period Ending June 30, 2004 NRC 2004-0081, Transmittal of Point Beach Nuclear Plant, Units 1 and 2, Excellence Plan - Revision 42004-08-13013 August 2004 Transmittal of Point Beach Nuclear Plant, Units 1 and 2, Excellence Plan - Revision 4 ML0426603132004-07-31031 July 2004 BAW-2467NP, Low Upper-Shelf Toughness Fracture Mechanics Analysis of Reactor Vessel of Point Beach Units I and 2 for Extended Life Through 53 Effective Full Power Years. ML0508800622004-05-0707 May 2004 Licensee Procedure, HPIP 4.58, Issuance of Respiratory Equipment Revision 14 ML0508800432004-04-30030 April 2004 NMC Incident Response Team for Issues Encountered During Unit 1 Reduced Inventory and Nozzle Dam Installation at Pbnp 2022-07-29
[Table view] |
Text
WESTINGHOUSE NON PROPRIETARY CLASS 3 LTR-PAFM-10-50-NP Revision 0 Section Xl Flaw Evaluation of Indication Recorded on RC-32-MRCL-AIII-03 of the Point Beach Unit 1 Inlet Nozzle to Pipe Weld March 2010 Author: Warren Bamford*
Primary Systems Design and Repair Verifier: Anees Udyawar*
Piping Analysis and Fracture Mechanics Manager: Seth Swamy*
Piping Analysis and Fracture Mechanics
© 2010 Westinghouse Electric Company LLC All Rights Reserved
LTR-PAFM-10-50-NP Introduction During the spring 2010 inspection of the reactor vessel inlet nozzle to pipe weld, an indication was identified in the "A" loop. This technical note summarizes the detection and characterization of the indication, as well as the flaw evaluation which was required. The indication was found to be acceptable for further service without repair, using the acceptance criteria of Section Xl, paragraph IWB-3600.
Indication Detection and Sizing During Phased Array (PA) ultrasonic detection examinations on RC-32-MRCL-AIII-03 (Elbow to Inlet Nozzle at 328.50) dissimilar metal weld (Cast Stainless Elbow with Stainless weld & Stainless buttering), an indication was recorded at 18 inches from top dead center (TDC) and 2.1 inches from the weld centerline on the nozzle side of the weld in the nozzle forging and approximately 0.9 inches from the buttering. This indication can be seen in the "toward", "away",
"clockwise", and "counterclockwise" directions, indicating that it is volumetric in nature (e.g., slag inclusion). The indication orientation is predominantly circumferential in nature. During the previous 10-Year Reactor Vessel examination in 1998, two (2) indications were recorded in this region and sized to be allowable due to being "buried" (subsurface).
Sizing scans were performed with the specified PA search unit, which assisted with the characterization of the indication. The sizing scans characterized the indication as being 0.71 inches long and 0.505 inches in through-wall dimension (18.10% alt). The cladding thickness (not counted) is 0.25 inches, and the nominal pipe thickness (minus clad) is 3.27 inches. The surface "S" dimension was conservatively considered to be zero (0) to account for near-surface uncertainties.
Due to the fact that no vendor to-date has been capable of meeting the ASME Section Xl, Appendix VIII, Supplement 10 (dissimilar metal weld)-required 0.125 inch root mean square (RMS) acceptance criteria, the NRC has issued RIS-2003-01 which allows the use of procedures that do not meet all of the Supplement 10 criteria provided the best available technology is used for indication sizing. In cases where the 0.125 inch RMS is not achieved, the Performance Demonstration Initiative (PDI) developed a policy (PDI 03-01) which describes how the error can be documented. This is called the RMS Error (RMSE) number. The vendor at PBNP, IHI Southwest Technologies (ISwT) has an RMSE of 0.212 inches (0.087 inches greater than 0.125 RMS), which has to be applied to any indication(s) sized per the PBNP relief request (RR-21).
In addition, because of the type of flaws that all UT vendors are tested on (i.e. -
all flaws are open to the inside surface), there are no procedurally demonstrated Page 2 of 10
LTR-PAFM-10-50-NP techniques for determining that indications close to the in-side surface are, in fact, sub-surface. Hence, any indication is treated as surface-connected during the ASME Section Xl evaluation(s).
With RMSE applied, the indication size is considered conservatively to be 0.592 inches through wall. The maximum allowable flaw depth, per the flaw acceptance standards of IWB-3500, would be 12.5% of the wall thickness (approximately 0.41 inches through-wall).
A supplemental eddy current scan of the region was completed, and verified that the indication is not surface connected. Eddy current was applied using two excitation frequencies (30 kHz and 80 kHz). The high frequency was selected for sensitivity to surface flaws and the lower frequency for surface and sub-surface flaws. Point Beach Procedure ISwT-AET1 was used for the scans using two ECT probes oriented at 45 deg. with respect to each other to obtain sensitivity to flaws in any direction. The ECT probes were scanned using the same tooling and coordinate system used for the AUT by replacing two of the AUT search units with ECT probe modules. ECT indications were smaller than those obtained from the calibration standard flaws, with the exception of one region where the amplitude was slightly exceeded, but this region was within the nozzle weld area, which is well beyond the area of the UT indication.
Based on current findings, it Is considered that this indication or group of indications is most likely to be embedded fabrication flaws; however, It is being evaluated as a surface-connected flaw due to the proximity to the inside surface.
The location is actually near to the buttering of the nozzle, and also near to the clad-to-base metal interface, as shown in the sketch of Figure 1.
Flaw Evaluation Results In preparation for the reactor vessel inspections, a set of flaw evaluation charts had been prepared for the reactor vessel weld regions [1,2], and the Indication was compared with these flaw evaluation results, and found to be acceptable for further service without repair. The flaw evaluation chart of interest is Figure A-6.3 of reference 1, which is provided in an updated version as the last figure of this technical note, with the indication plotted.
For inside surface flaws in the inlet nozzle region the most severe transients are:
Loss of Flow (normal/upset)
Large Loss of Coolant (emergency/faulted)
Page 3 of 10
LTR-PAFM-10-50-NP It should be mentioned that residual stresses are known to exist In the adjacent weld, but since the reactor vessel, including the weld butter, is stress relieved, the stress values in this region are small, measurements of stress relieved heavy section welds have shown residual stresses of about 5 ksi at each surface, with the stresses decreasing and becoming compressive in the center of the weld.
These stresses are present at all times, and will have an effect on fracture at low temperatures, when the toughness is in the transition region. At RCS operating temperatures, the residual stresses have no effect on the failure conditions. This has been demonstrated experimentally In the Heavy Section Steel Technology Intermediate Vessel test program. Therefore, residual stresses have not been used in the calculations discussed for this region.
It will be seen from Figure A-6.3 of WCAP 11477 [1] that the allowable depth for any indication, regardless of shape, is at least 20 percent of the wall thickness.
The allowable depth line is across the very upper edge of the figure. This line is the result of a direct application of the Section Xl acceptance criteria.
The allowable flaw depth Is determined by calculation of the stress intensity factor (K) as a function of postulated flaw depth for each of the governing transients, and then determining where the K value exceeds the allowable toughness.
For the Loss of Flow transient for the Nozzle to Pipe Weld, the fracture toughness will be on the upper shelf, since there Is no Irradiation effect, and the initial RTNDT for this weld is 60F, from the available certified material test reports
[2]. The following critical flaw depths for normal/upset conditions result from these calculations:
Flaw Shape (all) Critical flaw Depth (a/t) 0.01 1.0 0.1667 1.0 0.5 1.0 The flaw evaluation chart is then determined from the worst case of the results above and the results for the governing faulted condition, the Loss of Coolant Accident. The results for the governing emergency/faulted condition:
Flaw Shape (a/I) Critical flaw Depth (a/t) 0.01 1.0 0.1667 1.0 0.5 1.0 Page 4 of 10
LTR-PAFM-10-50-NP The allowable -flaw- depth for this location must also be compared -with the allowable depth based on the primary stress limit criteria of Section III, NB-3200.
The allowable depth from this calculation is 58% of the wall thickness, for a continuous circumferential flaw, so the fracture mechanics limits of IWB-3600 will be governing.
Therefore, we see that the allowable flaw depth is very large, regardless of the flaw shape for this location. For conservatism the allowable flaw depth in the chart of Figure 2 has been cut off at a/t = 0.2.
Use of the Flaw Evaluation Chart of Figure 2 Once the indication is discovered, it must be characterized as to its location.
Length (I) and depth dimension (a for surface flaws, 2a for embedded flaws),
including its distance from the inside surface (S) for embedded indications. This characterization is discussed in further detail in Article IWA 3000 of Section XI.
Since the "S" dimension could not be determined using PDI procedures, it is assumed to be zero.
The following parameters must be calculated from the above dimensions to use the charts (see Figure 2):
Flaw Shape Parameter, all Flaw Depth Parameter, a/t where t = wall thickness of region where indication is located I = length of indication a = depth of surface flaw; or half depth of embedded flaw in the width direction Once the above parameters have been calculated, these two parameters for each indication may be plotted directly on the appropriate evaluation chart. Their location on the chart determines the acceptability immediately.
The evaluation chart for surface flaws is shown in Figure 2, for circumferential flaws. Note that there are three lines in the chart, representing the acceptable length of service, 10, 20, and 30 years.
Page 5 of 10
LTR-PAFM-10-50-NP Fatigue crack growth is the only mnechanism of growth for this indication, as the hydrogen overpressure applied to the reactor water chemistry precludes stress corrosion cracking in the materials present in this region.
The crack growth during service is negligible. Fatigue crack growth was calculated in WCAP-1 1477 [1] for several flaws of similar depth to the location of interest. The flaws Inthe table below had a length of 6 times the depth and were open to the surface and exposed to the water environment. The flaws in the table show no appreciable flaw growth from service. The Indication of interest is not nearly as elongated as the six to one flaw whose results are shown here, and is not exposed to the water environment, so the growth will be even less than predicted here. Therefore, there is no difference in the allowable depth as a function of service time for this location, and the allowable depths for 10, 20 and 30 years of service are the same.
Initial Crack Length After Year Crack Depth (in.) 10 20 30 40 0.202 0.20245 0.20245 0.20246 0.20247 0.303 0.30374 0.30376 0.30378 0.30380 0.405 0.40514 0.40517 0.40519 0.40522 0.506 0.50640 0.50644 0.50648 0.50652 Leak Before Break The identification of this indication in the reactor vessel nozzle region has no effect whatsoever on the margins for leak before break at Point Beach Unit 1.
The concept of leak before break is a simple one, in that a margin is established between the size flaw which could lead to detectable leakage, and the size flaw which could cause failure.
The indication which has been discovered here will have no effect of the margins between leak and break, because it is extremely unlikely to extend during service.
Let us examine the two aspects of leak before break, the propensity for a through wall flaw to leak, and the critical flaw size, or the size flaw which could lead to failure. The leak rate for a through-wall flaw in this region is a function of the wall thickness of the nozzle or pipe, and the internal pressure; these factors are unaffected by the presence of the indication. As for the size flaw which could cause failure of the pipe, it is a function of the material properties of the nozzle and pipe, and the loadings which exist, and neither of these is affected by the indication.
Page 6 of 10
LTR-PAFM-10-50-NP The leak before break margins are effectively higher now than at any other time in the operating history of Point Beach Nuclear Plant, because there is a new awareness, and a much higher sensitivity to small amounts of leakage now. After a number of recent operating events, the industry made a conscious effort to improve their leak detection capability. As a result, virtually all pressurized water reactors (PWRs) in the US have a leak detection capability of less than or equal to 0.1 gpm, as "needed." All plants also monitor seven day moving averages of reactor coolant system leak rates.
Action levels have been standardized for all PWRs, and are based on deviations from:
- The seven day rolling average,
Action response times following a leak detection vary, based on the action level exceeded and range up to containment entry to identify the source of the leak.
Utilities take the commitment of shutdowns due to unidentified leakage seriously.
This is exemplified with utility shutdowns in July 2009, due to a 0.2 gpm leakage, and another in August 2009, with 0.09 gpm leakage. This improvement in leak detection sensitivity is due to multiple measures being monitored. The leakage rate used as a basis for leak before break at Point Beach is 1 gpm. [3]
The newly required generic leak rate action levels are identified in PWROG report, WCAP-16465 [4], and are below:
Each PWR utility is required to Implement the following standard action levels for RCS inventory balance in their RCS leakage monitoring program.
A. Action levels on the absolute value of unidentified RCS inventory balance (from surveillance data):
Level 1 - One seven day rolling average of unidentified RCS inventory balance values greater than 0.1 gpm.
Level 2 - Two consecutive unidentified RCS inventory balance values greater than 0.15 gpm.
Level 3 - One unidentified RCS inventory balance value greater than 0.3 gpm.
Note: Calculation of the absolute RCS inventory balance values must include the rules for the treatment of negative values and missing observations.
B. Action levels on the deviation from the baseline mean:
Level 1 - Nine consecutive unidentified RCS inventory balance values greater than the baseline mean [p] value.
Page 7 of 10
LTR-PAFM-10-50-NP Level 2 Two of three consecutive unidentified RCS inventory balance values greater than [p + 20], where a is the baseline standard deviation.
Level 3 ,One unidentified RCS inventory balance value greater than [p +3o].
It should be noted that the NRC staff, in their approval of the aging management evaluation for Westinghouse Class 1 piping and associated components [5]
identified a concern about maintaining the leak before break status for a plant if an indication was to be found and evaluated in cast stainless steel. Likewise, concern was expressed about such an evaluation of a fatigue crack. Since the indication of Interest here is not located In cast stainless steel, and is not a fatigue crack, or even exposed to the water environment, no concern about the leak before break status of the plant exists here.
Similarly, the leak before break evaluation for Point Beach Nuclear Plant Unit 1 primary loop piping approved by the NRC in reference [6] is not affected by this indication.
References
- 1. A.A. Chan and W.H. Bamford, "Handbook on Flaw Evaluation for Point Beach Units I and 2 Reactor Vessels", Westinghouse Electric Report WCAP-11477 Rev. 1, July 1990.
- 2. W.H. Bamford, et al, "Background and Technical Basis for the Handbook on Flaw Evaluation for Point Beach Units 1 and 2 Reactor Vessels",
Westinghouse Electric Report WCAP-1 1478 Rev. 1, July 1990.
- 3. D.C. Bhowmick, "Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for the Point Beach Nuclear Plant Units 1 and 2 for the Power Uprate and License Renewal Program" Westinghouse Electric Report WCAP-14439-P, Rev. 2, September 2003
- 4. Westinghouse Electric Report, WCAP-16465-NP, Rev. 0, "Pressurized Water Reactor Owners Group Standard RCS Leakage Action Levels and Response Guidelines for Pressurized Water Reactors," September, 2006
- 5. Westinghouse Electric Report, WCAP-14575-A, "Aging Management Evaluation for Class 1 Piping and Associated Pressure Boundary Components", December 2000.
- 6. NRC Safety Evaluation dated June 6, 2005, "Point Beach Nuclear Plant, Units 1 and 2, Issuance of Amendments re: Leak Before Break Evaluation for Primary Loop Piping." Amendments 219/224, TAC docs. MC1279 and MC 1280. (ML043360295).
Page 8 of 10
LTR-PAFM-10-50-NP 30 Ar Figure 1: Inspection Volume of the Region of Interest, and Location of the Indication Page 9 of 10
LTR-PAFM-10-50-NP 20 A 1I A- The 10, 20, 30 yea 1t flawimits 14 B- WIthin t zone, the surface flaw C
,12 analrticl c itein IWB-3600 C- ASME Code allowable (Table CL10 IWB-3514-1) 6 4
2 0 ý-
0.0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.5 Flaw Shape (all)
Fige 2 igue A4.3) Evauai Chat for h" Nozzl Saf-end to Nozzle Weld [1]
Inside Surface Surface Flow -. LongitudiCal flaw Outside Surface Embedded Flaw X Circumferential Flaw Pop 10 Of 10