ML13333B402

From kanterella
Jump to navigation Jump to search

Requests in-progress Audit of Unit 1 Dcrdr & Preimplementation Audit of Units 2 & 3 Dcrdr During Wk of 860714,based on Findings of Encl Evaluation of Unit 1 Dcrdr Program Plan & Technical Evaluation of Units 2 & 3 Dcrdr
ML13333B402
Person / Time
Site: San Onofre  
Issue date: 05/29/1986
From: Dudley R, Rood H
Office of Nuclear Reactor Regulation
To: Baskin K, Holcombe J
San Diego Gas & Electric Co, Southern California Edison Co
Shared Package
ML13333B403 List:
References
TAC-51201, TAC-51202 NUDOCS 8606090463
Download: ML13333B402 (3)


Text

ockREG t N

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0. C. 20555 MAY 29 1986 Docket Nos.

50 and 50-361 Mr. Kenneth P. Baskin Mr. James C. Holcombe Vice President Vice President - Power Supply Southern California Edison Company San Diego Gas & Electric Company 2244 Walnut Grove Avenue 101 Ash Street Post Office Box 800 Post Office Box 1831 Rosemead, California 91770 San Diego, California 92112 Gentlemen:

Subject:

Request for On-site Audits of Detailed Control Room Design Review (DCRDR) for San Onofre Units 1, 2, and 3 Enclosed is an evaluation of the Unit 1 DCRDR Program Plan and a technical evaluation of the Unit 2 and 3 DCRDR.

Based upon the findings contained in the enclosures, which were prepared by our consultants from Science Applications International Corporation (SAIC), we request that you arrange for an 2.5 day In-Progress audit of the Unit 1 DCRDR and a 1.5 day Pre Implementation audit of the Units 2 and 3 DCRDR during the week of July 14, 1986.

To facilitate the audits, we request that you make the following arrangements:

1. Ensure that DCRDR review team personnel are available and ready to discuss or respond to NRC staff questions during the audit.
2.

Be prepared to provide any documentation of the DCRDR results, including review materials such as task analysis work sheets, survey and/or inventory checklists, operator questionnaires and other completed data collection forms used in the DCRDR.

3.

Provide for access to the control room, remote shutdown panel and simulator for the NRC staff and contractors. The NRC staff also requests clearance to bring camera equipment on-site to take photographs at any of the above areas.

4.

Provide for conference or office space for NRC staff meetings with the DCRDR review team and for the NRC audit team's private use.

Following the audits, the staff will transmit to you an audit report for Unit 1 and a safety evaluation report for Units 2 and 3.

DRO6 AO63 860529 PD

2

-2 Also include in Enclosure 1 and 2 are suggested agendas for each audit. If you have any questions regarding this request please contact us.

Sincerely, Harry Rood, Senior Project Manager PWR Project Directorate No. 7 Division of PWR Licensing-B Richard Dudley, Project Manager PWR Project Directorate No. 1 Division of PWR Licensing-A

Enclosures:

As stated cc:

See next page DISTRIBUTION Docket File PD7 Reading JLee NRC PDR LPDR JPartlow EJordan BGrimes HRood RDudley Attorney, ELD FMiraglia ACRS (10)

PD7 PD1 PD1 HRood/yt WV'ighton RDudley GLear 5/1/86 5//86 5/g /86 5/A /86

Mr. Kenneth P. Baskin San Onofre Nuclear Generating Station Southern California Edison Company Units 2 and 3 cc:

Mr. James C. Holcombe Mr. Hans Kaspar, Executive Director Vice President -

Power Supply Marine Review Committee, Inc.

San Diego Gas & Electric Company 531 Encinitas Boulevard, Suite 105 101 Ash Street Encinitas, California 92024 Post Office Box 1831 San Diego, California 92112 Charles R. Kocher, Esq.

Mr. Mark Medford James A. Beoletto, Esq.

Southern California Edison Company Southern California Edison Company

-2244 Walnut Grove Avenue 2244 Walnut Grove Avenue P. 0. Box 800 P. 0. Box 800 Rosemead, California 91770 Rosemead, California 91770 Dr. L. Bernath Manager, Nuclear Department Orrick, Herrington & Sutcliffe San Diego Gas & Electric Company ATTN: David R. Pigott, Esq.

P. 0. Box 1831 600 Montgomery Street San Diego, California 92112 San Francisco, California 94111 Richard J. Wharton, Esq.

University of San Diego School of Alan R. Watts, Esq.

Law Rourke & Woodruff Environmental Law Clinic Suite 1020 San Diego, California 92110 1055 North Main Street Santa Ana, California, 92701 Charles E. McClung, Jr., Esq.

Attorney at Law Mr. S. McClusky 24012 Calle de la Plaza/Suite 330 Bechtel Power Corporation Laguna Hills, California 92653 P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. C. B. Brinkman 1450 Maria Lane/Suite 210 Combustion Engineering, Inc.

Walnut Creek, California 94596 7910 Woodmont Avenue, Suite 1310 Bethesda, Maryland 20814 Resident Inspector, San Onofre NPS c/o U. S. Nuclear Regulatory Commission Mr. Dennis F. Kirsh Post Office Box 4329 U.S. Nuclear Regulatory Commission San Clemente, California 92672 Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596