APPENDIX A Southern California Edison Company P. 0. Box 800 Rosemead, California 91770 Docket No. 50-362 Construction Permit No. CPPR-98 Notice of Violation Based on the results of an NRC inspection conducted on March 3-17 and 21-28, 1980, it appears that one of your activities was not conducted in full compliance with conditions of your NRC Construction Permit No.
CPPR-98 as indicated below:
Appendix B of 10CFR50, Criterion V, states in part, that, "Activities affecting quality shall be prescribed by documented instructions ---
and shall be accomplished in accordance with these instructions---."
Appendix A to the PSAR, commits to comply with the requirements of 10CFR50, Appendix B. The Bechtel Work Plan Procedure/Quality Control Instruction (WPP/QCI) No. 200, Control of Welding Filler Material, Rev. 11.0, Paragraph 6.1.6 states that "At the completion of the welder's shift, ---
, all unused filler material ---
shall be returned to the Rod Room attendants;"
Contrary to the above, the NRC inspector found E7018 electrodes that had not been returned to the Rod Room attendant on March 14 and 24, 1980, in the Unit 3 HPSI Pump Room and the Unit 3 containment vessel.
This is an infraction.