Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - Control Room JPM A (Rev_073012)
NUREG 1021, Revision 9 SIM JPM A
Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Realign a Misaligned Control Rod JPM No.:
2012 Systems - Control Room JPM A K/A
Reference:
001, A4.06 (2.9/3.2)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout, of AP/1/A/5500/14 marked up for place-keeping through Step 16.
Initial Conditions:
Due to a plant transient, Control Rod M-4 is misaligned from its bank by 24 steps.
Unit 1 has been stabilized at 45% power for the past 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />.
The crew entered AP/1/A/5500/14 (Rod Control Malfunction), and completed Enclosure 1 (Response to Dropped or Misaligned Rod) through Step 16.
IAE and RE has determined that rod realignment is permissible by moving the misaligned rod inward.
Initiating Cue:
The CRS has directed you to realign Control Rod M-4 with Bank D by performing Enclosure 1 (Response to Dropped or Misaligned Rod), of AP/1/A/5500/14 (Rod Control Malfunction) starting at Step 17.
IAE is standing by to assist in the realignment.
Task Standard:
The operator will correct the misalignment of Control Rod M-4 by performing Steps 17-22 and 45.a of Enclosure 1 (Response to Dropped or Misaligned Rod), of AP/1/A/5500/14 (Rod Control Malfunction).
Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 Required Materials:
Reactor Operator Logbook General
References:
AP/1/A/5500/14 (Rod Control Malfunction), Rev 14 Handouts: (Response to Dropped or Misaligned Rod), of AP/1/A/5500/14 (Rod Control Malfunction) marked up for place-keeping through Step 16.
Time Critical Task:
NO Validation Time:
15 minutes
Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 SIMULATOR OPERATIONAL GUIDELINES
- 1.
Reset simulator to IC-37 (At power >50%/Rods in AUTO).
- 2.
Insert MALF-IRE010M4 (Stuck Rod [M-4 in Control Bank D]).
- 3.
Place Simulator in RUN.
- 4.
Insert MALF-DEH002A4 (Turbine Runback).
- 5.
Respond to plant via AP/1/A/5500/03 (Load Rejection).
- 6.
Ensure Control Rods moving inward with Control Rod M-4 not moving.
- 7.
When Control Rod M-4 is higher than the remainder of Control Bank such that DRPI reads 72 Steps, and the other Group D rods indicate 48 Steps, Freeze the Simulator, and REMOVE MALF-IRE010M4 (Stuck Rod [M-4 in Control Bank D]).
- 8.
Place Simulator in RUN, and stabilize the plant at 45%.
- 9.
Perform the actions of AP/1/A/5500/14 (Rod Control Malfunction), through Step 16 of (Response to Dropped or Misaligned Rod).
- 10.
Freeze the Simulator OR
- 1.
Reset to IC-252 (February, 2012)
- 2.
Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
- 3.
Leave Simulator in FREEZE until operator is ready to begin.
NOTE:
During the performance of this JPM, the Simulator Instructor will need to monitor BOP alarms and silence as needed.
Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout, of AP/1/A/5500/14 marked up for place-keeping through Step 16.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.
1 (Step 17) Record the following in the Reactor Operator Logbook:
(Step 17.a) Record step counter readings for all rod groups in affected bank.
The operator records 49 for the Control Bank D Group 1 and Group 2 step counter readings in the Reactor Operator Logbook.
2 (Step 17.b) Check affected rod location - IN CONTROL BANK.
The operator observes on DRPI that the misaligned rod is M-4, which is in Control Bank D; and records this in the Reactor Operator Logbook.
3 (Step 17.c) Dispatch IAE to obtain Bank Overlap Display in Logic Cabinet (Rod Control Cabinets approximately 5 ft from floor).
The operator contacts IAE and requests Bank Overlap Display reading.
Cue:
As IAE, report that Bank Overlap Display reading is 475.
Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 4
(Step 17.d) Record bank overlap display.
The operator records 475 for the Bank Overlap Display reading value in the Reactor Operator Logbook.
- 5 (Step 18) Open coil disconnect switches on all lift coils in affected bank except for misaligned rod(s).
The operator moves Coil Disconnect Switches for Control Rods D-4, D-12, H-8, and M-12 to the UP position.
6 (Caution prior to Step 19).
Failure to pause between each bank selected may result in dropping rods.
The operator reads the Caution, and proceeds to Step 19.
- 7 (Step 19) Transfer rod control to affected bank using "CRD BANK SELECTOR".
The operator rotates CRD Bank Selector Switch to CBD position.
8 (Step 20) Check "ROD CONTROL URGENT FAILURE" alarm (1AD-2, A-
- 10) - DARK.
The operator observes alarm is dark.
Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 9
(Step 21) Insert misaligned rod(s) as follows:
(Notes prior to Step 21.a)
The demand counter for the group being moved will be the only counter to change.
The "ROD CONTROL URGENT FAILURE" (1AD-2, A-10) alarm will not occur if the rod is in Shutdown Bank C, D, or E.
(Step 21.a) WHEN "ROD CONTROL URGENT FAILURE" (1AD-2, A-10) alarm occurs, THEN acknowledge alarm and continue rod movement in the "BANK SELECT" position.
The operator reads the Notes, and proceeds to Step 21.a.
The operator reads the conditional step, and proceeds to Step 21.b.
10 (Step 21.b) Maintain constant T-Avg by adjusting turbine load or boron concentration.
The operator reads the step, and proceeds to Step 21.c.
Cue:
The BOP will control Tavg as necessary.
Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 11 (Step 21.c) Slowly insert misaligned rod(s) until DRPI changes one increment as follows:
(Step 21.c.1) Insert misaligned rod(s) one step while ensuring unaffected rods do not move.
The operator takes IN/HOLD/OUT lever to IN, and observes that Control Rod M-4 moves inward one step, and then releases the lever.
The operator observes DRPI for unaffected Control Rods (H-8, M-12, D-4 and D-12) and verifies that they do not move.
The operator recognizes that "ROD CONTROL URGENT FAILURE" alarm is illuminated and depresses the acknowledge pushbutton.
12 (Step 21.c.2) Wait at least 5 seconds to allow DRPI to update.
The operator pauses 5 seconds.
- 13 (Step 21.c.3) IF DRPI does not change, THEN repeat steps 1) and 2) until one of the following met:
DRPI changes one increment.
OR Step counter is 6 steps (12 steps if DRPI in half accuracy) lower than value recorded in RO logbook.
The operator takes IN/HOLD/OUT lever to IN, and observes that Control Rod M-4 moves inward one step, and then releases the lever.
The operator observes DRPI for M-4 change to 66 Steps.
The operator observes DRPI for unaffected Control Rods (H-8, M-12, D-4 and D-12) and verifies that they do not move.
The operator pauses 5 seconds.
Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 14 (Step 21.d) Check DRPI for misaligned rod - CHANGED ONE INCREMENT IN STEP 21.c.
The operator observes that the M-4 Control Rod DRPI has changed from 72 steps to 66 steps.
15 (Step 21.e) Calculate misaligned rod's actual height as follows:
IF DRPI at full accuracy, THEN add three to the DRPI indication presently displayed for the misaligned rod.
IF DRPI at half accuracy, THEN contact IAE to determine value for group demand step counter.
The operator observes that DRPI is at full accuracy, and adds 3 to the M-4 DRPI indication.
- 16 (Step 21.f) Place the misaligned rod's group demand step counter to the value calculated in Step 21.e.
The operator places the Control Bank D Group 2 step counter to 69.
17 (Step 21.g) Consult with IAE to determine where the misaligned rods should be positioned to restore proper alignment.
The operator contacts IAE.
Cue:
IAE reports that Control Rod M-4 should be inserted such that Control Bank D Group 2 step counter indicates 49.
Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Cue:
RE indicates that there are no restrictions on Control Rod M-4 insertion rate.
Examiner NOTE:
When the operator repositions the misaligned rod, 1AD-2/A-9 and B-9 (RIL Lo/Lo-Lo) will alarm.
If necessary, cue operator that the BOP will address the ARPs for these alarms.
- 18 (Step 21.h) Reposition misaligned rod(s) at a rate less than or equal to 60 steps/hr until its associated group demand step counter matches value determined in 21.g.
The operator takes IN/HOLD/OUT lever to IN, and observes that Control Rod M-4 moves inward.
The operator releases the level when the Control Bank D Group 2 step counter indicates 49.
The operator observes DRPI and determines that Control Rod M-4 has been realigned with the other Control Rods in Control Bank D.
Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 19 (Step 21.i) Do not continue until rod realignment is complete.
The operator observes that the rod realignment is complete; and continues.
20 (Step 22) GO TO Step 45.
The operator proceeds to Step 45.
- 21 (Step 45) Restore Rod Control system to normal as follows:
(Step 45.a) Reconnect all lift coils which were previously disconnected.
The operator moves Coil Disconnect Switches for Control Rods D-4, D-12, H-8, and M-12 to the DOWN position.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - Control Room JPM A NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - Control Room JPM A Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Due to a plant transient, Control Rod M-4 is misaligned from its bank by 24 steps.
Unit 1 has been stabilized at 45% power for the past 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />.
The crew entered AP/1/A/5500/14 (Rod Control Malfunction),
and completed Enclosure 1 (Response to Dropped or Misaligned Rod) through Step 16.
IAE and RE has determined that rod realignment is permissible by moving the misaligned rod inward.
INITIATING CUE:
The CRS has directed you to realign Control Rod M-4 with Bank D by performing Enclosure 1 (Response to Dropped or Misaligned Rod), of AP/1/A/5500/14 (Rod Control Malfunction) starting at Step 17.
IAE is standing by to assist in the realignment.
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - Control Room JPM B (Rev_073012)
NUREG 1021, Revision 9 SIM JPM B
Appendix C Page 2 of 11 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM B NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Perform the Main Turbine Overspeed Trip Test JPM No.:
2012 Systems - Control Room JPM B (Alternate Path)
K/A
Reference:
045 A3.04 (3.4/3.6)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout PT/1/A/4250/004C marked up through Step 12.6.
Initial Conditions:
Unit 1 is starting up after a refueling outage.
The Turbine/Generator is off line and rolling at 1800 RPM in preparation for performing PT/1/A/4250/004C (Turbine OPC and Mechanical Overspeed Trip Test).
All prerequisite conditions have been met and two operators have been stationed at the Turbine as required.
Communications have been established with all involved.
Initiating Cue:
The CRS has directed you to complete the Turbine OPC and Mechanical Overspeed Trip Test per PT/1/A/4250/004C (Turbine OPC and Mechanical Overspeed Trip Test), starting with Step 12.7.
Task Standard:
The operator will raise Turbine speed to OPC setpoint, and then raise speed until the Turbine Overspeed trip should be actuated. The operator recognizes the turbine has failed to trip at the expected setpoint and then manually trips the Turbine.
Appendix C Page 3 of 11 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM B NUREG 1021, Revision 9 Required Materials:
Ensure test key #63 is available.
General
References:
PT/1/A/4250/004C (Turbine OPC and Mechanical Overspeed Trip Test),
Rev. 17 Handouts:
PT/1/A/4250/004C (Turbine OPC and Mechanical Overspeed Trip Test) marked up through Step 12.6.
Time Critical Task:
No Validation Time:
15 minutes
Appendix C Page 4 of 11 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM B NUREG 1021, Revision 9 SIMULATOR OPERATIONAL GUIDELINES
- 1.
Reset to IC-15, Turbine at 1800 RPM, Voltage Regulator NOT in service.
- 2.
Insert malfunction: MAL-DEH003A, Failure of Auto Turbine Trip.
- 3.
Ensure cts File Defeat Turbine Mechanical Overspeed Trip.cts is inserted.
- 4.
Ensure voltage regulator switch in MAN position.
- 5.
Ensure "excitation" is in "TRIP."
- 6.
Ensure Main Gen MOD's open.
- 7.
Freeze the Simulator.
- 1. Reset Simulator to Temporary Snap IC-253 (March, 2012).
- 2. Momentarily place Simulator in Run to acknowledge alarms.
- 3. Leave Simulator in FREEZE until operator is ready to begin.
NOTE:
Provide an operator to acknowledge unrelated alarms and control Reactor Power (since Rods are in Manual).
Appendix C Page 5 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM B NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout PT/1/A/4250/004C marked up through Step 12.6.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.
- 1 (Step 12.7) Depress ACC RATE.
The operator presses the ACC RATE pushbutton on the Turbine Control Panel, and observes White status light is LIT.
- 2 (Step 12.8) Enter acceleration rate of 25 RPM/MIN in Variable Display The operator enters 0025 in the Variable Display, and presses ENTER.
3 (Step 12.9) Depress REFERENCE.
The operator presses the REFERENCE pushbutton on the Turbine Control Panel, and observes White status light is LIT.
- 4 (Step 12.10) Enter speed of 1860 rpm in the Variable Display.
The operator enters 1860 in the Variable Display, and presses ENTER.
Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM B NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 5
(Notes prior to Step 12.11)
Steps 12.11 - 12.14 should be read and understood for quick performance. Once OPC Controller actuates, going to Mechanical Overspeed Test on turbine will prevent multiple actuation of OPC Controller and loss of LH header pressure.
Digital Control Board meter should be used in the following steps.
The operator reads the NOTEs and reviews Steps 12.11 - 12.14, and proceeds.
- 6 (Step 12.11) Depress "GO."
The operator presses the GO pushbutton on the Turbine Control Panel, and observes White status light is LIT.
7 (Step 12.12) Check Turbine starts increasing speed at selected rate.
The operator observes the Digital Turbine Speed indicator and determines that Turbine speed is rising at the expected rate.
8 (Step 12.13) IF demand speed of 1860 rpm is reached before OPC Controller actuates, perform one of the following:
(Step 12.13.1) Reduce Turbine speed to 1800 rpm (100%).
OR (Step 12.13.2) IF unable to reduce speed, have operator at Turbine Trip Lever trip Turbine.
The operator observes that Turbine Speed rises to 1860, and stops, and places and NA in this step.
Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM B NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 9 (Step 12.14) After OPC Controller actuated, place "OPC" in "MECHANICAL OVERSPEED TEST" using "OPC" key #63.
The operator rotates the 63 OPC Key Switch clockwise.
10 (Step 12.15) IF LH header pressure fails to recover, following an OPC controller actuation,..
The operator observes LH Fluid Pressure (Chart Recorder) and determines that pressure has recovered properly; and places an NA in this step.
11 (Step 12.16) Record on 3.1 (Turbine OPC Overspeed Test and Turbine Overspeed Mechanical Trip Test Data Sheet) the actual speed at which the Turbine OPC Controller actuated.
The operator provides the required Data to another operator.
Cue:
Another operator will log the data.
12 (Note prior to Step 12.17)
Steps 12.17 - 12.23 test Mechanical Overspeed Trip mechanism.
The operator reads the NOTE and proceeds.
- 13 (Step 12.17) Depress "ACC RATE".
The operator presses the ACC RATE pushbutton on the Turbine Control Panel, and observes White status light is LIT.
- 14 (Step 12.18) Enter acceleration rate of 50 rpm/min in Variable Display.
The operator enters 0050 in the Variable Display, and presses ENTER.
- 15 (Step 12.19) Depress "REFERENCE."
The operator presses the REFERENCE pushbutton on the Turbine Control Panel, and observes White status light is LIT.
Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM B NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 16 (Step 12.20) Enter speed of 2000 rpm in Variable Display.
The operator enters 2000 in the Variable Display, and presses ENTER.
- 17 (Step 12.21) Depress "GO."
The operator presses the GO pushbutton on the Turbine Control Panel, and observes White status light is LIT.
18 (Step 12.22) Check Turbine starts increasing speed to 2000 rpm at selected rate.
The operator observes the Digital Turbine Speed indicator and determines that Turbine speed is rising at the expected rate.
19 (Caution prior to Step 12.23) The Mechanical Overspeed Trip must occur at or before 1998 RPM (111%)
The operator reads the CAUTION and proceeds.
- 20 (Step 12.23) IF Turbine speed reaches 1998 rpm (111%) before Mechanical Overspeed Trip actuates, trip Turbine.
The operator observes the Digital Turbine Speed indicator and determines Turbine has not tripped at or before 1998 RPM and trips the turbine within one minute of exceeding 1998 RPM by placing the Turbine Trip Switch in the TRIP position.
The operator observes all Throttle and Governor valves indicate closed, speed is decreasing.
Appendix C Page 9 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM B NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 21 (Step 12.24) Record on 3.1 (Turbine OPC Overspeed Test and Turbine Overspeed Mechanical Trip Test Data Sheet) the actual speed at which the Turbine trips.
The operator provides the required Data to another operator.
Cue:
Another operator will log the data.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - Control Room JPM B NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - Control Room JPM B Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Unit 1 is starting up after a refueling outage.
The Turbine/Generator is off line and rolling at 1800 RPM in preparation for performing PT/1/A/4250/004C (Turbine OPC and Mechanical Overspeed Trip Test).
All prerequisite conditions have been met and two operators have been stationed at the Turbine as required.
Communications have been established with all involved.
INITIATING CUE:
The CRS has directed you to complete the Turbine OPC and Mechanical Overspeed Trip Test per PT/1/A/4250/004C (Turbine OPC and Mechanical Overspeed Trip Test), starting with Step 12.7.
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - Control Room JPM C (Rev_073012)
NUREG 1021, Revision 9 SIM JPM C
Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Remove Pressurizer Heaters from Service JPM No.:
2012 Systems - Control Room JPM C (Alternate Path)
K/A
Reference:
010, A4.02, 3.6/3.4 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM, and Handout.6 (Operation of Pzr Heaters) of OP/1/A/6100/003.
Initial Conditions:
Unit 1 has just increased reactor power to 100% per OP/1/A/6100/003 (Controlling Procedure for Unit Operation).
Chemistry has confirmed that the Boron Concentration difference between the Pzr and the NC System is 4 ppm.
Initiating Cue:
The CRS has directed you to remove Pzr Heater Groups A, B and D from service per Enclosure 4.6 (Operation of Pzr Heaters) of OP/1/A/6100/003, and ensure that NC System pressure is being controlled normally at 2235 psig.
All outstanding R&Rs that may impact performance of Enclosure 4.6 have been evaluated.
Appendix C Page 3 of 15 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 Task Standard:
The operator will remove the A, B and D Pzr Heater Groups from service in accordance with Step 3.4.4 of Enclosure 4.6, and then after responding to the failure of the C Pzr Heater Group, manually control pressure by re-energizing at least one heater group. The operator will place at least one Pzr Heater Group in service in accordance with Step 3.3.1 (or equivalent) of Enclosure 4.6, before MCB Annunciator 1AD-6, C6 alarms.
Required Materials:
None General
References:
OP/1/A/6100/003 (Controlling Procedure for Unit Operation), Rev. 174 OP/1/A/6100/010G (Annunciator Response for Panel 1AD-6), Rev. 67 NSD 704 (Technical Procedure Use and Adherence), Rev. 20 Handouts:.6 (Operation of Pzr Heaters) of OP/1/A/6100/003 (Controlling Procedure for Unit Operation)
Time Critical Task:
NO Validation Time:
12 minutes
Appendix C Page 4 of 15 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 SIMULATOR OPERATIONAL GUIDELINES
- 1.
Reset simulator to IC-39 (100%)
- 2.
Ensure Simulator reflects having been completed through Step 3.35.9.4 of OP/1/A/6100/003, Enclosure 4.1 (Power Increase).
- 3.
Ensure that Pzr Heaters groups A, B, and D are energized.
- 4.
Acknowledge Alarms and Freeze Simulator
- 5.
Create Lesson Plan NRC JPM C (Failure of Pzr Variable Heaters).
(ANN) 1AD6-D06 = ON Insert X10_190_1 = False (0) (C heaters energize/de-energize Red Status light - OFF)
- 1. Reset Simulator to Temporary Snap IC-254 (February, 2012).
- 2. Execute Lesson Plan NRC JPM C (Failure of Pzr Variable Heaters).
- 3. Momentarily place Simulator in Run to acknowledge alarms.
- 4. Leave Simulator in FREEZE until operator is ready to begin.
NOTE:
During the performance of this JPM, the simulator operator will need to execute failure at Step 20 of the JPM.
Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM, and Handout.6 (Operation of Pzr Heaters) of OP/1/A/6100/003.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.
1 (Enclosure 4.6, Step 3.1)
Evaluate all outstanding R&Rs that may impact performance of this procedure.
The operator recognizes that this step has already been performed (Initial Conditions), and proceeds.
2 (Note prior to Step 3.2)
During steady state conditions, Pzr Htr Groups are normally OFF and in AUTO.
The operator reads the Note and proceeds.
3 (Step 3.2) Perform the following sections as applicable:
Section 3.3, Placing A, B, D Pzr Heater Groups in Service.
Section 3.4, Removing A, B, D Pzr Heater Groups form Service.
Section 3.5, Placing C Pzr Heater Group in Service.
Section 3.6, Removing C Pzr Heater Group from Service.
Section 3.7, Manual Operation of A, B, D Pzr Heater Groups The operator recognizes that Section 3.4 is the applicable section and proceeds to Section 3.4.
Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 4
(Step 3.4) Removing A, B, D Pzr Heater Groups From Service (Caution prior to Step 3.4.1)
Pzr Htr Groups and Pzr Spray Controls should be operated with extreme caution to prevent NC System pressure transients.
(Step 3.4.1) Ensure Boron Concentration difference between Pzr and NC System less than 50 ppm.
The operator reads the Caution and proceeds.
The operator recognizes that this condition is already met (Initial Conditions), and proceeds.
5 (Step 3.4.2) IF three Pzr Htr Groups in service AND desire to operate with two Pzr Htr Groups in service..
The operator recognizes that this step is NOT applicable and proceeds.
6 (Step 3.4.3) IF three Pzr Htr Groups in service AND desire to operate with one Pzr Htr Group in service..
The operator recognizes that this step is NOT applicable and proceeds.
- 7 (Step 3.4.4) IF three Pzr Htr Groups in service AND desire to remove all Pzr Htr Groups from service, perform the following:
(Step 3.4.4.1) Place one of the following in AUTO:
A Pzr Htr Mode Select B Pzr Htr Mode Select D Pzr Htr Mode Select The operator rotates either the A, B or D Pzr Htr Mode Select Switch counter -
clockwise to AUTO.
Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 8
(Step 3.4.4.2) Check associated Pzr Htr Group in OFF.
A Pzr Htr Group B Pzr Htr Group D Pzr Htr Group The operator observes the Green status light LIT and the Red status light OFF for the heater group, whose Mode Select Switch was moved to AUTO in the previous step.
9 (Step 3.4.4.3) Monitor Pzr pressure for 2 minutes.
The operator observes actual Pressurizer Pressure and Spray Valve position (Or equivalent) for 2 minutes and determines that Pzr Pressure has stabilized.
Examiner Cue:
Two minutes has elapsed.
- 10 (Step 3.4.4.4) Place second Pzr Htr Mode Select Switch in AUTO:
A Pzr Htr Mode Select B Pzr Htr Mode Select D Pzr Htr Mode Select The operator rotates either the A, B or D Pzr Htr Mode Select Switch counter-clockwise to AUTO.
11 (Step 3.4.4.5) Check associated Pzr Htr Group in OFF.
A Pzr Htr Group B Pzr Htr Group D Pzr Htr Group The operator observes the Green status light LIT and the Red status light OFF for the heater group, whose Mode Select Switch was moved to AUTO in the previous step.
Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 12 (Step 3.4.4.6) Monitor Pzr pressure for 2 minutes.
The operator observes actual Pressurizer Pressure and Spray Valve position (Or equivalent) for 2 minutes and determines that Pzr Pressure has stabilized.
Examiner Cue:
Two minutes has elapsed.
13 (Note prior to Step 3.4.4.7)
Placing Pzr Press Master in manual makes automatic operation of 1NC-34A (Pzr PORV) unavailable and should be evaluated using Electronic Risk Assessment Tool. This assessment should be performed prior to placing Pzr Press Master in manual.
The operator reads the Note and proceeds.
14 (Step 3.4.4.7) IF time allows AND Unit 1 in Modes 1-4, evaluate unavailability of 1NC-34A (Pzr PORV) using Electronic Risk Assessment Tool.
The operator informs the CRS.
Examiner Cue:
As the CRS, indicate that the ERAT has been used, and the Pzr Press Master may be placed in MAN.
15 (Note prior to Step 3.4.4.8)
Steps 3.4.4.8 - 3.4.4.10 C should be performed without delay.
The operator reads the Note and proceeds.
Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 16 (Step 3.4.4.8) Place third Pzr Htr Mode Select in AUTO:
A Pzr Htr Mode Select B Pzr Htr Mode Select D Pzr Htr Mode Select The operator rotates either the A, B or D Pzr Htr Mode Select Switch counter-clockwise to AUTO.
17 (Step 3.4.4.9) Check associated Pzr Htr Group in OFF.
A Pzr Htr Group B Pzr Htr Group D Pzr Htr Group The operator observes the Green status light LIT and the Red status light OFF for the heater group, whose Mode Select Switch was moved to AUTO in the previous step.
(Step 3.4.4.10 A) Place PZR PRESS MASTER in manual.
The operator observes the NC-Pressurizer and PRT DCS Screen and observes Pressurizer pressure.
The operator selects Pzr Pressure Master and selects M (Turns RED).
Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 19 (Step 3.4.4.10 B) Adjust PZR PRESS MASTER output until the following occurs:
C Pzr Htr Group begins cycling 1NC-27C (A Loop Pzr Spray Control) Closes 1NC-29C (B Loop Pzr Spray Control) Closes Using the NC-Pressurizer and PRT DCS Screen, the operator adjusts until Pzr Press Master output (DOWN) until the error signal is < 15 psig.
The operator observes C Pzr Heater Group Red Status light cycling ON and OFF, and determines that the C Pzr Htr Group is cycling.
The operator observes the 1NC-27C SLIMs Limit Switch and determines that 1NC-27C is CLOSED.
The operator observes the 1NC-29C SLIMs Limit Switch and determines that 1NC-29C is CLOSED.
- 20 (Step 3.4.4.10 C) Place PZR PRESS MASTER in auto.
Using the NC-Pressurizer and PRT DCS Screen, the operator selects Pzr Pressure Master and selects A (Turns GREEN).
Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Execute & Activate Lesson Plan (Failure of Pzr Variable Heaters) (Alternate Path)
It is expected that MCB Annunciator 1AD6/D6 (PZR HTR CONTROLLER TROUBLE) will alarm.
- 21 (Step 3.4.4.11) Monitor Pzr pressure for 2 minutes.
The operator observes actual Pressurizer Pressure and Spray valve Position (Or equivalent) and determines that Pzr Pressure is lowering.
The operator observes MCB Annunciator 1AD6/D6 and addresses ARP.
22 (OP/1/A/6100/010 G, Immediate Action 1)
Remove Group C Heater Group from automatic control by opening supply breaker.
The operator observes the C Pzr Heater Group Green Status light is LIT, and determines that the Group C Heater supply breaker is OPEN.
Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 23 (OP/1/A/6100/010 G, Immediate Action 2)
Manually control pressure using other heater groups.
The operator recognizes that no Pzr htrs are energized and proceeds to.6, Step 3.3.1 (Or Equivalent) to place one Pzr Htr Group in service.
Examiner Note:
The operator may use one or more Pzr Heater Groups to maintain NC System Pressure within the normal band.
The operator MUST place at least one Pzr Htr Group in service to complete the Critical nature of this task.
The operator should realize the need to get one set of htrs on for pressure control and MAY start that one set of htrs based on ARP guidance to manually control pressure. If NOT, the required OP Steps of Section 3.3.1 are scripted.
However, Section 3.7 of.6 may be used as well.
Examiner Note:
IF MCB Annunciator 1AD-6, C6, alarms before the operator energizes one set of Heaters, the Critical Step is Failed.
Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 24 (Enclosure 4.6, Step 3.3)
Placing A, B, D Pzr Heater Groups in service.
(Caution prior to Step 3.3.1)
Pzr Htr Groups and Pzr Spray Controls should be operated with extreme caution to prevent NC System pressure transients.
(Step 3.3.1) IF desired to operate with one Pzr Htr group in service, perform the following:
(Step 3.3.1.1) Place of the following in MAN:
A Pzr Htr Mode Select B Pzr Htr Mode Select D Pzr Htr Mode Select The operator reads the Caution, and proceeds.
The operator rotates either the A, B or D Pzr Htr Mode Select Switch clockwise to MAN.
25 (Step 3.3.1.2) Place the associated Pzr Htr Group in ON:
A Pzr Htr Group B Pzr Htr Group D Pzr Htr Group The operator depresses the ON pushbutton for the heater group, whose Mode Select Switch was moved to MAN in the previous step, and observes the Red status light LIT and the Green status light OFF.
26 (Step 3.3.1.3) Monitor Pzr pressure for 2 minutes.
The operator observes Pressurizer Pressure and Spray valve Position (Or equivalent) for 2 minutes and determines that Pzr Pressure has stabilized at 2235 +/-15 psig.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - Control Room JPM C NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - Control Room JPM C Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Unit 1 has just increased reactor power to 100% per OP/1/A/6100/003 (Controlling Procedure for Unit Operation).
Chemistry has confirmed that the Boron Concentration difference between the Pzr and the NC System is 4 ppm.
INITIATING CUE:
The CRS has directed you to remove Pzr Heater Groups A, B and D from service per Enclosure 4.6 (Operation of Pzr Heaters) of OP/1/A/6100/003, and ensure that NC System pressure is being controlled normally at 2235 psig.
All outstanding R&Rs that may impact performance of Enclosure 4.6 have been evaluated.
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - Control Room JPM D (Rev_080112)
NUREG 1021, Revision 9 SIM JPM D
Appendix C Page 2 of 11 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM D NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Align the Containment Spray System During Cold Leg Recirc JPM No.:
2012 Systems - Control Room JPM D (Alternate Path)
K/A
Reference:
026, A4.01 (4.5/4.3)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout EP/1/A/5000/ES-1.3 marked up for place-keeping through Step 7.
Initial Conditions:
Earlier in the shift, the Unit 1 reactor tripped due to a Large Break LOCA inside of containment.
EP/1/A/5000/ES-1.3 (Transfer To Cold Leg Recirc) has been implemented and completed through step # 7.
Containment pressure is approximately 4 psig.
The FWST Level is approximately 80 inches and lowering.
Initiating Cue:
The CRS has directed you to perform Step 8 of EP/1/A/5000/ES-1.3 (Transfer To Cold Leg Recirc) and align NS for Recirc.
Task Standard:
The operator will perform step 8 through sub-step 8.f.11 of EP/A/1/5000/ES-1.3. The operator will attempt to place the A Train of NS in service manually, discover that it cannot be placed in service, and then place the B Train in service as an alternative.
Required Materials:
None
Appendix C Page 3 of 11 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM D NUREG 1021, Revision 9 General
References:
EP/1/A/5000/ES-1.3 (Transfer to Cold leg Recirc), Rev 27.
PT/0/A/4600/113 (Operator Time Critical task Verification), Enclosure 13.8 (Transfer to Cold Leg Recirc), Rev 17.
Handouts:
EP/1/A/5000/ES-1.3 (Transfer to Cold leg Recirc) marked up for place-keeping through Step 7.
Time Critical Task:
No Validation Time:
12 minutes
Appendix C Page 4 of 11 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM D NUREG 1021, Revision 9 SIMULATOR OPERATIONAL GUIDELINES
- 1. Reset to IC-39.
- 3. Insert REM-NS0032A = 0 (1NS-32A fails to OPEN)
- 4. Carry out actions of EP/1/A/5000/E-0 until transition to EP/1/A/5000/E-1.
- 5. Carry out actions of EP/1/A/5000/E-1 until transition to EP/1/A/5000/ES-1.3.
- 6. Carry out actions of EP/1/A/5000/ES-1.3 through Step 7.
- 7. Ensure FWST level is 80-90
- 8. Ensure Containment pressure is > 3 psig (If not, raise pressure by creating Steam Break in Containment (MAL-007A and MAL-007B = 41000000)).
- 9. Freeze the Simulator OR
- 1.
Reset to IC-255 (February, 2012)
- 2.
Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
- 3.
Leave Simulator in FREEZE until operator is ready to begin.
Appendix C Page 5 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM D NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout EP/1/A/5000/ES-1.3 marked up for place-keeping through Step 7.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.
- 1 (Step 8) Align NS for recirc as follows:
(Step 8.a ) CLOSE the following valves:
1NS-20A (1A NS Pump Suction From FWST Isol).
1NS-3B (1B NS Pump Suction From FWST Isol).
The operator presses the 1NS-20A CLOSE pushbutton, and observes the Green status light LIT.
The operator presses the 1NS-3B CLOSE pushbutton, and observes the Green status light LIT.
2 (Step 8.b ) Check containment pressure -
GREATER THAN 3 PSIG.
The operator observes Containment Pressure Channels I through IV (or Equivalent), and determines that containment pressure is 4.5 psig.
Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM D NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 3
(Step 8.c ) Check at least one of the following alarms -
LIT:
"CONT SUMP LEVEL GREATER THAN 3 FT" on 1AD LIT OR "CONT SUMP LEVEL GREATER THAN 3 FT" on 1AD LIT.
The operator observes that both alarms are LIT.
4 (Step 8.d ) Check 1A NS Pump - AVAILABLE TO RUN.
The operator observes 1A NS Pump Green status light is LIT, and determines that it is available to run.
5 (Step 8.e) Align A Train NS to containment sump as follows:
(Step 8.e.1) Check 1NI-185A (1A ND Pump Suction From Cont Sump Isol) -
OPEN.
The operator observes the 1NI-185A Red status light LIT, Green status light is OFF.
6 (Step 8.e.2 ) Check 1B NS pump - OFF.
The operator observes 1B NS Pump Green status light is LIT, Red status light is OFF.
7 (Step 8.e.3 ) Check 1A RN pump - ON.
The operator observes 1A RN Pump Red status light is LIT, Green status light is OFF; and that motor amps are 92 amps.
Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM D NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 8
(Step 8.e.4 ) OPEN 1NS-32A (1A NS Hx Outlet Cont Outside Isol).
The operator presses the 1NS-32A OPEN pushbutton, and observes the Green status light LIT, Red status light OFF.
(Alternate Path)
The operator proceeds to the RNO.
9 (Step 8.e.4 RNO ) GO TO Step 8.f.
The operator proceeds to Step 8.f.
10 (Step 8.f) Align B Train NS to containment sump as follows:
(Step 8.f.1) Check 1NI-184B (1B ND Pump Suction From Cont Sump Isol) -
OPEN.
The operator observes the 1NI-184B Red status light LIT, Green status light is OFF.
11 (Step 8.f.2 ) Check 1A NS pump - OFF.
The operator observes 1A NS Pump Green status light is LIT, Red status light is OFF.
12 (Step 8.f.3) Check 1B RN pump - ON.
The operator observes 1B RN Pump Red status light is LIT, Green status light is OFF; and that motor amps are 90 amps.
- 13 (Step 8.f.4) OPEN 1NS-12B (1B NS Hx Outlet Cont Outside Isol).
The operator presses the 1NS-12B OPEN pushbutton, and observes the Red status light LIT, Green status light OFF.
- 14 (Step 8.f.5) OPEN 1NS-15B (1B NS Hx Outlet Cont Outside Isol).
The operator presses the 1NS-15B OPEN pushbutton, and observes the Red status light LIT, Green status light OFF.
Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM D NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 15 (Step 8.f.6) Check 1NS-3B (1B NS Pump Suction From FWST Isol) - CLOSED.
The operator observes 1NS-3B Green status light is LIT, Red status light is OFF.
The operator presses the 1NS-1B OPEN pushbutton, and observes the Red status light LIT, Green status light OFF.
17 (Step 8.f.8) Wait up to 30 seconds for the following valves to open:
1NS-12B 1NS-15B 1NS-1B The operator observes the 1NS-12B Red status light LIT, Green status light OFF.
The operator observes the 1NS-15B Red status light LIT, Green status light OFF.
The operator observes the 1NS-1B Red status light LIT, Green status light OFF.
- 18 (Step 8.f.9) Start 1B NS pump.
The operator presses the 1B NS Pump START Pushbutton, and observes the Red status light LIT, Green status light OFF; and motor amps rises to 40 amps.
The operator presses the 1RN-235B OPEN pushbutton, and observes Red and Green status lights LIT.
Appendix C Page 9 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM D NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 20 (Step 8.f.11) WHEN 1RN-235B begins to open, THEN THROTTLE OPEN 1RN-238B (B NS Hx Outlet Isol) to establish 3600 GPM to 1B NS Hx.
The operator presses OPEN pushbutton (Jog Control) 1RN-238B to get 3600 gpm (+/- 200 gpm)
RN flow indicated on 1MRNLP5880.
Cue:
Another operator will complete the remaining steps.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - Control Room JPM D NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - Control Room JPM D Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Earlier in the shift, the Unit 1 reactor tripped due to a Large Break LOCA inside of containment.
EP/1/A/5000/ES-1.3 (Transfer To Cold Leg Recirc) has been implemented and completed through step # 7.
Containment pressure is approximately 4 psig.
The FWST Level is approximately 80 inches and lowering.
INITIATING CUE:
The CRS has directed you to perform Step 8 of EP/1/A/5000/ES-1.3 (Transfer To Cold Leg Recirc) and align NS for Recirc.
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - Control Room JPM E (Rev_080112)
NUREG 1021, Revision 9 SIM JPM E
Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM E NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Midloop Makeup to the NCS JPM No.:
2012 Systems - Control Room JPM E K/A
Reference:
025, AA1.02 (3.8/3.9)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout of AP/1/A/5500/19.
Initial Conditions:
Unit 1 is in mode 5 during a refueling outage.
ND Pump 1B was in operation and NC Level was being maintained at 10" above centerline of 'C' Hotleg.
Upon receipt of the "NC System Lo Level" Alarm, NC Level is observed at ~3.0 inches.
AP/1/A/5500/19 (Loss of ND or ND System Leakage) has been entered and completed up to Step 6.a RNO a.1.
The CRS is considering makeup options for the NCS.
Initiating Cue:
The CRS has directed you to use Enclosure 5 (Makeup Via NV Pumps Through S/I Flowpath) of AP/1/A/5500/19 (Loss of ND or ND System leakage) to initiate makeup to the NCS.
The crew will continue with the completion of AP/1/A/5500/19.
Task Standard:
The operator will initiate make up to the NCS using Enclosure 5 (Makeup Via NV Pumps Through S/I Flowpath) of AP/1/A/5500/19 (Loss of ND or ND System leakage).
Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM E NUREG 1021, Revision 9 Required Materials:
None General
References:
AP/1/A/5500/19 (Loss of ND or ND System leakage), Rev 25 Handouts: (Makeup Via NV Pumps Through S/I Flowpath) of AP/1/A/5500/19 (Loss of ND or ND System leakage).
Time Critical Task:
NO Validation Time:
12 minutes
Appendix C Page 4 of 10 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM E NUREG 1021, Revision 9 SIMULATOR OPERATIONAL GUIDELINES
- 2. Ensure that OAC Screen M1A 1053 is displayed.
- 3. Close NI-178B.
- 4. Insert REM-ND0035 = 0.3 - 1ND35, ND to FWST Isol, select new value = 0.3; when NCS level is ~2.8" on highest Ultrasonic Channel, THEN delIA REM-ND0035.
- 5. Stop ND Pump 1B.
- 6. Open NI-178B
- 7. Level will rise to desired level of ~3.5"
- 8. Ensure that AP/1/A/5500/19 is completed through Step 6.a. RNO a.1.
- 9. Freeze the Simulator
- 10. Place Red tag Stickers on NC Pump Safety Breakers and NV pump 1A, and both NI pumps.
- 11. Update Thermal Margin to 30 minutes on the Unit Status Board OR
- 1.
Reset to IC-256 (February, 2012)
- 2.
Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
- 3.
Leave Simulator in FREEZE until operator is ready to begin.
Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM E NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout of AP/1/A/5500/19.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.
1 (Step 1) Check at least one NV pump available as follows:
NV pump - AVAILABLE TO START NV pump breaker -
RACKED IN.
The operator observes the 1B NV Pump Green status light is LIT, and determines that the pump breaker is Racked In and ready for start.
- 2 (Step 2) OPEN the following valves:
1NV-221A (U1 NV Pump Suct From FWST Isol).
1NV-222B (U1 NV Pump Suct From FWST Isol).
The operator presses the OPEN pushbutton for 1NV-221A, and observes the Red status light LIT, Green status light is OFF.
The operator presses the OPEN pushbutton for 1NV-222B, and observes the Red status light LIT, Green status light is OFF.
- 3 (Step 3) CLOSE the following valves:
1NV-141A (U1 VCT Outlet Isol).
1NV-142B (U1 VCT Outlet Isol).
The operator presses the CLOSE pushbutton for 1NV-141A, and observes the Green status light LIT, Red status light is OFF.
The operator presses the CLOSE pushbutton for 1NV-142B, and observes the Green status light LIT, Red status light is OFF.
Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM E NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 4
(Step 4) Ensure NV pump miniflow valves OPEN:
1NV-151A (U1 NV Pump Recirc Isol).
1NV-150B (U1 NV Pump Recirc Isol).
The operator observes that the 1NV-151A Red status light is LIT, Green status light is OFF.
The operator observes that the 1NV-150B Red status light is LIT, Green status light is OFF.
5 (Caution prior to Step 5)
Failure to maintain the normal charging header isolated while 1NI-9A (NC Cold Leg Inj From NV) or 1NI-10B (NC Cold Leg Inj From NV) is open, will result in NV pump runout conditions.
The operator reads the Caution and proceeds to Step 5.
- 6 (Step 5) CLOSE one of the following valves to prevent pump runout:
1NV-244A (U1 Charging Hdr Cont Outside Isol)
OR 1NV-245B (U1 Charging Hdr Cont Outside Isol).
The operator presses the CLOSE pushbutton for 1NV-244A, and observes the Green status light LIT, Red status light is OFF.
OR The operator presses the CLOSE pushbutton for 1NV-245B, and observes the Green status light LIT, Red status light is OFF.
Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM E NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 7 (Step 6) OPEN from Control Room, or dispatch operator to OPEN one or more of the following valves:
1NI-9A (NC Cold Leg Inj From NV) (aux bldg, 733+12, JJ-51, room 730, VCT hallway 1 ft south of JJ-51).
1NI-10B (NC Cold Leg Inj From NV) (aux bldg, 733+4, JJ-51, room 730, VCT hallway 1 ft south of JJ-51)
Dispatch operator to unlock and OPEN 1NI-3 (NC Inj From NV Chk Vlv Isol) (aux bldg, 733+15, JJ-52, mechanical penetration room).
The operator presses the OPEN pushbutton for 1NI-9A, and observes the Red status light LIT, Green status light is OFF.
AND/OR The operator presses the OPEN pushbutton for 1NI-10B, and observes the Red status light LIT, Green status light is OFF.
AND/OR The operator dispatches an NLO to open 1NI-9A and/or 1NI-10B and/or 1NI-3.
Cue:
If an NEO was dispatched, report that desired valve(s) is/are OPEN.
8 (Step 7) Check both NI pumps - OFF.
The operator observes the status lights for 1A NI Pump are OFF.
The operator observes the status lights for 1B NI Pump are OFF.
Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM E NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 9
(Step 8) Check NV pump -
RUNNING.
The operator observes the status lights for 1A NV Pump are OFF.
The operator observes the 1B NV Pump Green status light is LIT, Red status light is OFF.
10 (Step 8 RNO) Perform the following:
(Step 8 RNO a) CLOSE 1NV-238 (U1 Charging Hdr.
The operator observes the 1NV-238 SLIMs indicating 0% flow and demand (Downscale).
- 11 (Step 8 RNO b) Start associated NV Lube Oil pump.
The operator presses the START pushbutton for the 1B NV Lube Oil Pump.
- 12 (Step 8 RNO c) Start NV pump.
The operator presses the START pushbutton for the 1B NV Pump, and observes the Red status light LIT, Green status light is OFF; and that motor amps rises to 100 amps.
13 (Step 8 RNO d) Place associated NV Lube Oil pump in "AUTO".
The operator observes the AUTO pushbutton for the 1B NV Lube Oil Pump is depressed.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - Control Room JPM E NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - Control Room JPM E Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Unit 1 is in mode 5 during a refueling outage.
ND Pump 1B was in operation and NC Level was being maintained at 10" above centerline of 'C' Hotleg.
Upon receipt of the "NC System Lo Level" Alarm, NC Level is observed at ~3.0 inches.
AP/1/A/5500/19 (Loss of ND or ND System Leakage) has been entered and completed up to Step 6.a RNO a.1.
The CRS is considering makeup options for the NCS.
INITIATING CUE:
The CRS has directed you to use Enclosure 5 (Makeup Via NV Pumps Through S/I Flowpath) of AP/1/A/5500/19 (Loss of ND or ND System leakage) to initiate makeup to the NCS.
The crew will continue with the completion of AP/1/A/5500/19.
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - Control Room JPM F (Rev_080112)
NUREG 1021, Revision 9 SIM JPM F
Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Respond to High VCT Temperature JPM No.:
2012 Systems - Control Room JPM F (Alternate Path)
K/A
Reference:
APE 026, AA1.02 (3.2/3.3)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout of AP/1/A/5500/21.
Ensure AP/1/A/5500/21 marked up for place-keeping through Step 12 is available at the CRS Desk.
Initial Conditions:
Unit 1 is at 100% power when a leak develops in the KC System.
The crew entered AP/1/A/5500/21 (Loss of KC or KC System Leakage).
The crew has completed the actions through Step 12.
MCB Annunciator 1AD-7, D1, VCT HI TEMP, has just alarmed, and Foldout Page item #5 now applies.
The leak is suspected to be on the aux building non-essential header, and this header is likely to NOT be restored within 15 minutes.
Initiating Cue:
The CRS has directed you to perform the actions of Enclosure 6 of AP/1/A/5500/21 (Loss of KC or KC System Leakage), while the crew continues with AP-21.
Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 Task Standard:
The operator will isolate Letdown, and attempt to start the PD Pump.
Upon PD Pump start, the motor will fail, and the operator will ultimately align the suction of the NV Pumps to the FWST.
Required Materials:
None General
References:
AP/1/A/5500/21 (Loss of KC or KC System Leakage), Rev 9 OP/1/A/6100/010 H (Annunciator Response For Panel 1AD-7), Rev 63 Handouts:
AP/1/A/5500/21 (Loss of KC or KC System Leakage) marked up for place-keeping through Step 12.
(VCT High Temperature Actions) of AP/1/A/5500/21 (Loss of KC or KC System Leakage).
Time Critical Task:
NO Validation Time:
12 minutes
Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 SIMULATOR OPERATIONAL GUIDELINES
- 1.
Reset simulator to IC-39 (100%).
- 2.
Place in RUN
- 3.
Insert MALF-NV006C = TRUE (PD Pump fails to start manually).
- 4.
Insert REM-KC130 = 0.01 until VCT hi temp alarm occurs. This is done to simulate a leak in the Letdown Heat Exchanger KC flow which robs flow from LDHX and causes Letdown temperature to rise.
- 5.
Ensure MCB Annunciator 1AD-7 D1, HI VCT TEMP, has alarmed.
- 6.
Perform actions of AP/1/A/5500/21 through Step 12.
- 7.
Acknowledge the alarms.
- 8.
Freeze the Simulator OR
- 1.
Reset to IC-257 (February, 2012)
- 2.
Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
- 3.
Leave Simulator in FREEZE until operator is ready to begin.
Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout of AP/1/A/5500/21.
Ensure AP/1/A/5500/21 marked up for place-keeping through Step 12 is available at the CRS Desk.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.
Examiner NOTE: The Critical nature of Step 1 is to close 1NV-35A. IF this valve is NOT closed, the Critical nature of the Step can be satisfied by closing either 1NV-1A or 1NV-2A in Step 2.
1 (Step 1) Isolate letdown as follows:
(Step 1.a) Close:
1NV-458A (75 GPM L/D Orifice Outlet Cont Isol) 1NV-457A (45 GPM L/D Orifice Outlet Cont Isol) 1NV-35A (Variable L/D Orifice Outlet Cont Isol).
The operator observes the Green status light LIT, Red status light OFF.
The operator observes the Green status light LIT, Red status light OFF.
The operator rotates the 1NV-35A Control Switch to the CLOSE position, allowing it to return to AUTO, and observes the Green status light LIT, Red status light OFF.
Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 2
(Step 1.b) Close:
1NV-1A (NC L/D Isol To Regen Hx) 1NV-2A (NC L/D Isol To Regen Hx).
The operator rotates the 1NV-1A Control Switch to the CLOSE position, allowing it to return to AUTO, and observes the Green status light LIT, Red status light OFF.
The operator rotates the 1NV-2A Control Switch to the CLOSE position, allowing it to return to AUTO, and observes the Green status light LIT, Red status light OFF.
3 (Step 1.c) Check ND - IN SERVICE PRIOR TO EVENT.
The operator observes the plant operating at power, recognizes that ND is NOT in operation, and proceeds to the Step 1.c RNO.
4 (Step 1.c RNO) GO TO Step 2.
The operator proceeds to Step 2.
5 (Step 2) Check NV pumps suction - ALIGNED TO VCT.
The operator observes the 1NV-141A Red status light LIT, Green status light OFF.
The operator observes the 1NV-142B Red status light LIT, Green status light OFF.
6 (Caution prior to Step 3)
VCT high temperature will degrade NC pump seal cooling and NV pump operation.
The operator reads the Caution and proceeds.
Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 7
(Note prior to Step 3) A loss of KC cooling to KC aux building non-essential header causes VCT temperature to rise, primarily due to NV pump recirc flow.
The operator reads the Note and proceeds.
8 (Step 3) IF restoration of KC cooling to aux building non-essential header is expected within next 15 minutes, THEN exit this enclosure.
The operator requests this information from the CRS.
Cue:
IF required, as the CRS, report that the leak is suspected to be on the aux building non-essential header, and this header is likely to NOT be restored within 15 minutes.
9 (Step 4) Check excess letdown - ISOLATED.
The operator observes the 1NV-24B Green status light LIT, Red status light OFF.
The operator observes the 1NV-25B Green status light LIT, Red status light OFF.
The operator determines that Excess letdown is isolated.
10 (Step 5) IF AT ANY TIME excess letdown must be established, AND KC cooling still lost to KC aux building non-essential header, THEN excess letdown must be aligned to NCDT instead of VCT.
The operator reads the conditional step and proceeds.
Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 11 (Notes prior to Step 6) PD pump will not heat up VCT since it does not recirc water to VCT.
Running PD pump instead of swapping NV to FWST will prevent thermal transient on NC pumps, and allow continued operation of unit. 1A and 1B NV pumps will be stopped to prevent VCT overheating.
The operator reads the Notes and proceeds.
12 (Step 6) Check:
PD pump - AVAILABLE TO RUN 1ETA - ENERGIZED 1RN-42A (AB Non Ess Supply Isol) - OPEN.
The operator observes the PD Pump breaker Green status light is LIT.
The operator observes the voltage on 1ETA to be 4167 volts.
The operator observes 1RN-42A red status light LIT, Green status light OFF, and recognizes that the PD Pump is available.
13 (Step 7) Start PD pump as follows:
(Step 7.a) Open the following valves:
1RN-63B (AB Non Ess Return Isol).
1RN-64A (AB Non Ess Return Isol).
The operator observes the 1RN-63B Red status light LIT, Green status light OFF.
The operator presses the 1RN-64A OPEN pushbutton, and observes the Red status light LIT, Green status light OFF.
14 (Step 7.b) Ensure Charging flow - LESS THAN 90 GPM.
The operator observes 1NVP5630, and determines that Charging flow is <90 gpm, and lowering.
Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 15 (Step 7.c) Place "PD PUMP SPEED CNTRL" in "MAN" and set for minimum speed.
The operator observes the PD Pump Speed Control SLIMs MAN light LIT, and the controller output and setpoint indicate 0.
16 (Step 7.d) Open 1NV-1047A (PD Pump Recirculation).
The operator presses the 1NV-1047A OPEN pushbutton, and observes the Red status light is LIT, Green status light OFF.
17 (Step 7.e) Start the PD pump.
The operator presses the PD Pump START pushbutton, and observes the Green status light LIT, Red status light OFF; and recognizes that the PD Pump has failed to start (Alternate Path).
The operator proceeds to the Step 7 RNO.
- 18 (Step 7 RNO) GO TO Step
- 15.
The operator proceeds to Step 15.
19 (Step 15) Check Reactor -
TRIPPED.
The operator observes the plant operating at power, recognizes that the plant is NOT tripped, and proceeds to the Step 15 RNO.
Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 20 (Step 15 RNO) Perform the following:
(Step 15 RNO a) Reduce turbine load as required to maintain T-Ave at T-Ref in subsequent steps.
(Step 15 RNO b) REFER TO AP/1/A/5500/04 (Rapid Downpower) as required.
The operator informs the CRS that subsequent steps will place the plant in a downpower due to boration; and requests that the CRS refer to AP-4.
Cue:
As the CRS, acknowledge the report, and indicate that the OATC will maintain Tavg-Tref, and refer AP-04.
- 21 (Step 16) Swap NV suction to FWST as follows:
(Step 16.a) Open:
1NV-221A (NV Pumps Suct From FWST).
1NV-222B (NV Pumps Suct From FWST).
The operator presses the 1NV-221A OPEN pushbutton, and observes the Red status light LIT, Green status light OFF.
OR The operator presses the 1NV-222B OPEN pushbutton, and observes the Red status light LIT, Green status light OFF.
- 22 (Step 16.b) Close:
1NV-141A (VCT Outlet Isol) 1NV-142B (VCT Outlet Isol).
The operator presses the 1NV-141A CLOSE pushbutton, and observes the Green status light LIT, Red status light OFF.
OR The operator presses the 1NV-142B CLOSE pushbutton, and observes the Green status light LIT, Red status light OFF.
Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 23 (Step 17) WHEN KC cooling is restored to KC aux building non-essential header, THEN NV suction may be realigned to VCT as follows:
Open:
1NV-141A (VCT Outlet Isol) 1NV-142B (VCT Outlet Isol).
Close 1NV-221A (NV Pumps Suct From FWST) 1NV-222B (NV Pumps Suct From FWST).
The operator reads the conditional Step and proceeds.
24 (Step 18) RETURN TO step in effect in body of this procedure.
The operator informs the CRS that Enclosure 6 is complete.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - Control Room JPM F NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - Control Room JPM F Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Unit 1 is at 100% power when a leak develops in the KC System.
The crew entered AP/1/A/5500/21 (Loss of KC or KC System Leakage).
The crew has completed the actions through Step 12.
MCB Annunciator 1AD-7, D1, VCT HI TEMP, has just alarmed, and Foldout Page item #5 now applies.
The leak is suspected to be on the aux building non-essential header, and this header is likely to NOT be restored within 15 minutes.
INITIATING CUE:
The CRS has directed you to perform the actions of Enclosure 6 of AP/1/A/5500/21 (Loss of KC or KC System Leakage), while the crew continues with AP-21.
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - Control Room JPM G (Rev_080112)
NUREG 1021, Revision 9 SIM JPM G
Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Perform Diesel Generator Operability Test JPM No.:
2012 Systems - Control Room JPM G (Alternate Path)
K/A
Reference:
064, A4.06 (3.9/3.9)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout PT/1/A/4350/002B, with Enclosure 13.1 marked up for place-keeping through Step 2.6.
Initial Conditions:
Unit 1 is operating at 100% power.
A monthly test of the 1B Emergency Diesel Generator is required.
The A Train is the operating Train.
The System Engineer wants to start and stop the Diesel from the Control Room.
PT/1/A/4350/002B Enclosure 13.1 is complete through Step 2.6.
Two NEOs, Bob and Carol are standing by at the 1B D/G to assist.
They have a copy of the PT, and can be reached at ext. 4276 Initiating Cue:
The CRS has directed you to conduct a Slow Start of the 1B Emergency Diesel Generator starting with Step 2.7 of Enclosure 13.1 of PT/1/A/4350/002B (Diesel Generator 1B Operability Test).
Appendix C Page 3 of 15 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 Task Standard:
The 1B DG is started from the Control Room and prepared for parallel operation with 1ETB. The 1B DG is stopped using its normal stop switch when indications of a sudden loss of crankcase vacuum and a loss of Engine speed are observed.
Required Materials:
None General
References:
PT/1/A/4350/002B (Diesel Generator 1B Operability Test), Rev 94 Handouts:
PT/1/A/4350/002B, Diesel Generator 1B Operability Test, with 3.1 marked up for place-keeping through Step 2.6.
Time Critical Task:
NO Validation Time:
30 minutes
Appendix C Page 4 of 15 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 SIMULATOR OPERATIONAL GUIDELINES
- 1. Reset to IC # 21, 100% Power, BOL. Go to RUN.
- 2. Ensure that the A Train is the operating Train.
- 3. Insert MAL-DG006B1, DGB Auto Excitation Failure = 95.
insertMAL-DG002B = TRUE (ANN) 1AD11_D06 = ON OR
- 1.
Reset to IC-258 (February, 2012)
- 2.
Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
- 3.
Leave Simulator in FREEZE until operator is ready to begin.
NOTE:
During the NEO Actions of JPM Step 12, Simulator Instructor must change 1AD-11/D06 = OFF (Simulates Before & After LOP Off)
THEN, Execute and Activate Lesson Plan (JPM G DG 1B Fails to Min Speed).
NOTE: At step 6 once D/G had come up to voltage and freq, DELETE DG006B1. This will allow the operator to control voltage.
Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout PT/1/A/4350/002B, with Enclosure 13.1 marked up for place-keeping through Step 2.6.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 1 (Step 2.7) Place Control Room 1B D/G Mode Select to applicable position:
LOCAL to start D/G from local panel OR C/R to start D/G from Control Room The operator places the Control Room 1B D/G Mode Select to C/R.
2 (Step 2.8) Notify Unit 1 Control Room of the following:
Adjusting Main Generator voltage while the D/G is tied to the grid will significantly affect the power factor on the operating D/G 1B Diesel Generator will soon be started and a plant announcement is required The operator informs the OATC that adjusting Main Generator voltage while the D/G is tied to the grid will significantly affect the power factor on the operating D/G.
The operator informs the CRS that 1B Diesel Generator will soon be started and a plant announcement is required.
Cue:
Acknowledge as the U-1 OATC, and then as the CRS.
Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 3
(Caution prior to Step 2.9)
Steps 2.9-2.12 should be performed in less than two minutes.
The operator reads Caution and proceeds to Step 2.9.
- 4 (Step 2.9) Rotate Load Limit control knob on Woodward Governor Actuator counter-clockwise to SLOW START position.
The operator contacts the NEO and directs that the Load Limit control knob on Woodward Governor Actuator be rotated counter-clockwise to SLOW START position.
Cue:
NEO reports that the Load Limit control knob is in the SLOW START position.
- 5 (Step 2.10) Start "1B Diesel Generator".
The operator depresses the START pushbutton on the 1B D/G, and observes Red status light LIT, and Green status light OFF.
The operator observes status light 1SI-15/B-3 LIT momentarily then OFF, and THEN status light 1SI-15/B-4 LIT.
The operator observes 1B D/G Frequency to be 60.2Hz, and voltage 4163v.
Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6
(Step 2.11) Check either of the following:
D/G starts and reaches 95% speed (57 Hz)
OR (Local start timer times out and shuts down 1B D/G).
The operator observes 1B DG Frequency to be 60.2 Hz.
Simulator Operator:
DELETE DG006B1 to allow student to control voltage.
- 7 (Step 2.12) AFTER D/G has started OR local start timer times out AND shuts down 1B D/G, rotate "Load Limit" control knob on Woodward Governor fully clockwise (MAX FUEL).
The operator contacts the NEO and directs that the Load Limit control knob on Woodward Governor Actuator be rotated fully clockwise.
Cue:
NEO reports that the Load Limit control knob is in the MAX FUEL position.
8 (Step 2.13) IF 1B D/G starts, record the following:
D/G start date:
D/G start time:
The operator records the current time and date in the space provided.
Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 9
(Note prior to Step 2.14)
PIP M 10-4241 identifies a known issue with long start times when 1B D/G is started in "Slow Start" Mode. This is due to Woodward Governor response when "Load Limit" control knob is NOT set in Max Fuel position. IF 1B D/G start time exceeds the point the local timer times out AND shuts down 1B D/G, THEN a 1B D/G Fast Start is recommended to confirm 1B D/G operability.
The operator reads the Note and proceeds.
10 (Step 2.14) IF local start timer times out AND shuts down 1B D/G,.
The operator recognizes that this step is NA and continues.
11 (Step 2.15) Evaluate operability of 1B D/G.
The operator requests the CRS to evaluate the operability of the 1B D/G inoperable.
Cue:
Examiner Acknowledge as the CRS and Initial Step 2.14 in procedure.
Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 12 (Steps 2.16-22) Local actions.
The operator observes that Step 2.16-2.22 are local actions and directs the NEO to perform these actions in the procedure and report back to the Control Room.
Simulator Operator:
SET 1AD-11/D06 = OFF (Simulates Before & After LOP Off).
Cue:
NEO reports that local actions have been taken and steps 2.15 through 2.21 are signed off in the procedure.
Cue:
If asked, the NEO reports:
Oil level is visible in the Governor sight glass.
Jacket Water pressure is
> 24 psig.
Lube Oil pressure is > 36 psig.
The Before & After LOP is OFF and in AUTO.
1LD-113B (1B D/G Lube Oil Filter Bypass) indicates Closed.
Fuel Oil Pressure is > 32 psig.
Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 13 (Step 2.23) Check the following on OAC (Turn-on Code - RNESS1B):
1RN-171B (B KD HX Supply Isol) indicates OPEN.
RN flow indicated through D/G Heat Exchanger using OAC OR alternate indication.
The operator turns on OAC Code RNESS1B and observes that 1RN-171B is OPEN (Red) and that there is 1300 gpm through the 1B D/G Heat Exchanger.
14 (Step 2.24) Check the following:
Steady-state D/G volts 3740
- 4580 V.
Steady-state D/G frequency 58.8 - 61.2 Hz.
The operator observes 1B D/G voltage to be 4163 V.
The operator observes 1B D/G frequency to be 60.2 Hz.
15 (Step 2.25) Ensure Control Room 1B D/G Mode Select to applicable position:
LOCAL to load D/G from local panel OR C/R to load D/G from Control Room The operator observes the Control Room 1B D/G Mode Select to C/R.
Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 16 (Step 2.26) Record 1EQCME1BCAMP (1B D/G Voltage Regulator Control Ammeter) (on 1B D/G Voltage Regulator Panel):
The operator contacts the NEO and requests 1EQCME1BCAMP reading.
Cue:
NEO reports that 1EQCME1BCAMP reading is 1.2 amps.
The operator records the amps in the space provided.
17 (Step 2.27) Check Line Volts 3960-4360 V.
The operator observes line voltage to be 4169 V.
18 (Step 2.28) Adjust D/G voltage 50-100 V higher than line voltage using 1B D/G Voltage Adjust.
The operator rotates the 1B D/G Voltage Adjust switch to RAISE and adjusts DG voltage to 4219-4269 V.
19 (Caution prior to Step 2.29)
Failure of the Droop Permissive could result in erratic D/G operation while paralleled to the bus.
The operator reads the Caution and proceeds to Step 2.28.
20 (Step 2.29) IF OAC available, check OAC point M1D3356 (1B D/G Droop Permissive) indicates COMPLETE.
The operator observes OAC Point M1D3356 indicates COMPLETE.
21 (Step 2.30) Place 1B D/G Synch to ON.
The operator places the 1B D/G Synch Switch to ON, and observes synch scope stopped at 6 oclock.
Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 22 (Note prior to Step 2.31) As a guide, have synchroscope traveling no faster than one revolution in 20 seconds.
The operator reads the Note and proceeds.
23 (Step 2.31) Using 1B D/G Gov Cntrl, adjust D/G speed to allow synchroscope to move slowly and smoothly in the FAST (clockwise) direction.
The operator uses the Governor Control adjust so that the synchroscope is moving slowly and smoothly in the FAST (clockwise) direction.
Simulator Operator: Execute and Activate Lesson Plan (JPM G DG 1B Fails to Min Speed).
NOTE: This will fail the D/G to minimum speed causing the synchroscope to rapidly change direction; and causing 1AD-11/A-6 to alarm. (Alternate Path)
Cue:
The operator may contact the NEO.
If so, report that the DG is making a great deal of noise.
Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 24 (Precaution 6.7) IF a sudden loss of crankcase vacuum is indicated, together with an unusual knock or sudden decrease of speed, stop engine with normal stop switch to ensure circulation of LD and KD for at least 20 minutes.
Engine covers must remain in place during this cooling period, since engine vapors may ignite.
The operator places the 1B D/G normal stop switch to STOP.
Examiner NOTE:
The critical portion of this step is to Stop the Diesel.
While the preferred means to stop the Diesel is via the normal stop switch, if the operator stops the engine via the emergency stop pushbutton, the critical portion of the step is satisfied.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - Control Room JPM G NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - Control Room JPM G Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Unit 1 is operating at 100% power.
A monthly test of the 1B Emergency Diesel Generator is required.
The A Train is the operating Train.
The System Engineer wants to start and stop the Diesel from the Control Room.
PT/1/A/4350/002B Enclosure 13.1 is complete through Step 2.6.
Two NEOs, Bob and Carol are standing by at the 1B D/G to assist. They have a copy of the PT, and can be reached at ext. 4276 INITIATING CUE:
The CRS has directed you to conduct a Slow Start of the 1B Emergency Diesel Generator starting with Step 2.7 of Enclosure 13.1 of PT/1/A/4350/002B (Diesel Generator 1B Operability Test).
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - Control Room JPM H (Rev_080112)
NUREG 1021, Revision 9 SIM JPM H
Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Control Room Air Intake High Radiation Alarms JPM No.:
2012 Systems - Control Room JPM H K/A
Reference:
APE 061, AA2.01 (3.5/3.7)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).
Initial Conditions:
Units 1 and 2 are operating at 100% power.
Annunciator 1RAD-2 B2, EMF 43B CR AIR INTAKE B HI RAD, alarmed 45 seconds ago.
Annunciator 1RAD-1 B2, EMF 43A CR AIR INTAKE A HI RAD, alarmed 15 seconds ago.
Initiating Cue:
The CRS has directed you perform the immediate actions associated with the Annunciator Response Procedures for both alarms.
Task Standard:
The operator will determine that the Unit 2 intake presents a greater threat than Unit 1, and align the VC inlet to take suction on Unit 1 only; and then pressurize the Control Room from the A Train Outside Air Pressure Fan.
Required Materials:
None General
References:
OP/1/A/6100/010 Q (Annunciator Response for Panel 1RAD-1), Rev 63 OP/1/A/6100/010 R (Annunciator Response for Panel 1RAD-2), Rev 38
Appendix C Page 3 of 15 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 OP/0/A/6450/011 (Control Area Ventilation / Chilled Water System), Rev 95 Handouts:.14 (Response When EMF43A or 43B In Trip 2 or Non-Functional) of OP/0/A/6450/011 (Control Area Ventilation / Chilled Water System)
.4 (Control Room Atmosphere Pressurization During Abnormal Conditions) of OP/0/A/6450/011 (Control Area Ventilation /
Chilled Water System)
Time Critical Task:
NO Validation Time:
15 minutes
Appendix C Page 4 of 15 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 SIMULATOR OPERATIONAL GUIDELINES
- 1.
Reset simulator to IC-39 (100%).
- 2.
Place in RUN
- 3.
Adjust the output of EMF 43B to greater than the Trip II setpoint (Insert MAL-EMF-43B = 500).
- 4.
Adjust the output of EMF 43A to greater than the Trip II setpoint, but less than the value of EMF 43B (Insert MAL-EMF-43A = 300).
- 5.
Ensure 1RAD-1 B2 and 1RAD-2 B2 are both LIT.
- 6.
Ensure Air Intake Valves from BOTH Units are OPEN.
- 7.
Acknowledge all alarms.
- 8.
Freeze the Simulator OR
- 1.
Reset to IC-259 (February, 2012)
- 2.
Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
- 3.
Leave Simulator in FREEZE until operator is ready to begin.
Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.
1 (OP/1/A/6100/010 Q, IA)
Perform OP/0/A/6450/011 (Control Area Ventilation /
Chilled Water System).14 (Response When EMF 43A and/or EMF 43B In Trip 2 or Non-Functional).
After checking the other ARP, the operator proceeds to OP/0/A/6450/011.14.
Examiner Note:
The Immediate Actions for both ARPs are the same. The operator can address in either order (Step 1 and 2 can be done in any order).
When operator seeks.14, provide a previously prepared copy.
2 (OP/1/A/6100/010 R, IA)
Perform OP/0/A/6450/011 (Control Area Ventilation /
Chilled Water System).14 (Response When EMF 43A and/or EMF 43B In Trip 2 or Non-Functional).
After checking the other ARP, the operator proceeds to OP/0/A/6450/011.14.
Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 3
(OP/0/A/6450/011.14, Step 2.1)
EMF43A or EMF43B in Trip 2 Alarm or Non-Functional.
The operator observes that EMF-43A is in TRIP II.
The operator observes that EMF-43B is in TRIP II.
4 (Step 3.1) Evaluate all outstanding R&Rs that may impact performance of this procedure.
The operator requests this information from the CRS.
Cue:
There are no outstanding R&Rs on this equipment.
5 (Step 3.2) Perform the following sections, as applicable:
Section 3.3, Response for EMF43A or EMF43B Non Functional Section 3.4, Response for Trip 2 on EMF43A (Control Rm Air Intake Loc A)
Section 3.5, Response for Trip 2 on EMF43B (Control Rm Air Intake Loc B)
Section 3.6, Response for Trip 2 on EMF43A (Control Rm Air Intake Loc A) AND EMF43B (Control Rm Air Intake Loc B)
The operator observes that EMF-43A is in TRIP II.
The operator observes that EMF-43B is in TRIP II.
The operator proceeds to Section 3.6.
Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6
(Step 3.6) Response for Trip 2 on EMF43A (Control Rm Air Intake Loc A) AND EMF43B (Control Rm Air Intake Loc B)
(Step 3.6.1) Notify RP of Trip 2 on both EMF43A and EMF43B.
The operator calls and notifies RP of the situation, and records.
Cue:
RP Technician Don Smith acknowledges.
7 (Note prior to Step 3.6.2)
Both sets of air intakes should never be closed at same time.
The operator reads the Note and proceeds.
- 8 (Step 3.6.2) IF both Unit 1 and Unit 2 intake valves open, perform the following:
(Step 3.6.2.1) Determine location with highest radiation hazard per one or both of the following:
(Step 3.6.2.1.A) Check EMF readings in Control Room and determine location with highest radiation hazard.
The operator observes that both Unit 1 and Unit 2 intake valves are OPEN.
The operator observes EMF 43A and EMF 43B and determines that EMF 43B has the highest reading.
Examiner Note:
The operator must accomplish this step or JPM Step 10 (Step 3.6.2.1.B) to satisfy the Critical nature of this step.
This Step is ONLY Critical if JPM Step 10 is NOT completed.
Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 9
(Note prior to Step 3.6.2.1.B) Each unit's intake can be accessed from associated unit's D/G building roof. The intake is 2 candy cane shaped 18" pipes on Aux building roof, next to Reactor building.
The operator reads the Note and proceeds.
- 10 (Step 3.6.2.1.B) Notify RP to check VC intake radiation and determine location with highest radiation hazard.
The operator calls requests RP to survey the areas.
Cue:
If asked, RP Technician Don Smith acknowledges and reports Unit 2 intake at 5 mr/hr, and Unit 1 intake at 3 mr/hr.
Examiner Note:
The operator must accomplish this step OR JPM Step 8 (Step 3.6.2.1.A) to satisfy the Critical nature of this step.
This Step is ONLY Critical if JPM Step 8 is NOT completed.
11 (Step 3.6.2.2) IF both intake radiation hazards are the same,..
The operator recognizes that the threat at Unit 2 is higher and that this step is NA.
Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 12 (Step 3.6.2.3) IF Unit 1 intake (monitored by EMF43A) is intake with highest radiation hazard.
The operator recognizes that the threat at Unit 2 is higher and that this step is NA.
- 13 (Step 3.6.2.4) IF Unit 2 intake (monitored by EMF43B) is intake with highest radiation hazard ensure the following closed:
1VC-9A (VC Otsd Air Intake Isol from Unit 2) 1VC-10A (VC Otsd Air Intake Isol from Unit 2) 1VC-11B (VC Otsd Air Intake Isol from Unit 2) 1VC-12B (VC Otsd Air Intake Isol from Unit 2)
The operator presses the 1VC-9A pushbutton, and observes the Green status light LIT, Red status light OFF.
The operator presses the 1VC-10A pushbutton, and observes the Green status light LIT, Red status light OFF.
The operator presses the 1VC-11B pushbutton, and observes the Green status light LIT, Red status light OFF.
The operator presses the 1VC-12B pushbutton, and observes the Green status light LIT, Red status light OFF.
Cue:
If asked, indicate that a Concurrent Verification (CV) has been completed.
Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 14 (Step 3.6.3) IF EMF43A (Control Rm Air Intake Loc A) AND EMF43B (Control Rm Air Intake Loc B) Trip 2 alarm valid (no loss of power), perform the following:
(Step 3.6.3.1) Pressurize Control Room per.4 (Control Room Atmosphere Pressurization During Abnormal Conditions ).
The operator observes both instruments and determines that both EMF 43A and EMF 43B are valid alarms; and proceeds to Enclosure 4.4.
Examiner Note:
When operator seeks.4, provide a previously prepared copy.
15 (OP/0/A/6450/011.4, Step 2.1)
Control Room atmosphere has been determined to be in need of pressurization to protect Control Room personnel.
The operator recognizes that this Initial Condition has been satisfied during the performance of the Immediate Actions.
16 (Step 2.2) VC / YC Train A OR B is selected and is in operation per this procedure.
The operator observes that the VC/YC Train B Mode Select Switch is in B, and that the VC/YC Train A Mode Select Switch is in OFF, and determines that the Train B is selected and in operation.
17 (Step 3.1) Evaluate all outstanding R&Rs that may impact performance of this procedure.
The operator requests this information from the CRS.
Cue:
There are no outstanding R&Rs on this equipment.
Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 18 (Step 3.2) Pressurize Control Room using Outside Air Pressure Fans as follows:
(Step 3.2.1) Ensure at least one the following groups of intake valves open:
1VC-1A (VC Otsd Air Intake Isol from Unit 1) 1VC-2A (VC Otsd Air Intake Isol from Unit 1) 1VC-3B (VC Otsd Air Intake Isol from Unit 1) 1VC-4B (VC Otsd Air Intake Isol from Unit 1)
OR 1VC-9A (VC Otsd Air Intake Isol from Unit 2) 1VC-10A (VC Otsd Air Intake Isol from Unit 2) 1VC-11B (VC Otsd Air Intake Isol from Unit 2) 1VC-12B (VC Otsd Air Intake Isol from Unit 2)
The operator observes the Red status lights LIT for the Unit 1 valves.
Cue:
If asked, indicate that a Concurrent Verification (CV) has been completed.
19 (Step 3.2.2) IF A Train VC/
YC operating,..
The operator observes that the A Train of VC/YC is OFF.
- 20 (Step 3.2.3) IF B Train VC /
YC operating, place "B Train CR Outside Air Press Fan" to "ON".
The operator rotates the B Train CR Outside Air Press Fan Control Switch to the ON position.
Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 21 (Step 3.2.4) Depress "MAN" for the following (to ensure fans off):
- 1 CRA Otsd Air Fan
- 2 CRA Otsd Air Fan The operator presses the MAN pushbutton for #1 CRA Otsd Air Fan, and observes the Green status light is LIT, Red status light is OFF.
The operator presses the MAN pushbutton for #2 CRA Otsd Air Fan, and observes the Green status light is LIT, Red status light is OFF.
- 22 (Step 3.2.5) Depress "OFF" for the following:
CRA-OAD-4 (CR Area Otsd Air Fans Damper)
CRA-OAD-3 (CR Area Otsd Air Fans Damper)
The operator presses the OFF pushbutton for CRA-OAD-4, and observes the Red status light is OFF.
The operator presses the OFF pushbutton for CRA-OAD-3, and observes the Red status light is OFF.
Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 23 (Step 3.2.6) Check the following dark:
CRA-OAD-4 (CR Area Otsd Air Fans Damper)
"OPEN" light CRA-OAD-3 (CR Area Otsd Air Fans Damper)
"OPEN" light The operator observes CRA-OAD-4 light is OFF.
The operator observes CRA-OAD-3 light is OFF.
Cue:
Another operator will complete this procedure Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - Control Room JPM H NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - Control Room JPM H Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Units 1 and 2 are operating at 100% power.
Annunciator 1RAD-2 B2, EMF 43B CR AIR INTAKE B HI RAD, alarmed 45 seconds ago.
Annunciator 1RAD-1 B2, EMF 43A CR AIR INTAKE A HI RAD, alarmed 15 seconds ago.
INITIATING CUE:
The CRS has directed you perform the immediate actions associated with the Annunciator Response Procedures for both alarms.
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - In-Plant JPM I (Rev_080212)
NUREG 1021, Revision 9 In-Plant JPM I
Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Swap Battery Charger EVCA Power Supply from Unit 1 to Unit 2 JPM No.:
2012 Systems - In-Plant JPM I K/A
Reference:
APE 058 AA2.01 (3.7/4.1)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
X Actual Performance:
Classroom Simulator Plant X
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 2 of AP/1/A/5500/07.
Initial Conditions:
Unit 1 has just experienced a LOOP (Loss of Offsite Power).
The 1A D/G will not start.
1ETA is de-energized.
AP/1/A/5500/07 (Loss of Electrical Power), Case 1 has been entered.
While performing Enclosure 7 (DC Bus Alignment), the RO notices that Vital Battery Charger EVCA is de-energized.
Initiating Cue:
The CRS directs you to swap power supplies to the EVCA Battery Charger from Unit 1 to Unit 2 in accordance with Enclosure 22 (Swapping Battery Charger Power Supplies) of AP/1/A/5500/07 (Loss of Electrical Power).
Task Standard:
The operator aligns power to Battery Charger EVCA from Unit 2 within 20 minutes of dispatch.
Required Materials:
PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 Dosimetry General
References:
AP/1/A/5500/07 (Loss of Electrical Power), Rev 31 PT/0/A/4600/113 (Operator Time Critical Task Verification), Enclosure 13.15 (Essential Battery Charger Power Supply), Rev 17 Handouts: 2 (Swapping Battery Charger Power Supplies) of AP/1/A/5500/07 (Loss of Electrical Power).
Time Critical Task:
YES-20 Minutes UFSAR 8.3.2.1.4.2 states that "should a loss of battery charger or an AC power source occur, a single battery is capable of supplying two channels for 1-hour while maintaining sufficient terminal voltage".
To ensure that the assumed battery life expectancy is not exceeded, AP-07 (along with other loss of power procedures) contains requirements to restore the associated battery charger to service within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of a loss of power.
PT/0/A/4600/113, Enclosure 13.15 (Essential Battery Charger Power Supply) is performed periodically to ensure that this time-critical time can be met and assumes that it takes 40 minutes to dispatch an operator and 20 minutes to complete the local actions.
Validation Time:
15 minutes Notes:
Start this JPM from the hallway outside of the Ops kitchen area.
Record the Time Critical Completion Time (in JPM step number 13) when the Charger "DC Output" Breaker is closed in.
Appendix C Page 4 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 2 of AP/1/A/5500/07.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 1
(Caution prior to Step 1)
This enclosure should be performed without delay to limit time battery is supplying DC bus.
The operator reads the Caution and proceeds.
Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 2
(Step 1) Perform applicable section(s) as specified in (DC Bus Alignment):
To swap power supplies to EVCA Battery Charger, perform Step 2.
To swap power supplies to EVCB Battery Charger, perform Step 3.
To swap power supplies to EVCC Battery Charger, perform Step 4.
To swap power supplies to EVCD Battery Charger, perform Step 5.
To swap power supplies to EVCS Battery Charger, perform one of the following:
IF 1EMXH is aligned to EVCS, THEN swap power supplies to 1EMXH PER Step 6.
OR IF 2EMXH is aligned to EVCS, THEN swap power supplies to 2EMXH PER Step 7.
The operator determines from initial conditions that Battery Charger EVCA is the desired charger and proceeds to step 2.
Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 3
(Step 2/2.a) To swap power supplies to EVCA Battery Charger, perform the following:
Determine which unit is desired to supply EVCA:
Unit 1 OR Unit 2 The operator determines from initial conditions that it is desired to supply Battery Charger EVCA from Unit 2, and places a check mark in front of Unit 2.
Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 4
(Steps 2.b.1-2) Have Control Room perform the following:
IF Unit I ETA is energized, THEN.
IF Unit 2 ETA is energized, THEN:
Ensure 2A D/G load sequencer reset.
Depress "STOP" for "EVCA Batt Charger" on 2MC-8.
The operator determines from initial conditions that 1ETA is NOT energized and proceeds to step 2.b.2.
The operator contacts to Control Room and asks if 2ETA is energized.
Cue:
2ETA is energized.
The operator contacts the Control Room and directs RO to ensure 2A D/G Sequencer is reset and EVCA stop button on 2MC-8 is depressed.
Cue:
2A D/G sequencer is reset, AND STOP Pushbutton has been depressed.
- 5 (Step 2.c) Open EVCA Battery Charger "DC OUTPUT" breaker The operator places the EVCA Battery Charger breaker in down direction.
Cue:
Switch is moved in the down direction and breaker indicates OFF.
Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6
(Caution prior to Step 2.d) It may be necessary to apply pressure on the breaker rotary switch in the counterclockwise direction while operating kirk key devices.
The operator reads the Caution and proceeds to Step 2.d
- 7 (Step 2.d) Open the following breakers:
ECB1-1B (Normal Inc Supply From MCC 1EMXA)
ECB1-1C (Alt Inc Supply From MCC 2EMXA)
The operator opens the Normal breaker.
Cue:
Normal Supply breaker handle rotated counter clockwise to the OFF position.
The operator observes the Alternate breaker.
Cue:
Breaker handle is indicating OFF.
- 8 (Step 2.e) Remove kirk key from breaker in step above.
The operator rotates and removes the kirk key from breaker ECB1-1B.
Cue:
Kirk key rotated and removed.
Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 9
(Step 2.f) IF Unit 1 to supply EVCA, The operator determines from initial conditions that it is NOT desired to supply power to EVCA from Unit 1 and proceeds to step 2.g.
- 10 (Step 2.g) IF Unit 2 to supply EVCA, THEN perform the following:
Use kirk key and close ECB1-1C (Alt Inc Supply From MCC 2EMXA).
Have Unit 2 Control Room operator start Battery Charger EVCA on 2MC-8.
The operator inserts key into the Unit 2 supply breaker and closes it.
Cue:
Kirk Key inserted.
Alternate Supply breaker handle rotated clockwise to the ON position.
The operator contacts the Control Room and requests that they start the Battery Charger EVCA on 2MC-8.
Cue:
Unit 2 RO has started EVCA Batt. Charger from 2MC-8.
11 (Step 2.h) IF EVCA battery charger DC volts are greater than or equal to 115 volts, THEN GO TO Step 2.j.
The operator checks EVCA battery charger DC output voltage.
Cue:
Charger DC output voltage is 132 volts.
The operator proceeds to Step 2.j.
Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 12 (Step 2.j) Ensure EVCA Battery Charger "FLOAT/EQUALIZE switch in FLOAT position.
The operator places the Battery Charger "FLOAT/EQUALIZE switch in FLOAT position.
Cue:
Switch in FLOAT position. The green FLOAT light is illuminated.
- 13 (Step 2.k) Close EVCA Battery Charger "DC OUTPUT" breaker The operator places the EVCA Battery Charger "DC OUTPUT" breaker to the UP position.
Cue:
Breaker handle has been pulled into the up position.
Stop Time for Time Critical Task:
14 (Step 2.l) Notify Control Room that EVCA Battery Charger is running.
The operator contacts the Control Room and informs the RO that the EVCA Battery Charger is running.
Cue:
The RO acknowledges.
Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 15 (Step 2.m) IF another battery charger needs to be swapped, THEN perform the applicable step as directed in Step 1.
The operator recognizes that no other battery Chargers need to be re-energized.
Cue:
No other chargers need to be swapped.
16 (Step 2.n) Exit this enclosure.
The operator exits the procedure.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
TIME CRITICAL STOP TIME:
Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - In-Plant JPM I NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - In-Plant JPM I Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Unit 1 has just experienced a LOOP (Loss of Offsite Power).
The 1A D/G will not start.
1ETA is de-energized.
AP/1/A/5500/07 (Loss of Electrical Power), Case 1 has been entered.
While performing Enclosure 7 (DC Bus Alignment), the RO notices that Vital Battery Charger EVCA is de-energized.
INITIATING CUE:
The CRS directs you to swap power supplies to the EVCA Battery Charger from Unit 1 to Unit 2 in accordance with Enclosure 22 (Swapping Battery Charger Power Supplies) of AP/1/A/5500/07 (Loss of Electrical Power).
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
THIS IS A TIME CRITICAL JPM
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - In-Plant JPM J (Rev_080212)
NUREG 1021, Revision 9 In-Plant JPM J
Appendix C Page 2 of 8 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - In-Plant JPM J NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Emergency Borate the Reactor Coolant System Locally Using 2NV-269 JPM No.:
2012 Systems - In-Plant JPM J K/A
Reference:
APE 024, AA1.04 (3.6/3.7)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
X Actual Performance:
Classroom Simulator Plant X
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout AP/2/A/5500/38 page 8 of 19 marked up for place-keeping.
Initial Conditions:
Unit 2 was at 100% power when a Boron dilution event occurred.
AP/2/A/5500/38 (Emergency Boration) was entered.
While attempting to open 2NV-265B (Boric Acid To NV Pumps), the RO discovered that 2NV-265B was de-energized.
Initiating Cue:
The CRS has directed you to emergency borate the NC System by performing Step 12.d RNO of AP/2/A/5500/38 (Emergency Boration and Response to Inadvertent Dilution).
Task Standard:
2NV-269 is located and manually opened (simulated) within ten (10) minutes.
Required Materials:
PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
Dosimetry
Appendix C Page 3 of 8 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - In-Plant JPM J NUREG 1021, Revision 9 General
References:
AP/2/A/5500/38 (Emergency Boration and Response to Inadvertent Dilution), Rev 10 PT/0/A/4600/113 (Operator Time Critical Task Verification), Enclosure 13.4 (Stop Dilution and Borate During a Dilution Event), Rev 17 Handouts:
Step 12.d RNO (Page 8 of 19) of AP/2/A/5500/38 (Emergency Boration and Response to Inadvertent Dilution) marked up for place-keeping.
Time Critical Task:
YES - The operators will stop dilution and initiate boration within 15 minutes in Mode 1 and 2, which may involve time critical local actions to open NV-265 or NV-269 (10 minutes from dispatch).
UFSAR 15.4.6 states that "there is adequate time available (at least 15 minutes) after a reactor trip for the operator to determine the cause of the dilution, isolate the primary grade water sources and initiate reboration before the reactor can return to criticality".
To meet the 15 minute time assumed in the UFSAR, PT/0/A/4600/113 (Operator Time Critical Task Verification), Enclosure 13.4 (Stop Dilution and Borate During a Dilution Event), Rev 17 is performed and assumed that it takes 5 minutes to dispatch the operator and 10 minutes to perform the actions.
Validation Time:
8 minutes Notes:
Start this JPM from the hallway outside of the Ops kitchen area.
Record the Time Critical Completion Time (in JPM step number 2) when 2NV-269 is open (Simulated).
Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM J NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout AP/2/A/5500/38 page 8 of 19 marked up for place-keeping.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 1
(Step 12.d RNO) Perform the following:
(Step 12.d RNO 1) Dispatch operator to OPEN 2NV-265B (aux bldg, 733+3, JJ-57, near chemical addition tank).
The operator locates 2NV-265B, presses downward on the Motor handwheel clutch, and rotates the handwheel in the counter-clockwise direction (simulated).
Cue:
Give the following cue as soon as the operator begins to describe opening the valve:
Handwheel clutch engaged Force applied in the counter clockwise direction Handwheel is NOT moving The operator recognizes that valve cannot be opened and continues.
Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM J NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 2
(Step 12.d RNO 2) IF 2NV-265B cannot be opened, THEN:
(Step 12.d RNO 2.a)
Dispatch operator to unlock and open 2NV-269 (Unit 2 NV Pump Boric Acid Supply Isol) (aux bldg, 733+4, JJ-58, near chemical addition tank).
The operator locates 2NV-269, removes the locking device, and rotates the handwheel in the counter-clockwise direction (simulated) within ten minutes of dispatch.
Cue:
Lock removed, Handwheel rotated fully counter-clockwise.
Stop Time for Time Critical Task:
3 (Step 12.d RNO 2.b) OPEN 2NV-267A (Boric Acid To Blender Control).
The operator calls the Control Room to report 2NV-269 Open and requests that the BOP Open 2NV-267A.
Cue:
The Control Room operator acknowledges that 2NV-269 and 2NV-267A is open.
Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM J NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 4
(Step 12.d RNO 3) Do not continue until 2NV-265B or 2NV-269 flowpath above is aligned.
The operator recognizes that 2NV-269 is OPEN, and indicates that the task is complete.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
TIME CRITICAL STOP TIME:
Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - In-Plant JPM J NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - In-Plant JPM J Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Unit 2 was at 100% power when a Boron dilution event occurred.
AP/2/A/5500/38 (Emergency Boration) was entered.
While attempting to open 2NV-265B (Boric Acid To NV Pumps), the RO discovered that 2NV-265B was de-energized.
INITIATING CUE:
The CRS has directed you to emergency borate the NC System by performing Step 12.d RNO of AP/2/A/5500/38 (Emergency Boration and Response to Inadvertent Dilution).
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
THIS IS A TIME CRITICAL JPM
Appendix C Job Performance Measure Form ES-C-1 Worksheet 2012 Systems - In-Plant JPM K (Rev_080212)
NUREG 1021, Revision 9 In-Plant JPM K
Appendix C Page 2 of 11 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - In-Plant JPM K NUREG 1021, Revision 9 Facility:
McGuire Task No.:
Task
Title:
Bypass A, B, and C VI Dryers following a Loss of Instrument Air JPM No.:
2012 Systems - In-Plant JPM K (Alternate Path)
K/A
Reference:
APE 065 AA1.02 (2.6/2.8)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
X Actual Performance:
Classroom Simulator Plant X
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout of AP/1/A/5500/22.
Initial Conditions:
Unit 1 is operating at 100% power.
AP/1/A/5500/22 (Loss of VI) has been implemented due to decreasing VI Pressure.
VI Pressure is holding at 75 psig but the leak has not been isolated.
Several other operators have been dispatched for various tasks in response to the loss of VI.
Initiating Cue:
The CRS directs you to bypass the VI dryers and isolate VS per (VI Dryer and VI to VS System Isolation) of AP/1/A/5500/22 (Loss of VI) using the copy of the procedure located beside Service Bldg Lube Oil Station door.
Task Standard:
The operator will fail open the Dryer Bypass Valve when it is recognized that the valve has failed Closed, and then close the A, B, and C VI Dryers Inlet and Outlet Isolation valves.
Required Materials:
PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
Appendix C Page 3 of 11 Form ES-C-1 Job Performance Measure Worksheet 2012 Systems - In-Plant JPM K NUREG 1021, Revision 9 General
References:
AP/1/A/5500/22 (Loss of VI), Rev 31 Handouts: (VI Dryer and VI to VS System Isolation) of AP/1/A/5500/22 (Loss of VI)
Time Critical Task:
NO Validation Time:
10 minutes
Appendix C Page 4 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM K NUREG 1021, Revision 9 (Denote Critical Steps with an asterisk*)
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout of AP/1/A/5500/22.
START TIME:
STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 1
(Step 1) At "TB-681 VI AIR DRYERS REFLASH MODULE" (service bldg, 733+4, opposite A VI air dryer), check VI PURGE EXH VALVES-CLOSED light - LIT.
The operator observes the light.
Cue:
The VI PURGE EXH VALVES-CLOSED light is LIT.
Appendix C Page 5 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM K NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 2
(Step 2) Check the following valves - CLOSED:
1VI-1838 (A VI Dryer Purge Exhaust Isol)
(service bldg, 733+10, between A
& B VI dryers) 1VI-1839 (B VI Dryer Purge Exhaust Isol)
(service bldg, 733+10, above B VI dryer) 1VI-1840 (C VI Dryer Purge Exhaust Isol)
(service bldg, 733+10, above C VI dryer).
The operator observes Closed on valve position indicator.
Cue:
1VI-1838 indicates CLOSED.
The operator observes Closed on valve position indicator.
Cue:
1VI-1839 indicates CLOSED.
The operator observes Closed on valve position indicator.
Cue:
1VI-1840 indicates CLOSED.
3 (Step 3) Ensure VI dryers bypassed as follows:
(Step 3.a) At "TB-681 VI AIR DRYERS REFLASH MODULE" (service bldg, 733+4, opposite A VI air dryer), check "VI DRYER BYPASS VALVE OPEN 1VI1812" light - LIT.
The operator observes the light.
Cue:
The VI DRYER BYPASS VALVE OPEN 1VI1812 light is DARK.
The operator proceeds to the RNO (Alternate Path).
Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM K NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 4
(Step 3.a RNO) On "OVERRIDE-OPENS VI DRYER BYPASS VALVE 1VI1812", depress "OVERRIDE" pushbutton to open VI dryer bypass valve.
The operator presses the OVERIDE pushbutton.
Cue:
The OVERIDE pushbutton has been pressed.
The operator proceeds to the RNO.
5 (Step 3.b) Check 1VI-1812 (VI Air Dryer Bypass Filter Isol) (service bldg, 733+5, V-34, northeast corner of Shared Load Center Room, behind "A" VI Dryer) -
OPEN.
The operator observes valve position indicator.
Cue:
1VI-1812 indicates CLOSED.
- 6 (Step 3.b RNO) Fail air to 1VI-1812 to OPEN valve.
The operator closes instrument root valve and uses petcock to bleed air off regulator (fails Air Supply).
The operator observes valve position indicator.
Cue:
1VI-1812 indicates OPEN.
Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM K NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 7
(Step 3.c) Ensure the following valves OPEN:
1VI-93 (A VI Dryer Bypass)
(service bldg, 733+8, V-34, Northeast corner of Shared Load Center Room, behind A VI Dryer) 1VI-94 (A VI Dryer Bypass)
(service bldg, 733+8, V-34, Northeast corner of Shared Load Center Room, behind A VI Dryer)
The operator observes valve position indicator.
Cue:
1VI-93 indicates OPEN.
The operator observes valve.
Cue:
1VI-94 valve stem position is fully out.
Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM K NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT
- 8 (Step 3.d) WHEN VI dryers are bypassed PER Step 3.a through 3.c, THEN CLOSE the following valves:
CLOSE 1VI-98 (A VI Dryer Inlet Isolation)
(service bldg, 733+5, V-33, between "A" VI Dryer Prefilter and east wall CLOSE 1VI-99 (A VI Dryer Outlet Isolation)
(service bldg, 733+8, V-34, north of "A" VI Dryer)
CLOSE 1VI-22 (B VI Dryer Inlet Isolation)
(service bldg, 733+6, V-33, north of "B" VI Dryer)
CLOSE 1VI-23 (B VI Dryer Outlet Isolation)
(service bldg, 733+8, V-33, above "B" VI Dryer Prefilter and Afterfilter)
CLOSE 1VI-24 (C VI Dryer Inlet Isolation)
(service bldg, 733+5, V-33, north of "C" VI Dryer)
CLOSE 1VI-25 (C VI Dryer Outlet Isolation)
(service bldg, 733+9, V-33, above C VI Dryer Prefilter and Afterfilter)
The operator rotates 1VI-98 Handwheel 90 degrees until closed.
Cue:
1VI-98 indicates CLOSED.
The operator rotates 1VI-99 Handwheel in the Clockwise direction until motion stops.
Cue:
1VI-99 indicates CLOSED.
The operator rotates 1VI-22 Handwheel 90 degrees until closed.
Cue:
1VI-22 indicates CLOSED.
The operator rotates 1VI-23 Handwheel in the Clockwise direction until motion stops.
Cue:
1VI-23 indicates CLOSED.
The operator rotates 1VI-24 Handwheel 90 degrees until closed.
Cue:
1VI-24 indicates CLOSED.
The operator rotates 1VI-25 Handwheel in the Clockwise direction until motion stops.
Cue:
1VI-25 indicates CLOSED.
Appendix C Page 9 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2012 Systems - In-Plant JPM K NUREG 1021, Revision 9 STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 9
(Step 4) Isolate VI supply to VS as follows:
(Step 4.a) At the VI Sequencer Panel check 1VI-820 (VI to VS Isolation Valve) - CLOSED.
The operator observes the 1VI-820 status lights.
Cue:
1VI-820 Green status light is LIT, Red status light OFF.
Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION 2012 Systems - In-Plant JPM K NUREG 1021, Revision 9 Job Performance Measure No.:
2012 Systems - In-Plant JPM K Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Result:
SAT UNSAT Examiners Signature:
Date:
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 9 INITIAL CONDITIONS:
Unit 1 is operating at 100% power.
AP/1/A/5500/22 (Loss of VI) has been implemented due to decreasing VI Pressure.
VI Pressure is holding at 75 psig but the leak has not been isolated.
Several other operators have been dispatched for various tasks in response to the loss of VI.
INITIATING CUE:
The CRS directs you to bypass the VI dryers and isolate VS per (VI Dryer and VI to VS System Isolation) of AP/1/A/5500/22 (Loss of VI) using the copy of the procedure located beside Service Bldg Lube Oil Station door.
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.