MONTHYEARML12220A1662012-08-0606 August 2012 ASME Code Update for the Fourth Ten-Year Interval, Inservice Testing Program Project stage: Request ML12261A0532012-09-17017 September 2012 Acceptance Review Email, Relief Request Nos. IST-4-P1 (ME9201-ME9202), IST-4-P2 (ME9203-ME9204), IST-4-P-3 (ME9205-ME9206), IST-4-V-1 (ME9207-ME9208), and IST-4-V-2 (ME9209-ME9210), Fourth 10-Year Inservice Testing Interval Project stage: Acceptance Review ML12313A4752012-11-0808 November 2012 Request for Additional Information Email, Relief Request IST-4-P-2, ASME OM Code Requirements for Testing CSS and LPSI Pumps, Fourth 10-Year Inservice Inspection Interval Project stage: RAI ML12348A2872012-11-28028 November 2012 Confirmatory Action Letter Response - Proprietary Documents Project stage: Request ML12341A2782012-12-0404 December 2012 Relief Request: American Society of Mechanical Engineers (Asme), Code Case N-770-1 Project stage: Request ML12362A1982012-12-26026 December 2012 (Songs), Units 2 and 3 - Request to NRC for Digital Upgrade Phase 0 Meeting Project stage: Request ML13002A0082012-12-27027 December 2012 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Project stage: Request ML13007A2152013-01-0707 January 2013 Acceptance Review Email, Relief Request from Volumetric Exam Requirements Specified in ASME Code Case N-770-1 for Dissimilar Metal Piping Welds for the Third 10-Year Inservice Inspection Interval Project stage: Acceptance Review ML13029A7232013-01-29029 January 2013 Acceptance Review Email, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Project stage: Acceptance Review ML13098A0432013-04-0505 April 2013 License Amendment Application Number 263, Revise Technical Specifications to Require Compliance Project stage: Other ML13136A0082013-05-15015 May 2013 (SONGS) Units 2 and 3 - NRC Generic Letter 2004-02 Closure Path and Schedule Project stage: Request ML13212A2502013-07-30030 July 2013 Withdrawal of Licensing Actions Due to Permanent Cessation of Operations Project stage: Request ML13226A3612013-08-27027 August 2013 Withdrawal of Several Applications for Relief Requests and Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule (TAC Nos. ME9201-ME9210, MF0335-MF0336, and MF0438-MF0439) Project stage: Withdrawal 2012-09-17
[Table View] |
|
---|
Category:Letter
MONTHYEARML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 and Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Service'S December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commission'S Analysis of Southern California Edison'S Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 ML22136A0842022-05-12012 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report ML22122A0402022-04-28028 April 2022 (Songs), Units 1, 2 and 3 - Annual Radioactive Effluent Release Report - 2021 ML22105A5662022-04-0505 April 2022 20053 Letter - OI Closure to Licensee - Wrongdoing Signed ML22081A1692022-03-31031 March 2022 SONGS Application Acceptance Proposed Exemption from Title 10 of the CFR, Part 72.106(b), ISFSI Controlled Boundary IR 05000206/20214022022-03-24024 March 2022 Notice of Violation, NRC Inspection Report 05000206/2021402, 05000361/2021402, 05000362/2021402, and 07200041/2021401; and Investigation Report 4-2021-004- Public- Cover Letter ML22084A0552022-03-23023 March 2022 10 CFR 50.82(a)(8Xv and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 San Onofre Nuclear Generating Station Units 1, 2, and 3 and Independent Spent Fuel Storage Installation IR 05000361/20220012022-03-14014 March 2022 NRC Inspection Report 05000361/2022-001; 05000362/2022-001 ML22066B0242022-03-0303 March 2022 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision 2 to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML22062B0282022-02-28028 February 2022 and Independent Spent Fuel Storage Installation (Isfsi), Response to Request for Supplemental Information Regarding Request for Exemption from 10 CFR 72.106(b) ML22059B0392022-02-25025 February 2022 International, Proprietary Information to Support SCE Exemption ML22060A1132022-02-24024 February 2022 Nuclear Property Insurance ML22060A1152022-02-24024 February 2022 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2021 ML22048B4972022-02-15015 February 2022 (Songs), Units 1, 2 and 3 - 2021 Annual Turtle Incidental Take Report ML22031A1112022-01-26026 January 2022 (Songs), Units 2 and 3 - Annual Corporate Financial Reports 2024-01-17
[Table view] |
Text
Richard J.St. Onge J EDISON SOUTHERN CALIFORNIA Director, Nuclear Regulatory Affairs and Emergency Planning An EDISON INTERNATIONAL Company 10 CFR 50, Appendix H, III.B.3 December 27, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket Nos. 50-361 and 50-362 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule San Onofre Nuclear Generating Station (SONGS) Units 2 and 3
References:
- 1. Materials Reliability Program: Coordinated PWR Reactor Vessel Surveillance Program (CRVSP) Guidelines (MRP-326). EPRI, Palo Alto, CA: 2011.
102287.
Dear Sir or Madam:
Pursuant to 10 CFR 50, Appendix H, III.B.3, Southern California Edison (SCE) is requesting Nuclear Regulatory Commission (NRC) review and approval of the enclosed revision to the surveillance capsule removal schedule for SONGS Units 2 and 3. The proposed reactor vessel surveillance capsule removal schedule was developed to implement recommendations in MRP-326, CoordinatedPressure Water Reactor (PWR) Reactor Vessel Surveillance Program (CRVSP) Guidelinesfor SONGS Units 2 and 3. The Industry program defined in MRP-326 addresses the need for reactor vessel property data at fluences representative of 60 years of operation and beyond.
The requested change to the SONGS Units 2 and 3 reactor vessel surveillance capsule removal schedule satisfies the requirements of 10 CFR 50, Appendix H and ASTM E-185-82, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels", dated July 1, 1982.
Approval of this proposed change is requested by December 31, 2014.
This letter and the enclosure contain no new commitments.
If you have any questions or require additional information concerning this subject, please contact Mr. Mark E. Morgan at (949) 368-6745.
Sincerely, P.O. Box 128 San Clemente, CA 92672
Document Control Desk December 27, 2012
Enclosure:
- 1. Proposed Change to the Reactor Vessel Surveillance Program Capsule Pull Schedule, San Onofre Nuclear Generation Station (SONGS) Units 2 and 3 cc: E.E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, SONGS Units 2, and 3 B. Benney, NRC Project Manager, SONGS Units 2 and 3 G. G. Wamick, NRC Senior Resident Inspector, SONGS Units 2 and 3
Enclosure 1 Proposed Change to the Reactor Vessel Surveillance Program Capsule Pull Schedule San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 10 CFR 50, Appendix H, 1Il.B.3, as Recommended by MRP-326
Enclosure 1 Proposed Change to the Reactor Vessel Surveillance Program Capsule Pull Schedule San Onofre Nuclear Generation Station (SONGS) Units 2 and 3
1.0 Background
Appendix H to 10 CFR Part 50 describes reactor vessel material surveillance program requirements. Paragraph (111)(B)(3) of this Appendix states that a proposed material withdrawal schedule must be submitted with a technical justification per 10 CFR 50.4, and approved prior to implementation.
Industry has developed a Coordinated Pressurized Water Reactor (PWR) Reactor Vessel Surveillance Program (CRVSP), which is documented in MRP-326, CoordinatedPWR Reactor Vessel Surveillance Program (CRVSP) Guidelines. The purpose of the CRVSP is to increase the fluence levels of future surveillance capsules at withdrawal while maintaining compliant with 10 CFR 50 Appendix H and consistent with the guidance of NUREG-1801, Rev. 2, GALL Report. The CRVSP will help generate high fluence PWR surveillance data in support of extended life operations.
The proposed withdrawal schedule satisfies the requirements of American Society for Testing and Materials (ASTM) E 185-73 the version that was current at the time the reactor vessel surveillance program was designed.
Table (1) shows the currently approved withdrawal schedule for San Onofre Nuclear Generating Stations (SONGS) Units 2 and 3 reactor vessel surveillance capsules (Updated Final Safety Analysis Report Table 5.3-12).
2.0 Proposed Revision Table (2) provides the proposed revision to the reactor vessel surveillance capsule withdrawal schedule for SONGS Units 2 and 3. The revised schedule is based on the recommendations for SONGS Units 2 and 3 in MRP-326, and reflects updated fluence information from previously removed surveillance capsules with appropriate adjustment made for fuels loaded in subsequent cycles. As shown below in Section 3.0, the proposed withdrawal schedule satisfies the requirements of ASTM E 185-73, the version that was current at the time the reactor vessels were designed and is consistent with ASTM E 185-82 and the current requirements of Appendix H to 10 CFR Part 50.
3.0 Justification The SONGS Units 2 and 3 reactor vessel was designed to the 1971 Edition through the summer 1971 Addenda of the American Society of Mechanical Engineers Code. American Society for Testing and Materials E 185-73 was the current standard when the surveillance program was designed. As stated in the SONGS Units 2 and 3 Updated Final Safety Analysis Report section 5.3.1.6, the reactor vessel surveillance program meets the requirements of ASTM E 185 and 10CFR50 Appendix H.
The guidance provided in ASTM E 185-82 is consistent with, but more specific than, the guidance provided in earlier editions, including ASTM E 185-73 to which the SONGS Units 2 and 3 reactor vessel surveillance program is required to conform. Therefore, compliance with Page 1 of 3
Enclosure 1 Proposed Change to the Reactor Vessel Surveillance Program Capsule Pull Schedule San Onofre Nuclear Generation Station (SONGS) Units 2 and 3 the ASTM E185-82 withdrawal schedule guidance ensures compliance with ASTM E 185-73 withdrawal schedule guidance. ASTM E 185-82 provides a withdrawal schedule in terms of years of operation but also provides the option to develop a schedule tied to target fluences accumulated in the vessel. As in the case of the currently approved withdrawal schedule, the proposed withdrawal schedule follows the guidance that ties the withdrawal schedule to vessel fluence targets.
This request proposes to revise the reactor vessel surveillance capsule withdrawal schedule from approximately 24 Effective Full Power Years (EFPY) of operation to the refueling outage most closely approaching 26.5 EFPY. Additional explanation of the basis for proposed changes to the SONGS Units 2 and 3 surveillance capsule schedule is provided in MRP-326.
The capsules located at the 83 degree azimuthal locations meet the requirements of ASTM E 185-82 to withdraw the third capsule at a time when the accumulated neutron fluence on the capsule corresponds to the approximate end of life peak fluence at the reactor vessel %T location. As noted on Table (2), SCE plans to withdraw the 83-degree capsules at approximately 26.5 EFPY which approximately corresponds to the cycle-1 9 refueling outages of both Units. SONGS Units 2 and 3 are currently in extended outages to implement replacement steam generator repairs. It is not possible to accurately forecast the date at which target neutron fluences will be achieved. This proposed change meets the requirements of Appendix H to 10 CFR Part 50.
Three (3) additional standby reactor vessel material surveillance capsules located at the 104, 284 and 277 degree azimuthal locations remain available for monitoring material properties during a period of extended operation beyond the current license expiration.
Page 2 of 3
Enclosure 1 Proposed Change to the Reactor Vessel Surveillance Program Capsule Pull Schedule San Onofre Nuclear Generation Station (SONGS) Units 2 and 3 Table 1 Current SONGS Units 2 and 3 Reactor Vessel Surveillance Program Capsule Removal Schedule Capsule Azimuthal SONGS Unit-2 SONGS Unit-3 Number Location Removal Neutron Removal Time Neutron (degrees) Time (EFPY) Fluence (EFPY) Fluence (x 1019 n/cm2) (x 1019 n/cm 2 )
1 83 24 3.8 x 1019 24 3.8 x 1019 2 97 2.85 5.07 x 1O'8 4.33 8.0 x 101l 3 104 Standby Standby 4 284 Standby -- Standby --
5 263 13.3 2.2 x 1019 14.92 2.47 x 1019 6 277 Standby Standby --
Table 2 Proposed SONGS Units 2 and 3 Reactor Vessel Surveillance Program Capsule Removal Schedule Capsule Azimuthal SONGS Unit-2 SONGS Unit-3 Number Location Removal Neutron Removal Time Neutron (degrees) Time (EFPY) Fluence (EFPY) Fluence (x 1019 (x 1019 n/cm 2) n/cm 2) 1 83 26.5 (a) 4.37 x 101 9 26.5 (a) 4.19 x 101 9 (a)
(a) 2 97 2.85 5.07 x 101" 4.33 8.0 x 1018 3 104 Standby Standby --
4 284 Standby -- Standby --
5 263 13.3 2.2 x 10' 9 14.92 2.47 x 10' 9 6 277 Standby Standby (a) Proposed revision to capsule removal schedule based on MRP-326 Page 3 of 3