Richard J. St. Onge Director, Nuclear Regulatory Affairs and Emergency Planning An EDISON INTERNATIONAL Company December 26, 2012 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001

Subject:

Docket Nos. 50-361 and 50-362 Request to NRC for Digital Upgrade Phase 0 Meeting San Onofre Nuclear Generating Station (SONGS), Units 2 and 3

Reference:

Letter dated 10/12/2011 from Richard St. Onge (SCE) to Document Control Desk (NRC),

Subject:

"Support for NRC Review of Lockheed Martin NuPAC Safety System Topical Report", ADAMS Accession

  1. ML112860071

Dear Sir or Madam:

Southern California Edison (SCE) is planning the staged replacement of several safety related instrumentation, protection , and control systems at the San Onofre Nuclear Generating Station for Units 2 and 3 (Reference).

The systems under consideration include the Core Protection Calculators (CPC), the Plant Protection System (PPS) and Emergency Diesel Generator Controls. SCE is presently working with Lockheed Martin on a Field Programmable Gate Array (FPGA) distributed logic platform and anticipates developing the system requirements specifications in 2013.

In keeping with the guidance of Digitall&C-ISG-06 "Digital Instrumentation and Controls Task Working Group #6 Licensing Process, Interim Staff Guidance", section C.2 "Pre-Application (Phase 0)", SCE would like to request scheduling for a Pre-licensing Application Phase 0 meeting to be held at a mutually beneficial date in the first or second quarter of 2013 . During this first Phase 0 meeting, SCE plans to discuss the listed Phase 0 topics discussed within Digital I&C-ISG-06. SCE would also like to discuss the overall schedule for safety digital I&C system upgrades at SONGS, including the NRC schedule for the issuance of a Safety Evaluation (SE) for the Lockheed Martin Topical Report submittal (Document Control No. NS-LTA-2011-00022, dated June 28, 2011, ADAMS Accession # ML11201A323). SCE's preference is to submit a license amendment request using a Tier 1 review process as described under Digitall&C-ISG-06, section C.1 "Process Overview".

P.O. Box 128 San Clemente, CA 92672

Document Control Desk December 26, 2012 This communication contains no new or revised commitments.

If you have any questions or require additional information, please contact Mr. Mark Morgan at (949) 368-6745.

Sincerely, cc: E. E. Collins, Regional Administrator, NRC Region IV R. Hall , NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Inspector, San Onofre Units 2 and 3 B. Benney, NRC Project Manager, San Onofre Units 2 and 3