MONTHYEARML23249A1002023-09-0606 September 2023 Requalification Program Inspection RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21307A2872021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21231A1052021-08-19019 August 2021 Requalification Program Inspection ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) ML21105A5352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1472020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17090A3662017-01-17017 January 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17069A4182017-01-16016 January 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) 2023-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17090A3662017-01-17017 January 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17069A4202017-01-16016 January 2017 Draft Written Exam ML17075A3822017-01-16016 January 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17075A3832017-01-16016 January 2017 Handouts to Applicants, Limerick (Folder 3) ML17069A4182017-01-16016 January 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17069A4172017-01-16016 January 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17075A3842017-01-16016 January 2017 Final Operating Test (Sections a, B and C) (Folder 3) 2023-06-16
[Table view] |
Text
2012 Limerick ILT NRC Written Exam Performance Analysis An exam review was conducted with the entire class on 10122 followed by interviews with the individual candidates on 10122 - 10/23. The following questions were missed by 50% or more of the candidates:
Question #22 -*While the OT for Reactor High Level does not expressly designate the Equipment Drain Tank as the preferred blowdown path for lowering level with a fuel failure, there is a statement in the bases that Reactor Coolant radioactivity should be taken into consideration prior to blowing down to the Main Condenser. The candidates who selected the Hotwell for the preferred RWCU blowdown path had a lack of familiarity with OT -110 Bases. Question determined to be technically accurate and valid.
Question #34 -Most of the candidates who answered incorrectly believed that with the Turbine First Stage Pressure Trip light indications provided, a full scram would occur.
This reveals a knowledge gap in this area. In a discussion with the ILT Lead, the candidates had been trained on this logic and had seen similar questions on other exams.
Question detern1ined to be technically accurate and valid.
Question #38 -Three of the candidates who answered incorrectly interpreted the question differently from which it was intended. These students answered the first part regarding the rod block status for <3 LPRM inputs to APRM 1 on axial level 'C' after the APRM had been bypassed. This should have only applied to the second part of the question regarding the alternate Reference APRM for the RBM once the APRM was bypassed.
Other candidates who answered incorrectly evaluated the LPRM inputs for the RBM, not the APRM. Prior to further use, this question should be enhanced to distinguish that the Rod Block status is evaluated prior to bypassing the APRM. This question was determined to be technically accurate and valid.
Question #78 -Most of the candidates who answered incorrectly had a lack of familiarity with actions directed by T-I00 and didn't recognize that venting the Drywell could not be aligned with a loss of Instrument Air to the dampers. Question determined to be technically accurate and valid.
Question #85 -Most of the candidates who answered incorrectly were unfamiliar with the note in the EAL regarding the use of Dose Assessment results over Rad Monitor readings for declaration purposes. This has been identified as a weakness in the ILT program. Question determined to be technically accurate and valid.
Question #93 -Most of the candidates who answered incorrectly either assumed the failed Narrow Range Level instrument was part of RPS or that the instrument was out of cal. This was identified as an ILT knowledge gap. Question determined to be technically accurate and valid.