ML12325A327
| ML12325A327 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 11/15/2012 |
| From: | Caruso J Operations Branch I |
| To: | Wasong A Exelon Generation Co |
| Jackson D | |
| Shared Package | |
| ML120230224 | List: |
| References | |
| TAC U01858 | |
| Download: ML12325A327 (2) | |
Text
Limerick Generating Station IL T NRC Exam Reference Material Reactor Operator ARC-MCR-122 F-4, IB RPS & UPS DIST. PNL. TROUBLE GP-5 Attachment 6, 'ESTIMATED GENERATOR CAPABILITY CURVES AT VARIOUS HYDROGEN GAS PRESSURES" ON-l 04, "CONTROL ROD PROBLEMS" (Partial)
S32.3.A, "MAIN GENERATOR INSPECTION DURING HEAVY GRID LOAD" Steam Tables Unit 1 and Unit 2 RPS logic diagram (Partial)
TRIPS:
T-I02 sheet 1, PC/P leg (Partial)
T-102 sheet 1, SPIT leg
Limerick Generating Station IL T NRC Exam Reference Material Senior Reactor Operator RO and SRO Complete (QI-IOO) Reference List ARC-MCR-I22 F-4, IB RPS & UPS DIST. PNL. TROUBLE GP-5 Attachment 6, 'ESTIMATED GENERATOR CAPABILITY CURVES AT VARIOUS HYDROGEN GAS PRESSURES" ON-104, "CONTROL ROD PROBLEMS" (Partial)
OP-AA-IOS-I07-I002, "INTERFACE PROCEDURE BETWEEN COMED/PECO AND lEXELON GENERATION FOR TRANSMISSION OPERATIONS (Partial)
LS-AA-I04-I002, "50.59 APPLICABILITY REVIEW FORM" S32.3.A, "MAfN GENERATOR INSPECTION DURING HEAVY GRID LOAD" Stearn Tables Unit 1 and Unit 2 RPS logic diagram (Partial)
TRIPS:
T-I02 sheet 1, PC/P leg (Partial)
T-I02 sheet 1, DW/T leg (Partial)
T-102 sheet 1, SPIT leg T-102 sheet 2 Technical Specifications:
Figure 3.3.6-1 3/4.3.1 3/4.3.2 3/4.3.9 3/4.4.1.4 3/4.S.2.1 3/4.9.2 lEAL HOT MATRIX:
Radiological Effluents Fission Product Barrier Matrix RPS Failure/Inadvertent Criticality