ML12270A410

From kanterella
Jump to navigation Jump to search
Initial Exam 2012-301 Final Administrative Documents
ML12270A410
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/24/2012
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
Download: ML12270A410 (56)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: Oconee 2012-301 Date of Examination: 06/11/2012 li NRC Examinations Developed by:

Written I Operating Test Written / Operating Test Target Chief Date* Task Description (Reference) Examiner s Initials

-180 1. Examination administration date confirmed (C.l.a; C.2.a and b) 10/25/20 1 1

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) 10/25/20 11

-120 3. Facility contact briefed on security and other requirements (C.2.c) 10/25/2011

-120 4. Corporate notification letter sent (C.2.d) 10/31/2011

[-90] [5. Reference material due (C.1.e; C.3.c; Attachment 2)] 4/12/2012

{-75} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES 301-1, ES-301-2, ES-301-5, ES-D-ls, ES-401-1/2, ES-401-3, and ES-401-4, as 3/12/2012 applicable (C.1.e and f C.3.d)

{-70} {7. Examination outline(s) reviewed by NRC and feedback provided to facility 3/15/2012 licensee (C.2.h; C.3.e)}

{-45 } 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, 4/26/2012 ES-301-5, ES-301-6, and ES-401-6), and reference materials due (C.1.e, f g and h; C.3.d)

-30 9. Preliminary license applications (NRC Form T 398 s ) due (C.1.l; C.2.g; ES-202) 05/12/2012

-14 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) 05/28/2012

-14 11. Examination approved by NRC supervisor for facility licensee review N/A (C.2.h;_C.3.f)_(Licensee_prepared_examination).

-14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) 05/24/2012

-7 13. Written examinations and operating tests approved by NRC supervisor 5/25/2012 (C.2.i; C.3.h)

-7 14. Final applications reviewed; 1 or 2 (if>10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent 05/25/2012 (C.2.i;_Attachment 4;_ES-202,_C.2.e;_ES-204)

-7 15. Proctoring/written exam administration guidelines reviewed with facility licensee 06/19/2012 (C.3 .k)

-7 16. Approved scenarios, job performance measures, and questions distributed to 06/1 1/20 12 NRC examiners (C.3.i)

Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Date of Examination:

Initials Item Task Description a b* c#

1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.

R b. Assess whether the outline was systematically and randomly prepared in accordance with I Section D.1 of ES-401 and whether all K/A categories are appropriately sampled.

T T c. Assess whether the outline over-emphasizes any systems, evolufions, or generic topics.

d. Assess whether the justifications for deselected or rejected K)A statements are appropriate. (t
2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S and major transients.

M b. Assess whether there are enough scenario sets (and spares) to test the projected number u and mix of applicants in accordance with the expected crew composition and rotation schedule L without compromising exam integrity, and ensure that each applicant can be tested using A at least one new or significantly modified scenario, that no scenarios are duplicated T from the applicants audit test(s), and that scenarios will not be repeated on subsequent days.

c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R

and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants audit test(s)

(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.

b. Verifythatthe administrative outline meets the criteria specified on Form ES-301-1:

(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations N

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. )
4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered

\

in the appropriate exam sections.

G E b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.

c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.

R d. Check for duplication and overlap among exam sections.

L e. Check the entire exam for balance of coverage.

f. Assess whether the exam fits the appropriate job level (RO or SRO).
a. Author  ? 3_

b.

c.

Facility Reviewer (*)

NRC Chief Examiner (#)

Jrnz5 W 1.Acc4f

/ ,---/ 5,iz

d. NRC Supervisor Jri V.\I1pLJ,.i/ 4.

Note: # Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

Not applicable for NRC-prepared examination outlines

- WRITPEN EXAM SAMPLE PLAN ONLY -

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: OCONEE (Written Only) Date of Examination: JUNE 2012 Initials Item Task Description a b*

1 a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401. M N/A w

R b. Assess whether the outline was systematically and randomly prepared in accordance with t( N/A I Section D.1 of ES-401 and whether all K/A categories are appropriately sampled.

T T c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics. A( N/A k E

N d. Assess whether the justifications for deselected or rejected K/A statements are appropriate. A( N/A

2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number NIA N/A N/A of normal evolutions, instrument and component failures, technical specifications, S and major transients.

M b. Assess whether there are enough scenario sets (and spares) to test the projected number N/A N/A N/A U and mix of applicants in accordance with the expected crew composition and rotation L schedule without compromising exam integrity, and ensure that each applicant can be A tested using at least one new or significantly modified scenario, that no scenarios are T duplicated from the applicants audit test(s), and that scenarios will not be repeated on subsequent days.

R

c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative N/A N/A N/A and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2: N/A N/A N/A (1) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form

/ (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants audit test(s)

(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1: N/A N/A N/A (1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
c. Determine if there are enough different outlines to test the projected number and mix N/A N/A N/A of applicants and ensure that no items are duplicated on subsequent days.
4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered .4t N/A 5 in the appropriate exam sections.

G E b. Assess whether the 10 CFR 55.41/43 and 5545 sampling is appropriate. .At N/A /n

c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5. .4L N/A g
d. Check for duplication and overlap among exam sections. N/A N/A N/A L e. Check the entire exam for balance of coverage. .M N/A 3
f. Assess whether the exam fits the appropriate job level (RD or SRO). .hL N/A g
a. Author Michael K. Meeks / 10/26/2011
b. Facility Reviewer (*) N/A
c. NRC Chief Examiner (#) Ronald F. Aiello / J/)
d. NRC Supervisor Brunof Caballero /  ?-us4o 12 I /I Note: # Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

Not applicable for NRC-prepared examination outlines

- WRITTEN EXAM SAMPLE PLAN ONLY -

ES-201 Examination Security Agreement Form ES-201 -3

1. Pre-Exarnination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 06/11/2012 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 0611112012. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE / RESPONSIBILITY SIG RE (1) DATE SIGN TURE(2) DATE NOTE

1. C- L)4pL? 1r .-.

I N .11

-2) i2-

2. b,LI LLJuJA.) £ M\ II-
3. £,a - EiL4M  ; 0
4. :ass -
5. 77p i/tl? do -

j- .utpriL_

4 srrmd - I-4 Dt1 J

6. P( o, 14 RuIi, Oo - ig-i /7 (-e -/2-7.V)4 1LCL- - S1c4 Go -

4/ 4/i)

8. 4c i%4).. S, -

I -W-r fl i 9.I(&C-Wtrtw1 - 5;i,L2 5yo

10. fJ 41 J jtf. J(,y /v4 fr25/2 ii. ZSe L G-z2-fl--
12. (JJ4o%J E 4 .2l2Wl7_ 4kr )2/I2._
13. silt, 14.t)L14Ltv. ttkov &< 0 /s;k -

2)2 y/, j- fr/ia is. ;Itc O/ V/,Jhnj /zy/z t1 21 NOTES:

  • p I

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 06/11/2012 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 0611112012. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY LGNAT DATE SlGNA) DATE NOTE

( w_ 2-17 2 , )

?

2. 5 5-- f4- Ch6/i-
3. Liricic Go4.,oer1 rw Xcn- 7ec,- ,flcLw 3 -
4. 5)eveyxi-Msel MNS O RLc 3-5-/2. Y2r
5. ]ECf L. MeL pJS A (Q1C
6. At-L () M y?.

1 J( (ku-LL 3 3

7. ir -

sc__ PWi- --çj

8. L 0

,s ..-..--, AJiI yr (L

9. o /E /4ib _____ -/V-/L O-Ai I!XAM AIbJ 3+i 7 A
11. Th* rLo -t,a1I.T-( cxwv 3-)-n-- rL 12.7iP EJ-4t-- LIA.L. 3/ cf?

131XIfri1.

cII-1-CUAlfl l

cu- RD 7

t 3 I2. 11.1 rf7 ç*J 4

d

14. Er-ta. (J j
15. s1.o A SLPf f

NOTES:

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 06/1112012 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 06111/2012. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE / RESPONSIBILITY SIGNATURE (1) DATE SIGNATURE (2) DATE NOTE i.C4s J4-1 f?O/& t 4

L/fJR. 67 QIL

2. CF4(L vl:4u- /
3. Prs3Ic... .SRO / E,..,. thi -.

10 4.4rick Cq (Z. / ,4I(Jc4tO 5.77/1 Ctf)Or- R 1X,( VfLfl41o 1 /t) /

6. LAfJ7 6Y LiP//! c4P/oLf/F /t 1/1-
7. Vite P rrL.1 4D MtiV s--
8. Ed( SLL4eW O5 &, - LZ 2
9. DiarL(3OUL (

io.j//t 4 7 C

//2 *L

11. 1 Ro / cw 2 -w-Tl I 2.4wt  ?-6 (E v .( cdcLv1 0 rz(2 e64z
13. flt.1 ir) Ao / %R UiD4irJ S4[- (s
14. Tjy aciff SfZo/ pfr7 (h,/;Cgi1

-n 1 1-

15. o,c A ° / E- -t tJ : J, 9 --/7-1 - fç 2

NOTES:

3

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 06/11/2012 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 0611112012. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE! RESPONSIBILITY IGNtT)JRE (1) DATE ,I4rjJRE (2) DATE NOTE i.D.f tR.O/Ck#k /

2.C& YSeMcu QP 4 fr4_ 7zi/f 1frL

3. [).) s/vli 2- - (ofzz//2
4. Eyi,ees- /i4 -

L24 5/z/1Z%[L6AJ 4)S -

5. !Y) eLrLQ ç SJ249, -
6. -

7.J-fE I,/J/c M) 4 4(z is1-4i c 4

cJ M 1 - -2f-i2_-

OjJE4 AeJ)p,,/ I,1S4-(Udv( -

b7-!z

9. M,c4ce1 Q//4ck ,I,-.-i%x y

4 W7/fz ---

1O.3cJA Iss , r-- _J A (7 I .4 (12(Ib-12.h-i,.J7 -1)L.ø1- C5 AZ14Z

13. At4 i-ARK --- ( -

I rZ51Z-J L a1I 14 )

1 -

SL /H . F 15.

NOTES:

L4

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 06/11/2012 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner, understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 06111/2012. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (2) DATE NOTE

1. c$;$ fr:r
2. (LJ,ço)A. £ b

- ilII

3. h,az J 4 Et )4i 10/h
4. ?I, c C._c r

ii, I

5. TQ-Th /a-,7 Jc Sr-,tJ £t(ps1 -
6. R,(( t,I,i,or 19I 2
7. 14 L LJJ1 -q-1z
8. c vs S;vL, 5 r o#
10. .314/ILl ,. vM, Siiig4,g ii. e ()d/-.M 4r+
12. U? I -- - .-
13. Iq SILO /

14.A /144. 2J2Y//

/)

15.4fAi 7?.1i o / 0

/J 4

V j

NOTES:

ES-201 Examination Security Agreement Form ES-201 -3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 06111/2012 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 06I11I2012. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE / RESPONSIBILITY GNATURE (1) DATE SIGNATURE (2) DATE NOTE Z-z-7* n

2. 5 ç
3. LJc. PL Gol,.oerI rwj 2;?Cfl. 7eo Iflc.-Jocr 3r-lL 4.jvr I-- MLckIlc M, sLJ, ep) 3 -S-/s.
5. ece- L. Mett ojs Ptni 51
6. S,tAt-L f)FJ jjY fljtyt. Ire-i 7.
8. .SLv.-
9. /%4(.5 -/74tcb, -

1O.LQ . D-Ac i2xMt IdakJ ii. AtI1k 4.o_ vc.

12. 7tV.- I-64t-- 5-/, 1_..----

13])afrU Wxst 3Iaaft.i

14. Ertc d&

)5

15. 3e-.re%

1 j(D SILo - A c /,._ 1 vlti t/4, Az NOTES:

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 0611112012 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner, understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 06111/2012. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) DATE SIGNATURE (2) DATE NOTE zo/&%

LI/if/i

2. CA(Lc,5 frL vl.+o-
3. S-t-. P1..... .W?O /

4.4rck (O / E 1/4I(Jc{4o 577121 cq1oJ 7Zc vi4-

6. i)o ? , ah/,,P <,,pr/jP 7.

8.

9.

10.

11.

12.

13.

14.

15.

NOTES:

3

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Oconee Date of Examination: 6111112 Examination Level: RO SRO Operating Test Number: I Administrative Topic Type Describe activity to be performed (see Note) Code*

Admin-120, U3 SFP Boron and Volume Change Conduct of Operations D, R Calculation G 2.1.23 (4.3/4.4)

(Both) (20 mm)

Admin-127, Diverse verification of reactor Conduct of Operations N,R power G 2.1.45 (4.3/4.3)

(RO Only) (20 mm)

Equipment Control Admin-202, Determine SSF RCMUP Operability M,R (RO Only) (15 mm)

C 2.2.42 (3.9/4.6)

Radiological Control Admin-304A, Determine Posting and Access G 2.3.12 (3.2/3.7) M,R requirements of LPI Room based on Plan View (Both) (15 mm)

Emergency Plan N/A NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 - Administrative Topics Outline Form ES-301-1 Facility: Oconee. Date of Examination: 6111112 Examination Level: RO El SRO Operating Test Number: I Administrative Topic Type Describe activity to be performed (see Note) Code*

Conduct of Operations Admin-120, U3 SFP Boron and Volume Change G 2.1.23 (4.3/4.4)

D, R Calculation (Both) (20 mm)

Conduct of Operations Admin-141, Calculation of Primary to G 2.1.7 (4.4/4.7) M,R Secondary Leak Rate and Unit Shutdown Requirements (SRO only) (16 mm)

Equipment Control Admin-211, Determine Tech Spec and SLC G 2.2.40 (3.4/4.7)

D,R requirements for inoperable ADV flowpath (SRO only) (20 mm)

Radiological Control Admin-304A, Determine Posting and Access G 2.3.12 (3.2/3.7) M,R requirements of LPI Room based on Plan View (Both) (15 mm)

Admin-410, Determine Emergency Emergency Plan Classification And Complete Emergency G 2.4.41 (2.9/4.6) D,R Notification Form (SRO only) (20 mm)

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Control Roomlln-Plant Systems Outline Form ES-301-2 Facility: Oconee Date of Examination: 6111112 Exam Level: R0j SRO-l LI SRO-U LI Operating Test No.: I Control Room Systems© (8 for RO); (7 for SRO-l); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. CR0-I 08, Recover a Dropped Rod OP/l/A11105/019, End. 4.15 (Recovery Of Dropped/Misaligned D, A, S I Safety Or Regulating Control Rod with Diamond In Automatic)

[KA: APE 005 AA2.03 (3.5/4.4)]_(15_mm)

b. CRO-223, Bypass ES Subsystem 2 OP/i/Ni 105/014 End. 4.9 (Removal and Restoration of ES N, S, 2 Channels)

[KA: SYS 013 A4.02 (4.3/4.4)]_(10_mm)

c. CRO-306, Align HPIILPI Piggyback Mode EOP End. 5.12, (ECCS Suction Swap to RBES) M, A, EN, L, 3

[KA: EPE 009 EK3.21 (4.2/4.5)] (20 mm)

d. CRO-408, Start Fourth Reactor Coolant Pump OP/1/N1103/006 End. 4.4 (Starting 1B2 RCP) D, A, P, L, S 4P

[KA: SYS 003 A4.03 (2.8/2.5)]_(16_mm)

e. CR0404, Alignment of Condensate Recirc 4S EP/i/N1800/OOi (Emergency Operating Procedure), End. 5.23 D L (Alignment of Condensate Recirc)

[KA: APE 054 G2.1.20 (4.56/4.6)]_(15_mm) 5

f. CRO-506, Establish Containment Closure AP111N17001026, End. 5.1 (Establishing Containment Closure) M, A, L, S

[KA: SYS 103 A2.03 (3.5*3.8*)]_(22_MIN)

g. CRO-604, Energizing MFB From CT4 Using Live Bus Transfer OP/0/A/1106/019 End. 4.11 (Energizing MFB From N, L, S 6 CT-4 Using Live Bus Transfer)

[KA: SYS 062 A4.01 (3.3/3.1)]_(15_mm)

h. CRO-801A, Align Intake Canal for Recirc on Dam Failure APIIIN1700I13 (Dam Failure) D, A, L, S 8

[KA: SYS 075 A2.01 (3.0*/3.2)]_(15_mm)

In-Plant Systems@ (3 for RO); (3 for SRO-l); (3 or 2 for SRO-U)

I. NLO-200, Align HPI Pump Suction to BWST During a Blackout D, E, L, R 2 EOP End. 5.7 (HPI Pump Operations from ASW Pump Switchgear)

[KA: APE 022 G2.4.35 (3.8/4.0)]_(20_mm)

j. NLO-032, Aligning Vacuum Pumps to a Units Vacuum System D, E 4S AP/27 End. 5.1 (Main Vacuum Pump Alignment)

[KA APE 051 G2.1.20 (4.6/4.6)]_(10_mm)

k. NLO-700, Restoration of ICS AUTO Power AP/23 End. 5.2, (Restoration of ICS AUTO Power) D, A, E 7

[KA: BW/A02 AAI.1 (4.0/3.8)]_(16_mm)

@ All RO and SRO-l control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

Type Codes Criteria for RO I SRO-l I SRO-U (A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irectfrombank (E)mergency or abnormal in-plant I I 1 / I (EN)gineered safety feature - I - I 1 (control room system)

(L)ow-Power / Shutdown 1 I 1 I 1 (N)ew or (M)odified from bank including I (A) 2I 2I 1 (P)revious 2 exams 3I 3 I 2 (randomly selected)

(R)CA (S)imulator

ES-301 Control Roomlln-Plant Systems Outline Form ES-301 -2 Facility: Oconee Date of Examination: 6111112 Exam Level: RD SRO-I SRO-U Operating Test No.:

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function a.

b.

c. CRO-306, Align HPIILPI Piggyback Mode EOP End. 5.12, (ECCS Suction Swap to RBES) M, A, EN, L, 3

[KA: EPE 009 EK3.21 (4.2/4.5)] (20 mm) S

d. CR0408, Start Fourth Reactor Coolant Pump OPI1IA/1103/006 End. 4.4 (Starting 1B2 RCP) D, A, P, L, S 4P

[KA: SYS 003 A4.03 (2.8/2.5)] (16 mm) e.

f.

g.

h. CRO-801A, Align Intake Canal for Recirc on Dam Failure D, A, L, S AP/1/A/1700113 (Dam Failure) 8

[KA: SYS 075 A2.01 (3.0*/3.2)] (15 mm)

In-Plant Systems@ (3 for RO); (3 for SRO-l); (3 or 2 for SRO-U)

I. NLO-200, Align HPI Pump Suction to BWST During a Blackout D, E, R 2 EOP End. 5.7 (HPI Pump Operations from ASW Pump Switchgear)

[KA: APE 022 G2.4.35 (3.8/4.0)] (20 mm)

j. NLO-032, Aligning Vacuum Pumps to a Units Vacuum System D, E 4S AP/27 End. 5.1 (Main Vacuum Pump Alignment)

[KA: APE 051 G2.1.20 (4.6/4.6)]_(10_mm)

k. NIA

@ All RO and SRO-l control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

Type Codes Criteria for RO I SRO-l I SRO-U (A)lternate path 4-6 / 4-6 I 2-3 (C)ontrol room (D)irectfrombank 9I8I4 (E)mergency or abnormal in-plant 1 I 1 I I (EN)gineered safety feature - I - / 1 (control room system)

(L)ow-Power I Shutdown 1 I 1 I 1 (N)ew or (M)odified from bank including 1 (A) 2I 2I 1 (P)revious 2 exams 3 / 3 I 2 (randomly selected)

(R)CA 1/1I1 (S)imulator

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: Oconee Date of Examination: 6/11/2012 Operating Test Number: I Initials

1. General Criteria a b* c#
a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.
c. The operating test shall not duplicate items from the applicants audit test(s). (see Section D.1 .a.) )
d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. -
2. Walk-Through Criteria --
a. Each JPM includes the following, as applicable:
  • initial conditions
  • initiating cues
  • references and tools, including associated procedures
  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee
  • operationally important specific performance criteria that include:

detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards 1.

restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrafive walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance s criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified jy on those forms and Form ES-201-2. I
3. Simulator Criteria --

The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.

Printed Name / Signature Date

a. Author
b. Facility Reviewer(*) //t ,/_1 7dot3 J
c. NRC Chief Examiner (#) vJ. LAs( 5/2 s/o_
d. NRC Supervisor )A1tA} 7\VtDWiJ&1 / (,thj7?tjrJALL-.------_ o5/?c/1-L

&2-NOTE: The facility signature is not applicable for NRC-developed tests.

  1. Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

ES-301 Simulator Scenario Quality Checklist Form ES-301-4 Facilty: Oconee Date of Exam:6/1 1/2012 Scenario Numbers: 1 / 2 / 3 Operating Test No.:1 QUALITATIVE ATTRIBUTES Initials a b* c#

1. The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but It does not cue the operators into expected events.
2. The scenarios consist mostly of related events.

i 1

.c:

3. Each event description consists of

. the point in the scenario when it is to be initiated

  • the malfunction(s) that are entered to initiate the event

. the symptoms/cues that will be visible to the crew

. the expected operator actions (by shift position)

. the event termination point (if applicable)

4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible preceding incident such as a seismic event.
5. The events are valid with regard to physics and thermodynamics.
6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives.
7. If time compression techniques are used, the scenario summary clearly so indicates.

Operators have sufficient time to carry out expected activities without undue time constraints.

Cues are given.

8. The simulator modeling is not altered.
9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
10. Every operator will be evaluated using at least one new or significantly modified scenario.

All other scenarios have been altered in accordance with Section D.5 of ES-301. ci2i.

11. All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios).
12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301 -5 (submit the form with the simulator scenarios).
13. The level of difficulty is appropriate to support licensing decisions for each crew position.

Target Quantitative Attributes (Per Scenario; See Section D.5.d) Actual Attributes --

1. Total malfunctions (58) 8/ 8 / 8

.1 2.

3.

Malfunctions after EOP entry (12)

Abnormal events (24) 2 /2 /2 3 I 4 /3

(%) L

4. Major transients (12) 1 / 2 /I
5. EOPs entered/requiring substantive actions (12) 2 / 2 I 1
6. EOP contingencies requiring substantive actions (02) 1 / 2 /1
7. Critical tasks (23) 2 / 4 / 2

\

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Oconee Date of Exam: 06-11-12 Operating Test No.: I A E Scenarios P V 1 2 3 4 T M P E I L N CREW CREW CREW CREW T N I T POSITION POSfl1ON POSmON POSmON A C SA B S A B S A B S A B L A T R T 0 R T 0 R T 0 R T M(*)

N Y 0 c P 0 c P o c P 0 C P R lU T

E RO RX 6 5 110 X NORI 1 111 SRO-l 516 57442 D

SRO-U MAJ 7 7 8 221 D TS 022 RO RX 110 X NOR 111 I/C 234 1 24 246 4 4 2 SRO-U MAJ 7 7 8 2 2 1 D TS 022 NOR I I/C 234 124 245 4 4 2 SRO-U 5 6 67 X MAJ 7 7 8 221 TS 23 14 34 022 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. () Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-i basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301 Competencies Checklist Form ES-301-6 Facility: Oconee Date of Examination: 6/11/2012 Operating Test No.: 1 APPLICANTS RO X RO X RO El RO El SRO-l El SRO-l El SRO-l El SRO-l El SRO-U El SRO-U El SRO-U X SRO-U El Competencies JjO_ CEAO_ SCENARIO - SCENARIO 1234123412341234 Interpret/Diagnose 5,6, 1,5, 5,7, 2,3, 1,2, 2,3, 2,3, 1,2, 2,3,

. . 7 67 8 47 47 46 45 45 45 Events and Conditions 8 6,7 6,7 6,7, 8

Comply With and 1,5, 1,5, 1,5, 2,3, 1,2, 2,3, 1,2, 1,2, 1,2, 6,7 6,7 7,8 47 47 4,6, 34 45 34 Use Procedures (1) 8 5,6, 6,7 5,6, 7 7,8 Operate Control 1,5, 1,5, 1,5, 2,3, 1,2, 2,4, 6,7 6,7 7,8 4,7 4,7 6,8 Boards (2)

Communicate 1,5, 1,5, 1,5, 2,3, 1,2, 2,3, 1,2, 1,2, 1,2, 6,7 7 7,8 4,7 47 46 34 4,5 34 and Interact 8 5,6, 6,7 5,6, 7 7,8 Demonstrate 1,2, 1,2, 1,2,

. 34 45 34 (3)

Supervisory Ability 5,6, 7 5,6, 7 7,8 Comply With and 2,3 1,4 3,4 Use Tech. Specs. (3)

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Only applicable to SROs.

Instructions:

Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

ES-401, Rev. 9 PWR Examination Outline Form ES-401 -2 Facility: Date of Exam:

RO KIA Category Points SRO.Only Points Tier Group KKKKKKAAAAG A2 G* Total 1 2 3 4 5 6 1 2 3 4

  • Total

= = = = =

1. 1 333 33 3 18 3 3 6 Emergency &

Abnormal Plant 2 7

N!A NIA 9 2 2 4 Evolutions Tier Totals 5 4 5 5 4 4 27 5 5 10

= I = = = = =

1 331233232322 28 2 3 5 rent 2 iijoiiiiiiiiw 2 3 i

Systems Tier Totals 4 4 4 3 4 3 4 3 3 38 5 8

= = = = = *1

3. Generic Knowledge and Abilities 1 2 3 4 10 if_1 2 3 4 7 Categories 3 3 2 2 II 2 2 2

= Ji

1. Ensure that at least two topics from every applicable KIA category are sampled within each tier of the RO and SRO-only outlines (I.e., exceptfor one category In Tier 3 of the SRO-only outline, the 1erTotals@

in each KIA category shall not be less than two).

2. The point total for each group and tier in the proposed outline must match that specified In the table.

The final point total for each group and tier may deviate by )l from that specified in the table based on NRC revisions.

The final RO exam must total 75 points and the SRO-only exam must total 25 points.

3. Systemslevolutlons within each group are Identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally Important, site-specific systems that are not Included on the outline should be added. Refer to section 0.1 .b of ES-401 for guidance regarding the elimination of inappropriate KIA statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant-specific priority, only those KIAs having an importance rating (IR) of 2.5 or higher shall be selected.

Use the RO and SRO ratings for the RD and SRO-only portions, respectively.

6. Select SRO topics for Tiers I and 2 from the shaded systems and KIA categories.
7. The generic (G) KIAs in Tiers I and 2 shall be selected from Section 2 of the KIA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to section 0.1 .b of ES-401 for the applicable KAs.
8. On the following pages, enter the KIA numbers, a brief description of each topic, the topics=lmportance ratings (IRS>

for the applicable license level, and the point totals (#) for each system and category.

Enter the group and tier totals for each category in the table above; If fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter It on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RD and SRO.only exams.

9. For TierS, select topics from Section 2 of the K1A catalog, and enter the KIA numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to KJAs that are linked to 10 CFR 55.43..

ES-401, REV 9 T1G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR Kl K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO 008AK2.0l Pressurizer Vapor Space Accident / 3 2.7 2.7 fi fi Valves 009EK2.03 Small Break LOCA /3 3 3.3 t, fl fl S/Gs 011 6A2.0l Large Break LOCA /3 4.2 4.7 Actions to be taken based on RCS temperature and pressure saturated and superheated 0.15AK2.10 RCP Malfunctions / 4 2.8 2.8 RCP indicators and controls 022AK1 .03 Loss of Rx Coolant Makeup / 2 3 3.4 LI fl LI LI fl LI Relationship between charging flow and PZR level 026AG2.4.49 Loss of Component Cooling Water / 8 4.6 4.4 Ability to perform without reference to procedures those actions that require immediate operation of system components and controls.

IC 029EA1 .03 ATWS / 1 3.5 3.2 Charging pump suction valves from VCT operating switch 038EK1 .02 Steam Gen. Tube Rupture / 3 3.2 3.5 Leak rate vs. pressure drop 4.7 fl LI LI LI LI LI LI LI Ability to recognize abnormal indications for system 054AG2.4.4 Loss of Main Feedwater / 4 4.5 LI operating parameters which are entry-level conditions for emergency and abnormal operating procedures.

LI LI LI Actions necessary to restore power 055EA2.03 Station Blackout / 6 3.9 4.7 LI LI LI LI LI LI LI Actions contained in EOP for loss of offsite power 056AK3.02 Loss of Off-site Power / 6 4.4 4.7 LI LI LI LI LI LI LI LI LI LI Page 1 of 2 10/26/2011 10:46 PM

ES-401, REV 9 T1G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME! SAFETY FUNCTION: IR Kl K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO El fi El [ RWST and VCT valves 057AA1 .04 Loss of Vital AC Inst. Bus / 6 3.5 3.6 El El El El El El

)i I 058AK,342 Loss of DC Power / 6 4 4.2 fl H, H El. J fl fl Actions contained in EOP for loss of do power

)o i 062AA1 .06 Loss of Nuclear Svc Water / 4 2.9 2.9 Control of flow rates to components cooled by the SWS 31)

/

065AG2. 1.28 Loss of Instrument Air! 8 4.1 4.1 fl fl fl fi Knowledge of the purpose and function of major system components and controls.

077AK1.0l Generator Voltage and Electric Grid 3.3 3.5 fi El El El [I El El El El El Definition of the terms: volts, walls, amps, VARS, power Disturbances I 6 factor BEO4EA2.l Inadequate Heat Transfer Loss of

- 3.2 4.4 El El El El El El El El El fi Facility conditions and selection of appropriate Secondary Heat Sink! 4 procedures during abnormal and emergency operations.

BEO5EK3.3 Steam Line Rupture - Excessive Heat 4.2 3.8 U Li U U U U U U Manipulation of controls required to obtain desired Transfer /4 operating results during abnormal, and emergency situations.

Page 2 of 2 10/26/2011 10:46 PM

ES-401, REV 9 T1G2 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME! SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO 024AK3.Ol Emergency Boration / 1 4.1 4.4 When emergency boration is required O? .CI G9AK3.O4 Accidental Liquid Rad Waste Rel. / 9 3.8 4.3 DEEZEELiEEiL Aetes-eontained-in-EG?-fer-aeei4eo1al-iiri-radiTlve-waefe-re1ee

%fftr Accidental Gaseous Radwaste Rel. / 9 25 37 Fl F iFLiLJUU Calculation of offsite doses due to a release from the g 14/Oc power plant 068AA1.07 Control Room Evac. /8 4.1 4.2 PZR heaters 074EK2.02 Inad. Core Cooling / 4 3.9 4 PORV BAO1AG2.1.31 Plant Runback / 1 4.6 4.3 fl fl Ability to locate control room switches, controls and indications and to determine that they are correctly reflecting the desired plant lineup.

BAO4AK1 .3 Turbine Trip / 4 3.2 3.3 Annunciators and conditions indicating signals, and remedial actions associated with the (Turbine Trip).

BEO8EA1 .1 LOCA Cooldown - Depress. I 4 4 3.7 Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

BE14EA2.1 EOP Enclosures 3.4 4 Li Li Li D Li Li Li Li Li Facility conditions and selection of appropriated procedures during abnormal and emergency operations.

Page 1 of 1 10/26/2011 10:46 PM

ES-401, REV 9 T2G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME I SAFETY FUNCTION: IR Ki K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO 003K2.02 Reactor Coolant Pump 2.5 2.6 jJ CCW pumps 004K3.05 Chemical and Volume Control 3.8 4.2 LI LI [l LI LI LI LI LI LI LI LI PZR LCS

çI4L.

005A4.04 Residual Heat Removal 3.1 2.9 LI LI LI LI LI LI LI LI LI Controls and indication for closed cooling water pumps n

7B1T/borated water sources 006 K6.01 Emergency Core Cooling 3.4 3.9 LI LI LI LI []

006K6.10 EmergencyCoreCooling 2.6 2.8 LI LI LI LI LI LI LI LI [] Valves Ability to evaluate !ant pedormance and make operational 007G2.1 .7 Pressurizer Relief/Quench Tank 4.4 4.7 LI LI LI LI LI LI LI LI LI LI judgments based on operating characteristics, reactor behavior and instrument interpretation.

RCS 007K1 .03 Pressurizer Relief/Quench Tank 3.0 3.2 LI LI LI LI LI LI LI LI LI LI O08K4.09 Component Cooling Water 2.7 2.9 LI LI LI LI LI LI LI LI LI LI The standb/ feature for the CCW pumps 01 0G2.2.42 Pressurizer Pressure Control 3.9 4.6 LI LI LI LI LI LI LI LI LI LI Ability to recognize system parameters that are entry-level conditions for Technic Specifications RPIS 01 2K1 .04 Reactor Protection 3.2 3.3 LI LI LI LI LI LI LI LI LI LI 01 3K5.02 Engineered Safety Features Actuation 2.9 3.3 LI LI LI LI LI LI LI LI LI LI Safety system logic and reliability Page 1 of 3 10/26/2011 10:46 PM

ES-401, REV 9 T2G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR Kl K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO

[] [ [ Initiation of safeguards mode of operation 022A3.0l Containment Cooling 4.1 4.3 [

026K4.02 Containment Spray 3.1 3.6 Neutralized boric acid to reduce corrosion and remove inorganic fission product iodine from steam (NAOH) in containment spray 039K5.0l Main and Reheat Steam 2.9 3.1 Definition and causes of steam/water hammer 059A2.07 Main Feedwater 3.0 3.3 Tripping of MFW pump turbine 061 Al .03 Auxiliary/Emergency Feedwater 3.1 3.6 Interactions when multi unit systems are cross tied 061 K5.03 Auxiliary/Emergency Feedwater 2.6 2.9 Pump head effects when control valve is shut 062A1 .03 AC Electrical Distribution 2.5 2.8 Effect on instrumentation and controls of switching power supplies

,062K1 .04 AC Electrical Distribution 3.7 4.2 Off-site power sources 063A3.01 DC Electrical Distribution 2.7 3.1 Meters, annunciators, dials, recorders and indicating lights 864O& Emergency Diesel Generator 2.5 2.5 ED/G room temperature 073A4.0l Process Radiation Monitoring 3.9 3.9 Li Li Effluent release Page2of 3 10/26/2011 10:46PM

ES-401, REV 9 T2G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR Kl K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO O762 Service Water 2.5 2.6 Reactor building closed coding water

!. c 7 1 O76K Service Water 2.5 2.8 [ Secondary closed cooling water 078A3.Ol Instrument Air 3.1 3.2 Air pressure 078K2.02 InstrumentAir 3.3 3.5 E Emergencyaircompressor 2..

1 03A2O5 Containment 2.9 3.9 Emergency containment entry 103K4.0l Containment 3.0 3.7 Vacuum breaker protection Page3of3 10/26/2011 10:46 PM

ES-401, REV 9 T2G2 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR Ki K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO 001 K2.03 Control Rod Drive 2.7 3.1 El El El El El El El El El El One-line diagram of power supplies to logic circuits 002A3.03 Reactor Coolant - 4.4 4.6 El fl El El El El El El Pressure, temperatures and flows 015K4.l0 Nuclear Instrumentation 3.2 3.5 El El El El fl ri El El El Redundant sources of information on power level cit 4//

028A1 .02 Hydrogen Recombiner and Purge 3.4 3.7 Containment pressure Control 029A4.04 Containment Purge 3.5 3.6 El El El El El El El El El Containment evacuation signal 033G2.4.9 Spent Fuel Pool Cooling 3.8 4.2 El El El El El El El El El El Knowledge of low power! shutdown implications in accident (e.g. LOCA or loss of RHR) mitigation strategies.

056A2.04 Condensate 2.6 2.8 El El El Elj El El El l] El El fl Loss of condensate pumps 2.5 2.9 El Li El El El Radiation monitors 068K6.l0 Liquid Radwaste El El El El El 072K5.0l Area Radiation Monitoring 2.7 3.0 El El El El 1 El El El El El El Radiation theory, including sources, types, units and effects 079K1 .01 Station Air 3.0 3.1 El El El El El El El El El El 1S Page 1 of 1 l0!26!2011 10:46PM

ES-401, REV 9 T3 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR K1 K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO G2.1.17 Conduct of operations 4.0 LI LI LI LI LI LI LI Ability to make accurate, clear and concise verbal reports.

G2.1 .20 Conduct of operations 4.6 4.6 ri LI LI LI LI El El LI LI J Ability to execute procedure steps.

G2.1 .39 Conduct of operations 3.6 4.3 LI El LI LI LI LI LI LI El U Knowledge of conservative decision making practices G2.2. 1 Equipment Control LI LI LI LI LI LI LI LI LI LI ] Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity.

G2.2.39 Equipment Control 3.9 4.5 LI LI LI LI LI LI LI LI LI LI Knowledge of less than one hour technical specification action statements for systems.

G2.2.6 Equipment Control 3.0 3.6 LI Knowledge of the process for making changes to procedures G2.3.1 1 Radiation Control 3.8 4.3 LI Ability to control radiation releases.

G2.3.7 Radiation Control 3.5 3.6 Ability to comply with radiation work permit requirements during normal or abnormal conditions G2.4.29 Emergency Procedures/Plans 3.1 4.4 fl LI Knowledge of the emergency plan.

G2.4.39 Emergency Procedures/Plans 3.9 3.8 LI LI LI LI LI LI LI El LI fl Knowledge of the ROs responsibilities in emergency plan implementation.

Page 1 of 1 10/26/2011 10:46 PM

ES-401, REV 9 SRO T1G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME I SAFETY FUNCTION: IR Ki K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO 008AA2.30 Pressurizer Vapor Space Accident / 3 4.3 4.7 Inadequate core cooling 01 5AA2.07 RCP Malfunctions / 4 2.9 Calculation of expected values of flow in the loop with RCP secured 025AG2.1 .20 Loss of RHR System / 4 4.6 4.6 Ability to execute procedure steps.

054AG2.l.19 Loss of Main Feedwater/4 3.9 3.8 Ability to use plant computer to evaluate system or component status.

058AG2. 2.38 Loss of DC Power / 6 3.6 4.5 Knowledge of conditions and limitations in the facility license.

BEO4EA2.l Inadequate Heat Transfer Loss of

- 3.2 4.4 Facility conditions and selection of appropriate procedures Secondary Heat Sink / 4 during abnormal and emergency operations.

Page 1 of 1 10/26/2011 10:46 PM

ES-401, REV 9 SRO T1G2 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: JR k1 K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RD SRO 001 AG2.l .32 Continuous Rod Withdrawal / 1 3.8 4.0 Ability to explain and apply all system limits and precautions.

028AA2.l0 Pressurizer Level Malfunction / 2 3.3 - 3.4 Whether the automatic mode for PZR level control is functioning improperly, necessity of shift to manual modes BEO3EA2.2 Inadequate Subcooling Margin! 4 3.5 4 Adherence to appropriate procedures and operation within the limitations in the facility s license and amendments.

BEl4EG242 EOP Enclosures 4.5 4.6 Knowledge of system set points, interlocks and automatic actions associated with EOP entry conditions.

Page 1 of 1 10/26/2011 10:46 PM

ES-401, REV 9 SRO T2G1 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME / SAFETY FUNCTION: IR Kl K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO 006G2.4. Emergency Core Cooling 3.8 4.3 Knowledge of operational implications of EOP warnings, cautions and notes.

007A2.04 Pressurizer Relief/Quench Tank 2.5 2.9 Overpressurization of the waste gas vent header 27 24 ml 061 A2.08 Auxiliary/Emergency Feedwater Z.9.1 063G2.4.18 DC Electrical Distribution 3.3 4.0 J Knowledge of the specificbases for EOPs.

064G2.2.22 Emergency Diesel Generator 4.0 4.7 Knowledge of limiting conditions for operations and safety limits.

Page 1 of 1 10/26/2011 10:46 PM

ES-401, REV 9 SRO T2G2 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME I SAFETY FUNCTION: IR Kl K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO 01 6A2.02 Non-nuclear Instrumentation 2.9 3.2 El Loss of power supply 6r7G2.2.25 In-core Temperature Monitor 3.2 4.2 El El El El El El El El El El Knowledge of the bases in Technical Specifications for limiting conditions for operations and safety limits.

068G2.2.40 liquid Radwaste 3.4 El El El El El El El El El El J Ability to apply technical specifications for a system.

Page 1 of 1 10/26/2011 10:46PM

ES-401, REV 9 SRO T3 PWR EXAMINATION OUTLINE FORM ES-401-2 KA NAME I SAFETY FUNCTION: IR Kl K2 K3 K4 K5 K6 Al A2 A3 A4 G TOPIC:

RO SRO G2.1.43 Conduct of operations 4.1 4.3 Ability to use procedures to determine the effects on reactivity of plant changes G2.2.15 Equipment Control 3.9 4.3 Ability to determine the expected plant configuration using design and configuration control documentaion G2.2.40 Equipment Control 3.4 4.7 Ability to apply technical specifications for a system.

G2.3.14 Radiation Control 3.4 3.8 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities G23.4 Radiation Control 3.2 3.7 fl Knowledge of radiation exposure limits under normal and emergency conditions G2.4.19 Emergency Procedures/Plans 3.4 4.1 Knowledge of EOP layout, symbols and icons.

G2.4.44 Emergency Procedures/Plans 2.4 4.4 Knowledge of emergency plan protective action recom mendations.

Page 1 of 1 10/26/2011 10:46PM

ES-401 Record of Rejected K/As Form ES-401-4 Tier I Randomly Reason for Rejection Group Selected KA 1/ 1 EPEO29 EA1.03 Q(7) We do not have a switch that performs this function. At ONS the LDST valves stay open even with ES injection. Chief examiner selected EPEO29 EA1.O1 1/ 1 APEO57 AA1.04 Q(12) Loss of a Vital AC bus has no affect on any BWST or LDST valves. They are powered elsewhere. Chief examiner selected APAO57 M1.03 1/ 1 APEO57 AA1.03 Q(12) FDW pump speed is not powered from Vital AC. Chief Examiner selected APEO57 AA1.O1 1/12/12 1/ 1 APEO58 AK3.02 Q(13) We have no actions for loss of DC power in the EOP or any APs. Chief examiner selected APEO58 AK3.O1 1/ 1 APEO58 AK3.O1 Q(13) Cannot write a discriminating question. Chief examiner picked new KA 058AK1.O1 1/27/12 1/ 1 APEO62 AA1.06 Q(14) If LPSW is lost there is no flow to control. Could not write a discriminating question to this KA. Chief examiner selected APEO62 AA1.07 1/ 2 APEO59 AK3.04 Q(20) We have no EOP actions for accidental liquid Radwaste release. Chief examiner selected APEO59 AK3.O1 1/2 APEO59 AK3.O1 Q(20) Cannot write a discriminating question. Already have a question on RIA-54. Chief examiner picked new KA 051AK3.O1 1/27/12 1/ 2 APEO6O AK1.04 Q(21) Operators do not perform any calculations of offsite doses due to a release. Chief examiner selected APEO6O AK1.O1 1/ 2 APEO6O AK1.O1 Q(21) Could not write a discriminating question to this KA. Chief examiner selected APEO37AK3.05 2/1/12 2/ 1 SYSOO5 A4.04 Q(30) We dont have a closed loop system for cooling LPI. Chief examiner selected 005A4.02 2/ 1 SYSOO6 K6.O1 Q(31) Could not write a discriminating question to this KA. Chief examiner selected 006K6.02 2/ 1 SYSO64 A1.05 Q(48) NO temperature monitoring or guidance or limitations for Keowee control room.

Chief examiner picked new KA 012K5.O1 1/27/12 2/ 1 SYSO76 K2.04 Q(50) SYSO76K2.O400verlap with Q28. Both test power supplies to CC pumps. Chief examiner picked new KA 5YS076K2.O1 1/27/12 2/ 1 SYSO76 K3.02 Q(51) Our LPSW does cool our RCW which is the closed loop cooling system on the secondary side. Chief examiner picked new 076K3.07 1/27/12 2 I1 5Y5103 A2.05 Q(54) Cannot write a discriminating question. Chief examiner picked new KA 103A2.03 1/27/12

ES-40 1 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected KA 2/ 1 SYS1O3 K4.01 Q(55) Our containment does not have a vacuum breaker. Chief examiner selected 103 K4.06 2/2 SYSO28 A1.02 Q(59) We no longer have a Hydrogen recombiner. Chief examiner selected 017A1.01 1/ 1 APEO15/017 AA2.07 Q(77) We do not calculate RCS loop flows when a RCP is secured. Chief examiner selected 015/017AA2.09 1/ 1 APEO54 2.1.19 Q(79) Could not write an SRO level question on this K/A. The Chief Examiner randomly selected K/A APEOS4G2. 1.7. 3/6/2012 1/2 APEOO1 2.1.32 Q(82) Could not write a discriminating SRO question. Chief examiner picked new KA APEO36G2.1.32 2/9/12 1/2 BWE14 2.4.1 Q(85) EOP entry and EOP enclosures are not related. Chief peicked new KA 8E14G2.4.5 1/2 BWE14 2.4.2 Q(85) EOP entry and EOP enclosures are not related. Chief Examiner selected new KA.

BE14G2.4.1 1/27/12 1/ 2 BWE14 2.4.5 Q(85) Could not write a discriminating SRO question. Chief examiner picked new KA BWE14G2.4.20 3/29/12 2/ 1 SYSOO6 2.4.40 Q(86) Could not write an SRO level question on this KA. Chief provided G2.4.45 as new KA on 5/6/12.

2/ 1 SYSOO6 2.4.20 Q(86) We have very few notes; cautions etc in our EOP and could not write a discriminating question. Chief examiner picked new KA 006G2.4.45.

2/ 1 SYSOO7 A2.04 Q(87) Vent header pressure has no affect on QT. Chief examiner picked new KA 007A2.01 2/9/12 2/ 1 SYSO63 2.4.18 Q(89) There is no tie to the DC system in the bases for the EOP. Chief examiner selected 063G2.4.12 2/2 SYSO17 2.2.25 Q(92) We have very few notes; cautions etc in our EOP and could not write a discriminating question. Chief examiner picked new 006G2.4.40 2/1/12.

2/2 SYSO34 2.2.25 Q(92) No FH Equipment in TS bases. Chief examiner picked new KA 034G2.1.35 3/0 GEN2.4 2.4.19 Q(99) Our EOP does not have symbols or icons. Chief examiner selected G2.4.18

ES-401 Written Examination Quality Checklist Form ES-401-6 Facility: Oconee Nudear Station Date of Exam: 6/11/2012 Exam Level: RO L/SRO Item Description

1. Questions and answers are technically accurate and applicable to the facility.
2. a. NRC K/As are referenced for all questions.
b. Facility learning objectives are referenced as available.
3. SRO questions are approptiate in accordance with Section D.2.d of ES-401
4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exams, consult the NRR OL program office).
5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

the audit exam was systematically and randomly developed; or the audit exam was completed before the license exam was started; or the examinations were developed independently; or the licensee certifies that there is no duplication; or other (explain)

6. Bank use meets limits (no more than 75 percent from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO / SRO-only question distribution(s) at right.
7. Between 50 and 60 percent of the questions on the RO exam are written at the comprehension/ analysis level; the SRO exam may exceed 60 percent if the randomly selected K/As support the higher cognitive levels; enter the actual RO / SRO question distribution(s) at right.
8. References/handouts provided do not give away answers or aid in the elimination of distractors.
9. Question content conforms with specific K/A statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified.
10. Question psychometric quality and format meet the guidelines in ES Appendix B.
11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet.

Printed Name / Signature Date

a. Author giJ (d45f8U1J/,&J,.J44Jj._
b. Facility Reviewer (*)

vdr Jzz4z

c. NRC Chief Examiner (#) 4 i. L4%-4 JfE1 1 1
d. NRC Regional Supervisor 2

/T 7 Note: The facility reviewers initials/signature are not applicable for NRC-developed examinations.

  1. Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

Oconee June 2012 Initial Exam ES-401 Written Examination Review Worksheet FINAL Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 5 (easy difficult) rating scale (questions in the 2 4 range are acceptable).
3. Check the appropriate box if a psychometric flaw is identified:
  • The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
  • The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
  • The answer choices are a collection of unrelated true/false statements.
  • The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
  • One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
4. Check the appropriate box if a job content error is identified:
  • The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
  • The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
  • The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
  • The question requires reverse logic or application compared to the job requirements.
5. Check guestions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
7. Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
8. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only I H 1 B S 008AK2.O1 Question appears to match the K/A. Not very discriminating.

Oconee 2009A NRC RO #1 2 H 2 N S 009EK2.03 Question appears to match the K/A.

SAT 3 H 2 N S OIIEA2.01 Question appears to match the K/A.

SAT 4 H 2 M S 015AK2.10 Question appears to match the K/A.

SAT Oconee 2009 NRC exam RO #5 5 H 2 X N E 022AK1.03 Question appears to match the K/A. Do not believe that distractors B and D are plausible. 1-HP-410 is not listed anywhere in AP-14. What would operators do if 1C HPI or lB HPI were running instead of 1A? Would this bring into play l-HP-27? Lets attempt to find something more plausible. Will Discuss.

Changed distractors B and D. 511412012 SAT 6 F 2 N S 026G2.4.49 Question appears to match the K/A. Not very discriminating. SAT 7 F 2 N S O29EAtOI Question appears to match the K/A. SAT 2

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK L0D (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 8 H 2 X B/M E 038EK1.02 Question kind of matches the K/A. Using the statement as written in (1) distractors c and d are not plausible.

The SGTR tab directs minimizing core SCM during cooldown to ensure the IA S/G is isolated as quickly as possible. How does minimizing subcooling aid in isolating a S/G more rapidly? Need to either reword (1), or change the first part of distractors c and d.

Oconee 2010A Q #9 Made changes as requested. 5/1412012 SAT 9 F 2 N S 054G2.4.4 Question appears to match the K/A. SAT 10 H 3 N E 055EA2.03 Question appears to match the K/A. The procedure flow path included with the question does not match the intended answer. I believe that C is the correct answer, but is not complete. lAW Enclosure 5.38, ACB-3 must be opened and then ACB-4 must be closed to energize CT-4. I think I read this correctly please let me know if I did not. Just want to make sure everything is correct.

Discussion reveals that ACB-3 auto opens on the lockout. 5/14/2012 SAT 11 F 2 X N E 056AK3.02 Question appears to match the K/A. AP-1 I actions are acceptable. Not sure C is plausible. Need to develop a new distractor, or more information on why it is plausible.

Changed distractors A, B and C. 5/14/2012 SAT 12 F 2 N E 057AA1.01 Question appears to match the K/A. Does the control room receive an alarm that would indicate this condition? If so it would be better for the applicant to get this information from an alarm.

Modified stem with alarms. 5/14/2012 SAT 13 H 2 N S O58AKtOI Question appears to match the K/A. SAT 3

J

Oconee June 2012 lntal Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 14 H 2 X N E 062AA1.07 Question appears to match the K/A. The 7500 gpm flow is very high and does not seem to be plausible. This valve normally controls at 3000 gpm. Suggest lowering the flow rate in the stem to 2000 gpm and rising and state in the distractors flow will stabilize at 3000 gpm, or 5200 gpm.

Made changes but changed the intent of the question. Will go back and return to 3000 and 5200 and reorder. Continue to Work.

Reviewed changes (added back 3000 and 5200) Now SAT 512412012 15 F 2 N S 065AG2.1.28 Question appears to match the K/A. SAT 16 H 2 N S/E 077AA1 .01 Question kind of matchers the K/A. With the reference provided the applicant need not know the definition of PF. If you ask the question without the applicant must know the definition to correctly determine if PF will be higher or lower. Question is SAT without the reference.

Made changes as requested. 5/14I2012 SAT 17 H 2 N S BWO4EA2.1 Question appears to match the K/A. SAT 18 H 2 N S BWO5EK3.3 Question appears to match the K/A. SAT 19 F 1 X X N U 024AK3.01 Question kind of matches the K/A, in a backwards logic sort of way. Distractors A and C are not plausible. The capacities of the TBVs are much greater than I or 5 percent.

Changed A and C distractors. 5/1412012 SAT 20 F 2 N S 051AK3.01 Question appears to match the K/A. Not very discriminating. SAT 1

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 21 H 2 X N E 037AK3.05 Question kind of matches the K/A. In your K/A analysis you state the applicant requires knowledge of RCS inventory balance, but the question does not really ask about an inventory balance, merely the level at which pressurizer level is maintained. I think you can better match the K/A Made changes as requested. 511412012 SAT 22 F 2 N S 068AAt07 Question appears to match the K/A. SAT 23 H 2 X N E 074EK2.02 Question appears to match the K/A. It appears the flow rate in distractors A and C is greater than the output of a single HPI pump. This is not plausible. Need to find a different more plausible flow rate. (I understand that if you had two pumps operating... but only one is running and I dont believe it can put out this kind of flow, Changed second part of question. 511412012 SAT 24 H 2 X N E BWAOIG2.1.31 Question appears to match the K/A. The stem is somewhat confusing. Is a runback in progress at 0400? If not what is causing power to decrease? Is reactor power lowering prior to the RCP trip? Need to make stem clearer, or teach me. On the drawing provided to the applicants there is not a runback initiated, and he diamond is in track. Is the drawing showing the applicant that the runback is complete? Need to discuss.

Added Note for drawing. 511412012 SAT 25 H 2 M S BWAO4AKI .3 Question appears to match the K/A.

Oconee 2010A Q #85 SAT 26 H 2 B S BWO8EAI.1 Question appears to match the K/A.

2007 Oconee RO Retest Q # 27 SAT 5

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 27 H 2 M S BWI4EA2.lQuestion appears to match the K/A.

Oconee 2009 RO Q# 27 SAT 28 F 2 N U 003K2.02 Question appears to match the K/A. IXN should be one of the choices. Are 1XS1 and 1XS2 the same voltage as IXL? These do not appear to be plausible. Need to add 1XN and one other power supply.

Added IXN as requested. 511412012 SAT 29 H 2 N S 004K3.05 Question appears to match the K/A. SAT 30 F 2 N U 005A4.03 Question appears to match the K/A. A and D do not appear to be plausible. These are not normally used to control anything.

Need to find other distractors or use a 2 X 2.

Made changes in a 2X2. 5114/2012 SAT 31 H 2 X N S/E 006K6.02 Question Kind of matches the K/A. How many CFTs are analyzed for during a design basis event? If only one is required then the core is still okay. Maybe we should include a statement to consider each CFT separately. Otherwise good and different attempt at matching the K/A.

After discussion question is SAT 5/14/2012 32 H 2 X N E 006K6.1 0 Question appears to match the K/A. First part of A and B do not appear to be plausible. 10 minutes is a very short time. Need to find another time like 20 minutes or so. Will Discuss Made changes as requested. 5I14I2012 SAT 6

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK L0D (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 33 H 2 X M E 007G2.1.7 Question appears to match the K/A. Modified from Oconee 2010A NRC Exam. (I think this is the third time I have seen this question in a modified form. Is there not anything else you can write a Quench tank question on?) This is a backward method of matching the K/A.

Replaced question, new question is SAT 5/1412012.

34 F 2 X N U 007K1.03 Question appears to match the K/A. Distractors A and B are not plausible. One pressure you could use is the reset pressure from the actual PORV, You state it opens at 2450 psig, when does it close on lowering pressure? Or you need to make a 2 X 2 out of the last two distractors.

Changed question to a 2X2. SAT 5/24/2012 35 F 2 N S 008K4.09 Question appears to match K/A. SAT 36 H 2 X X N E 010G2.2.42 Question appears to match the K/A. Distractor C and D plausibility discussions do not make sense. It states the second part is plausible because RCS pressure is in the normal operating window and above the bank 2 cutoff of 2150 psig. The stem states that RCS pressure is 2145 psig. Need to raise pressure to approximately 2155 psig or something similar to test the pressurizer saturation recovery circuit as intended. If this is not the intent, then I am not sure C and D are plausible.

Made changes as requested. SAT 512412012 37 H 2 N S 01 2K1 .04 Question appears to match the K/A. SAT 38 H 2 N S 013K5.02 Question appears to match the K/A. SAT 39 H 2 N S 022A3.01 Question appears to match the K/A. SAT 7

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues TIE Cred. Partial Job- Minutia #1 Back- Q= SRO BIMIN UIEIS Explanation Focus Dist. Link units ward K/A Only 40 F 2 N SIE 026K4.02 Question appears to match the K/A. How long ago was the Change to baskets in the RB made? If this was several years ago, this may not be a plausible distractor. Otherwise SAT Changed question. 5/1412012 SAT 41 H 2 N S 039K5.01 Question appears to match the K/A. SAT 42 H 2 N S 059A2.07 Question appears to match the K/A. SAT 43 H 2 N S 061A1.03 Question appears to match the K/A. SAT 4 F 2 N S 061 K5.03 Question appears to match the K/A. SAT 45 F 2 N S 062A1 .03 Question appears to match the K/A. SAT 46 H 2 B S 062K4.01 Question appears to match the K/A. Place the distractors in a different order so they are not exactly like the BANK question otherwise SAT 47 H 2 M S 063A3.01 Question appears to match the K/A. SAT Oconee 2009 NRC exam Q # 14.

8)

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 48 H 2 M E 012K5.O1 Question appears to match the K/A. Question is similar to question 36 this could be a double jeopardy issue. Will discuss Oconee 2007 NRC exam Q # 38.Changed second part of stem to fix problem.

SAT 5/1412012 49 H 2 M S 073A4.01 Question appears to match the K/A. SAT Oconee 2007Retest NRC exam Q # 38.

50 F 2 N S 076K2.01 Question appears to match the K/A. SAT 51 H 2 N U 076K3.07 Question appears to match the K/A. Do not believe that distractors B and C are plausible. Need to find other distractors or 2X2.

Changed C and discussed why B is plausible. 5114/2012 SAT 52 F 2 N E 078A3.01 Question appears to match the K/A. If these air compressors did not start, what would stabilize pressure at 87 psig?

Does some other air compressor start? If no other air compressors start then A is not plausible because something would have to start to stabilize pressure. If pressure was at 90 psig, then only the backup air compressor would be running.

Made changes as requested. 5114/2012 SAT 53 F 2 N/M S 078K202 Question appears to match the K/A. Is this new or modified? SAT 54 H 2 N S/E 103A2.03 Question appears to match the K/A. Are the buttons on the main control board for going to override called Voters? is so, this would be acceptable. Otherwise distractors B and D are not plausible.

Buttons are voters. 5/14/2012 SAT 11 F

Oconee June 2012 Initial Exam 1 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LCD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 55 F 2 B S 103K4.06 Question appears to match the K/A. SAT Oconee2009BQ#60 56 F 2 N S 001 K2.03 Question appears to match the KIA. SAT 57 F 2 N U 002A3.03 Question does not appear to match the K/A. The K/A asks for ability to monitor automatic operation of the RCS including pressure, temperature, and flows. The question does have an element of reducing flow, but is not a parameter that is monitored in the question. The question states 1 RCP trips.., what power will the unit runback to and how fast. None of the parameters called for in the K/A are addressed. Need another attempt at this one.

Wrote new question 511412012 SAT 58 H 2 N S 015K4.10 Question appears to match the K/A. SAT 59 H 2 N S 017A1.01 Question appears to match the K/A. SAT 60 F 1 N S 029A4.04 Question appears to match the K/A. Not very discriminating SAT 61 H 2 X N E 033G2.4.9 Question kind of matches the K/A. (tough K/A) Distractor analysis states that 9.6 minutes is correct, should be 9.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The material that was sent to me AP135 enclosure 5.4 has 57 pages, the electronic version has 86 pages. Not sure I agree with the 250 gpm flow rate. Will discuss Made changes including distractors B and 0. 511412012 SAT 62 H 2 N S 056A2.04 Question appears to match the K/A. SAT 10

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK L0D (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N UIEIS Explanation Focus Dist. Link units ward K/A Only 63 F 2 N S 068K6.1O Question appears to match the K/A. SAT 64 H 2 N S 072K5.O1 Question kind of matches the K/A. SAT 65 F 2 N S 079K1.01 Question appears to match the K/A. SAT 66 F I N E G2.1.17 Question appears to match the K/A. very little discriminatory value. Will Discuss Changed Crew Brief to Discussion. 511412012 SAT 67 F I N U G2.1 .20 Question appears to match the K/A. This too is not very discriminating, Your SRO usually states and the operators repeat back: IAAT... Notify you. How can A and B be plausible? It might be different if the step is an immediate action step like trip the reactor etc.

Changed to having the RO perform an IAAT step separate from the rest of the crew. 5!14I2012 SAT 68 F I B SIE G2.1 .39 Question appears to match the K/A. Another question off of the 2009 exam. I am concerned with the issue of predictability. Will discuss Oconee 2009 NRC exam RO # 68.

69 F 2 N S G2.2.21 Question appears to match the K/A. SAT 70 F 2 X N U G2.2.39 Question really does not match the K/A. You are not really testing actions statements, but the time associated with them.

Distractors A and B are not plausible. Try using a 2 X 2 with C and D times and the action statements.

Changed question to ask more of the action statements. 511412012 SAT 1 1

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues TIF Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 71 F 2 N S G2.2.6 Question appears to match the K/A. SAT 72 F 2 M E G2.3.1 I Question appears to match the K/A. Not sure that A is plausible. I realize on the original it was used but reasons were added. As written I do not think this is plausible.

Oconee 2009B NRC exam RO # 72. (Modified)

Changed A, 511412012 SAT 73 H 2 M E G2.3.7 Question appears to match the K/A. Dont really think distractors C and D are plausible. Try a 2X2 using A and B. This also something we would use on an administrative JPM.

Oconee 2007 NRC retest exam RO # 71.

Made changes as requested. 5I14!2012 SAT 74 F 2 M S G2.4.29 Question appears to match the K/A. SAT 2008 Catawba NRC exam Q 75 (Modified) 75 F 2 N S G2.4.39 Question appears to match the K/A.

RO Exam: Unsat = 8 Enhancements = 23 Sat =44 Generic comments:

1) Please ensure all bank questions answers are in a different order than the original.
2) Somewhat concerned with exam predictability with all the questions from the 2009 exams (eight are listed from 2009 exams as you have them listed Some are 2010 exams, however, you have been numbering your exams different from the NRC and it is difficult to determine is they are all off of the same exams). I know some are modified but there is still some concern, If the changes that we make to the test due tc unsats or enhancements alleviates the issue OK. If not we will address the issue then.

12

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues TIF Cred. Partial Job- Minutia #1 Back- Q SRO 8/M/N UIEIS Explanation Focus Dist. Link units ward K/A Only SRO Questions 76 2 H X N E 008AA2.30 Question kind of matches the K/A. Appears to be SRO only. Had another examiner review for K/A match. Match appears to be Okay. Will discuss After discussions determined question to be SAT 5124/2012 77 2 F X N E 015AA2.09 Question appears to match K/A. Mat Have an SRO aspect to it. (Not totally sold on this; these limits are normally RO and SRO items in Reactor Protection System lesson material. So, while this is in basis it is also systems knowledge). Reactor power to flow limits are almost always related to DNB. The responses with KWIFoot maybe acceptable if you can show where and how they are verified (Rod insertion limits etc.) The DNB statements should be margin to DNB. Will discuss. Licensee wants to wait until final validation.

Changed question to decay heat removal being satisfied.

5/14/2012 SAT 78 2 H B S 025AG2.1.20 Question appears to match the K/A. Appears to be SRO only. SAT 2010-301 Oconee NRC exam Q78 79 2 H X N E 054AG2.1.7 Question appears to match the K/A. Appears to be SRO only. Could we take an HPI pump out of service to make B more plausible? May changes as requested. 5/14/2012 SAT 1

Oconee June 2012 Initial Exam

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues TIE Cred. Partial Job- Minutia #1 Back- Q= SRO BIM/N UIE/S Explanation Focus Dist. Link units ward K/A Only 80 2 H X M E 058AG2.2.38 Question appears to match the K/A. Appears to have an SRO Aspect. Question is kind of confusing the way it is written. Stem needs to be reworded to help the applicant understand what we are asking.

2009A (2010-301) Oconee NRC exam Q#80 Made changes to stem. No Reference to be provided. 5/14/2012 SAT 81 H 2 N U/E BWO4EA2.1 Question appears to match the K/A. Appears to have an SRO aspect to it. This question is very similar to question 79 appears to be a double jeopardy situation. Need to change one of these.

Made changes as requested. 5114/2012 SAT 82 F 2 B S 036AG2.1.32 Question appears to match the K/A. Appears to be SRO only.

Oconee 2009B #Q91.

83 H 2 X N E 028AA2.10 Question appears to match the K/A. Appears to have an SRO aspect to it, B and D reasons are subsets of A and C. (Putting it another way, How could a pressure spike from a pump start with a bubble in the pressurizer cause pressure to rise to the safety setpoint without an insurge?

Need to find another distractor for B and D. No procedure requires the valve to be taken to manual, this would allow the question to two correct answer. Still need to work on first part of distractors.

511412012 Changed two distractors, changed part of the stem SAT 512412012 14 L

Oconee June 2012 Initial Exam

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 84 H 2 X N E BWO3EA2.2 Question appears to match the K/A. Appears to have an SRO aspect to it. As written D could be considered correct. (the applicant has nothing telling them that the TDEFW pump is not being used. If it were would not D be correct? Does the question imply that the EFW pumps are not operating simply because we are in the LDSCM TAB? After discussion B is the only correct answer.

511412012 SAT 85 H 2 X X N U BWI4EG2.4.20 Question appears to match the K/A. May have an SRO aspect to it. Looking at your lesson material it is very difficult to determine if this is SRO only knowledge. The objectives (R55, R56, and R57) all state these objectives are also RD objectives. Will discuss. I understand where you got the times from and the second time is sort of plausible. Will discuss. This question has a subset issue, as written C could be considered correct.

Made changes a requested. 511412012 SAT 86 H 2 X N U 006G2.4.40 Question may not match the K/A. Question appears to be SRO only. What in the question in based on ECCS? ( I realize an ES actuation has taken place, but is any part of the classification due to ECCS malfunction? Part of the classification should be due to the ECCS system. Will discuss Gave new K/A. 006G2.4.45. Replaced question OK only first page of reference is to be allowed (Graph). 511412012 SAT 87 H 2 X X N U 007A2.01 Question appears to match the K/A. Not sure it is SRO only.

The question essentially asks for a major procedure strategy which is usually considered RD knowledge. The first part of the question is RD knowledge. Also if the crew was still in UNPP step 21 would have the operator Utilize HPI as necessary to maintain RCS pressure and SCM.

The question does not state that the crew had completed UNPP, and does not appear to be asking for a transition. Therefore I believe this is RD knowledge. Will Discuss.

Made several changes to question. 511412012 SAT 15

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK L0D (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 88 H 2 X N E 061 A2.08 Question appears to match the K/A. Appears to have an SRO aspect to it. In the previous version of this question we were asking if the pump was inoperable. Now we are asking in accordance with TS when the valve must be repositioned. I am not sure the times should be asked without a reference. If given a reference, would this be a direct look-up? Will discuss No changes added reference as suggested. 511412012 SAT 89 H 2 X N E 063G2 4.12 Question appears to match the K/A. Question does have an SRO aspect to it. (As stated previously knowing who can conduct focus briefs is the responsibility of all operators.) The classification aspect is SRO knowledge and would be acceptable if the classification or lack of needing a classification was related to the DC electrical distribution system.

Made changes declaration is on Loss of DC. 511412012 SAT 90 F 2 N S 064G2.2.22 (Emergency power path Keowee is substituted for D/Gs.

Question appears to match the K/A. Appears to be SRO only.

SAT 91 H 2 N S 016A2.02 Question appears to match the K/A. Appears to be SRO only. SAT 92 F 2 N S/E 034G2.1.35 Question appears to match the K/A. Appears to be SRO only. SAT Required to change question due to a procedure change. First Part of question is not plausible. Continue to work. 511412012 Changed first parts of question as to who is responsible. SAT 512412012 16 L

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 93 H 2 X N E 068G2.2.40 Question appears to match the K/A. Appears to be SRO only. Need to add the title of I RIA-54. Not sure distractor A is plausible. Will discuss.

Made changes to distractor A, however, H (distractor C) will be a direct look-up Continue to work Had several discussions, and licensee explained how one could pick all of the other distractors. SAT 512412012 94 H 2 M S G2.1.43 Question appears to match the K/A. First part is GEE, second part appears to be SRO only. Not very discriminating.

SAT 2007 ONS NRC #67 (Modified) 95 F I X X B E G2.2.15 Question kind of matches the K/A. This is essentially a reactivity manipulation, why would it ever be plausible to be controlled from the WCC? Not sure it is SRO only. I realize this was on an NRC exam in the past but do not think it is SRO only. Not very discriminating. Is this not normally controlled by a procedure? Will discuss 2007 ONS NRC #97 Made changes as requested. 5/14/2012 SAT 96 H 2 X X M E G2.2.40 Question kind of matches the K/A. Although the applicant does not really have to apply the technical specification for the system, but determine how long can elapse until the LCO must be entered.

Distractor D is not plausible: you told the applicants that the SR was performed on 12/1 @2100, why would someone pick this if they knew it was performed? We need to discuss this one.

2009 Oconee # 87. Made changes to C and D. 5114I2012 SAT 17 L

Oconee June 2012 Initial Exam

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q= SRO RIM/N UIE/S Explanation Focus Dist. Link units ward K/A Only 97 F 2 X N E G2.3.14 Question appears to match the K/A. Question appears to have an SRO aspect to it. Distractor D is very weak.

Changed distractor D. 5I14I2012 SAT 98 B S G2.3.4 Question appears to match the K/A. Very low level SRO only.

Little discriminating value.

2009 Oconee # 99.

5114/2012 SAT 99 H 2 N E G2.4.18 Question appears to match the K/A. Question has an SRO aspect to it. Similar to question # 79 and 81. This would be triple jeopardy. One or two of these must change.

Replaced Question 5/14/2012 SAT 100 F 2 N E G2.4.44 Question appears to match the K/A. Question has an. SRO aspect to it. Reference material does not match up with the question.

TSC is used as the correct answer, and in one distractor, but the reference information is on the EOF. I realize that both of these organizations can recommend protective actions. Usually the EOF does it after it is fully manned. 55 minutes after the event has begun, the control room is not normally responsible for notifications. So it appears to me that the Control Room is not a plausible distractor will discuss.

Made changes as requested. 511412012 SAT SRO Exam:

Unsats = 4 Enhancements = 14 Sats = 7 Same generic concerns as the RO exam.

F

ES-403, Rev. 9 Written Examination Grading Form ES-403-1 Quality Checklist Facility: Oconee Nuclear Plant Date of Exam: 06/20/2012 Exam Level: RO!SRO Initials Item Description a b c

1. Clean answer sheets copied before grading N/A
2. Answer key changes and question deletions justified and N/A documented
3. Applicants scores checked for addition errors N/A j, (reviewers_spot_check>_25%_of_examinations)
4. Grading for all borderline cases (80 +/-2% overall and 70 or 80, N/A as_applicable,_+/-4%_on_the_SRO-only)_reviewed_in_detail
5. All other failing examinations checked to ensure that grades N/A are_justified
6. Performance on missed questions checked for training 1 N/A deficiencies and wording problems; evaluate validity of questions missed by half or more of the_applicants Printed Name/Signature Date
a. Grader .
b. Facility Reviewer(*)
c. NRC Chief Examiner (*) 6. 14 Tc3 2/401
d. NRC Supervisor (*) /

/

(*) The facility reviewers signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.