ML12269A466
ML12269A466 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 09/25/2012 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Cortopassi L Omaha Public Power District |
References | |
IR-12-011 | |
Download: ML12269A466 (8) | |
See also: IR 05000285/2012011
Text
N U C LE AR R E GU LA TOR Y C OM MI S S I ON
R E G IO N I V
1600 EAST LAMAR BLVD
AR L I NG TO N , TE X AS 7 60 1 1 - 4511
September 25, 2012
Lou Cortopassi, Vice President
and Chief Nuclear Officer
Omaha Public Power District
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT: FORT CALHOUN STATION - INITIAL REQUEST FOR INFORMATION
TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC
INSPECTION REPORT 05000285/2012011
Dear Mr. Cortopassi:
On October 22, 2012, the NRC will begin a Component Design Bases Inspection at the Fort
Calhoun Station focused on the auxiliary feedwater system. A three-person team will perform
this inspection using NRC Inspection Procedure 71111.21, "Component Design Bases
Inspection."
The inspection focuses on components and operating experience throughout the auxiliary
feedwater system. The samples reviewed during this inspection will be identified during an
information gathering visit and during the subsequent in-office preparation week. In addition, a
number of operating experience issues will also be selected for review.
The inspection will include 2-weeks of onsite inspection by the team. The inspection will consist
of one NRC inspector and two contractors that will focus on engineering. The current inspection
schedule is as follows:
Preparation Week: October 15, 2012
Onsite weeks: October 22, 2012
November 5, 2012
During the onsite weeks, the lead inspector will also request a tour of the auxiliary feedwater
system, both mechanical and electrical components. Additional information and documentation
needed to support the inspection will be identified during the inspection, including interviews
with engineering managers, engineers, and probabilistic safety assessment staff.
Our experience with these inspections has shown that they are extremely resource intensive,
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into three groups. The first group lists
information necessary for general preparation and component sample selection. This
information should be available to the regional office no later than October 12, 2012. If possible,
this information should be provided electronically to the lead inspector. Since the inspection will
L. Cortopassi -2-
be concentrated on high risk/low margin components, calculations associated with your list of
high risk components should be available to review during the information gathering visit to
assist in our selection of components based on available design margin.
The second group of documents requested is those items that the team will need access to the
first day of onsite inspection to complete the required inspection samples. The third group lists
information necessary to aid the inspection team in tracking issues identified as a result of the
inspection. It is requested that this information be provided to the lead inspector as the
information is generated during the inspection. Additional requests by inspectors will be made
throughout all onsite weeks for specific documents needed to complete the review of that
component/selection. It is important that all of these documents are up to date and complete in
order to minimize the number of additional documents requested during the preparation and/or
the onsite portions of the inspection. In order to facilitate the inspection, we request that a
contact individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
During the onsite portion of our inspection, we request that you make available a conference
room large enough to accommodate the inspection team. In that conference room, please
make available a computer with access to a printer, your condition reporting database, and your
documentation database.
The lead inspector for this inspection is Matthew Young. We understand that our licensing
engineer contact for this inspection is Erick Matzke. If there are any questions about the
inspection or the requested materials, please contact the lead inspector at (817) 200-1545 or via
e-mail at matt.young@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA/
Thomas Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-285
License: DPR-40
L. Cortopassi -3-
Enclosure:
Component Design Basis Inspection
Document Request
cc w/enclosure:
Electronic Distribution to Fort Calhoun Station
L. Cortopassi -4-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Allen.Howe@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
FCS Administrative Assistant - Vacant
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
SUNSI Review Completed: _Yes_ ADAMS: _Yes No Initials: MRY
_Publicly Available Non-Publicly Available Sensitive _Non-Sensitive
RIV:RI:DRS/EB1 RIV:BC/EB1 RIV:BC/BR. F
M. Young T. Farnholtz J. Clark
/RA/ /RA/ /RA/
9/24/12 9/25/12 9/25/12
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
INFORMATION REQUEST FOR FORT CALHOUN STATION COMPONENT DESIGN BASES
(CDBI) INSPECTION
Inspection Report: 0500050285/2012011
On-site Inspection Dates: October 22 - 26, 2012
November 5 - 9, 2012
Inspection Procedure: IP 71111.21, "Component Design Bases
Inspection"
Lead Inspector/Team Leader: Matthew Young
817-200-1545
matt.young@nrc.gov
I. Information Requested Prior to the information Gathering Visit (October 12, 2012)
The following information (Section I of this enclosure) should be sent to the Region IV
office in hard copy or electronic format (ims.certrec.com or compact disc, preferred), in
care of Matthew Young, by October 12, 2012 to facilitate the reduction in the items to be
selected for a final list during the preparation week October 15, 2012. The specific items
selected from the lists shall be available and ready for review on the day indicated in this
request. *Please provide requested documentation electronically in "pdf" files, Excel, or
other searchable formats, if possible. The information should contain descriptive names,
and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should
contain enough information to be easily understood by someone who has knowledge of
pressurized water reactor technology. If requested documents are large and only hard
copy formats are available, please inform the inspectors, and provide subject
documentation during the first day of the onsite inspection.
1. An excel spreadsheet of equipment basic events (with definitions) including
importance measures sorted by risk achievement worth (RAW) and Fussell-
Vesely (FV) from your internal events probabilistic risk assessment (PRA). Include
basic events with RAW value of 1.3 or greater.
2. Provide a list of the top 500 cut-sets from your PRA.
3. Copies of PRA "system notebooks," and the latest PRA summary document.
4. An excel spreadsheet of PRA human action basic events or risk ranking of
operator actions from your site specific PSA sorted by RAW and FV. Provide
copies of your human reliability worksheets for these items.
5. If you have an external events or fire PSA model, provide the information
requested in items 1-4 for external events and fire.
6. Site top 10 issues list.
-1- Enclosure
FOR THE AUXILIARY FEEDWATER SYSTEM ONLY
7. Any pre-existing evaluation or list of components and associated calculations with
low design margins, (i.e., pumps closest to the design limit for flow or pressure,
diesel generator close to design required output, heat exchangers close to rated
design heat removal, etc.).
8. List of motor operated valves (MOVs) in the valve program and associated with the
auxiliary feedwater system, with design margin and risk ranking.
9. List of air operated valves (AOVs) in the valve program and associated with the
auxiliary feedwater system, with design margin and risk ranking.
10. List of high risk maintenance rule systems/components and functions; based on
engineering or expert panel judgment.
11. Structure, system and components in the Maintenance Rule (a)(1) category.
12. A list of operating experience evaluations for the last 5 years.
13. A list of all time-critical operator actions associated with the auxiliary feedwater
system in procedures.
14. A list with description of permanent and temporary modifications for auxiliary
feedwater system.
15. List of current "operator work arounds/burdens" for the auxiliary feedwater system.
16. List of root cause evaluations associated with component failures or design issues
initiated/completed in the last 5 years.
17. Current management and engineering organizational charts.
18. Fort Calhoun Station IPE and IPEEE, if available electronically.
19. Mechanical piping drawings for:
Auxiliary Feedwater System
Supporting Systems for Auxiliary Feedwater System
20. Electrical one-line drawings for:
Offsite power/switchyard supplies
Normal AC power systems
Emergency AC/DC power systems including
120VAC power, and
125VDC/24VDC safety class systems
-2- Enclosure
21. List of any common-cause failures of components in the auxiliary feedwater system
in the last 5 years.
22. An electronic copy of the licensing basis documents (i.e., Updated Final Safety
Analysis Report, Technical Specifications).
23. An electronic copy of the System Health notebooks.
24. System Description Manuals with simplified drawings of plant systems
II. Information Requested to be Available on First Day of the Onsite Week (October
22, 2012)
1. List of condition reports (corrective action documents) associated with the auxiliary
feedwater system for the last 5 years.
2. The corrective maintenance history associated with the auxiliary feedwater system
for the last 5 years.
3. Copies of calculations associated with the auxiliary feedwater system (if not
previously provided), excluding data files. Please review the calculations and also
provide copies of reference material (such as drawings, engineering requests, and
vendor letters).
4. Copies of operability evaluations with the auxiliary feedwater system.
5. Copies of selected operator work-around evaluations associated with the auxiliary
feedwater system.
6. Copies of any open temporary modifications associated with the auxiliary
feedwater system.
7. Trend data on the selected electrical/mechanical components performance for last
5 years (for example, pumps performance including in-service testing, other
vibration monitoring, oil sample results, etc., as applicable).
8. A copy of any internal/external self-assessments and associated corrective action
documents generated in preparation for the inspection.
9. A copy of engineering/operations related audits completed in the last 3 years.
10. List of licensee contacts for the inspection team with pager or phone numbers.
III. Information Requested to be provided throughout the inspection.
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
-3- Enclosure
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member).
3. Reference materials (available electronically and as needed during all onsite
weeks):
General set of plant drawings
Procurement documents for components selected
Plant procedures (normal, abnormal, emergency, surveillance, etc.)
Vendor manuals
Inspector Contact Information:
Matthew Young
Reactor Inspector
(817) 200-1545
matt.young@nrc.gov
Mailing Address:
US NRC, Region IV
Attn: Matthew Young
1600 East Lamar Blvd
Arlington, TX 76011-4511
-4- Enclosure