Category:Letter type:CP
MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters CP-202400107, (CPNPP) - 2023 Annual Radiological Environmental Operating Report2024-04-18018 April 2024 (CPNPP) - 2023 Annual Radiological Environmental Operating Report CP-202400099, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2024-04-0909 April 2024 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202400092, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-04-0101 April 2024 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400089, Property Damage Insurance2024-03-25025 March 2024 Property Damage Insurance CP-202400087, (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable2024-03-21021 March 2024 (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable CP-202400085, (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-0707 March 2024 (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202400073, (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-03-0404 March 2024 (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400072, (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation2024-02-29029 February 2024 (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions CP-202400063, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)2024-02-12012 February 2024 (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23) CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300533, (CPNPP) - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-14014 November 2023 (CPNPP) - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report2023-08-17017 August 2023 (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1122023-08-0101 August 2023 (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 3 CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)2023-07-18018 July 2023 (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review CP-202300207, Revision to Comanche Peak Nuclear Power Plants Response to Notice of Violation (NOV) 05000445/2021011-052023-05-25025 May 2023 Revision to Comanche Peak Nuclear Power Plants Response to Notice of Violation (NOV) 05000445/2021011-05 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)2023-05-0404 May 2023 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Environmental Operating Report CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Effluent Release Report CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)2023-04-20020 April 2023 Submittal of 2022 Annual Environmental Operating Report (Non-Radiological) 2024-09-12
[Table view] |
Text
Rafael Flores Luminant Power Senior Vice President P 0 Box 1002
& Chief Nuclear Officer 6322 North FM 56 Rafael.Flores@Luminant.corm Glen Rose, TX 76043 Luminant T285 C 817 559 0403 F 254 897 6652 CP-201200978 Ref. # 10CFR50.55a(a)(3)(ii)
TXX-12129 August 23, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NO. 50-445 RELIEF REQUEST NO. C-2 FOR THE UNIT 1 REACTOR PRESSURE VESSEL LEAK-OFF FLANGE (THIRD ISI INTERVAL START DATE: AUGUST 13, 2010)
REFERENCES:
- 1. Letter logged TXX-10156 dated December 15, 2010, from Rafael Flores to the NRC submitting Relief Request No. C-9 for the Unit 1 Second 10 Year ISI Interval From 10CFR50.55a Inspection Requirements Due to Hardship (Second Interval Start Date:
August 13, 2000)(ML103560595)
- 2. Letter logged TXX-11128 dated October 13, 2011, from Rafael Flores to the NRC, Supplement to Relief Request No. C-9 for Alternative Pressure Testing Requirements for Reactor Vessel Flange Leak-off Piping (ML11292A052)
- 3. NRC Letter dated December 19, 2011, from Michael T. Markley to Rafael Flores concerning Comanche Peak Nuclear Power Plant, Unit I - Approval of Relief Request No. C-9 for the Second 10-Year Inservice Inspection Interval (TAC No. ME5214)
(ML113100092)
Dear Sir or Madam:
Pursuant to 10 CFR 50.55a(a)(3)(ii), Luminant Generation Company LLC (Luminant Power) is submitting Relief Request C-2 for Comanche Peak Nuclear Power Plant (CPNPP) Unit I for the third ten year inservice inspection interval. Luminant Power has determined that compliance with certain inspection requirements of ASME Section XI would result in an unnecessary hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The Reactor Pressure Vessel flange leak-off piping configuration precludes system pressure testing when the reactor vessel head is removed. The configuration also precludes pressurizing the line externally when the head is installed. A visual examination of the accessible areas was performed during the second interval on the unpressurized subject piping as part of the Class 2 leakage test. No evidence of leakage has been identified for the subject component. No undue risk to the public health and safety is presented by this request.
This relief request was previously submitted to the NRC via References 1 and 2 and reviewed via Reference 3.
A member of the STARS Alliance Callaway - Comanche Peak . Diablo Canyon - Palo Verde San Onofre South Texas Project . Wolf Creek
U. S. Nuclear Regulatory Commission TXX-12129 Page 2 of 2 08/23/2012 Luminant Power requests approval of this relief request by March 29, 2013, to support the upcoming CPNPP Unit 1 refueling outage.
This communication contains no new commitments regarding CPNPP Unit 1.
Should you have any questions, please contact Mr. Jack Hicks at (254) 897-6725.
Sincerely, Luminant Generation Company LLC Rafael Flores By: IVh bj. _ ý/ L_
FWreO VW.Madden Director, Oversight & Regulatory Affairs
Attachment:
s: (1) Relief Request C-2 (Third Interval Start Date: August 13, 2010)
(2) Reactor Pressure Vessel Seal Leak-off Details c- E. E. Collins, Region IV Luis Ponce B. K. Singal, NRR Texas Department of Licensing and Regulation Resident Inspectors, Comanche Peak P. 0. Box 12157 Jack Ballard, ANII, Comanche Peak Austin, Texas 78711-2332 to TXX-12129 Page 1 of 3 COMANCHE PEAK NUCLEAR POWER PLANT UNIT 1 RELIEF REQUEST NUMBER - C-2 FOR THE REACTOR PRESSURE VESSEL LEAK-OFF PIPING (THIRD 10-YEAR IS1 INTERVAL START DATE: AUGUST 13, 2010)
- 1. ASME Code Component Affected:
ASME Code Class: Code Class 2
References:
ASME Section XI, Table IWC-2500-1 and IWC-5222 Examination Category: C-H (All Pressure Retaining Components)
Item Number: C7.10
Description:
Alternative Pressure Testing Requirements for the RPV Flange Leak-Off Piping Component: NPS 3/4" RPV Flange Seal Leak-Off Piping Plant Drawings: BRP-RC-1-RB-038, BRP-RC-1-RB-039, BRP-RC-1-RB-040, BRP-RC-1-RB-041, M1-0250
- 2. Applicable Code Edition and Addenda:
The applicable ASME Boiler and Pressure Vessel Code (hereafter referred to as the "Code")
edition and addenda is ASME Section XI, "Rules for Inservice of Nuclear Power Plant Components," 1998 Edition through 2000 Addenda.
- 3. Applicable Code Requirement:
IWC-2500, Table IWC-2500-1, Code Category C-H, Item Number C7.10 requires that all Class 2 pressure retaining components be subject to a system leakage test with a Visual, VT-2 examination each inspection period. The system leakage test is performed at the pressure obtained while the subject portion of the system is performing its normal operating function or during a comparable test.
Per IWC-5222(a), the pressure retaining boundary includes the portion of the system required to operate or support the safety function up to and including the first normally closed valve.
- 4. Reason for Request: Impracticality of Compliance (10CFR50.55a(a)(3)(ii))
As discussed in 3, "Applicable Code Requirements," ASME Section XI, 1998 Edition through 2000 Addenda requires that Class 2 pressure boundary piping shall be pressure tested once each inspection period. The Reactor Pressure Vessel (RPV) head flange seal leak detection piping is separated from the reactor coolant pressure boundary by one passive membrane, which is an 0-ring located on the inner vessel flange as shown in Attachment 2 to TXX-12129. A second O-ring is located on the outside of the tap in the vessel flange. Failure of the inner 0-ring is the only condition under which this line is pressurized. Therefore, the line is not expected to be pressurized during the system pressure test following a refueling outage.
The configuration of this piping precludes system pressure testing while the vessel head is removed because the time required by personnel for the installation and removal of a threaded plug in the flange face to act as a pressure boundary for the test would incur significant dose (estimated 20 - 40 mRem/min), which would be an ALARA concern. This activity would also present a Foreign Material Exclusion issue for the 1/8" plug that would be required to be installed to complete a leakage test at pressure.
to TXX-12129 Page 2 of 3 COMANCHE PEAK NUCLEAR POWER PLANT UNIT 1 RELIEF REQUEST NUMBER - C-2 FOR THE REACTOR PRESSURE VESSEL LEAK-OFF PIPING (THIRD 10-YEAR IS1 INTERVAL START DATE: AUGUST 13, 2010)
The configuration also precludes pressurizing the line externally with the head installed. The top head of the vessel contains two grooves that hold the O-rings. The o-rings are held in place by a series of retainer clips that are housed in recessed cavities in the flange face. If a pressure test were to be performed with the head on, the inner O-ring would be pressurized in a direction opposite to its design function. This test pressure would result in a net inward force on the inner O-ring that would tend to push it into the recessed cavity that houses the retainer clips. The thin O-ring material would likely be damaged by the inward force.
- 5. Burden Caused by Compliance:
Purposely failing or not installing the inner O-ring in order to perform a pressure test would ing a new O-ring set and the time and radiation exposure associated with removing and reinstalling the RPV head to replace the O-rings would be an undue hardship. Therefore, compliance with the IWC-5222(b) system pressure test requirements results in an unnecessary hardship without a sufficient compensating increase in the level of quality and safety.
- 6. Proposed Alternative and Basis for Use:
In lieu of the requirements of IWC-5222(b), a VT-2 visual examination of the accessible areas will be performed each period on the piping subjected to the static pressure head when the reactor cavity is filled. This test will be part of the reactor coolant Class 2 leakage test.
If the inner O-ring should leak during the operating cycle it will be identified by an increase in temperature of the leak-off line above ambient temperature. This high temperature would actuate an alarm in the Control Room, which would be closely monitored by procedurally controlled operator actions allowing identification of any further compensatory actions required.
This leakage would be collected in the Reactor Coolant Drain Tank.
Additionally, the flange seal leak-off line is essentially a leakage collection/detection system and the line would only function as a Class 2 pressure boundary if the inner O-ring fails, thereby pressurizing the line. If any significant leakage does occur in the leak-off line piping itself during this time of pressurization then it would clearly exhibit boric acid accumulation and be discernable during the proposed VT-2 visual examination that will be performed unpressurized as proposed in this request.
- 7. Duration of Proposed Alternative:
This alternative is requested for the Third Inservice Inspection Interval, which began on August 13, 2010.
- 8. Precedents:
(1) Comanche Peak Nuclear Power Plant, Second Inspection Interval Relief Request C-9.
"Alternative Pressure Testing Requirements for the RPV Flange Leak-Off Piping", as reviewed by the NRC (2) LaSalle County Station Third Inspection Interval Relief Request 13R-08.
"Pressure Testing of the Reactor Vessel Head Flange Leak Detection System", as approved by the NRC in a letter dated January 30, 2008 (ADAMS Accession No. ML073610587) to TXX-12129 Page 3 of 3 COMANCHE PEAK NUCLEAR POWER PLANT UNIT 1 RELIEF REQUEST NUMBER - C-2 FOR THE REACTOR PRESSURE VESSEL LEAK-OFF PIPING (THIRD 10-YEAR IS1 INTERVAL START DATE: AUGUST 13, 2010)
(3) Susquehanna Steam Electric Station Third 10-Year Inservice Inspection (ISI) Interval Program Plan Request for Relief 3RR-07 "Exemption for Pressure Testing Reactor Pressure Vessel Head Flange Seal Leak Detection System", approved by the NRC in a letter dated September 24, 2004 (ADAMS Accession No. ML042680078)
The following precedents were for same lines that zwere designated Class 1:
(4) Millstone Power Station Unit 3 Relief Request IR-3-11, "Alternative Pressure Testing Requirements for the RPV Flange Leak-Off Piping", approved by the NRC Letter dated April 29, 2010 (ADAMS Accession No. ML101040042)
(5) North Anna Unit 1 Relief Request SPT-013, "Examination Category B-P Pressure Retaining Components in the Reactor Coolant System," approved by NRC letter dated February 9, 2006 (ADAMS Accession No. ML060450517)
(6) Limerick Second Interval Relief Request RR-33, "Pressure Testing of the Reactor Vessel Head Flange Leak Detection System (Unit 1 only))", (ADAMS Accession Nos. ML080370257, ML082550270 and ML090060218), as approved by the NRC in a letter dated January 27, 2009 (7) Limerick Third Interval Relief Request 13R-08, "Reactor Pressure Vessel (RPV) Head Flange Seal Leak Detection System Pressure Testing", (ADAMS Accession No. ML080500584) as approved by the NRC in a letter dated March 11, 2008
- 9.
Reference:
Code Case N-805, "Alternative to Class1 Extended Boundary End of Interval or Class 2 System Leakage Testing of Reactor Vessel Head Flange O-ring Leak Detection System," was issued to the 2010 Edition of the ASME Section XI Code and is listed in Supplement 6 for Code Cases.
However, Code Case N-805 has not been approved by the NRC and is not identified in Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1."
to TXX- 12129 Page 1 of 3 Reactor Pressure Vessel Seal Leak-Off Details Luminant Power Comanche Peak Nuclear Power Plant to TXX- 12129 Page 2 of 3 Figure 1:
REACTOR PRESSURE VESSEL HEAD FLANGE LEAK-OFF LINE CONFIGURATION to TXX- 12129 Page 3 of 3 Figure 2 Reactor Pressure Vessel Head Flange Leak-Off Line Details