MONTHYEARHNP-11-001, Request for License Amendment, Measurement Uncertainty Recapture Power Uprate2011-04-28028 April 2011 Request for License Amendment, Measurement Uncertainty Recapture Power Uprate Project stage: Request ML11165A1862011-06-10010 June 2011 NRR E-mail Capture - FW: Acceptance Review for Harris 1 Measurment Uncertainity Recapture (MUR) TAC ME6169 Project stage: Acceptance Review ML11206A4962011-06-29029 June 2011 NRR E-mail Capture - Draft RAI Questions to Support Harris MUR Review (ME6169) Project stage: Draft RAI ML11181A0162011-07-0101 July 2011 Acceptance for Review of Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Acceptance Review ML11208C5092011-07-27027 July 2011 NRR E-mail Capture - Request for Additional Information Shearon Harris Unit 1, License Amendment Request Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1122001162011-07-29029 July 2011 NRR E-mail Capture - Shearon Harris Unit 1 - Measurement Uncertainty Recapture - MUR RAI (Cont/Vent) ME6169 Project stage: RAI ML11213A0002011-07-29029 July 2011 NRR E-mail Capture - Measurement Uncertainty Recapture Power Uprate - MUR RAI (HP-HPB)(ME6169) Project stage: RAI HNP-11-073, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-08-0303 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI ML11213A1792011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11214A0792011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11214A1742011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11222A1492011-08-0808 August 2011 NRR E-mail Capture - Measurement Uncertainty Recapture Power Uprate - MUR RAI (Mat)(ME6169) Project stage: RAI ML11222A1482011-08-0808 August 2011 NRR E-mail Capture - Measurement Uncertainty Recapture Power Uprate - MUR RAI (EMCB)(ME6169) Project stage: RAI HNP-11-076, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-08-15015 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI HNP-11-034, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2011-08-16016 August 2011 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Project stage: Request HNP-11-079, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment2011-08-31031 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Project stage: Response to RAI ML11256A0262011-09-0606 September 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI HNP-11-082, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-09-0707 September 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI ML11271A1652011-09-28028 September 2011 NRR E-mail Capture - Additional MUR RAI (EEB)(ME6169) Project stage: RAI ML11272A0652011-09-28028 September 2011 NRR E-mail Capture - Additional MUR RAI (Emcb Part 2)(ME6169) Project stage: RAI ML11276A1872011-09-30030 September 2011 NRR E-mail Capture - MUR RAI (Cvib)( ME6169) Project stage: RAI ML1127300822011-09-30030 September 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1022011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1052011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11278A1702011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1072011-10-18018 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Project stage: RAI HNP-11-094, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate (RAI 8)2011-10-20020 October 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate (RAI 8) Project stage: Response to RAI HNP-11-095, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 9)2011-10-21021 October 2011 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 9) Project stage: Response to RAI HNP-11-096, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 10)2011-10-28028 October 2011 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 10) Project stage: Response to RAI HNP-11-107, Supplement to Request for License Amendment Measurement Uncertainty Recapture Power Update2011-11-28028 November 2011 Supplement to Request for License Amendment Measurement Uncertainty Recapture Power Update Project stage: Supplement ML11340A0812011-12-0909 December 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance HNP-11-097, Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information2011-12-20020 December 2011 Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information Project stage: Supplement ML11356A1592012-02-0808 February 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML11356A1542012-02-0808 February 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance HNP-12-002, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Supplemental Information2012-02-0909 February 2012 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Supplemental Information Project stage: Supplement HNP-12-044, Response to Request for Additional Information on License Amendment Request - Measurement Uncertainty Recapture Power Uprate2012-03-26026 March 2012 Response to Request for Additional Information on License Amendment Request - Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI HNP-12-065, CFR 50.46 Annual Report of Changes to LOCA Analyses2012-05-30030 May 2012 CFR 50.46 Annual Report of Changes to LOCA Analyses Project stage: Request ML11356A0962012-05-30030 May 2012 Issuance of License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Approval HNP-12-069, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 1392012-06-0505 June 2012 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 139 Project stage: Request ML12157A2812012-06-11011 June 2012 Correction to Issuance of Amendment No. 139 Measurement Uncertainty Recapture Power Uprate Project stage: Approval 2011-08-15
[Table View] |
Text
Christopher L. Burton Vice President Harris Nuclear Plant Progress Energy Carolinas, Inc.
P.O. Box 165 New Hill, NC 27562 T> 919.362.2502 June 5, 2012 Serial: HNP-12-069 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 / Renewed Facility Operating License No. NPF-63
Subject:
REQUEST FOR LICENSE AMENDMENT MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE COMMENTS REGARDING AMENDMENT 139
References:
- 1. Letter from C. L. Burton to the U.S. NRC, REQUEST FOR LICENSE AMENDMENT, MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE, Serial HNP-11-001 dated April 28, 2011, ADAMS Accession No. ML11124A180
- 2. Letter from C. L. Burton to the U.S. NRC, REQUEST FOR LICENSE AMENDMENT, MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE REQUEST FOR ADDITIONAL INFORMATION RESPONSE RELATED TO REACTOR CORE SAFETY LIMITS, Serial HNP-12-044 dated March 26, 2012, ADAMS Accession No. ML12100A160
- 3. Letter from A. T. Billoch Colón to C. L. Burton, SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - ISSUANCE OF AMENDMENT RE: MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE, dated May 30, 2012, ADAMS Accession No. ML11356A096 Ladies and Gentlemen:
During the Shearon Harris Nuclear Power Plant, Unit 1 (HNP) implementation review of the Measurement Uncertainty Recapture Power Uprate Amendment, Reference 3, we discovered two discrepancies related to the Reactor Core Safety Limits discussion and Technical Specification (TS) Figure 2.1-1. Both are the result of errors by the Harris organization in the original License Amendment Request (LAR, Reference 1) or supplements.
U.S. Nuclear Regulatory Commission Page 2 HNP-12-069 Reference 3, Safety Evaluation, page 67, Table 6 Technical Specification Figure 2.1-1, incorrectly correlates the highest pressure data set to a value of 2375 psig. The correct pressure for that data set is 2385 psig.
TS Figure 2.1-1, Reactor Core Safety Limits, contains curves of Tavg (RCS average temperature) versus Power at pressures of 2385, 2235, and 1960 psig. The data breakpoints corresponding to the curves were correctly provided in Reference 1, Enclosure 1, on page 4 of 18. A request for additional information (RAI) asked that we provide the current and proposed (post-uprate) breakpoints for the three Reactor Core Safety Limit curves. The RAI response, Reference 2, incorrectly identified the pressure corresponding to the upper curve as 2375 instead of 2385 due to a data transcription error from the calculation to the RAI response. The incorrect information was then carried forward from the RAI response to the Safety Evaluation (page 67, Table 6, Technical Specification Figure 2.1-1) resulting in correlating the upper curve of Figure 2.1-1, labeled 2385, to a data set incorrectly labeled 2375 psig. The three Reactor Core Safety Limit curves of Technical Specification Figure 2.1-1, both prior and subsequent to Amendment 139, are correctly labeled 2385 psig, 2235 psig, and 1960 psig.
The impact is limited to the one number (2375) in Table 6, and does not affect the discussion of how the curves were developed in our LAR, its supplements, or the discussion in the Safety Evaluation. Please issue a revised page 67 to the Safety Evaluation, replacing 2375 with 2385 in Table 6, Technical Specification Figure 2.1-1, supported by the correct information in Reference 1.
A second error was discovered on the title of Technical Specification Figure 2.1-1 in Amendment 139. Figure 2.1-1, as issued, is titled REACTOR CORE SAFETY LIMITS - THREE LOOPS IN OPERATION WITH MEASURED RCS FLOW [293,540 GPM X (1.0 + C1)]. It should be > (greater than) instead of (greater than or equal to).
The TS markup in the original LAR was correct, however the > sign was inadvertently changed to in the retyped pages submitted in the LAR. This was caused by an administrative error when retyping the page to incorporate the changed figure (not intended to change the title).
> is correctly cited in the discussion of Figure 2.1-1 in the LAR and the SE. Please issue a revised Technical Specification page 2-2, changing to > in the title of Figure 2.1-1, supported by Reference 1, Enclosure, Attachment 1, OPERATING LICENSE AND TECHNICAL SPECIFICATION PAGE MARKUPS. The corrected retyped page is enclosed.
The undesired condition associated with the incorrect information provided to the NRC discussed above has been entered into the HNP Corrective Action Program. The HNP Senior Resident Inspector has been informed.
u.s. Nuclear Regulatory Commission HNP-12-069 Page 3 This document contains no regulatory commitments. Please refer any questions regarding this submittal to Dave Corlett at (919) 362-3137.
I declare under penalty of perjury that the foregoing is true and correct. Executed on
[
JVPE --5 :to I:L ].
Sincerely,
~.z.~
CLB/jrc
Enclosure:
Retyped Technical Specification Page 2-2 cc:
Mr. J. D. Austin, NRC Sr. Resident Inspector, HNP Ms. A. T. Billoch Colon, NRC Project Manager, HNP Mr. W. L. Cox, III, Section ChiefN.C. DENR Mr. V. M. McCree, NRC Regional Administrator, Region II
HNP-12-069 Enclosure Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 / Renewed Facility Operating License No. NPF-63 REQUEST FOR LICENSE AMENDMENT MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE RETYPED TECHNICAL SPECIFICATION PAGE 2-2
SHEARON HARRIS - UNIT 1 2-2 Amendment No. 139 FIGURE 2.1-1 REACTOR CORE SAFETY LIMITS - THREE LOOPS IN OPERATION WITH MEASURED RCS FLOW > [293,540 GPM X (1.0 + C1)]
570 580 590 600 610 620 630 640 650 660 0
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
1.1 1.2 Tavg (F)
Power (Fraction of Nominal) 2385 psig 2235 psig 1960 psig