MONTHYEARML11195A0102011-07-0808 July 2011 R.E. Ginna, 60-Day Response to NRC Bulletin 2011-01: Mitigating Strategies Project stage: Request ML1208803552012-04-0202 April 2012 Closeout of Bulletin 2011-01, Mitigating Strategies - R. E. Ginna Nuclear Power Plant Project stage: Other 2011-07-08
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:Safety Evaluation
MONTHYEARML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23073A3682023-03-16016 March 2023 Authorization and Safety Evaluation for Proposed Alternative I6R-10, Revision 0 Related to the Steam Generators, ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22094A1072022-06-22022 June 2022 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 151 Adopt 10 CFR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22119A0942022-06-21021 June 2022 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 150 Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21250A3822021-09-29029 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel Internals ML21246A1062021-09-22022 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Alternative Request GR-03, Valve Position Verification Testing Extension Sixth 10-Year Inservice Testing Program Interval ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21175A0012021-07-27027 July 2021 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 145 Regarding Technical Specifications Change to Make a One-Time Exception to the Steam Generator Tube Inspection Requirements ML21166A1682021-06-25025 June 2021 ML20353A1262021-03-11011 March 2021 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 144 Implementation of WCAP-14333 and WCAP-15376, TSTF-411-A, and TSTF-418-A to Revise Reactor Trip and Engineered Safety Feature Actuation System Instrumentation ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20090D2912020-06-0202 June 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-02 for the Sixth 10-Year Inservice Inspection Interval (EPID L-2019-LLR-0071). Supersedes ML20056D559 ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20057E0912020-04-0303 April 2020 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 139 Add a One-Time Note for Use of Alternative Residual Heat Removal Method ML20056D5592020-03-13013 March 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-02 for the Sixth 10-Year Inservice Inspection Interval ML20055F8862020-03-13013 March 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-01 for the Sixth 10-Year Inservice Inspection Interval ML19325D8242019-12-23023 December 2019 R. E. Ginna Nuclear Power Plant Issuance of Amendment No. 136 to Revise Technical Specification 5.5.15, Containment Leakage Rate Testing Program, to Extend Containment Integrated Leak Rate Test Frequency ML19318E0802019-12-0202 December 2019 R. E. Ginna Nuclear Power Plant - Safety Evaluation of Alternative Request SR-1 Related to Snubber Program Aligned with Sixth 10-Year Inservice Testing Interval Program ML19252A2462019-10-29029 October 2019 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 134 to Revise the Emergency Response Organization Staffing Requirements ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19205A4532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives PR-01 and PR-02 for Sixth 10-Year Inservice Testing Program ML19205A3532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives GR-01, VR-01, and VR-02 for the Sixth 10-Year Inservice Testing Program (EPID L-2018-LLR-0382; EPID L-2018-LLR-0383) ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19100A0042019-04-22022 April 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request ISI-18 Regarding Fifth 10-Year Inservice Inspection Program Interval ML18309A3012018-11-15015 November 2018 R. E. Ginna - Issuance of Amendment Nos. 327, 305, 232, 173, and 133, Respectively, Eliminating the Nuclear Advisory Committee Requirements ML18213A3692018-11-13013 November 2018 Issuance of Amendment No. 132 Revise Technical Specifications 3.3.1, Reactor Trip System Instrumentation, and 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML18295A6302018-10-31031 October 2018 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 131 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF 547, Clarification of Rod Position Requirements ML18214A1762018-08-31031 August 2018 Issuance of Amendment No. 130, Revise Technical Specification Surveillance Requirement 3.8.4.3, DC (Direct Current) Sources - Modes 1, 2, 3, and 4 ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18190A4722018-07-12012 July 2018 R.E Ginna - Correction to Amendment No. 127 Related to Request to Delete a Modification Associated with the Risk-Informed, Performance Based Fire Protection Program in Accordance with 10 CFR 50.48(c) (CAC No. MF9948; EPID L-2017-LLA-0253) ML18137A6142018-06-26026 June 2018 Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station; and R. E. Ginna Nuclear Power Plant - Issuance of Amendments Revising Emergency Action Level Schemes ML18114A0252018-06-25025 June 2018 Issuance of Amendment No. 127, Modify License Condition 2.C.(3) Related to Commitment Associated with Implementation of National Fire Protection Association Standard 805 (CAC MF9948; EPID L-2017-LLA-0253) 2023-08-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 2, 2012 Mr. Joseph E. Pacher Vice President RE. Ginna Nuclear Power Plant RE. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT:
CLOSEOUT OF BULLETIN 2011-01, "MITIGATING STRATEGIES" RE. GINNA NUCLEAR POWER PLANT (TAC NO. ME6435)
Dear Mr. Pacher:
On May 11, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies" (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML111250360), to all holde.rs of operating licenses for nuclear power reactors, except those that have permanently ceased operation and have certified that fuel has been removed from the reactor vessel. The purpose of the bulletin was to obtain a comprehensive verification that licensees' mitigating strategies to maintain or restore core cooling, spent fuel cooling, and containment following a large explosion or fire were compliant with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2).
The bulletin required two sets of responses pursuant to the provisions of 10 CFR 50.54(f).
RE. Ginna Nuclear Power Plant, LLC provided its responses to the bulletin by letters dated June 10 and July 8, 2011 (ADAMS Nos. ML11166A037 and ML11195A010).
The Nuclear Regulatory Commission staff has reviewed the information submitted by R E.
Ginna Nuclear Power Plant, LLC and concludes that its response to the bulletin is acceptable.
Our safety evaluation is enclosed.
Please feel free to contact me at 301-415-1364 if you have any questions.
Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" RE. GINNA NUCLEAR POWER PLANT, LLC RE. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244
1.0 INTRODUCTION
On May 11. 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML111250360) to all holders of operating licenses for nuclear power reactors, except those that have permanently ceased operation and have certified that fuel has been removed from the reactor vessel. The bulletin required two sets of responses pursuant to the provisions of with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(f). The first responses were due 30 days after issuance of the bulletin. By letter dated June 10, 2011 (ADAMS Accession No. ML11166A037), RE. Ginna Nuclear Power Plant, LLC (Ginna) provided its response to this first set of questions (first response). The second responses were due 60 days after issuance of the bulletin. By letter dated July 8, 2011 (ADAMS Accession No. ML11195A010), Ginna provided its response to this second set of questions (second response). As summarized below, the NRC staff has verified that Ginna provided the information requested in the bulletin.
2.0 BACKGROUND
On February 25, 2002, the NRC issued EA-02-026, "Order for Interim Safeguards and Security Compensatory Measures" (ICM Order). Section B.S.b of the ICM Order required licensees to develop specific guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities using readily available resources (equipment and personnel) that can be effectively implemented under the circumstances associated with the loss of large areas of the plant due to explosions or fire.
By letter dated July 26, 2007 (ADAMS Accession No. ML072040409), the NRC staff issued its safety evaluation (SE) to document the final disposition of information submitted by Ginna regarding Section B.5.b of the ICM Order. Along with the SE, the staff issued a conforming license condition to incorporate the B.5.b mitigating strategies into the licensing basis.
On March 27,2009, the NRC issued 10 CFR 50.54(hh)(2) as a new rule, in order to capture the B.5.b mitigating strategies and related license conditions as regulatory requirements for both Enclosure
-2 current and future licensees. At that time, licensee compliance with the conforming license conditions was sufficient to demonstrate compliance with 10 CFR 50.54(hh)(2) (74 FR 13926) so no further actions were required on the part of current licensees.
3.0 TECHNICAL EVALUATION
3.1 30-Day Request In order to confirm continued compliance with 10 CFR 50.54(hh)(2), the bulletin requested that licensees address the following two questions within 30 days of issuing the bulletin:
- 1. Is the equipment necessary to execute the mitigating strategies, as described in your submittals to the NRC, available and capable of performing its intended function?
- 2. Are the guidance and strategies implemented capable of being executed considering the current configuration of your facility and current staffing and skill levels of the staff?
The NRC staff reviewed Ginna's first response to determine if it had adequately addressed these questions.
3.1.1 Question 1: Availability and Capability of Equipment In its first response, Ginna confirmed that equipment it needs to execute the 10 CFR 50.54(hh)(2) mitigating strategies is available and capable of performing its intended function.
The NRC staff verified that this confirmation covered equipment needed for each of the three phases of B.5.b mitigation strategies. Therefore, the NRC staff finds that Ginna has adequately responded to Question 1.
3.1.2 Question 2: Guidance and Strategies Can Be Executed In its first response, Ginna confirmed that the guidance and strategies it has implemented for 10 CFR 50.54(hh){2) are capable of being executed considering the current facility configuration, staffing levels, and staffing skills. Since Ginna has considered its current facility configuration, staffing levels, and staffing skills, and confirmed that it can execute its implemented guidance and strategies, the NRC staff finds that Ginna has adequately responded to Question 2.
3.2 SO-Day Request The bulletin required a response to the following five questions within 60 days of issuing the bulletin:
- 1. Describe in detail the maintenance of equipment procured to support the strategies and guidance required by 10 CFR 50.54(hh)(2) in order to ensure that it is functional when needed.
- 2. Describe in detail the testing of equipment procured to support the strategies and guidance required by 10 CFR 50.54(hh)(2) in order to ensure that it will function when needed.
- 3. Describe in detail the controls for ensuring that the equipment is available when needed.
- 3
- 4. Describe in detail how configuration and guidance management is ensured so that strategies remain feasible.
S. Describe in detail how you ensure availability of offsite support.
The NRC staff reviewed Ginna's second response to determine if it had adequately addressed these questions. The NRC staff also reviewed the July 26,2007, SE to determine what equipment, training, and offsite resources at Ginna were relied upon by NRC staff to conclude that Ginna's actions would ensure compliance with Section B.S.b of the ICM Order and the conforming license condition.
3.2.1 Questions 1 and 2: Maintenance and Testing of Equipment Questions 1 and 2 of the 60-day request required licensees to describe in detail the maintenance and testing of equipment procured to support the strategies and guidance required by 10 CFR SO.S4(hh)(2) in order to ensure that it is functional when needed. In its second response, Ginna listed the equipment used to support the 10 CFR SO.S4(hh)(2) mitigating strategies which receives maintenance or testing. For each item, Ginna described the maintenance and testing performed, including the frequency and basis for the maintenance or testing activity.
The NRC staff verified that Ginna listed equipment that typically requires maintenance or testing which was relied upon to make conclusions in the SE or commonly needed to implement the mitigating strategies. In its second response, Ginna stated that the fire truck, portable pump, portable power supply, hoses, spray nozzles, and communications equipment receive maintenance or testing. The NRC staff noted that the fuel level for the portable pump is verified during maintenance. Ginna also identified other items that support the mitigating strategies that receive maintenance or testing.
The NRC staff verified that Ginna described the process used for corrective actions and listed the testing performed to ensure that the strategies were initially feasible. Ginna stated in its second response that its 10 CFR Part SO, Appendix B, corrective action program is used to document equipment failure, establish priorities, and perform trending.
Based upon the information above, the NRC staff finds that Ginna has provided the information requested by Questions 1 and 2.
3.2.2 Question 3: Controls on Equipment Question 3 of the 60-day request required licensees to describe in detail the controls on equipment, such as inventory requirements, to ensure that the equipment is available when needed. A list of inventory deficiencies and associated corrective actions to prevent loss was also requested.
The NRC staff verified that Ginna described its process for ensuring that B.S.b equipment will be available when needed. In its second response, Ginna identified equipment included in its inventory, the inventory frequency, storage requirements, and items verified. Items verified include proper quantity, location, and accessibility of equipment; compressed gas bottle pressures; calibrations; equipment shelf lives, and controls on storage locations. Ginna states
-4 that at the time of its second response there were no outstanding inventory deficiencies that would render the strategies not viable.
The NRC staff verified that Ginna inventoried equipment which was relied upon to make conclusions in the SE or commonly needed to implement the mitigating strategies. In its second response, Ginna stated that procured non-permanently installed B.S.b equipment is inventoried at least annually in accordance with station procedures. The second response specifically states that the following items are included in the inventory: fire truck; hoses; communications equipment; spray nozzles; couplings and adapters; and firefighter turnout gear. Ginna did not specifically state that the portable pump and portable power supply is included in its inventory, but both of these items receive periodic maintenance or testing at least monthly that would also ensure their availability. Ginna also identified other items that support the mitigating strategies that are inventoried.
Based upon the information above, the NRC staff finds that Ginna has provided the information requested by Question 3.
3.2.3 Question 4: Configuration and Guidance Management Question 4 of the 60-day request required licensees to describe in detail how configuration and guidance management is assured so that the strategies remain feasible.
The NRC staff verified that Ginna described its measures to evaluate plant configuration changes for their effects on the mitigating strategies and to ensure its procedures are current.
In its second response, Ginna stated that plant configuration changes are procedurally evaluated against the licensing basis, which includes the B.S.b mitigating strategies. Ginna states that the design change process requires a review of affected procedures and that procedure changes are validated to ensure that the B.S.b mitigating strategies remain viable.
The NRC staff verified that Ginna described measures it has taken to validate the procedures or guidelines developed to support the mitigating strategies. In its second response, Ginna identified testing in response to Question 2 that demonstrated the ability to execute some strategies. Ginna also states that "initially, mitigating strategies were validated by walkdowns, engineering evaluations and/or table top reviews" and they were similarly revalidated in 2011.
The NRC staff verified that Ginna described the training program implemented in support of the mitigating strategies and how its effectiveness is evaluated. In its second response, Ginna identified the training provided to its operations personnel, emergency response organization, security personnel, fire brigade, and other personnel. Ginna also identified the frequency with which each type of training is provided and the methods for training evaluating.
Based upon the information above, the NRC staff finds that Ginna has provided the information requested by Question 4.
- 5 3.2.4 Question 5: Offsite Support Question 5 of the 60-day request required licensees to describe in detail how offsite support availability is assured.
The NRC staff verified that Ginna listed the offsite organizations it relies upon for emergency response, including a description of agreements and related training. The NRC staff compared the list of offsite organizations that Ginna provided in its second response with the information relied upon to make conclusions in the SE. Ginna stated that it maintains letters of agreement or purchase orders with these offsite organizations, which are reviewed annually. Ginna also described the training and site familiarization it provides to these offsite organizations.
Based upon the information above, the NRC staff finds that Ginna has provided the information requested by Question 5.
4.0 CONCLUSION
As described above, the NRC staff has verified that Ginna has provided the information requested in Bulletin 2011-01. Specifically, Ginna responded to each of the questions in the bulletin as requested. The NRC staff concludes that Ginna has completed all of the requirements of the bulletin and no further information or actions under the bulletin are needed.
Principal Contributor: B. Purnell, NRR Date: April 2, 2012
April 2, 2012 Mr. Joseph E. Pacher Vice President RE. Ginna Nuclear Power Plant RE. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT:
CLOSEOUT OF BULLETIN 2011-01, "MITIGATING STRATEGIES" RE. GINNA NUCLEAR POWER PLANT (TAC NO. ME6435)
Dear Mr. Pacher:
On May 11,2011, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies" (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML111250360), to all holders of operating licenses for nuclear power reactors, except those that have permanently ceased operation and have certified that fuel has been removed from the reactor vessel. The purpose of the bulletin was to obtain a comprehensive verification that licensees' mitigating strategies to maintain or restore core cooling, spent fuel cooling, and containment following a large explosion or fire were compliant with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2).
The bulletin required two sets of responses pursuant to the provisions of 10 CFR 50.54(f).
RE. Ginna Nuclear Power Plant, LLC provided its responses to the bulletin by letters dated June 10 and July 8,2011 (ADAMS Nos. ML11166A037 and ML11195A010).
The Nuclear Regulatory Commission staff has reviewed the information submitted by RE.
Ginna Nuclear Power Plant, LLC and concludes that its response to the bulletin is acceptable.
Our safety evaluation is enclosed.
Please feel free to contact me at 301-415-1364 if you have any questions.
Sincerely,
/RN Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL1-1 R/F RidsNrrDorlLPL 1-1 RidsNrrPMREGinna RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrLASLittie RidsNrrDprPgcb BPurnell, PGCB GDentel, Rgn1 ADAMS Accession No' "" ML120880355 OFFICE LPL 1-1\PM LPL 1-1\LA PGCB/BC(A) LPL 1-1\BC KMorgan-Butier by NAME DPickett SLittie memo dated GWilson DATE 3/30/12 3/29/12 03/20/12 4/2/12 OffiCial Record Copy