NL-12-0152, Withdrawal of Relief Request HNP-ISI-RR-12 Proposed in Accordance with 10 CFR 50.55a(g)(5)(iii)

From kanterella
(Redirected from ML12032A239)
Jump to navigation Jump to search

Withdrawal of Relief Request HNP-ISI-RR-12 Proposed in Accordance with 10 CFR 50.55a(g)(5)(iii)
ML12032A239
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/31/2012
From: Ajluni M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-12-0152
Download: ML12032A239 (2)


Text

Southern Nuclear Operating Company, Inc.

40 Inyerness Center Parkway POSI Office Box 1295 Birmingham. Alabama 35201-1295 rei 205 992 5000 January 31, 2012 SOUIHERN A COMPANY Docket Nos.: 50-366 NL-12-0152 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Unit 2 Withdrawal of Relief Request HNP-ISI-RR-12 Proposed in Accordance with 10 CFR 50.55a(g)(5)(iii)

Ladies and Gentlemen:

By letter dated December 22, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML113570234), Southern Nuclear Operating Company (SNC) submitted relief request HNP-ISI-RR-12. By letter dated January 9, 2012 (ADAMS Accession Number ML12004A062), the Nuclear Regulatory Commission (NRC) requested information in support of review of the relief request. Subsequently, SNC has performed a weld overlay of the subject piping. Therefore, by this letter, SNC withdraws relief request HNP ISI-RR-12.

This letter contains no NRC commitments. If you have any questions, please contact B. D. McKinney at (205) 992-5982.

Respectfully submitted,

~~~-

M. J. Ajluni Nuclear Licensing Director MJAlJLS/

U. S. Nuclear Regulatory Commission NL-12-0152 Page 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Chief Nuclear Officer Mr. D. R. Madison, Vice President - Hatch Mr. B. L. Ivey, Vice President - Regulatory Affairs Mr. B. J. Adams, Vice President - Fleet Operations Ms. P. M. Marino, Vice President - Engineering RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. P. G. Boyle, NRR Senior Project Manager - Hatch Mr. E. D. Morris, Senior Resident Inspector - Hatch