MONTHYEARHNP-11-001, Request for License Amendment, Measurement Uncertainty Recapture Power Uprate2011-04-28028 April 2011 Request for License Amendment, Measurement Uncertainty Recapture Power Uprate Project stage: Request ML11165A1862011-06-10010 June 2011 NRR E-mail Capture - FW: Acceptance Review for Harris 1 Measurment Uncertainity Recapture (MUR) TAC ME6169 Project stage: Acceptance Review ML11206A4962011-06-29029 June 2011 NRR E-mail Capture - Draft RAI Questions to Support Harris MUR Review (ME6169) Project stage: Draft RAI ML11181A0162011-07-0101 July 2011 Acceptance for Review of Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Acceptance Review ML11208C5092011-07-27027 July 2011 NRR E-mail Capture - Request for Additional Information Shearon Harris Unit 1, License Amendment Request Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML1122001162011-07-29029 July 2011 NRR E-mail Capture - Shearon Harris Unit 1 - Measurement Uncertainty Recapture - MUR RAI (Cont/Vent) ME6169 Project stage: RAI ML11213A0002011-07-29029 July 2011 NRR E-mail Capture - Measurement Uncertainty Recapture Power Uprate - MUR RAI (HP-HPB)(ME6169) Project stage: RAI HNP-11-073, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-08-0303 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI ML11213A1792011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11214A0792011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11214A1742011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11222A1492011-08-0808 August 2011 NRR E-mail Capture - Measurement Uncertainty Recapture Power Uprate - MUR RAI (Mat)(ME6169) Project stage: RAI ML11222A1482011-08-0808 August 2011 NRR E-mail Capture - Measurement Uncertainty Recapture Power Uprate - MUR RAI (EMCB)(ME6169) Project stage: RAI HNP-11-076, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-08-15015 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI HNP-11-034, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2011-08-16016 August 2011 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Project stage: Request HNP-11-079, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment2011-08-31031 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Project stage: Response to RAI ML11256A0262011-09-0606 September 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI HNP-11-082, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-09-0707 September 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI ML11271A1652011-09-28028 September 2011 NRR E-mail Capture - Additional MUR RAI (EEB)(ME6169) Project stage: RAI ML11272A0652011-09-28028 September 2011 NRR E-mail Capture - Additional MUR RAI (Emcb Part 2)(ME6169) Project stage: RAI ML11276A1872011-09-30030 September 2011 NRR E-mail Capture - MUR RAI (Cvib)( ME6169) Project stage: RAI ML1127300822011-09-30030 September 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1022011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1052011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11278A1702011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1072011-10-18018 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Project stage: RAI HNP-11-094, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate (RAI 8)2011-10-20020 October 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate (RAI 8) Project stage: Response to RAI HNP-11-095, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 9)2011-10-21021 October 2011 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 9) Project stage: Response to RAI HNP-11-096, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 10)2011-10-28028 October 2011 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 10) Project stage: Response to RAI HNP-11-107, Supplement to Request for License Amendment Measurement Uncertainty Recapture Power Update2011-11-28028 November 2011 Supplement to Request for License Amendment Measurement Uncertainty Recapture Power Update Project stage: Supplement ML11340A0812011-12-0909 December 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance HNP-11-097, Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information2011-12-20020 December 2011 Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information Project stage: Supplement ML11356A1592012-02-0808 February 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML11356A1542012-02-0808 February 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance HNP-12-002, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Supplemental Information2012-02-0909 February 2012 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Supplemental Information Project stage: Supplement HNP-12-044, Response to Request for Additional Information on License Amendment Request - Measurement Uncertainty Recapture Power Uprate2012-03-26026 March 2012 Response to Request for Additional Information on License Amendment Request - Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI HNP-12-065, CFR 50.46 Annual Report of Changes to LOCA Analyses2012-05-30030 May 2012 CFR 50.46 Annual Report of Changes to LOCA Analyses Project stage: Request ML11356A0962012-05-30030 May 2012 Issuance of License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Approval HNP-12-069, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 1392012-06-0505 June 2012 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 139 Project stage: Request ML12157A2812012-06-11011 June 2012 Correction to Issuance of Amendment No. 139 Measurement Uncertainty Recapture Power Uprate Project stage: Approval 2011-08-15
[Table View] |
Text
Progress Energy 10 CFR 50.90 November 28, 2011 HNP-11-107 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63
Subject:
SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE
References:
- 1. Letter from C.L. Burton to the U.S. NRC, "Request for License Amendment, Measurement Uncertainty Recapture Power Uprate," dated April 28, 2011.
- 2. Letter from B. Mozafari to W. Jefferson Jr., "Shearon Harris Nuclear Plant -
Safety Evaluation for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule (TAC No. ME6998) dated October 21, 2011.
Ladies and Gentlemen:
By letter dated April 28, 2011, as supplemented on June 23, 2011, Carolina Power & Light Company (CP&L), doing business as Progress Energy Carolinas, Inc. (PEC), requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant, Unit 1 (HNP) from 2,900 megawatts thermal (MWt) to 2,948 MWt, an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly.
An update is provided to LAR Enclosure 2,Section IV. 1.C.vi - Surveillance Capsule Withdrawal Schedule. This update reflects a recently approved revision to the HNP surveillance capsule withdrawal schedule (Reference 2).
CP&L has concluded that the information provided in this response meets the intent of the original submittal (Reference 1) and does not impact the conclusions of the: 1) Technical Analysis, 2) No Significant Hazards Consideration, or 3) Environmental Consideration as provided in the original submittal.
In accordance with 10 CFR 50.91(b), HNP is providing the state of North Carolina with a copy of this supplement.
Progress Energy Carolinas, Inc.
Harris Nuclear Plant P, 0. Box 165 New Hill, NC 27562 L
U.S. Nuclear Regulatory Commission Page 2 HNP-11-107 This document contains no new Regulatory Commitments.
Please refer any questions regarding this submittal to Mr. David Corlett, Supervisor - HNP Licensing/Regulatory Programs, at (919) 362-3137.
I declare under penalty of perjury that the foregoing is true and correct. Executed on
/1 tt1
].
Sincerely, Keith Holbrook Manager, Support Services Harris Nuclear Plant
Enclosure:
Supplement to LAR Enclosure 2,Section IV. 1.C.vi - Surveillance Capsule Withdrawal Schedule cc:
Regional Administrator, USNRC/Region II Project Manager, Harris Nuclear, Plant, USNRC/NRR Resident Inspector, Harris Nuclear Plant, USNRC Section Chief, NC Division of Environmental Health
HNP-11-107 Enclosure SHEARON HARRIS NUCLEAR POWER PLANT / UNIT NO. 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 LICENSE AMENDMENT REQUEST MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE TAC ME6169 SUPPLEMENT TO LAR ENCLOSURE 2, SECTION IV. 1.C.VI SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE (3 PAGES)
U.S. Nuclear Regulatory Commission Page 2 of 3 HNP-1 1-107 Enclosure The License Amendment Request (LAR), Enclosure 2,Section IV. 1.C.vi - Surveillance Capsule Withdrawal Schedule, stated the following:
Capsule Wwas withdrawn during the Fall 2010 outage (end of cycle 16), with a projected fluence of 6. 89 E19 n/cm2. The Capsule W analysis will be used to optimize the neutron exposure and withdrawal schedule for the remaining two capsules (Y and Z), to obtain meaningful metallurgical data. HNP will adjust the withdrawal schedule for one of the remaining capsules based on the Capsule W analysis, so that capsule fluence will not exceed twice the maximum vesselfluence per ASTME185-82. If the last capsule's projected fluence value is excessive, it will either be relocated to a lower neutron flux position, or withdrawn for possible future testing or reinsertion. One capsule will continue to be irradiated to at least the projected reactor vessel fluence at 80 years of operation, withdrawn and tested consistent with the industry PWR coordinated surveillance plan currently under development.
By letter dated August 16, 2011 (ADAMS Accession No. ML11235A730), Carolina Power &
Light Company submitted for staff review a request for revising the withdrawal schedule for the reactor pressure vessel surveillance capsules for Shearon Harris Nuclear Power Plant (Harris),
Unit No. 1. The purpose of the licensee's submittal was to better align the withdrawal schedule with the projection of neutron fluence at the end-of-life extended, while satisfying the requirements of Appendix H. "Reactor Vessel Material Surveillance Program Requirements," to Title 10 of the Code of Federal Regulations (10 CFR) Part 50.Section III(B)(3) of Appendix H to 10 CFR Part 50 requires that proposed withdrawal schedules must be submitted and approved by the staff prior to implementation.
In December 2008, HNP was granted an extended license for operation. NUREG-1801, Revision 2, "Generic Aging Lessons Learned Report," (GALL Report) provides additional guidance for the surveillance program during the extended period of operation, approximately 20 years. This additional guidance is necessary because the requirements found in ASTM E185-82 were designed on 40-year operating periods.
The HNP surveillance program is based on ASTM El 85-82 and is compliant with the requirements of 10 CFR 50, Appendix H. ASTM El185-82 establishes the minimum number of surveillance capsules for removal and testing based on the projected ARTNDT. For both the 40-year period and the 60-year extended period of operation, the HNP RPV has limiting ARTNDT values below 1007F (56°C). Therefore, HNP was required to remove a minimum of three surveillance capsules during the 40-year period of operation, and must test an additional capsule for the 60-year extended period of operation to remain in compliance with ASTM E185-82 and the license renewal commitments as described in the GALL Report.
Three capsules have been withdrawn and tested (prior to Capsule W removal) covering the initial 40-year period. Capsule W was withdrawn during the Fall 2010 outage when the neutron fluence was expected to be approximately equal to the maximum neutron fluence on the clad-vessel interface at end-of-life, 55 effective full power years (EFPY). Capsule W was not analyzed as described in the LAR Section IV. 1.C.vi write-up, but was placed in storage. HNP committed that
U.S. Nuclear Regulatory Commission Page 3 of 3 HNP-11-107 Enclosure eitheikapsule Y or Z will be withdrawn during the 21st refueling outage scheduled for 2018, when the capsule will have been exposed to a total estimated neutron fluence of 9.39E19 n/cm2.
The other Capsule will remain in-place and maintained in readiness should it become necessary at a future date.
By letter from B. Mozafari to W. Jefferson Jr. dated October 21, 2011 (ADAMS Ascension No.
MLI 129A076), the NRC concluded that the proposed changes satisfied the requirements and recommendations of ASTM E185-82 and the GALL Report as pertinent to the application.
Therefore, the NRC staff concluded that the modified surveillance capsule withdrawal schedule was acceptable for implementation as documented in their Safety Evaluation Report.