Letter Sequence Other |
|---|
TAC:ME4679, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting
Results
Other: ENOC-11-00021, Entergy Operations, Inc., Entergy Nuclear Operations, Inc., Submittal of Planned Reorganization of Quality Control Reporting Relationship, GNRO-2012/00150, Final Report for Replacement Steam Dryer, GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages, ML111720830, ML112560396, ML112790370, ML12167A257, ML12167A269, ML12170B091, ML12177A287, ML13108A217, NRC-2012-0105, Environmental Assessment and Finding of No Significant Impact Related Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt
|
MONTHYEARML1010603922010-04-19019 April 2010 Notice of Forthcoming Conference Call with Indiana Michigan Power Company to Discuss the Proposed Responses to Requests for Additional Information Associated with GL 2004-02 for the D. C. Cook Nuclear Plant Project stage: RAI ML1026604002010-08-20020 August 2010 GE-Hitachi Nuclear Energy Americas LLC - Affidavit of Edward Schrull Withholding from Public Disclosure Proprietary Report NEDC-33477P Project stage: Request ML1026603992010-08-31031 August 2010 NEDO-33477, Revision 0, Safety Analysis Report for Grand Gulf Nuclear Station Constant Pressure Power Uprate Project stage: Request ML1026604032010-09-0808 September 2010 License Amendment Request Extended Power Uprate Project stage: Request GNRO-2010/00056, Grid Stability Evaluation2010-09-0808 September 2010 Grid Stability Evaluation Project stage: Request ML1026604072010-09-30030 September 2010 NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix E Through Appendix G Project stage: Request ML1026604062010-09-30030 September 2010 NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix B Through Appendix D Project stage: Request ML1026604012010-09-30030 September 2010 NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Cover Through Appendix a Project stage: Request ML1030102002010-11-0909 November 2010 Supplemental Information Needed for Acceptance of License Amendment Request, Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Megawatts Thermal Project stage: Acceptance Review GNRO-2010/00071, Supplemental Information, License Amendment Request, Extended Power Uprate2010-11-18018 November 2010 Supplemental Information, License Amendment Request, Extended Power Uprate Project stage: Supplement GNRO-2010/00073, Supplemental Information License Amendment Request, Extended Power Uprate2010-11-23023 November 2010 Supplemental Information License Amendment Request, Extended Power Uprate Project stage: Supplement ML1034201082010-12-16016 December 2010 Request for Withholding Information from Public Disclosure, 9/7/10 Affidavit Executed by E. Schrull, GEH Re NEDC-33601P Project stage: Withholding Request Acceptance ML1034705862011-01-0505 January 2011 Request for Withholding Information from Public Disclosure, 11/19/10 Affidavit Executed by E. Schrull, GE-Hitachi, Regarding NEDC-33621P Project stage: Withholding Request Acceptance ML1102602812011-01-26026 January 2011 E-mail, Request for Additional Information Instrument and Controls, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1102602872011-01-26026 January 2011 E-mail, Request for Additional Information Fire Protection, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1102701872011-01-27027 January 2011 Request for Additional Information, Emcb Non-Steam Dryer Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1103103902011-01-31031 January 2011 E-mail, Request for Additional Information, Vessels and Internal Integrity Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00005, Core Operating Limits Report Cycle 18 Mid-Cycle Revision2011-02-0808 February 2011 Core Operating Limits Report Cycle 18 Mid-Cycle Revision Project stage: Request ML1103901732011-02-0808 February 2011 Email, Request for Additional Information, Nrr/Dci/Csgb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00007, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request GNRO-2011/00012, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request GNRO-2011/00011, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1105407052011-02-23023 February 2011 E-mail, Request for Additional Information, Nrr/Dirs/Ihpb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1105407122011-02-23023 February 2011 E-mail, Request for Additional Information, Nrr/Dra/Apla Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00013, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1034200962011-02-25025 February 2011 Request for Withholding Information from Public Disclosure, 8/20/10 Affidavit Executed by E. Schrull, GEH, for NEDC-33477P Project stage: Withholding Request Acceptance ML1106007172011-03-0101 March 2011 Email Request for Additional Information, Round 2, Nrr/Dci/Cvib Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1105504752011-03-0202 March 2011 Request for Additional Information (Redacted), Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00016, Request for Additional Information Regarding Extended Power Uprate2011-03-0909 March 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1107501322011-03-16016 March 2011 Email, Dose Assessment Branch, Request for Additional Information, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1108202242011-03-23023 March 2011 Email, Request for Additional Information, Nrr/Dss/Srxb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1108202272011-03-23023 March 2011 Request for Additional Information, Nrr/Dss/Srxb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00018, Request for Additional Information Regarding Extended Power Uprate2011-03-30030 March 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request GNRO-2011/00021, Response to Request for Additional Information Regarding Extended Power Uprate2011-03-31031 March 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML1109401362011-04-0404 April 2011 Email, Request for Additional Information, Nrr/Dci/Csgb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1109502722011-04-0505 April 2011 Email, Request for Additional Information, Nrr/De/Eeeb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1109502812011-04-0505 April 2011 Request for Additional Information, Nrr/De/Eeeb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1110301112011-04-12012 April 2011 Email, Request for Additional Information, Nrr/Dss/Snpb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00024, Response to Request for Additional Information Regarding Extended Power Uprate2011-04-14014 April 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML1110401162011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 3/30/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00021 Project stage: Withholding Request Acceptance ML1110401252011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00013 Project stage: Withholding Request Acceptance ML1110401002011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 3/28/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00018 Project stage: Withholding Request Acceptance ML1110401072011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/17/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00012 Project stage: Withholding Request Acceptance ML1110401132011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00011 Project stage: Withholding Request Acceptance GNRO-2011/00035, Response to Request for Additional Information Regarding Extended Power Uprate2011-05-0505 May 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML1113001562011-05-10010 May 2011 Email, Request for Additional Information, Nrr/Dss/Scvb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00037, Request for Additional Information Regarding Extended Power Uprate2011-05-11011 May 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1114002992011-05-20020 May 2011 E-mail, Request for Additional Information, Nrr/Dci/Emcb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1113905252011-05-31031 May 2011 Request for Withholding Information from Public Disclosure, 4/21/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00025 Project stage: Withholding Request Acceptance ML1115204582011-06-0101 June 2011 Email, Request for Additional Information, Nrr/Dra/Aadb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI 2011-03-01
[Table View] |
Entergy Operations, Inc., Entergy Nuclear Operations, Inc., Submittal of Planned Reorganization of Quality Control Reporting Relationship| ML11335A045 |
| Person / Time |
|---|
| Site: |
Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, Reed College, FitzPatrick  |
|---|
| Issue date: |
11/14/2011 |
|---|
| From: |
Mccann J Entergy Operations, Entergy Nuclear Operations |
|---|
| To: |
Zimmerman R NRC/OE |
|---|
| References |
|---|
| EA-11-096, ENOC-11-00021 |
| Download: ML11335A045 (5) |
|
Text
z IEn tergy Entergy Operations, Inc Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Tel 914 272 3370 John F. McCann Vice President - Nuclear Safety, Emergency Planning and Licensing ENOC-1 1-00021 November 14,2011 Mr. Roy P. Zimmerman Director, Office of Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
NRC Confirmatory Order EA-11-096; Planned Reorganization of Quality Control Reporting Relationship Arkansas Nuclear One Indian Point Nuclear Generating Station Unit One Unit Two Unit 2 Unit 3 Docket 05000313 Docket 05000368 Docket 05000247 Docket 05000286 DPR-51 NPF-6 DPR-26 DPR-64 Grand Gulf Nuclear Station James A. FitzPatrick Nuclear Power Plant Docket 05000416 Docket 05000333 NPF-29 DPR-59 River Bend Station Palisades Nuclear Plant Docket 05000458 Docket 05000255 NPF-47 DPR-20 Waterford Steam Electric Station - Unit 3 Pilgrim Nuclear Power Station Docket 05000382 Docket 05000293 NPF-38 DPR-35 Vermont Yankee Nuclear Power Station Docket 05000271 DPR-28
REFERENCE:
NRC Confirmatory Order EA-1 1-096 dated August 24, 2011 (ML11224A255).
Dear Mr. Zimmerman:
Entergy Operations, Inc and Entergy Nuclear Operations, Inc (Entergy) hereby submit the plan for a reorganization of the Quality Control (QC) reporting relationship as required by Action 1 of the subject confirmatory order which states:
"Entergy will reorganize the Quality Control (QC) reporting relationship so that those persons whose primary function is to assign or perform QC inspections will report directly to a manager in the Quality Assurance (QA) organization. These same persons may have a dotted line reporting relationship to the site Maintenance o&o/
ENOC-1 1-00021 Page 2 of 3 department and may be tasked to perform maintenance activities other than QC inspections. Entergy will provide to the Director, Office of Enforcement, a plan to accomplish this reorganization within 90 days after the issuance of this CO and will complete the transition described above within 270 days after the issuance of this CO. If Entergy is unable to provide a plan or complete the transition as described above, this CO shall be null and void and the NRC reserves the right to reenter the enforcement process in the underlying matter."
Entergy's planned reorganization, shown in Attachment I, includes the following key elements:
- 1. The existing position title "Manager, QA", which currently is part of the nuclear oversight organization, changes to "Manager, Nuclear Oversight", and remains in the oversight organization. This position is located at each of Entergy's nine nuclear power plant sites. The new title reflects the responsibilities of this position which include QA, QC, and performance improvement activities. Each Manager, Nuclear Oversight will report to the Director, Oversight, which is a corporate-level position.
- 2. The existing position "QA Senior Auditor", which is currently part of the nuclear oversight organization, transitions to "Supervisor, QA", and remains in the oversight organization. This position is located at each of Entergy's nine nuclear power plant sites. This new management position will have the responsibilities of the QA Manager as defined and described in the Quality Assurance Program Manual (OAPM). The qualifications required by ANSI/ANS-3.1 1978, Section 4.4.5, "Quality Assurance" for the group leader, will be held by the Supervisor, QA. The Supervisor, QA at each nuclear power plant site will report to the Manager, Nuclear Oversight for that site. In unusual situations (e.g., unanticipated retirement, disability, resignation, etc) the qualifications may be held temporarily by the Manager, Nuclear Oversight.
- 3. The existing reporting relationship for the site QA Auditors (reporting to the Manager, QA) will change to report to the new position described in item 2 (Supervisor, QA).
- 4. The existing reporting relationship for those individuals whose primary function is site Quality Specialist (QC) in the maintenance organization will be changed to report to the new position described in item 2 (Supervisor, QA) in the oversight organization.
- 5. The existing reporting relationship for the Corporate ANSI Level III in the fleet operations support organization will be changed to report to the Manager, QA-Corporate in the fleet oversight organization.
Entergy has reviewed the actions necessary to implement this reorganization and concludes that the transition can be completed by May 20, 2012 (within 270 days of the Confirmatory Order dated August 24, 2011).
In addition to Action 1 regarding the QC reorganization, Entergy has completed the following other actions described in the confirmatory order.
Actions 2 and 3:
"Entergy will review its existing general employee training (GET) to ensure adequate coverage of 10 CFR 50.7, including insights from the underlying matter. To that end, Entergy will create a document identifying the relevant "lessons-learned" from
ENOC-1 1-00021 Page 3 of 3 the facts of this matter, and in reviewing its GET, Entergy will ensure that these lessons-learned are addressed in the training materials. Entergy will also document the results of its review of the GET within 60 days after the issuance of the CO. If this review reveals a need to revise the GET, Entergy will make the appropriate revisions within 180 days of the issuance of this CO."
and "Entergy will review its existing training provided to new supervisors to ensure adequate coverage of 10 CFR 50.7 including insights from the underlying matter.
To that end, Entergy will create a document identifying the relevant "lessons-learned" from the facts of this matter, and in reviewing the training provided to new supervisors, Entergy will ensure that these lessons-learned are addressed in the training materials. Entergy will also document the results of its review of the training within 60 days after the issuance of the CO. If this review reveals a need to revise the supervisory training, Entergy will make the appropriate revisions within 180 days of the issuance of this CO."
Entergy has completed preparation of the lessons-learned document. Entergy's review of the existing general employee training (GET) and the existing training provided to new supervisors has identified the need for revisions to ensure adequate coverage of 10 CFR 50.7, including insights identified in the lessons-learned evaluation. The results of the training review are documented and actions are in progress to complete the required revisions to the training materials by February 20, 2012 (within 180 days of the Confirmatory Order dated August 24, 2011).
Action 4:
'Within 30 days after the issuance of this CO, a senior Entergy nuclear executive will issue a fleet-wide written communication reinforcing Entergy's commitment to maintaining a safety conscious work environment and reaffirming Entergy's insistence upon the protection of employees' right and obligation to raise safety issues without fear of retaliation."
Entergy issued a fleet-wide written communication on September 19, 2011 using the InsideEntergy communication tool for Entergy employees within the nuclear fleet. The requirements of Action 4 are complete.
There are no new commitments identified in this letter. If you have questions please contact Mr.
Bryan Ford, Senior Manager, Licensing at 601-368-5516.
1 declare under penalty of perjury that the foregoing is true and correct. Executed on /i /llvl/'.
/ bf / krk cc: Document Control Desk, USNRC
ATTACHMENT I TO ENOC-11-00021 PLANNED QC REORGANIZATION FOR ACTION 1 OF NRC CONFIRMATORY ORDER EA-1 1-096 ENTERGY OPERATIONS, INC and ENTERGY NUCLEAR OPERATIONS, INC
ENOC-1 1-00021 Attachment I Page 1 of 1 Planned Reorganization President and'CEO / CNO Nuclear Operations 2: Position changes to Supervisor, QA 1: Title changes to Manager, Nuclear Oversight Other unaffected positions not shown Other unaffected positions not shown New reporting relationship 3: Reporting relationship changes to new supervisory position 4: Reporting relationship changes from site maintenance to oversight organization 5: Reporting relationship changes from corporate fleet operations support to corporate oversight organization