Category:Letter type:TSTF
MONTHYEARTSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-4932019-06-18018 June 2019 TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-06-18018 June 2019 Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-01, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems2019-01-17017 January 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems TSTF-18-13, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program.2018-12-20020 December 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. TSTF-18-06, TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition2018-10-31031 October 2018 TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition TSTF-18-12, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR2018-10-24024 October 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2018-10-12012 October 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. TSTF-18-08, Updated TSTF Membership and Distribution2018-07-17017 July 2018 Updated TSTF Membership and Distribution TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 22018-07-0202 July 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 TSTF-18-05, TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR2018-05-29029 May 2018 TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR TSTF-17-19, TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2018-04-27027 April 2018 TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program TSTF-18-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues.2018-04-16016 April 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. TSTF-18-03, Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases2018-03-30030 March 2018 Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition.2018-02-0808 February 2018 Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. TSTF-17-18, Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems.2018-01-19019 January 2018 Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems. TSTF-18-01, Technical Specifications Task Force - Change in TSTF Traveler Invoicing2018-01-12012 January 2018 Technical Specifications Task Force - Change in TSTF Traveler Invoicing TSTF-17-17, Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program2017-12-19019 December 2017 Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program TSTF-17-16, Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.22017-12-19019 December 2017 Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-17-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2017-10-30030 October 2017 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-17-12, Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr.2017-08-28028 August 2017 Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr. TSTF-17-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements.2017-08-0202 August 2017 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. TSTF-17-09, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement.2017-07-24024 July 2017 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. TSTF-17-08, Change in TSTF Traveler Invoicing2017-07-0505 July 2017 Change in TSTF Traveler Invoicing TSTF-17-07, Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2017-05-10010 May 2017 Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program TSTF-17-06, Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications2017-05-0909 May 2017 Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications TSTF-17-03, Technical Specifications Task Force - Request for Fee Exemption for TSTF-567, Add Containment Sump TS to Address GSI-191 Issues.2017-03-30030 March 2017 Technical Specifications Task Force - Request for Fee Exemption for TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. TSTF-17-04, Technical Specifications Task Force - Transmittal of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues.2017-03-30030 March 2017 Technical Specifications Task Force - Transmittal of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. TSTF-17-05, Technical Specifications Task Force (TSTF) - Updated TSTF Membership and Distribution2017-02-23023 February 2017 Technical Specifications Task Force (TSTF) - Updated TSTF Membership and Distribution TSTF-16-11, Response to NRC Request for Additional Information Regarding TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement.2017-02-0202 February 2017 Response to NRC Request for Additional Information Regarding TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. TSTF-17-02, Technical Specifications Task Force - Request for NRC to Withdraw November 7, 2013 Letter to TSTF Concerning TSTF-51, TSTF-286, and TSTF-4712017-02-0202 February 2017 Technical Specifications Task Force - Request for NRC to Withdraw November 7, 2013 Letter to TSTF Concerning TSTF-51, TSTF-286, and TSTF-471 TSTF-17-01, TSTF Draft Response to NRC Questions on TSTF-505, Provide Risk-Informed Extended Completion Times for 02/16/2017 Public Meeting2017-01-31031 January 2017 TSTF Draft Response to NRC Questions on TSTF-505, Provide Risk-Informed Extended Completion Times for 02/16/2017 Public Meeting TSTF-16-12, Technical Specifications Task Force - Updated TSTF Membership and Distribution2016-11-18018 November 2016 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-16-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 22016-11-0202 November 2016 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 TSTF-16-08, Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains.2016-10-13013 October 2016 Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains. 2022-07-08
[Table view] Category:Technical Specification
MONTHYEARML23278A1172023-10-0202 October 2023 Draft TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML23205A2342023-07-0606 July 2023 Draft TSTF-601, Extend Shield Building Completion Time After Refueling ML21316A2372021-11-11011 November 2021 Draft TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML21337A1092021-02-25025 February 2021 Draft TSTF-585, Rev. 1, Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time ML20302A2172020-10-27027 October 2020 TSTF-558-T, Clarify SR Bases Added by TSTF-523 ML20302A2182020-10-27027 October 2020 TSTF-561-T, Bracket LCO 3.5.1 LCO Note in the ISTS ML20302A2192020-10-27027 October 2020 TSTF-562-T, Bases Clarification for TS 3.8.1, Required Actions B.3.1 and B.3.2 ML20302A2202020-10-27027 October 2020 TSTF-573-T, Correct RPS Bases for MSIV and TSV Functions ML20302A2212020-10-27027 October 2020 TSTF-581-T, Replace References to RG 1.182 with RG 1.160 ML19254B3972019-09-10010 September 2019 Draft of TSTF-577, Performance Based Frequencies for Steam Generator Tube Inspections ML19239A2622019-08-27027 August 2019 Draft Traveler TSTF-576, Revise Safety/Relief Valve Requirements TSTF-18-03, Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases2018-03-30030 March 2018 Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases TSTF-17-12, Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr.2017-08-28028 August 2017 Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr. ML16306A2142016-10-21021 October 2016 TSTF-564, Draft, Safety Limit MCPR TSTF-14-06, Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements2014-03-0606 March 2014 Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements TSTF-13-02, Submittal of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation.2013-02-21021 February 2013 Submittal of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation. TSTF-12-07, Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.22012-03-29029 March 2012 Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 TSTF-12-08, Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation2012-03-29029 March 2012 Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation TSTF-11-17, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2011-10-12012 October 2011 Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. ML1125900902011-09-0808 September 2011 WOG 3.4.16 Bases Markup for TSTF-490 ML1033702362010-12-0202 December 2010 TSTF 432 Revision 1 Missing Page E-mail Attachment TSTF-07-31, Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 20072007-10-31031 October 2007 Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 2007 ML0720004712007-07-19019 July 2007 Proposed TS for RCS Leakage Detection TSTF-07-01, TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091)2007-01-0909 January 2007 TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091) 2023-07-06
[Table view] Category:Bases Change
MONTHYEARML23278A1172023-10-0202 October 2023 Draft TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML23205A2342023-07-0606 July 2023 Draft TSTF-601, Extend Shield Building Completion Time After Refueling ML21316A2372021-11-11011 November 2021 Draft TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML21337A1092021-02-25025 February 2021 Draft TSTF-585, Rev. 1, Provide an Alternative to the LCO 3.0.3 One-Hour Preparation Time ML19254B3972019-09-10010 September 2019 Draft of TSTF-577, Performance Based Frequencies for Steam Generator Tube Inspections ML19239A2622019-08-27027 August 2019 Draft Traveler TSTF-576, Revise Safety/Relief Valve Requirements TSTF-18-03, Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases2018-03-30030 March 2018 Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases TSTF-17-12, Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr.2017-08-28028 August 2017 Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr. ML16306A2142016-10-21021 October 2016 TSTF-564, Draft, Safety Limit MCPR TSTF-14-06, Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements2014-03-0606 March 2014 Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements TSTF-13-02, Submittal of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation.2013-02-21021 February 2013 Submittal of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation. TSTF-12-07, Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.22012-03-29029 March 2012 Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 TSTF-12-08, Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation2012-03-29029 March 2012 Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation TSTF-11-17, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2011-10-12012 October 2011 Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. ML1125900902011-09-0808 September 2011 WOG 3.4.16 Bases Markup for TSTF-490 ML1033702362010-12-0202 December 2010 TSTF 432 Revision 1 Missing Page E-mail Attachment TSTF-07-31, Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 20072007-10-31031 October 2007 Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 2007 ML0720004712007-07-19019 July 2007 Proposed TS for RCS Leakage Detection TSTF-07-01, TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091)2007-01-0909 January 2007 TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091) 2023-07-06
[Table view] Category:Technical Specifications
MONTHYEARML24016A2702023-12-12012 December 2023 TSTF-585, Draft Revision 3, Revise LCO 3.0.3 to Require Managing Risk ML23222A2612023-08-0707 August 2023 Draft Traveler TSTF-599, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators ML22320A5942022-10-24024 October 2022 Draft TSTF-596, Rev. 0, Expand the Applicability of the Surveillance Frequency Frequency Control Panel (Sfcp), Improved Standard Technical Specifications Change Traveler ML22244A2192022-07-0707 July 2022 Revised Draft TSTF-588, Revise List of COLR Methods (July 2022) ML21316A2362021-10-26026 October 2021 Draft TSTF-589,Eliminate Automatic Diesel Generator Start During Shutdown ML21316A2352021-09-24024 September 2021 Draft TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML21109A2952021-04-22022 April 2021 Draft Traveler TSTF-585, Revise LCO 3.0.3 ML21117A3522021-02-0101 February 2021 TSTF-576, Rev 1, Revise Safety/Relief Valve Requirements Draft ML20181A2212020-06-29029 June 2020 Draft TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML19323C9002019-11-19019 November 2019 Comparison of the Original Draft Justification and the Revised Draft Justification of TSTF-576, Revise Safety/Relief Valve Requirements TSTF-17-16, Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.22017-12-19019 December 2017 Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-17-17, Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program2017-12-19019 December 2017 Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program ML17023A0082017-01-23023 January 2017 Draft of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. TSTF-16-09, Technical Specifications Task Force - Revision 3 of TSTF-551, Revise Secondary Containment Surveillance Requirements.2016-10-0303 October 2016 Technical Specifications Task Force - Revision 3 of TSTF-551, Revise Secondary Containment Surveillance Requirements. TSTF-15-08, Technical Specifications Task Force - Transmittal of TSTF-529, Revision 3, Clarify Use and Application Rules.2015-09-14014 September 2015 Technical Specifications Task Force - Transmittal of TSTF-529, Revision 3, Clarify Use and Application Rules. TSTF-15-05, Withdrawal of TSTF-531, Revision 1, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2.2015-04-15015 April 2015 Withdrawal of TSTF-531, Revision 1, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2. ML15028A1282015-01-28028 January 2015 TSTF-14-13 TSTF Concerns with Proposed RIS on Pressure Boundary Leakage TSTF-13-09, Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal.2013-11-0404 November 2013 Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal. TSTF-13-12, Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed2013-09-10010 September 2013 Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed TSTF-12-04, Transmittal of TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-3732012-03-27027 March 2012 Transmittal of TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373 TSTF-12-01, Transmittal of TSTF-454, Revision 2, Extend PCIV Completion Times (NEDC-33046).2012-02-22022 February 2012 Transmittal of TSTF-454, Revision 2, Extend PCIV Completion Times (NEDC-33046). TSTF-11-17, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2011-10-12012 October 2011 Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. ML18115A4822011-06-14014 June 2011 NRC Revised TSTF-505, Revision 2, Draft Model Application ML17290A0822011-06-14014 June 2011 Draft Traveler TSTF 505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B. ML17290A0972011-06-14014 June 2011 Draft Table 1 of TSTF-505, Revision 2, Affected Technical Specifications ML17339A1682011-06-14014 June 2011 Draft Table 2 of TSTF-505, Revision 2, Conditions Requiring Plant-Specific Technical Justification TSTF-11-02, Correction to TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection2011-03-0101 March 2011 Correction to TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML1104205302011-02-0909 February 2011 ITSB Resolution of Excel Services Corporation Proposed TSTF-426 Wording ML1027306882011-02-0202 February 2011 Model Application and Model SE of TSTF-423, Revision 1, Technical Specification End States, NEDC-32988-A ML1027804862010-09-28028 September 2010 Response to Nrc'S Request for Additional Information Regarding TSTF-432, Revision 0, Change in Technical Specifications End States, (WCAP-16294) TSTF-09-24, Technical Specification Task Force Recommended Changes to Be Incorporated in Revision 4 of the Standard Technical Specifications, NUREG-1430 Through 14342009-11-30030 November 2009 Technical Specification Task Force Recommended Changes to Be Incorporated in Revision 4 of the Standard Technical Specifications, NUREG-1430 Through 1434 TSTF-09-15, Transmittal of TSTF-517, Revision 0, Allowance for Non-TS Cooling / Ventilation Systems Degradation on Support System Operability and Associated Implementation Guidance2009-10-28028 October 2009 Transmittal of TSTF-517, Revision 0, Allowance for Non-TS Cooling / Ventilation Systems Degradation on Support System Operability and Associated Implementation Guidance TSTF-09-10, Transmittal of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, Sections 3.1.1 - 3.7.52009-03-18018 March 2009 Transmittal of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, Sections 3.1.1 - 3.7.5 TSTF-08-21, Transmittal of TSTF-513, Revision 0, Revise Operability Requirements and Actions for RCS Leakage Instrumentation.2008-11-14014 November 2008 Transmittal of TSTF-513, Revision 0, Revise Operability Requirements and Actions for RCS Leakage Instrumentation. TSTF-08-19, Transmittal of TSTF-500, Revision 1, DC Electrical Rewrite - Update to TSTF-360.2008-11-0505 November 2008 Transmittal of TSTF-500, Revision 1, DC Electrical Rewrite - Update to TSTF-360. TSTF-08-18, Transmittal of TSTF-512, Revision 0, Revise SR 3.0.3 to Address SRs That Cannot Be Performed or Are Not Met.2008-10-14014 October 2008 Transmittal of TSTF-512, Revision 0, Revise SR 3.0.3 to Address SRs That Cannot Be Performed or Are Not Met. TSTF-08-16, Transmittal of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2008-09-17017 September 2008 Transmittal of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. TSTF-08-13, TSTF-426, Revision 1, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c2008-08-0505 August 2008 TSTF-426, Revision 1, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c TSTF-08-08, TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation.2008-07-0303 July 2008 TSTF-508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation. TSTF-08-07, Proposed Model Application for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.2008-03-11011 March 2008 Proposed Model Application for TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360. TSTF-08-04, TSTF-446, Revision 3, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791).2008-02-19019 February 2008 TSTF-446, Revision 3, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791). TSTF-08-01, Response to NRC June 25, 2007 Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.2008-01-18018 January 2008 Response to NRC June 25, 2007 Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions. ML0721201192007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4k - BWR6_3.03.6.05_B for TSTF-493R2eITSB ML0720702512007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 2 - 493 R2 pp-1_12 Markup Rev. B ML0720702602007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 3a - Bwog - 3.3.01_ B for TSTF -493R23e ITSB ML0720702692007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 3b-BWOG - 3.3.05_B for TSTF-493R23e ITSB ML0720703552007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4a - BWR4_3.03.1.01_B for TSTF-493R2eITSB ML0720703582007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4b - BWR4_3.03.2.01_B for TSTF 493 R2eITSB ML0721200762007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 4d - BWR4_3.03.5.01_B for TSTF-493R2eITSB ML0721201532007-07-25025 July 2007 NRC Response to 4/16/2007 Submittal of TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Enclosure 5b - CEOG_3.3.01d_B for TSTF-4932eITSB 2023-08-07
[Table view] |
Text
TECHNICAL SPECIFICATIONS TASK FORCE TSTF A JOINT OWNERS GROUP ACTIVITY October 12, 2011 TSTF-11-17 PROJ0753 Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Proposed Revision to the Model Application for TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b"
REFERENCE:
Letter from the Technical Specifications Task Force to the Nuclear Regulatory Commission Document Control Desk, "Transmittal of TSTF-505, Revision 1,
'Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b' Errata" dated June 14, 2011 (ADAMS Accession Number ML111650552).
In the referenced letter, the Technical Specifications Task Force (TSTF) provided Revision 1 of TSTF-505, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b."
TSTF-505 included as Attachment 1 a proposed model application for licensee adoption of TSTF-505.
Following discussions with the NRC, the TSTF proposes to replace the model application in Attachment 1 of TSTF-505 with the attached model.
Should you have any questions, please do not hesitate to contact us.
Norman J. Stringfellow (PWROG/W) Roy A. Browning (BWROG)
William J. Steelman (PWROG/CE) Wendy E. Croft (PWROG/B&W)
Enclosure cc: Robert Elliott, Technical Specifications Branch, NRC Michelle Honcharik, Licensing Processes Branch, NRC 11921 Rockville Pike, Suite 100, Rockville, MD 20852 Phone: 301-984-4400, Fax: 301-984-7600 Administration by EXCEL Services Corporation
PROPOSED MODEL APPLICATION FOR PLANT-SPECIFIC ADOPTION OF TSTF-505, REVISION 1, PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
SUBJECT:
[PLANT]
DOCKET NO. 50-[XXX]
LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT RISK INFORMED COMPLETION TIMES TSTF-505, REVISION 1, "PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B."
In accordance with the provisions of Section 50.90 of Title 10 of the Code of Federal Regulations (10CFR), [LICENSEE] is submitting a request for an amendment to the Technical Specifications (TS) for [PLANT.]
The proposed amendment would modify TS requirements to permit the use of Risk Informed Completion Times in accordance with TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b." The availability of this TS improvement was announced in the Federal Register on [Date] ([ ] FR [ ]).
- Attachment 1 provides a description and assessment of the proposed change, the requested confirmation of applicability, and plant-specific verifications.
- Attachment 2 provides the existing TS pages marked up to show the proposed changes.
- Attachment 3 provides revised (clean) TS pages.
- Attachment 4 provides existing TS Bases pages marked up to show the proposed changes.
[LICENSEE] requests approval of the proposed license amendment by [DATE], with the amendment being implemented [BY DATE OR WITHIN X DAYS].
In accordance with 10 CFR 50.91(a)(1), Notice for Public Comment, the analysis about the issue of no significant hazards consideration using the standards in 10 CFR 50.92 is being provided to the Commission.
In accordance with 10 CFR 50.91(b)(1), Notice for Public Comment; State Consultation, a copy of this application, with attachments, is being provided to the designated [STATE] Official.
I declare [or certify, verify, state] under penalty of perjury that the foregoing is true and correct.
Executed on [date][Signature]
If you should have any questions regarding this submittal, please contact [NAME, TELEPHONE NUMBER].
Sincerely,
[Name, Title]
Attachments: 1. Description and Assessment
- 2. Proposed Technical Specification Changes (Mark-Up)
- 3. Revised Technical Specification Pages
- 4. Proposed Technical Specification Bases Changes (Mark-Up)
Enclosures:
- 1. List of Revised Required Actions to Corresponding PRA Functions
- 2. Information Supporting Consistency with Regulatory Guide 1.200, Revision 2.
- 3. Information Supporting Technical Adequacy of PRA Models Without PRA Standards Endorsed by Regulatory Guide 1.200, Revision 2.
- 4. Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models.
- 5. Baseline CDF and LERF.
- 6. Justification of Application Of At-Power PRA Models to Shutdown Modes.
- 7. PRA Model Update Process.
- 8. Attributes of the CRMP Model.
- 9. Key Assumptions and Sources of Uncertainty.
- 10. Program Implementation
- 11. Monitoring Program
- 12. Risk Management Action Examples cc: NRC Project Manager NRC Regional Office NRC Resident Inspector State Contact
ATTACHMENT 1 DESCRIPTION AND ASSESSMENT OF THE PROPOSED CHANGE License Amendment Request for Adoption of TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
1.0 DESCRIPTION
The proposed amendment would modify the Technical Specification (TS) requirements related to Completion Times (CTs) for Required Actions to provide the option to calculate a longer, risk-informed CT (RICT). A new program, the Risk-Informed Completion Time Program, is added to TS Section 5 Administrative Controls.
The methodology for using the RICT Program is described in NEI 06-09, "Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS)
Guidelines," Revision 0, which was approved by the NRC on May 17, 2007. Adherence to NEI 06-09 is required by the RICT Program.
The proposed amendment is consistent with TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. However, only those Required Actions described in Enclosure 1 are proposed to be changed, [which does not include all of the modified Required Actions in TSTF-505 and which includes some plant-specific Required Actions not included in TSTF-505].
2.0 ASSESSMENT 2.1 Applicability of Published Safety Evaluation
[LICENSEE] has reviewed the model safety evaluation dated [DATE] as part of the Federal Register Notice for Comment. This review included a review of the NRC staffs evaluation, as well as the supporting information provided to support TSTF-505 and the safety evaluation for NEI 06-09. [As described in the subsequent paragraphs,][LICENSEE] has concluded that the technical basis presented in the TSTF-505 proposal and the associated model safety evaluation prepared by the NRC staff are applicable to [PLANT, UNIT NOS.] and support incorporation of this amendment in the [PLANT] TS. ]
2.2 Verifications and Regulatory Commitments In accordance with Section 4.0, Limitations and Conditions, of the safety evaluation for NEI 06-09, the following is provided:
- 1. Enclosure 1 identifies each of the TS Required Actions to which the RICT Program will apply, with a comparison of the TS functions to the functions modeled in the probabilistic risk assessment (PRA) of the structures, systems and components (SSCs) subject to those actions.
- 2. Enclosure 2 provides a discussion of the results of peer reviews and self assessments conducted for the plant-specific PRA models which support the RICT Program, as required by Regulatory Guide (RG) 1.200 Section 4.2.
- 3. [Enclosure 3 provides a description of all PRA models used to support the RICT Program for which Nuclear Regulatory Commission endorsed standards are not available.] [Enclosure 3 is not applicable since each PRA model used for the RICT Program is addressed using a standard endorsed by the Nuclear Regulatory Commission.] }
- 4. Enclosure 4 provides appropriate justification for excluding sources of risk not addressed by the PRA models.
- 5. Enclosure 5 provides the plant-specific baseline CDF and LERF to confirm that the potential risk increases allowed under the RICT Program are acceptable.
- 6. [Enclosure 6 provides appropriate plant-specific justification for using at power PRA models in shutdown modes to which the RICT Program applies (modes 3 [and 4]).]
[Enclosure 6 is not applicable since the RICT Program is not being applied to shutdown modes.]
- 7. Enclosure 7 provides a discussion of the licensees programs and procedures that assure the PRA models that support the RICT Program are maintained consistent with the as-built, as-operated plant.
- 8. Enclosure 8 provides a description of how the baseline PRA model, which calculates average annual risk, is evaluated and modified for use in the Configuration Risk Management Program (CRMP) to assess real-time configuration risk, and describes the scope of, and quality controls applied to, the CRMP
- 9. Enclosure 9 provides a discussion of how the key assumptions and sources of uncertainty in the PRA models were identified, and how their impact on the RICT Program was assessed and dispositioned.
- 10. Enclosure 10 provides a description of the implementing programs and procedures regarding the plant staff responsibilities for the RICT Program implementation, including risk management action (RMA) implementation.
- 11. Enclosure 11 provides a description of the implementation and monitoring program as described in NEI 06-09, Section 2.3.2, Step 7.
- 12. Enclosure 12 provides a description of the process to identify and provide RMAs.
2.3 Optional Changes and Variations
[LICENSEE is not proposing any changes, variations, or deviations from the TS changes described in the TSTF-505, Revision 1, or the applicable parts of the NRC staffs model safety evaluation dated [DATE].] [LICENSEE is proposing the following changes or variations from the TS changes described in the TSTF-505, Revision 1, or the applicable parts of the NRC staffs model safety evaluation dated [DATE]. These options were recognized as acceptable changes or variations in TSTF-505 and the NRC staff's model safety evaluation.]
{NOTE: If a change or variation is not identified in TSTF-505, the NRC staff's model safety evaluation, or NEI 06-09 then provide the description and justification.}
[The [PLANT] TS utilize different [numbering][and][titles] than the Standard Technical Specifications on which TSTF-505 was based. Specifically, [describe differences between the plant-specific TS numbering and/or titles (including Required Actions and programs) and the TSTF-505 numbering and titles.] These differences are administrative and do not affect the applicability of TSTF-505 to the [PLANT] TS.]
3.0 REGULATORY SAFETY ANALYSIS 3.1 No Significant Hazards Consideration Determination
[LICENSEE] has evaluated the proposed change to the TS using the criteria in 10 CFR 50.92 and has determined that the proposed change does not involve a significant hazards consideration.
[PLANT, UNIT NOS.] requests adoption of an approved change to the standard technical specifications (STS) and plant-specific technical specifications (TS), to modify the TS requirements related to Completion Times for Required Actions to provide the option to calculate a longer, risk-informed Completion Time. The allowance is described in a new program in Chapter 5, "Administrative Controls," entitled the "Risk-Informed Completion Time Program."
As required by 10 CFR 50.91(a), an analysis of the issue of no significant hazards consideration is presented below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change permits the extension of Completion Times provided the associated risk is assessed and managed in accordance with the NRC approved Risk-Informed Completion Time Program. The proposed change does not involve a significant increase in the probability of an accident previously evaluated because the change involves no change to the plant or its modes of operation. The proposed change does not increase the consequences of an accident because the design-basis mitigation function of the affected systems is not changed and the consequences of an accident during the extended Completion Time are no different from those during the existing Completion Time.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not change the design, configuration, or method of operation of the plant. The proposed change does not involve a physical alteration of the plant (no new or different kind of equipment will be installed).
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed change permit the extension of Completion Times provided risk is assessed and managed in accordance with the NRC approved Risk-Informed Completion Time Program. The proposed change implements a risk-informed configuration management program to assure that adequate margins of safety are maintained. Application of these new specifications and the configuration management program considers cumulative effects of multiple systems or components being out of service and does so more effectively than the current TS.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, [LICENSEE] concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
4.0 ENVIRONMENTAL CONSIDERATION
[LICENSEE] has reviewed the environmental evaluation included in the model safety evaluation published on [DATE] ([ ] FR [ ]) as part of the Notice of Availability. [LICENSEE] has concluded that the NRC staff findings presented in that evaluation are applicable to [PLANT, NO.].
The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meet the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore,
pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)
{provided by the licensee}
ATTACHMENT 3 REVISED TECHNICAL SPECIFICATION PAGES
{provided by the licensee}
ATTACHMENT 4 PROPOSED CHANGES TO TECHNICAL SPECIFICATION BASES CHANGES (MARK-UP) PAGES
{provided by the licensee}
ENCLOSURE 1 LIST OF REVISED REQUIRED ACTIONS TO CORRESPONDING PRA FUNCTIONS
{NOTE: This enclosure provides confirmation that the PRA models include the necessary scope of structures, systems, and components (SSCs) and their functions to address each proposed application of the RICT Program to the TS Required Actions.
The licensee lists each TS Required Action to which the RICT Program may be applied and, for each Required Action, describes the corresponding SSC and associated function modeled in the PRA. This is to include the applicable success criteria used in the PRA model compared to the licensing basis criteria, and if applicable a disposition of any differences which justifies use of the PRA success criteria when calculating RICTs. The calculated RICT is provided for the condition to which the RICT applies.}
ENCLOSURE 2 INFORMATION SUPPORTING CONSISTENCY WITH REGULATORY GUIDE 1.200, REVISION 2
{NOTE: This enclosure provides information supporting the licensee evaluation of the technical adequacy of the PRA models supporting the RICT Program based on peer reviews and self-assessments against the relevant PRA standards as endorsed in the current applicable revision of RG 1.200, including consideration of staff clarifications of the standards.
Per NEI 06-09 Rev. 0, capability category II of the standards is applicable; therefore, the licensee identifies those parts of the PRAs that conform to capability categories lower than II, and provides a disposition for the RICT Program. Consistent with RG 1.200 Section 4.2, the licensee identifies and provides a discussion of the resolution of any findings and observations from the peer reviews or self-assessments.
The licensee assessment must also address the clarifications and qualifications found in RG 1.200, either by a separate discussion provided by the licensee, or by confirmation that the peer reviews or self-assessments included consideration of the clarifications and qualifications of the current applicable RG 1.200 revision.}
ENCLOSURE 3 INFORMATION SUPPORTING TECHNICAL ADEQUACY OF PRA MODELS WITHOUT PRA STANDARDS ENDORSED BY REGULATORY GUIDE 1.200, REVISION 2
{NOTE: This enclosure provides information supporting the licensee evaluation of the PRA models supporting the RICT Program for which the relevant PRA standards are not yet endorsed in the current applicable revision of RG 1.200.
RG 1.200 Rev. 2 endorses standards for internal and external events including internal floods and fires, seismic events, and other external hazards for full power conditions. This scope includes the relevant hazard groups applicable to a RICT Program unless the program is to apply to lower modes of operation. In this case, shutdown and transition risk PRA models may apply but are not be covered by an endorsed standard. If applicable, the licensee should provide a detailed description of these PRA models and the basis for its determination of their technical adequacy to support the RICT Program.}
ENCLOSURE 4 INFORMATION SUPPORTING JUSTIFICATION OF EXCLUDING SOURCES OF RISK NOT ADDRESSED BY THE PRA MODELS
{NOTE: This enclosure identifies and provides a justification for excluding sources of risk which are not in the scope of the PRA models applied to the RICT Program.
Exclusion of risk sources determined to be insignificant to the calculation of configuration specific risk, or the use of conservative or bounding analyses for the calculation of RICTs in lieu of realistic PRA models, are described. A qualitative treatment may be sufficient if the licensee demonstrates that those risk contributions would not affect decisions in a RICT Program. The use of conservative bounding calculations in a RICT Program may also be acceptable.
However, when the risk associated with a particular hazard group would affect decisions, it is the Commissions policy that risk be assessed using a PRA that meets the staff-endorsed PRA standard.}
ENCLOSURE 5 BASELINE CDF AND LERF
{NOTE: This enclosure provides the plant-specific total CDF and total LERF to confirm that these are less than 10-4/year and 10-5/year, respectively. This assures that the potential risk increases allowed under the RICT Program are consistent with RG 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Revision 2.
The licensee should provide the totals and the contributions from each hazard group (internal events, fires, floods, seismic, other external).}
ENCLOSURE 6 JUSTIFICATION OF APPLICATION OF AT-POWER PRA MODELS TO SHUTDOWN MODES
{NOTE: This enclosure provides a justification for the use of existing PRA models during shutdown conditions if the RICT Program is applicable in these shutdown conditions.
The at-power PRA models may potentially be applied to lower modes of operation (hot standby for PWRs, and hot shutdown for PWRs and BWRs) for some Required Actions. If the licensee is not proposing to use the RICT Program in these modes, then this information is not required and this Enclosure should be marked "Not applicable." Otherwise, the licensee provides a detailed justification for those Required Actions proposed to apply the RICT Program in lower modes of operation using the at-power PRA models.}
ENCLOSURE 7 PRA MODEL UPDATE PROCESS
{NOTE: This enclosure describes how the PRA models used in the calculation of completion times is maintained consistent with the as-built, as-operated plant.
The licensee provides a discussion of its programs and procedures to assure the PRA models that support the RICT Program are maintained consistent with the as-built, as-operated plant.
This should include a discussion of the timing of significant PRA model changes as described in NEI 06-09, Section 2.3.4, Step 7. }
ENCLOSURE 8 ATTRIBUTES OF THE CRMP MODEL
{NOTE: This enclosure describes how the baseline PRA model, which calculates average annual risk, is evaluated and modified for use in the Configuration Risk Management Program (CRMP) to assess real-time configuration risk, and describes the scope of, and quality controls applied to, the CRMP.
The licensee provides a description of the PRA models and CRMP used to support the RICT Program. The following specific attributes must also be addressed:
- The baseline PRA models assess the average annual risk. However, some risk is not consistent throughout the year or the operating cycle, and the PRA models used for the CRMP need to properly assess the change in risk for the existing plant conditions. For example, success criteria may be different at core beginning of life compared to end of life, or at different times of the year for room cooling systems. The licensee describes these issues and how they are addressed in the CRMP.
- The baseline PRA models may assume some configurations are not allowable, but these assumptions may not be applicable to a CRMP. The licensee describes these issues and how they are addressed in the CRMP.
- The scope of SSCs within the CRMP is provided, along with confirmation that the CRMP tools can be readily applied for each TS Required Action within the scope of the Risk-Informed Completion Time Program. The licensee should also identify and justify SSCs that are not included in the CRMP that could provide accident mitigation functions.
- The licensee describes how consistency of calculated results from the baseline PRA model and the CRMP are verified to assure the CRMP PRA models are consistent with the baseline model and updated when the baseline PRA model is updated.
- The licensee describes the quality requirements applied to the CRMP PRA models.
- The licensee describes the training and qualification programs applicable to personnel responsible for development and use of the CRMP.}
ENCLOSURE 9 KEY ASSUMPTIONS AND SOURCES OF UNCERTAINTY
{NOTE: This enclosure describes the key assumptions and sources of uncertainty in the PRA models, and how their impact on the RICT Program was assessed and dispositioned.
Sensitivity analyses for various plant configuration cases under different assumptions should be provided to justify conclusions.}
ENCLOSURE 10 PROGRAM IMPLEMENTATION
{NOTE: This enclosure provides a description of the implementing programs and procedures regarding the plant staff responsibilities for the RICT Program implementation including training of plant personnel, and specifically discusses the decision process for risk management action (RMA) implementation during extended CTs.}
ENCLOSURE 11 MONITORING PROGRAM
{NOTE: This enclosure describes the monitoring program for cumulative risk impacts as described in NEI 06-09, Revision 0, Section 2.3.2, Step 7. This should include a description of how the calculations are made and what actions and thresholds are applied when corrective measures are necessary due to excessive risk increases.}
ENCLOSURE 12 RISK MANAGEMENT ACTION EXAMPLES
{NOTE: This enclosure describes the process for identification of RMAs applicable during extended CTs, and provides examples of RMAs.}