Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23205A2346 July 2023Draft TSTF-601, 'Extend Shield Building Completion Time After Refueling'Surveillance Frequency Control Program
ML21316A23711 November 2021Draft TSTF-591, Revise Risk Informed Completion Time (RICT) ProgramPost Accident Monitoring
Probabilistic Risk Assessment
Pressure and Temperature Limits Report
Affidavit
ML21337A10925 February 2021Draft TSTF-585, Rev. 1, Provide an Alternative to the LCO 3.0.3 One-Hour Preparation TimeSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Missed surveillance
Scaffolding
ML19254B39710 September 2019Draft of TSTF-577, Performance Based Frequencies for Steam Generator Tube Inspections
ML19239A26227 August 2019Draft Traveler TSTF-576, Revise Safety/Relief Valve RequirementsAnticipated operational occurrence
Surveillance Frequency Control Program
TSTF-18-03, Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases30 March 2018Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 BasesSafe Shutdown
Missed surveillance
TSTF-17-12, Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr.28 August 2017Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr.Reactor Vessel Water Level
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Minimum Critical Power Ratio
Fuel cladding
ML16306A21421 October 2016TSTF-564, Draft, Safety Limit MCPRReactor Vessel Water Level
Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
TSTF-14-06, Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements6 March 2014Transmittal of TSTF-547, Revision 0, Clarification of Rod Position RequirementsBoric Acid
Shutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
Power change
TSTF-13-02, Submittal of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation.21 February 2013Submittal of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation.Reactor Vessel Water Level
Stroke time
Time to boil
Surveillance Frequency Control Program
TSTF-12-07, Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.229 March 2012Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2Anticipated operational occurrence
Offsite Circuit
TSTF-12-08, Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation29 March 2012Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas AccumulationReactor Vessel Water Level
Stroke time
Time to boil
Surveillance Frequency Control Program
TSTF-11-17, Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.12 October 2011Proposed Revision to the Model Application for TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.Probabilistic Risk Assessment
ML1125900908 September 2011WOG 3.4.16 Bases Markup for TSTF-490
ML1033702362 December 2010TSTF 432 Revision 1 Missing Page E-mail Attachment
TSTF-07-31, Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 200731 October 2007Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 2007
ML07200047119 July 2007Proposed TS for RCS Leakage DetectionGrab sample
Fuel cladding
TSTF-07-01, TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091)9 January 2007TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091)Shutdown Margin