3F0511-02, Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models
| ML11167A138 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/06/2011 |
| From: | Progress Energy Florida |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 3F0511-02 | |
| Download: ML11167A138 (3) | |
Text
MR UNA m
m w
am
FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 /LICENSE NUMBER DPR-72 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ATTACHMENT B RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REQUIRED FOR THE DEVELOPMENT OF THE CONFIRMATORY LOCA AND NON-LOCA MODELS (PROPRIETARY)
U. S. Nuclear Regulatory Commission Page 1 of 2 3F0511-02 Request for Additional Information Required for the Development of Confirmatory LOCA and non-LOCA Models for the CR-3 Extended Power Uprate Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc. hereby provides a response to a request for additional information (RAI) required for the development of confirmatory Loss of Coolant Accident (LOCA) and non-LOCA models for the Crystal River Unit 3 (CR-3) Extended Power Uprate (EPU). Below is the NRC RAI that was forwarded to CR-3 by electronic mail on February 17, 2011.
NRC Item 4 Non-LOCA Analysis Report(s). the sections of turbine trip, loss offeed and steam line break CR-3 Response Analysis Input Summary (AIS) documents for the following events are attached (see the enclosed CD-ROM):
- 1. Turbine trip and load reject (AIS Document) 51-9060386-003
- 2. Main steam line break (MSLB) (AIS Document) 51-9059350-004 The remainder of the requested information is expected to be submitted when it become available.