Closeout of Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML111660010
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 06/27/2011
From: Nicholas Difrancesco
Plant Licensing Branch III
To: Pacilio M
Exelon Nuclear
Di Francesco N, NRR/DORL/LPL3-2, 415-111
References
TAC ME7798, TAC ME7805, TAC ME7797, TAC ME7804, GL-08-001
Download: ML111660010 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 June 27, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2, AND BYRON STATION, UNIT NOS. 1 AND 2 - CLOSEOUT OF GENERIC LETTER 2008~01 "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NOS. ME7797, ME7798, ME7804, AND ME7805)

Dear Mr. Pacilio:

On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008~01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.

GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:

(a)

A description of the results of evaluations that were performed pursuant to requested actions. This description should provide sufficient information to demonstrate that you are, or will be, in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; (b)

A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, (c)

A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.

By letters dated April 11, 2008, October 14, 2008, January 20, 2009, July 7, 2009, and November 30, 2009 (ADAMS Accession Nos. ML081020758, ML082880706, ML090210304, ML091880507, and ML093340548, respectively), Exelon Generation Company, LLC (Exelon, the licensee) provided.information in response to GL 2008-01 for the Braidwood Station, Units 1

M. Pacilio

- 2 and 2 (Braidwood), and Byron Station, Unit Nos. 1 and 2 (Byron). The NRC staff has reviewed the submitted information and has concluded that the licensee for Braidwood and Byron has acceptably demonstrated that for Braidwood and Byron, the "subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements; and that suitable design, operation, and testing measures are in place for maintaining this compliance,>>

as stated in GL 2008-01.

Consequently, Exelon's GL 2008-01 response for Braidwood and Byron is considered closed and no further information or action is requested of you with the exception of any commitments Exelon has made with respect to GL 2008-01 responses for Braidwood and Byron. The NRC staff expects that the associated commitments will be entered into the licensee's tracking system, and controlled consistent with the Nuclear Energy Institute (NEI) document NEI 99-04, "Guidelines for Managing NRC Commitment Changes."

The NRC's Region III staff has performed an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). Region III staff inspection activities are continuing, and the inspection results will be communicated by separate correspondence. 1"1 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please contact me at (301) 415-1115 or nicholas.difrancesco@nrc.gov.

Sincerely, Nicholas J. DiFrancesco, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, STN 50-456, and STN 50-457.

cc: Distribution via Listserv

M. Pacilio

- 2 and 2 (Braidwood), and Byron Station, Unit Nos. 1 and 2 (Byron). The NRC staff has reviewed the submitted information and has concluded that the licensee for Braidwood and Byron has acceptably demonstrated that for Braidwood and Byron, the "subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements; and that suitable design, operation, and testing measures are in place for maintaining this compliance,"

as stated in GL 2008-01.

Consequently, Exelon's GL 2008-01 response for Braidwood and Byron is considered closed and no further information or action is requested of you with the exception of any commitments Exelon has made with respect to GL 2008-01 responses for Braidwood and Byron. The NRC staff expects that the associated commitments will be entered into the licensee's tracking system, and controlled consistent with the Nuclear Energy Institute (NEI) document NEI 99-04, "Guidelines for Managing NRC Commitment Changes."

The NRC's Region III staff has performed an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). Region III staff inspection activities are continuing, and the inspection results will be communicated by separate correspondence. TI2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please contact me at (301) 415-1115 or nicholas.difrancesco@nrc.gov.

Sincerely, IRA!

Nicholas J. DiFrancesco, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, STN 50-456, and STN 50-457.

cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL3-2 RlF RidsNrrDorlLpl3-2 Resource JGall, NRR RidsNrrPMBraidwood Resource RidsNrrLASRohrer Resource RidsNrrDssSxrb Resource RidsAcrsAcnw _MailCTR Resource RidsOgcRp Resource RidsNrrDorlDpr Resource RidsRgn3MailCenter Resource ADAMS Accession No ML11166010

  • SE Memo dated NRR-106 OFFICE LPL3-2JPM LPL3-2/LA SRXB/BC LPL3-21PM LPL3-2IBC NAME NDiFrancesco SRohrer AUlses MMahoney JZimmerman DATE 6/24/11 6123111 5/11/11*

6/27/11 6127111 OFFICIAL RECORD COpy