TAC:ME7797
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Initiation
| |
| From | |
MONTHYEARML1116600102011-06-27027 June 2011
[table view]Closeout of Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems DCL-12-002, Revision to the Updated Final Safety Analysis Report Section 4.3.2.2, Power Distribution; and Technical Specification Bases 3.1.7, Rod Position Indication; 3.2.1, Heat Flux Hot Channel Factor (Fo(Z)),3.2.2,.2012-01-0505 January 2012 Revision to the Updated Final Safety Analysis Report Section 4.3.2.2, Power Distribution; and Technical Specification Bases 3.1.7, Rod Position Indication; 3.2.1, Heat Flux Hot Channel Factor (Fo(Z)),3.2.2,. ML1206501312012-03-0505 March 2012 Acceptance Review Email, License Amendment Request, Revise Updated Final Safety Analysis Report Section 4.3.2.2 to Allow Use of Beacon Power Distribution Monitoring System ML12324A0242012-11-30030 November 2012 Request for Additional Information Regarding License Renewal One-Time Inspection Procedure ML12345A3792013-01-0909 January 2013 Issuance of Amendment Nos. 214 and 216, Revise Final Safety Analysis Report Update Section 4.3.2.2 to Allow Use of Beacon Power Distribution Monitoring System ML13018A2322013-01-14014 January 2013 NRR E-mail Capture - Correction to BFN Units 1, 2, 3 RAI Regarding License Renewal one-time Inspection Procedure ML13067A3982013-02-28028 February 2013 Response to Request for Additional Information Regarding License Renewal One-Time Inspection Procedure ML13177A3522013-07-16016 July 2013 Review of Commitment Submittal for License Renewal Regarding the One-Time Inspection Procedure DCL-15-047, License Amendment Request 15-02 Revision of Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and Technical Specification 5.6.5. Core Operating Limits Report (Colr), For.2015-04-16016 April 2015 License Amendment Request 15-02 Revision of Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and Technical Specification 5.6.5. Core Operating Limits Report (Colr), For. 2013-01-14 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:ME7797&oldid=5277943"