MONTHYEARML1116600102011-06-27027 June 2011 Closeout of Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Project stage: Other DCL-12-002, Revision to the Updated Final Safety Analysis Report Section 4.3.2.2, Power Distribution; and Technical Specification Bases 3.1.7, Rod Position Indication; 3.2.1, Heat Flux Hot Channel Factor (Fo(Z)),3.2.2,.2012-01-0505 January 2012 Revision to the Updated Final Safety Analysis Report Section 4.3.2.2, Power Distribution; and Technical Specification Bases 3.1.7, Rod Position Indication; 3.2.1, Heat Flux Hot Channel Factor (Fo(Z)),3.2.2,. Project stage: Request ML1206501312012-03-0505 March 2012 Acceptance Review Email, License Amendment Request, Revise Updated Final Safety Analysis Report Section 4.3.2.2 to Allow Use of Beacon Power Distribution Monitoring System Project stage: Acceptance Review ML12324A0242012-11-30030 November 2012 Request for Additional Information Regarding License Renewal One-Time Inspection Procedure Project stage: RAI ML12345A3792013-01-0909 January 2013 Issuance of Amendment Nos. 214 and 216, Revise Final Safety Analysis Report Update Section 4.3.2.2 to Allow Use of Beacon Power Distribution Monitoring System Project stage: Approval ML13018A2322013-01-14014 January 2013 NRR E-mail Capture - Correction to BFN Units 1, 2, 3 RAI Regarding License Renewal one-time Inspection Procedure Project stage: RAI ML13067A3982013-02-28028 February 2013 Response to Request for Additional Information Regarding License Renewal One-Time Inspection Procedure Project stage: Response to RAI ML13177A3522013-07-16016 July 2013 Review of Commitment Submittal for License Renewal Regarding the One-Time Inspection Procedure Project stage: Approval DCL-15-047, License Amendment Request 15-02 Revision of Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and Technical Specification 5.6.5. Core Operating Limits Report (Colr), For.2015-04-16016 April 2015 License Amendment Request 15-02 Revision of Updated Final Safety Analysis Report for Beacon Power Distribution Monitoring System Methodology and Technical Specification 5.6.5. Core Operating Limits Report (Colr), For. Project stage: Request 2013-01-14
[Table View] |
Text
1 NRR-PMDAPEm Resource From:
Saba, Farideh Sent:
Monday, January 14, 2013 2:20 PM To:
Hess, Thomas A
Subject:
Correction to BFN Units 1, 2, 3, RAI regarding license renewal one-time inspection procedure (TAC Nos. ME7787, ME7798 and ME7799)
- Tom, This is to correct the due date for your response to the subject RAI dated November 30, 2012, which you and Ms. Eva agreed on. I have discussed this with Eva and she has confirmed that the agreed due date was within 90 days of the date of the letter. However, the letter inadvertently requested that TVA agreed to respond within 60 days of issuance of the letter. I confirm that the correct due date for your respond is within 90 days from November 30, 2012.
Please let me know if you have any questions.
Farideh Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV
Hearing Identifier:
NRR_PMDA Email Number:
586 Mail Envelope Properties (Farideh.Saba@nrc.gov20130114142000)
Subject:
Correction to BFN Units 1, 2, 3, RAI regarding license renewal one-time inspection procedure (TAC Nos. ME7787, ME7798 and ME7799)
Sent Date:
1/14/2013 2:20:06 PM Received Date:
1/14/2013 2:20:00 PM From:
Saba, Farideh Created By:
Farideh.Saba@nrc.gov Recipients:
"Hess, Thomas A" <tahess@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 730 1/14/2013 2:20:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
Yes Sensitivity:
Normal Expiration Date:
Recipients Received: