PPL Susquehanna Units 1 and 2, Revisions to Technical Requirements Manual Unit 1
ML110250472
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/14/2011
From:
Susquehanna
To: Gerlach R
Office of Nuclear Reactor Regulation
References
Download: ML110250472 (53)


Text

IJ 7 Jan. 17, 2011 L>

HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-2484 USER INFORMATION:

Name:GERLACH*ROSE M Address: NUCSA2 Phone#:

254-3194 TRANSMITTAL INFORMATION:

EMPL#:028401 CA#:0363.

TO:

GERLACH*ROSE M 01/14/2011 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION:

"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM1 -

TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS ADD MANUAL TABLE OF CONTENTS DATE: 01/12/2011 DATE: 01/13/2011 CATEGORY:

DOCUMENTS ID:

TEXT 2.2 ADD:

REV:

9 TYPE:

TRM1 REMOVE:

REV:8 CATEGORY:

DOCUMENTS ID:

TEXT 3.3.6 ADD:

REV:

3 TYPE: TRM1 REMOVE:

REV:2 CATEGORY:

DOCUMENTS ID:

TEXT B3.3.6 ADD:

REV:

4 REMOVE:

REV:3 TYPE: TRM1 Aw

ý49i-

CATEGORY:

DOCUMENTS TYPE:

TRM1 ID:

TEXT LOES ADD:

REV:

65 REMOVE:

REV:64 CATEGORY:

DOCUMENTS TYPE: TRM1 ID:

TEXT TOC ADD:

REV:

19 REMOVE:

REV:l8 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date Procedure TEXT LOES

Title:

TEXT TOC

Title:

e :

01/13/2011 Name Rev Issue Date 65 01/13/2011 LIST OF EFFECTIVE SECTIONS Change ID Change Number 19 01/13/2011 TABLE OF CONTENTS TEXT 1.1 0

11/18/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1

02/04/2005

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2

Title:

TEXT 3. 0

Title:

9 01/13/2011 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE LDCN 4414 4

05/23/2008 TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY TEXT 3.1.1 1

11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT 3.1.2 0

11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT 3.1.3 5

04/16/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 11 03/16/2010

Title:

CORE OPERATING LIMITS REPORT (COLR)

Pagel of 2i Report Date: 01/14/11 Page 1 of 26 Report Date: 01/14/11

S.SES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0

11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2

11/09/2007

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2

11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6

07/09/2010

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0

11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 3

01/13/2011

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1

11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1

10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3

04/17/2008

Title:

OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1

10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION Page 2 of 16 Report Date: 01/14/11 Page2 of

.16 Report Date: 01/14/11

SSES M.A.NUAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3. 4. 1

Title:

REACTOR TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.4.6

Title:

REACTOR TEXT 3.5.1 1

04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1

04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS 2

04/17/2008 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1

04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

06/15/2010 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1

02/04/2005

Title:

EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1

11/09/2007

Title:

EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0

11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0

11/18/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 16 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0

11/18/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1

Title:

PLANT TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT TEXT 3.7.3.3

Title:

PLANT TEXT 3.7.3.4

Title:

PLANT TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT 0

11/18/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN 0

11/18/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 2

04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3

04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3

04/16/2009 SYSTEMS C02 SYSTEMS 2

04/16/2009 SYSTEMS HALON SYSTEMS 2

04/16/2009 SYSTEMS FIRE HOSE STATIONS 2

04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1

04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 8

09/21/2010 SYSTEMS FIRE DETECTION INSTRUMENTATION LDCN 1

04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 3503 0

Page 4 of 16 Report Date: 01/14/11 Page4 of.16 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 0

11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0

11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1

04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 2

06/27/2008

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2

09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 4

06/21/2007

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1

08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 0

04/16/2009

Title:

STRUCTURAL INTEGRITY TEXT 3.8.1 2

04/05/2010

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2

11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2

12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

AUTOMATIC Page 5 of

.16 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3

Title:

ELECTRICAL TEXT 3.8.4

Title:

ELECTRICAL TEXT 3.8.5

Title:

ELECTRICAL TEXT 3.8.6

Title:

ELECTRICAL TEXT 3.8.7 1

04/05/2010 POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 0

11/18/2002 POWER 24 VDC ELECTRICAL POWER SUBSYSTEM 0

11/18/2002 POWER DEGRADED VOLTAGE PROTECTION 0

11/18/2002 POWER EMERGENCY SWITCHGEAR ROOM COOLING 1

06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0

11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0

11/18/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04/26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2

08/08/2006

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2

06/15/2010

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2

04/17/2008

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

Page ~

of 16 Report Date: 01/14/11 Page 6 of 16 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1

Title:

RADIOACTIVE TEXT 3.11.1.2

Title:

RADIOACTIVE TEXT 3.11.1.3

Title:

RADIOACTIVE TEXT 3.11.1.4

Title:

RADIOACTIVE TEXT 3.11.1.5

Title:

RADIOACTIVE TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.2.4

Title:

RADIOACTIVE TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE TEXT 3.11.3

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

04/26/2006 LIQUID EFFLUENTS CONCENTRATION 1

04/26/2006 LIQUID EFFLUENTS DOSE 1

04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1

12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2

05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3

04/26/2006 DOSE RATE 1

04/26/2006 DOSE -

NOBLE GASES 1

04/26/2006 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/18/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3

11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 4

09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1

04/26/2006 TOTAL DOSE Page 7 of 16 Report Date: 01/14/11 Page 7 of

.16 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1

Title:

RADIOACTIVE EFFLUENTS TEXT 3.11.4.2

Title:

RADIOACTIVE EFFLUENTS 4

08/08/2006 MONITORING PROGRAM 2

04/26/2006 LAND USE CENSUS TEXT 3.11.4.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2

Title:

LOADS CONTROL PROGRAM TEXT 3.12.3

Title:

LOADS CONTROL PROGRAM 4

04/17/2008 HEAVY LOADS REQUIREMENTS 0

11/19/2002 LIGHT LOADS REQUIREMENT TEXT 4. 1

Title:

TEXT 4. 2

Title:

TEXT 4. 3

Title:

TEXT 4. 4

Title:

TEXT 4. 5

Title:

TEXT 4. 6

Title:

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 1

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 08/31/1998 ORGANIZATION 08/31/1998 REPORTABLE EVENT ACTION 08/31/1998 SAFETY LIMIT VIOLATION 12/18/2008 PROCEDURES & PROGRAMS 08/31/1998 REPORTING REQUIREMENTS 08/31/1998 RADIATION PROTECTION PROGRAM Page.a of 16 Report Date: 01/14/11 Page 8 of

.16 Report Date: 01/14/11

SSES MA.NUTAL P Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0

08/31/1998

Title:

ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 4

05/23/2008

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY TEXT B3.1.1 1

11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT B3.1.3 3

03/31/2006

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0

11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1

11/09/2007

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3

12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 4

07/09/2010

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION TEXT B3.3.5 2

11/09/2007

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page 9 o f 11-6 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 4

01/13/2011

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1

11/09/2007

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1

10/22/2003

Title:

INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS)

INSTRUMENTATION TEXT B3.3.9

Title:

OPRM INSTRUMENTATION 3

04/17/2008 TEXT B3.3.10 3

08/09/2010

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1

10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1

Title:

REACTOR TEXT B3.4.2

Title:

REACTOR TEXT B3.4.3

Title:

REACTOR TEXT B3.4.4

Title:

REACTOR TEXT B3.4.5

Title:

REACTOR 0

11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1

04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0

11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0

11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page j~

of 16 Report Date: 01/14/11 Page 10 of

.16 Report Date: 01/14/11

SSES MANUAL P

Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 1

06/15/2010

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1

11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1

11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2

04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION LDCN 3933 TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0

11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0

11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL TEXT B3.7.3.1 3

06/15/2010

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2

04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 16 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3

Title:

PLANT TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT TEXT B3.7.3.6

Title:

PLANT TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT 0

11/19/2002 SYSTEMS BASES C02 SYSTEMS 1

04/26/2006 SYSTEMS BASES HALON SYSTEMS 1

04/26/2006 FIRE HOSE STATIONS SYSTEMS BASES 1

04/26/2006 SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0

11/19/2002 SYSTEMS BASES FIRE RATED ASSEMBLIES SYSTEMS BASES SYSTEMS BASES 1

01/12/2004 FIRE DETECTION INSTRUMENTATION 0

11/19/2002 SOLID RADWASTE SYSTEM 0

11/19/2002 SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2

Title:

PLANT TEXT B3.7.5.3

Title:

PLANT TEXT B3.7.6

Title:

PLANT TEXT B3.7.7

Title:

PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0

11/19/2002 LIQUID HOLDUP TANKS 2

06/27/2008 ESSW PUMPHOUSE VENTILATION 2

01/31/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page j~i of 16 Report Date: 01/14/11 Page 12 of.16 Report Date: 01/14/11

SSES MANUTAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8

Title:

PLANT TEXT B3.7.9

Title:

PLANT TEXT B3.7.10

Title:

PLANT 3

SNUBBERS 06/21/2007 SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1

12/14/2004 CONTROL STRUCTURE HVAC 1

12/14/2004 SPENT FUEL STORAGE POOLS TEXT B3.7.11

Title:

STRUCTURAL INTEGRITY 1

04/14/2010 TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT B3.8.2..1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT B3.8.3

Title:

ELECTRICAL TEXT B3.8.4

Title:

ELECTRICAL TEXT B3.8.5

Title:

ELECTRICAL TEXT B3.8.6

Title:

ELECTRICAL TEXT B3.8.7 2

03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD 1

09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD 0

11/19/2002 POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 0

11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0

11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1

02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1

06/15/2009 PROTECTION -

PROTECTION -

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM Page ii of 16 Report Date: 01/14/11 Page 13 of 16 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0

11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1

03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0

11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 1

Title:

MISCELLANEOUS BASES LEADING 04/17/2008 EDGE FLOW METER (LEFM)

TEXT B3.11.1.1

Title:

RADIOACTIVE TEXT B3.11.1.2

Title:

RADIOACTIVE TEXT B3.11.1.3

Title:

RADIOACTIVE TEXT B3.11.1.4

Title:

RADIOACTIVE 0

BASES 11/19/2002 LIQUID EFFLUENTS CONCENTRATION EFFLUENTS 0

11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS DOSE 0

11/19/2002 EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM 0

11/19/2002 EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Page LA of 16 Report Date: 01/14/11 Page 14 of

.16 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1

12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

NOBLE GASES TEXT 33.11.2.3

Title:

RADIOACTIVE EFFLUENTS PARTICULATES FORM 0

BASES 11/19/2002 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN TEXT B3.11.2.4 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT 133.11.2.5 4

11/14/2006

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION 1

BASES 01/27/2004 RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT 33.11.4.1 3

07/09/2010

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT 33.11.4.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3

Title:

RADIOACTIVE EFFLUENTS 0

BASES 11/19/2002 INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1

10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2

Title:

LOADS CONTROL PROGRAM 1

12/03/2010 BASES HEAVY LOADS REQUIREMENTS Page 15 of 16 Report Date: 01/14/11 Page 15 of 16 Report Date: 01/14/11

SSES MANUAL Manual Name:

TRMI1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS 0

Page ii of 16 Report Date:

01/14/11 Page 16 of

.16 Report Date: 01/14/11

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL).

SECTION TITLE PAGE 1.0 USE AND APPLICATION.......................................................................

TRM/1.0-1 1.1 D efin itio ns.........................................................................................

T R M /1.0-2 2.0 P LA N T P R O G RA M S.......................................................................................

2.0-1 2.1 P la nt P rogram s..........................................................................................

2.0-1 2.2 Instrument Trip Setpoint Table..........................................................

TRM/2.0-5 3.0 A P PLIC A B ILITY......................................................................................

T R M /3.0-1 3.0 TRO) - TR for Operation (TRO) Applicability.....................................

TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability......................................

TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS.......................................................

TRM/3.1-1 3.1.1 Alternate Rod Injection......................................................................

TRM/3.1-1 3.1.2 C R D H ousing S upport...............................................................................

3.1-4 3.1.3 Control Rod Block Instrumentation.............................................................

3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve......................................................................................

T R M /3.1-9 3.2 CORE OPERATING LIMITS REPORT...................................................

TRM/3.2-1 3.2.1 Core Operating Limits Report............................................................

TRM/3.2-1 3.3 INSTRUMENTATION..............................................................................

TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation................................................

TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation...................................................

TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation........................................

TRM/3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation.................................

TRM/3.3-9 3.3.5 Section Not Used..............................................................................

TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation......................................

TRM/3.3-13 3.3.7 Turbine Overspeed Protection System..............................................

TRM/3.3-17 3.3.8 Section Not Used..............................................................................

TRM/3.3-19 3.3.9 OPRM Instrumentation......................................................................

TRM/3.3-22 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops..............................................................................

TRM/3.3-23 3.3.11 MVP Isolation Instrumentation...........................................................

TRM/3.3-25 3.3.12 Water Monitoring Instrumentation.....................................................

TRM/3.3-27 3.4 REACTOR COOLANT SYSTEM.............................................................

TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry..................................................

TRM/3.4-1 3.4.2 N ot U sed...........................................................................................

T R M /3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors..................

3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit.................................

TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program................................

TRM/3.4-13 3.4.6 Reactor Recirculation Single Loop Operation (SLO)

Flow Rate Restriction.......................................................................

TRM/3.4-14 SUSQUEHANNA - UNIT 1 TRM / TOC-1 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC..........................................

TRM/3.5-1 3.5.1 ADS Manual Inhibit...........................................................................

TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation.................................

3.5-3 3.5.3 Long Term Nitrogen Supply to ADS...........................................................

3.5-6 3.6 CONTAINMENT.............................................................................................

3.6-1 3.6.1 VENTING or PURGING.............................................................................

3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ic a tio n....................................................................................................

3.6 -2 3.6.3 Suppression Pool Alarm Instrumentation....................................................

3.6-3 3.6.4 Primary Containment Closed System Boundaries.............................

TRM/3.6-6 3.7 PLANT SYSTEMS...........................................................................................

3.7-1 3.7.1 Emergency Service W ater System (Shutdown)..........................................

3.7-1 3.7.2 Ultimate Heat Sink and Ground W ater Level..............................................

3.7-3 3.7.3.1 Fire Suppression W ater Supply System............................................

TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems............................................................

TRM/3.7-8 3.7.3.3 C02 Systems....................................................................................

TRM/3.7-12 3.7.3.4 Halon Systems..................................................................................

TRM/3.7-16 3.7.3.5 Fire Hose Stations.............................................................................

TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses..................................

TRM/3.7-22 3.7.3.7 Fire Rated Assemblies......................................................................

TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation..........................................................

TRM/3.7-26 3.7.4 Solid Radwaste System....................................................................

TRM/3.7-35 3.7.5.1 Main Condenser Offgas Hydrogen Monitor............................................... 3.7-38 3.7.5.2 Main Condenser Explosive Gas Mixture....................................................

3.7-39 3.7.5.3 Liquid Holdup Tanks.........................................................................

TRM/3.7-40 3.7.6 ESSW Pumphouse Ventilation..........................................................

TRM/3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation................................................................

TRM/3.7-42 3.7.8 Snubbers...........................................................................................

TRM/3.7-44 3.7.9 Control Structure HVAC....................................................................

TRM/3.7-50 3.7.10 Spent Fuel Storage Pools.................................................................

TRM/3.7-52 3.7.11 Structural Integrity.............................................................................

TRM/3.7-55 SUSQUEHANNA - UNIT 1 TRM / TOC-2 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.8 ELECTRICAL POWER...........................................................................

TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective D evices............................................................................

T R M /3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous........................................................................................

T R M /3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A utom atic..........................................................................................

T R M /3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities..................................

TRM/3.8-13 3.8.4 24VDC Electrical Power Subsystem..................................................

TRM/3.8-15 3.8.5 Degraded Voltage Protection............................................................

TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling......................................................

3.8-24 3.8.7 Battery Monitoring and Maintenance Program..................................

TRM/3.8-26 3.9 REFUELING OPERATIONS............................................................................

3.9-1 3.9.1 D e ca y T im e................................................................................................

3.9-1 3.9.2 C om m unications........................................................................................

3.9-2 3.9.3 R efueling P latform......................................................................................

3.9-3 3.10 MISCELLANEOUS...................................................................................

TRM/3.10-1 3.10.1 Sealed Source Contamination.............................................................

TRM/3. 10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation..............

3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).........................

TRM/3.10-7 3.11 RADIOACTIVE EFFLUENTS..................................................................

TRM/3.11-1 3.11.1.2 Liquid Effluents Concentration...........................................................

TRM/3. 11-1 3.11.1.2 Liquid Effluents Dose........................................................................

TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System.......................................................

TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation.................................

3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation................... TRM/3.11-13 3.11.2.1 D ose R ate........................................................................................

T R M /3.11-17 3.11.2.2 Dose - Noble Gases.........................................................................

TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form................................................................................

T R M /3.11-21 3.11.2.4 Gaseous Radwaste Treatment System.............................................

TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System..............................................

TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation...................................................................................

T R M /3.11 -25 3.11.3 T otal D ose...........................................................................................

T R M /3.11-33 3.11.4.1 Monitoring Program.............................................................................

TRM/3.11-35 3.11.4.2 Land Use Census................................................................................

TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program..................................................

TRM/3.11-47 SUSQUEHANNA - UNIT 1 TRM /TOC-3 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.12 LOADS CONTROL PROGRAM..............................................................

TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool.................................................

TRM/3.12-1 3.12.2 Heavy Loads Requirements....................................................................

TRM/3.12-3 3.12.3 Light Loads Requirements......................................................................

TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS.....................................................................

4.0-1 4.1 O rg a n iz atio n....................................................................................................

4.0 -1 4.2 Reportable Event Action..................................................................................

4.0-2 4.3 Safety Limit Violation........................................................................................

4.0-3 4.4 Procedures and Programs...............................................................................

4.0-4 4.5 Reporting Requirements..................................................................................

4.0-5 4.6 Radiation Protection Program..........................................................................

4.0-7 4.7 T ra in in g............................................................................................................

4.0 -8 SUSQUEHANNA-UNIT 1 TRM / TOC-4 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM /TOC-4 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.0 A p p lica b ility................................................................................................

B 3.0-1 B 3.0 (TRO) - TR for Operation (TRO) Applicability.............................................

B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability.....................

B 3.0-9 B 3.1.1 Alternate Rod Injection......................................................................

TRM/B 3.1-1 B 3.1.2 CRD Housing Support.......................................................................

TRM/B 3.1-4 B 3.1.3 Control Rod Block Instrumentation....................................................

TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve......................................................................................

T R M /B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR)........................................................

B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation................................................

TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation...................................................

TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation........................................

TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation.................................

TRM/B 3.3-4 B 3.3.5 Section Not Used..............................................................................

TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation......................................

TRM/B 3.3-10 B 3.3.7 Turbine Overspeed Protection System..............................................

TRM/B 3.3-14 B 3.3.8 Section Not Used..............................................................................

TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation......................................................................

TRM/B 3.3-17 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops..............................................................................

TRM/B 3.3-18 B 3.3.11 MVP Isolation Instrumentation...........................................................

TRM/B 3.3-20 B 3.3.12 Water Monitoring Instrumentation.....................................................

TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry............................................................

B 3.4-1 B 3.4.2 N ot U sed...........................................................................................

T R M /B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors................................

TRM/B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit.................................

TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program.........................................

B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)

Flow Rate Restriction.......................................................................

TRM/B 3.4-7 B 3.5.1 A D S M anual Inhibit....................................................................................

B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation........................

TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS..................................................

TRM/B 3.5-4 SUSQUEHANNA UNIT I TRM / TOC-5 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM / TOC-5 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 19 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.6.1 VENTING or PURGING....................................................................

TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ica tio n....................................................................................................

B 3.6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation...........................................

TRM/B 3.6-4 B 3,6.4 Primary Containment Closed System Boundaries.............................

TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)..........................................

B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level..............................................

B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System............................................

TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems............................................................

TRM/B 3.7-5 B 3.7.3.3 C02 systems....................................................................................

TRM/B 3.7-7 B 3.7.3.4 Halon Systems..................................................................................

TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations.............................................................................

TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses..................................

TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies......................................................................

TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation..........................................................

TRM/B 3.7-14 B 3.7.4 Solid Radwaste System...................................................................

TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor................................................

B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture.....................................................

B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks..................................................................................

B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation..........................................................

TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation................................................................

TRM/B 3.7-22 B 3.7.8 S nubbers...........................................................................................

T R M /B 3.7-24 B 3.7.9 Control Structure HVAC....................................................................

TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools.................................................................

TRM/B 3.7-33 B 3.7.11 Structural Integrity.............................................................................

TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices............................................................................

TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous........................................................................................

T R M /B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A utom atic..........................................................................................

T R M /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities...........................................

B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem...........................................................

B 3.8-6 B 3.8.5 Degraded Voltage Protection............................................................

TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling..............................................

TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program..................................

TRM/B 3.8-18 B.3.9.1 D ecay T im e................................................................................................

B 3.9-1 B 3.9.2 C om m unications........................................................................................

B 3.9-2 SUSQUEHANNA -

UNIT I TRM/TOC-6 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM TOC-6 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

PPL Rev. 19 SECTION B 3.9.3 B 3.10.1 B 3.10.2 B 3.10.3 B 3.11.1.1 B 3.11.1.2 B 3.11.1.3 B 3.11.1.4 B 3.11.1.5 B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Refueling Platform......................................................................................

B 3.9-3 Sealed Source Contamination....................................................................

B 3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation...................... TRM/B 3.10-2 Independent Spent Fuel Storage Installation (ISFSI).........................

TRM/B 3.10-4 Liquid Effluents Concentration....................................................................

B 3.11-1 Liquid Effluents Dose.................................................................................

B 3.11-4 Liquid W aste Treatment System................................................................

B 3.11-6 Liquid Radwaste Effluent Monitoring Instrumentation.................................

B 3.11-7 Radioactive Liquid Process Monitoring Instrumentation.................... TRM/B 3.11-10 Dose Rate.........................................................................................

TRM/B 3.11-12 Dose - Noble Gases....................................

B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulate Form.........................................................................................

B 3.11-18 Gaseous Radwaste Treatment System.............................................

TRM/B 3.11-20 Ventilation Exhaust Treatment System..............................................

TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrumentation.................................................................................

TRM/B 3.11-24 T o ta l D o se..................................................................................................

B 3.11-2 6 Monitoring Program...........................................................................

TRM/B 3.11-28 Land Use Census.......................................................................................

B 3.11-34 Interlaboratory Comparison Program................................................

TRM/B 3.11-36 Crane Travel - Spent Fuel Storage Pool...........................................

TRM/B 3.12-1 Heavy Loads Requirements..............................................................

TRM/B 3.12-2 Light Loads Requirements................................................................

TRM/B 3.12-3 TRM1 text TOC 01/12/2011 SUSQUEHANNA UNIT 1 TRM / TOC-7 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM / TOC-7 EFFECTIVE DATE 01/0712011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 65 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 01/07/2011 TOC TABLE OF CONTENTS 1.0 2.0 USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM / 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 3.0 APPLICABILITY Page TRM / 3.0-1 Page TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 10/04/2002 08/31/1998 01/28/2005 06/25/2002 04/02/1999 03/27/2008 05/15/2008 01/07/2011 02/02/2010 11/15/2004 03/27/2008 11/15/2004 11/15/2005 04/14/2008 04/12/2007 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/22/2006 04/07/2009 03/27/2008 02/18/1999 02/18/1999 07/07/1999 03/11/2010 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 06/30/2010 I -

3.1 3.2 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM / 3.3-7 Page 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a 3.3 SUSQUEHANNA - UNIT 1 TRM / LOES-1 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 65 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.4 3.5 Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-1 la Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Pages TRM / 3.3-15 and TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-21 Page TRM / 3.3-22 Page TRM / 3.3-22a Pages TRM / 3.3-22b through TRM / 3.3-22d Page TRM / 3.3-23 Pages TRM / 3.3-24 and TRM / 3.3-25 Page TRM / 3.3-26 Pages TRM / 3.3-27 and TRM / 3.3-28 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page TRM / 3.4-9 Page TRM / 3.4-10 Page TRM / 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Pages TRM / 3.4-14 and TRM / 3.4-15 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Pages TRM / 3.5-4 and TRM / 3.5-5 Pages 3.5-6 and 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-3 Page TRM / 3.6-4 Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-8 10/31/2007 06/30/2010 03/30/2001 01/07/2011 12/14/1998 01/07/2011 06/14/2002 10/31/2007 10/22/2003 03/27/2008 11/15/2004 03/22/2006 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 03/27/2008 03/31/2006 06/10/2010 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.6 SUSQUEHANNA

- UNIT 1 TRM / LOES-2 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-2 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 65 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Page TRM / 3.7-4 Pages TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7.13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM 3.7-26 Page TRM 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Pages TRM / 3.7-31 and TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Page TRM / 3.7-34a Page TRM / 3.7-35 Pages TRM / 3.7-36 and TRM / 3.7-37 Pages 3.7-38 and 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-41 Page TRM /3.7-41a Page TRM / 3.7-42 Page TRM / 3.7-43 Pages TRM / 3.7-44 through TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Pages TRM / 3.7-55 through TRM / 3.7-57 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 12/29/1999 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 08/09/2005 01/13/2010 11/16/2001 09/16/2010 11/16/2001 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 SUSQUEHANNA

- UNIT 1 TRM / LOES-3 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-3 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 65 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3:8-2 Pages TRM / 3.8-3 and TRM /3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Page TRM / 3.8-7 Pages TRM / 3.8-8 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Pages TRM / 3.8-28 and TRM / 3.8-29 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 04/02/2002 01/28/2005 03/25/2010 04/02/2002 10/31/2007 12/03/2004 09/03/2004 12/03/2004 03/25/2010 08/31/1998 04/02/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 08/31/1998 03/31/2006 08/31/1998 08/31/1998 08/01/2006 03/22/2006 06/10/2010 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 and 3.10-3 Pages 3.10-2 and 3.10-3 Page TRM / 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM /3.11-1 Pages 3.11-2 and 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages TRM / 3.11-7 through TRM / 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 SUSQUEHANNA

- UNIT I TRM / LOES-4 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-4 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 65 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM /3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM /3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM / 3.11.30 through TRM / 3.11.32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-43 Page TRM / 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 08/01/2006 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA - UNIT 1 TRM / LOES-5 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 65 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 B 3.1 B 3.2 B 3.3 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Page TRM / B 3.1-5 Pages TRM / B 3.1-6 and TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B 3.3-2a Page TRM / B 3.3-3 Page TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B. 3.3-8 Page TRM / B 3.3-9 Pages TRM / B 3.3-10 through TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-17a through TRM / B 3.3-17c Page TRM / B 3.3-17d 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 11/15/2005 03/22/2006 02/18/1999 08/31/1998 04/07/2000 10/31/2007 12/11/2008 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/30/2007 06/30/2010 10/31/2007 01/07/2011 06/25/2002 10/31/2007 10/31/2007 10/22/2003 03/22/2006 03/22/2006 03/27/2008 SUSQUEHANNA

- UNIT I TRM / LOES-6 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 01107/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 65 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.4 B 3.5 B 3.6 Pages TRM / B 3.3-17e and TRM / B 3.3-17f Pages TRM / B 3.3-18 and TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 Pages TRM / B 3.3-22 and TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 Pages TRM / B 3.4-2 and TRM / B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Pages TRM / B 3.4-7 and TRM / B 3.4-8 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 through TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages B.3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Page TRM / B 3.7-6 Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Page TRM / B 3.7-10a Page TRM / B 3.7-11 Page TRM /B 3.7-1 la Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a 03/22/2006 08/03/2010 10/22/2003 05/16/2003 04/07/2009 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 06/10/2010 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/27/2008 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 B 3.7 SUSQUEHANNA

- UNIT I TRM / LOES-7 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-7 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 65 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Page TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-28 Pages TRM / B 3.7-29 and TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 through TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 B 3.8 B.3.9 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 08/10/2004 04/02/2002 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/3111998 08/31/1998 03/22/2006 08/23/1999 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 SUSQUEHANNA - UNIT 1 TRM / LOES-8 EFFECTIVE DATE 01/07/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-8 EFFECTIVE DATE 01/07/2011

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 65 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-1 Ia Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM/ B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM/ B 3.11-20a Page TRM/ B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11.23 Page TRM / B 3.11.23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 and B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 and B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 08/30/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/30/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/30/1998 11/30/2005 06/30/2010 08/30/1998 06/30/2010 08/30/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 TRM1 text LOES 1/12/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-9 EFFECTIVE DATE 01/07/2011

Instrument Trip Setpoint Program PPL Rev. 9 2.2 2.0 PLANT PROGRAMS AND SETPOINTS 2.2 Instrument Trip Setpoint Table The Instrument Trip Setpoint Limits in Table 2.2-1 are the Trip Setpoint value limits that were contained in the Instrumentation Setpoint tables for protection systems and other functions important to safety that were included in the scope of the original Standard Technical Specifications. Actual instrument setpoints are established utilizing the Allowable Values specified in the Technical Specifications and Technical Requirements. Allowable Values are established in the Reference LCOs and TROs identified in this Table. TRO references are enclosed in square brackets.

Instrumentation process setpoints for the listed subsystems and trip functions are set consistent with the Trip Setpoint Limit Column of Table 2.2-1. Actual setpoints are established in accordance with engineering procedures.

Alarm setpoints and other non-protection system trip settings as may be found in the Technical Specifications or in the Technical Requirements are not included in this table.

Reference N DAP-QA-1104 Setpoint Change Control SUSQUEHANNA - UNIT 1 TRM / 2.0-5 EFFECTIVE DATE 04/02/1999

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 1 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.1 Reactor Protection 2.2.1.1 3.3.1.1 Intermediate Range Monitor, Neutron Flux -

< 120/125 divisions of full scale High 2.2.1.2 3.3.1.1 Average Power Range Monitor, Neutron Flux

< 18% of RATED THERMAL POWER

- High (Setdown) 2.2.1.3 3.3.1.1 Average Power Range Monitor, Simulated 0.55 W + 58.7%

Thermal Power - High, Two Loop Operation 2.2.1.4 3.3.1.1 Average Power Range Monitor, Simulated 0.55 (W-AW) + 58.7%(b)

Thermal Power - High, Single Loop Operation 2.2.1.5 3.3.1.1 Average Power Range Monitor, Simulated

  • 113.5% of RATED THERMAL Thermal Power - High, Clamp POWER 2.2.1.6 3.3.1.1 Average Power Range Monitor, Neutron Flux -

< 118% of RATED THERMAL High POWER 2.2.1.7 3.3.1.1 Reactor Vessel Steam Dome Pressure - High

< 1087 psig 2.2.1.8 3.3.1.1 Reactor Vessel Water Level - Low, Level 3

>13.0 inches (a) 2.2.1.9 3.3.1.1 Main Steam Isolation Valve-Closure

< 10% closed 2.2.1.10 This Section Not Used 2.2.1.11 3.3.1.1 Drywell Pressure - High

< 65 gallons Level Transmitter 2.2.1.13 3.3.1.1 Scram Discharge Volume Water Level - High -

  • 61 gallons Float Switch 2.2.1.14 3.3.1.1 Turbine Stop Valve - Closure

< 5.5% closed 2.2.1.15 3.3.1.1 Turbine Control Valve Fast Closure, Trip

> 500 psig Oil Pressure - Low (continued)

(a) See Figure 2.2-1 (b) For Single loop operation, the value of AW = 8.7 SUSQUEHANNA - UNIT 1 TRIM / 2.0-6 EFFECTIVE DATE 03/27/2008

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 2 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO [TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.1.16 OPRM Instrumentation 2.2.1.16.1 3.3.1.1 Sp PBA Amplitude Trip See COLR - TRO 3.2 2.2.1.16.2 3.3.1.1 Np PBA Successive Confirmation Count Trip See COLR -TRO 3.2 2.2.1.16.3

[3.3.9]

TOL (E) Period Tolerance 0.10 sec 2.2.1.16.4

[3.3.9]

fc Conditioning Filter Cutoff Frequency 1.50 Hz 2.2.1.16.5

[3.3.9]

Tmin Oscillation Period Lower Time Limit 1.00 sec 2.2.1.16.6

[3.3.9]

Tmax Oscillation Period Upper Time Limit 3.50 sec 2.2.1.16.7

[3.3.9]

LPRMmin Minimum LRPMs/Cell Required for 2

Cell Operability 2.2.1.16.8

[3.3.9]

S1 Peak Threshold SetpointlABA & GRBA 1.20 2.2.1.16.9

[3.3.9]

S2 Valley Threshold Setpoint/ABA & GRBA 0.85 2.2.1.16.10

[3.3.9]

Smax Amplitude Trip Setpoint/ABA 1.50 2.2.1.16.11

[3.3.9]

DR3 Growth Rate Factor Setpoint/GRBA 1.60 2.2.2 Isolation Actuation Instrumentation 2.2.2.1 Primary Containment Isolation 2.2.2.1.1 3.3.6.1 Reactor Vessel Water Level Low, Level 3

> 13.0 inches(a) 2.2.2.1.2 3.3.6.1 Reactor Vessel Water Level Low Low, Level 2

> -38.0 inches(a) 2.2.2.1.3 3.3.6.1 Reactor Vessel Water Level Low Low Low,

> -129 inches(a)

Level I 2.2.2.1.4 3.3.6.1 Drywell Pressure - High

< 1.72 psig 2.2.2.1.5 3.3.6.1 SGTS Exhaust Radiation - High

< 23.0 mR/hr 2.2.2.1.6

[3.3.6]

Main Steam Line Radiation-High High 15 x full power background without hydrogen injection (continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-7 EFFECTIVE DATE 05/15/2008

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 3 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.2.2 2.2.2.2.1 2.2.2.2.2 2.2.2.2.3 2.2.2.2.4 2.2.2.2.5 Secondary Containment Isolation 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 3.3.6.2 2.2.2.3 Main Steam Line Isolation Reactor Vessel Water Level - Low Low, Level 2 Drywell Pressure - High Refuel Floor High Exhaust Duct Radiation -

High Railroad Access Shaft Exhaust Duct Radiation - High Refuel Floor Wall Exhaust Duct Radiation -

High Reactor Vessel Water Level - Low Low Low, Level 1 Main Steam Line Pressure - Low Main Steam Line Flow - High Condenser Vacuum - Low Reactor Building Main Steam Line Tunnel Temperature - High This Section Not Used This Section is not used.

Turbine Building Main Steam Tunnel Temperature - High

> -38.0 inches(a)

<1.72 psig

  • 18 mR/hr

< 5 mR/hr

  • 21 mR/hr 2.2.2.3.1 2.2.2.3.2 2.2.2.3.3 2.2.2.3.4 2.2.2.3.5 2.2.2.3.6 2.2.2.3.7 2.2.2.3.8 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1

[3.3.6]

>-129 inches(a)

> 861 psig

_< 173 psid

> 9.0 inches Hg vacuum

< 177°F

< 1970F 2.2.2.4 Reactor Water Cleanup System Isolation 2.2.2.4.1 2.2.2.4.2 2.2.2.4.3 2.2.2.4.4 2.2.2.4.5 2.2.2.4.6 2.2.2.4.7 2.2.2.4.8 2.2.2.4.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 Reactor Vessel Water Level - Low Low, Level 2 RWCU A Flow-High RWCU Flow-High RWCU Penetration Area Temperature - High This Section is not used.

RWCU Pump Area Temperature - High This Section is not used.

RWCU Heat Exchanger Area Temperature -

High This Section is not used.

>- -38 inches(a)

  • ý 59 gpm
  • 462 gpm
  • - 131 IF

< 1471F

  • ! 1470F (continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-8 EFFECTIVE DATE 01/07/2011

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 4 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.2.5 Reactor Core Isolation Cooling System Isolation 2.2.2.5.1 2.2.2.5.2 2.2.2.5.3 2.2.2.5.4 2.2.2.5.5 2.2.2.5.6 2.2.2.5.7 2.2.2.5.8 2.2.2.5.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 RCIC Steam Line A Pressure - High RCIC Steam Supply Line Pressure - Low RCIC Turbine Exhaust Diaphragm Pressure

- High RCIC Equipment Room Temperature - High RCIC Pipe Routing Area Temperature - High RCIC Emergency Area Cooler Temperature -

High Drywell Pressure - High This section is not used.

This section is not used.

< 188 inches H 20

_> 60 psig

  • 10.0 psig

< 1670F

< 1670F

< 167OF

  • 1.72 psig 2.2.2.6 High Pressure Coolant Injection System Isolation 2.2.2.6.1 2.2.2.6.2 2.2.2.6.3 2.2.2.6.4 2.2.2.6.5 2.2.2.6.6 2.2.2.6.7 2.2.2.6.8 2.2.2.6.9 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 3.3.6.1 HPCI Steam Line A Pressure - High HPCI Steam Supply Line Pressure - Low HPCI Turbine Exhaust Diaphragm Pressure -

High HPCI Equipment Room Temperature - High HPCI Emergency Area Cooler Temperature -

High HPCI Pipe Routing Area Temperature - High Drywell Pressure - High This section is not used.

This section is not used.

< 370 inches H20

> 104 psig

< 10 psig

< 1671F

< 1671F

_ 167°F

< 1.72 psig 2.2.2.7 Shutdown Cooling/System Isolation 2.2.2.7.1 3.3.6.1 2.2.2.7.2' 3.3.6.1 2.2.2.7.3

[3.3.61 2.2.3 ECCS Actuation 2.2.3.1 Core Spray System 2.2.3.1.1 3.3.5.1 Reactor Vessel Water Level - Low, Level 3 Reactor Vessel Steam Dome Pressure - High RHR Flow-High Reactor Vessel Water Level - Low Low Low, Level 1 Drywell Pressure - High Reactor Vessel Steam Dome Pressure - Low injection permissive

>13.0 inches(a)

  • 5 98 psig

<525,000 gpm 2! -129 inches(a)

  • 1.72 psig

Ž413, *!ý427 psig 2.2.3.1.2 2.2.3.1.3 3.3.5.1 3.3.5.1 (continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-9 EFFECTIVE DATE 01/07/2011

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 5 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.3.2 LPCI Mode of RHR System 2.2.3.2.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low,

>-129 inches(a)

Level 1 2.2.3.2.2 3.3.5.1 Drywell Pressure - High

_ 1.72 psig 2.2.3.2.3 3.3.5.1 Reactor Vessel Steam Dome Pressure -

_ 413,

  • 427 psig Low, injection permissive 2.2.3.2.4 3.3.5.1 Reactor Vessel Steam Dome Pressure -

_236 psig, decreasing Low, Recirculation Discharge Valve permissive 2.2.3.3 HPCI System 2.2.3.3.1 3.3.5.1 Reactor Vessel Water Level - Low Low,

> -38 inches(a)

Level 2 2.2.3.3.2 3.3.5.1 Drywell Pressure - High

< 1.72 psig 2.2.3.3.3 3.3.5.1 Condensate Storage Tank Level - Low

>40.5 inches above tank bottom 2.2.3.3.4 3.3.5.1 Reactor Vessel Water Level - High, Level 8

< 54 inches 2.2.3.4 Automatic Depressurization System (ADS) 2.2.3.4.1 3.3.5.1 Reactor Vessel Water Level - Low Low Low,

> -129 inches Level 1 2.2.3.4.2 3.3.5.1 Drywell Pressure - High

< 1.72 psig 2.2.3.4.3 3.3.5.1 ADS Timer

<102 seconds 2.2.3.4.4 3.3.5.1 Core Spray Pump Discharge Pressure - High

_ 135, < 155 psig 2.2.3.4.5 3.3.5.1 Low Pressure Coolant Injection Pump

> 121, < 129 psig Discharge Pressure - High 2.2.3.4.6 3.3.5.1 Reactor Vessel Water Level - Low, Level 3

> 13 inches Confirmatory 2.2.3.4.7 3.3.5.1 ADS Drywell Pressure Bypass Timer

< 420 seconds 2.2.3.5 Loss of Power - ECCS Actuation 2.2.3.5.1 4.16kv ESS Bus Undervoltage (Loss of Voltage < 20%)

2.2.3.5.1.1 3.3.8.1 Bus Undervoltage

Ž823.2, < 856.8 Volts 2.2.3.5.1.2 3.3.8.1 Time delay

Ž0.4,:5 0.6 seconds (continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-10 EFFECTIVE DATE 02/02/2010

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 6 of 8)

INSTRUMENTATION SETPOINTS 2.2.3.5.2 2.2.3.5.2.1 2.2.3.5.2.2 2.2.3.5.3 2.2.3.5.3.1 2.2.3.5.3.2 2.2.3.5.3.4 2.2.3.5.4 2.2.3.5.4.1 2.2.3.5.4.2 2.2.3.5.5 2.2.3.5.5.1 2.2.3.5.5.2 2.2.4 2.2.4.1 2.2.4.1 2.2.5 2.2.5.1 2.2.5.2 2.2.6 2.2.6.1 2.2.6.2 2.2.6.3 SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION 4.16kV ESS Bus Undervoltage (Degraded Voltage < 65%)

3.3.8.1 Bus Undervoltage 3.3.8.1 Time delay 4.16kV ESS Bus Undervoltage (Degraded Voltage, < 93%)

3.3.8.1 Bus Undervoltage 3.3.8.1 Time Delay (Non-LOCA) 3.3.8.1 Time Delay (LOCA) 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 65%)

[3.8.5]

480V Basis

[3.8.5]

Time Delay 480V ESS Bus 0B565 Undervoltage (Degraded Voltage, < 92%)

[3.8.5]

480V Basis

[3.8.5]

Time Delay ATWS Alternate Rod Injection and Recirculation Pump Trip 3.3.4.24[3.1.1]

Reactor Vessel, Water Level - Low Low, Level 2 3.3.4.2J[3.1.1]

Reactor Vessel Steam Dome Pressure - High End of Cycle Recirculation Pump Trip 3.3.4.1 Turbine Stop Valve-Closure 3.3.4.1 Turbine Control Valve - Fast Closure Reactor Core Isolation Cooling System Actuation 3.3.5.2 Reactor Vessel Water Level - Low Low, Level 2 3.3.5.2 Reactor Vessel Water Level - High, Level 8 3.3.5.2 Condensate Storage Tank Level - Low TRIP SETPOINT

>2641. 1, !5 2748.9 Volts

Ž 2.7,:5 3.3 seconds

>_ 3829.3, <3906.7 Volts

> 4 minute, 30 seconds

< 5 minute, 30 seconds

>9,

  • 11 seconds

>308.9, <315.1 Volts

_4.5, _< 5.5 seconds

Ž_ 437.6, <446.4 Volts

> 9, ! 11 seconds

>_ -38 inches(a)

_< 1135 psig

< 5.5% closed

>_ 500 psig

>-38 inches(a)

< 54 inches(a)

> 36.0 inches above tank bottom (continued)

(a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRIM / 2.0-11 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Program 2.2 PPL Rev. 9 TABLE 2.2-1 (Page 7 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.7 Control Rod Block 2.2.7.1 Rod Block Monitor 2.2.7.1.1 2.2.7.1.2 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 3.3.2 Low Power Range - Upscale Intermediate Power Range - Upscale High Power Range - Upscale Low Power Range Setpoint Intermediate Power Range Setpoint High Power Range Setpoint See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 See COLR TRO 3.2 2.2.7.2 APRM 2.2.7.2.1 2.2.7.2.2 2.2.7.2.3 2.2.7.2.4 2.2.7.2.5

[3.1.3]

(3.1.3]

[3.1.3]

[3.1.3]

[3.1.3]

Simulated Thermal Power-High

- Two Loop Operation Simulated Thermal Power-High

- Single Loop Operation Simulated Thermal Power-High - Clamp Downscale Neutron Flux - High (Setdown)

Upscale Downscale 0,55W + 54.2%

0.55 (W-AW) + 54.2% (c)

_ 108% of RATED THERMAL POWER

> 5% of RATED THERMAL POWER

< 12% of RATED THERMAL POWER

< 2E5 cps

> 3.0 cps(b)

< 108/125 divisions of full scale

> 5/125 divisions of full scale 2.2.7.3 Source Range Monitors 2.2.7.3.1 2.2.7.3.2 2.2.7.4 2.2.7.4.1 2.2.7.4.2

[3.1.3]

[3.1.3]

Intermediate Range Monitors

[3.1.3]

[3.1.3]

Upscale Downscale 2.2.7.5 Scram Discharge Volume 2.2.7.5.1

[3.1.3]

Water Level - High

< 35.9 gallons 2.2.7.6 Reactor Coolant System Recirculation Flow 2.2.7.6.1

[3.1.3]

Upscale 114%

(continued)

(b) With a signal-to-noise ratio > 2, or within the limits of Figure 2.2-2.

(c) For single loop operation, the value of 6W = 8.7 SUSQUEHANNA - UNIT 1 TRM / 2.0-12 EFFECTIVE DATE 03/27/2008

PPL Rev. 9 Instrument Trip Setpoint Program 2.2 TABLE 2.2-1 (Page 8 of 8)

INSTRUMENTATION SETPOINTS SYSTEM/REFERENCE LCO

[TRO]

TRIP FUNCTION TRIP SETPOINT 2.2.8 CREOASS 2.2.8.1 3.3.7.1 Main Control Room Outside Air Intake

< 5 mR/hr Radiation Monitor 2.2.8.1.1 3.3.7.1 Reactor Vessel Water Level - Low Low,

> -38.0 inches(a)

Level 2 2.2.8.1.2 3.3.7.1 Drywell Pressure-High

  • 1.72 psig 2.2.8.1.3 3.3.7.1 Refuel Floor High Exhaust Duct Radiation

< 18 mR/hr

- High 2.2.8.1.4 3.3.7.1 Railroad Access Shaft Exhaust Duct

<5 mR/hr Radiation - High 2.2.8.1.5 3.3.7.1 Refuel Floor Wall Exhaust Duct Radiation

  • 21 mR/hr

- High 2.2.9 Feedwater/Main Turbine Trip System Actuation 2.2.9.1 3.3.2.2 Reactor Vessel Level - High

< 54.0 inches(a) 2.2.10 MVP Isolation 2.2.10.1

[3.3.11]

Main Steam Line Radiation - High High

< 15 x full power background without hydrogen injection (a) See Figure 2.2-1 SUSQUEHANNA - UNIT 1 TRM / 2.0-13 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Table PPL Rev. 9 2.2 WATER LEVEL NOMENCLATURE HEIGHT ABOVE NaL VESSEL ZERO READING (IN.)

(8) 581.5

+54 (7) 566. 5

+39 (4) 557.5

+30 (2) 489.S

-38 (1) 398.5

-129

,_1 (3) 540X 5

+13 RNE [-NARROW RANGE--I

+60

+60-+60

+60-(8) 54 (T)L3 HI ALARM I RIC 4)[30 LO ALARM

-38 SCRAM CONTRIBUTE (2) INITIATE RCIC, TO ADS

HPCI, ARI TRIP RECIRC PUMPS

-129(1)

INITIATE RHR, CS START DIESEL CONTRIBITE TO ADS CLOSE MSIV'S

NOTE, SCALE IN INCHES ABOVE VESSEL ZERO FIGURE 2. 2-1 REACTOR VESSEL WATER LEVEL SUSQUEHANNA - UNIT 1 TRMV / 2.0-14 EFFECTIVE DATE 11/15/2004

Instrument Trip Setpoint Table 2.2 PPL Rev. 9 Instrument Trip Setpoint Table 2.2 U) 3 2.8 2.6 2.4 2.2 2

1.8 1.6 1.4 1.2 1

0.8 0.6

-~-

Acceptable 0.4 0.2 Not Acceptable I

4 ------

I--

I I

I I

I I

I I

0 2

6 10 14 18 22 26 30 Signal-to-Noise Ratio Figure 2.2-2 Minimum SRM Trip Setpoint Versus Signal-to-Noise Ratio SUSQUEHANNA - UNIT 1 TRM / 2.0-15 EFFECTIVE DATE 11/15/2005

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 3 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.

APPLICABILITY:

As specified in Table 3.3.6-1 ACTIONS NOTES

1.

Penetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls.

2.

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable Function 2.a AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Function 2.a B. One or more Functions with B.1 Restore isolation capability.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.

C. Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time compensatory measures for of Condition A or B not met.

the degraded condition.

SUSQUEHANNA - UNIT 1 TRM / 3.3-13 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 3 TECHNICAL REQUIREMENT SURVEILLANCE NOTES----------------------------

1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.

SURVEILLANCE FREQUENCY TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST 24 months on a staggered test basis SUSQUEHANNA - UNIT 1 TRM / 3.3-14 EFFECTIVE DATE 12/14/1998

PPL Rev. 3 TRM Isolation Actuation Instrumentation 3.3.6 TABLE 3.3.6-1 (Page 1 of 2)

PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS VALUE

1.

Main Steam Line Isolation

a.

Turbine Building Main 1,2,3 2

TRS 3.3.6.2

< 2001F Steam Line Tunnel TRS 3.3.6.3 Temperature - High TRS 3.3.6.5

2.

Primary Containment Isolation

a.

Main Steam Line 1,2,3 2

TRS 3.3.6.1

<21 x full power Radiation - High, High TRS 3.3.6.2 background without TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(a)

3.

Shutdown Cooling System Isolation (b)

a.

RHR Flow - High 3,4,5 1

TRS 3.3.6.1

  • 26,000 gpm TRS 3.3.6.2 TRS 3.3.6.4 TRS 3.3.6.5 (a)

Radiation detectors are exempt from response time testing.

(b)

Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.

SUSQUEHANNA - UNIT 1 TRM / 3.3-15 EFFECTIVE DATE 01/07/2011"

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 3 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1 TRM / 3.3-16 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES TRO The TRM Actuation instrumentation automatically initiates closure of appropriate primary containment isolation valves (PCIVs). The function of the PCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs) (Reference 1). The TRM Isolation Actuation Instrument has been relocated from the Technical Specifications because the identified Function is not credited in the plant design basis to mitigate any plant event, but does provide a diverse means to initiate an Isolation Actuation.

The isolation instrumentation includes the sensors, relays, and instruments that are necessary to cause initiation of primary containment and Reactor Coolant Pressure Boundary (RCPB) isolation. When the setpoint is reached, the sensor actuates, which then outputs an isolation signal to the isolation logic. Monitoring a wide range of independent parameters provides functional diversity. The input parameters to the isolation logic are:

(a)

Main steam line radiation, (b)

Turbine Building Main Steam Line Tunnel Temperature - High, and (c)

RHR Flow-High.

The valves associated with these trip channels are identified in Table B 3.3.6-1. Each of these valves is also associated with other trip channels as identified in LCO Bases B 3.6.1.3.

The trips occur after a one second delay. See Tech Spec Basis B 3.3.6-1.

(continued)

SUSQUEHANNA - UNIT 1 TRM / B 3.3-10 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES (continued)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. The ACTIONS are modified by two Notes. Note 1 allows penetration flow path(s) to be unisolated intermittently under administrative controls. These controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when a need for primary containment isolation is indicated.

Note 2 is provided to modify the ACTIONS for separate Condition entry, consistent with similar Note in the TS 3.3.6.1 Actions.

Condition C applies if the channel is not restored to OPERABLE status or placed in trip, or isolation capability is not restored, within the allowed Completion Time. If inoperable channels should not be placed in trip (e.g., might result in a undesirable transient) Action C may be intentionally entered as a result of not meeting Required Action A.1 in its required Completion Time. Required Action C.1 requires appropriate compensatory measures be in place within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Examples of appropriate compensatory measures may consist of verifying that diverse isolation functions remain OPERABLE. Furthermore, isolating the penetration (e.g., as may be required by TS Actions for an inoperability affecting both the TRM Function and a required TS Function) also provides adequate compensatory actions since isolating the affected penetration flow path(s) accomplishes the safety function of the inoperable channels. If it is not desired to isolate the affected penetration flow path(s) (e.g., as in the case where isolating the penetration flow path(s) could result in a reactor scram or disabling RHR-SDC), alternate compensatory measures should be pursued.

The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is acceptable due to the fact that these Functions are not assumed in any accident or transient analysis in the FSAR.

TRS The TRSs are defined to be performed at the specified Frequency to ensure that the TRM Isolation Actuation Instrumentation Functions are maintained OPERABLE. TRM Isolation Actuation Instrumentation Surveillances are performed consistent with the Bases for LCO 3.3.6.1 "Isolation Activation Instrumentation."

(continued)

SUSQUEHANNA - UNIT 1 TRM / B 3.3-11 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation B 3.3.6 PPL Rev. 4 B 3.3.6 TRM Isolation Actuation Instrumentation BASES (continued)

TRS 3.3.6.5 The LOGIC SYSTEM FUNCTIONAL TEST demonstrates the OPERABILITY of the required isolation logic for a specific channel. The system functional testing performed on PCIVs in LCO 3.6.1.3 overlaps this surveillance to provide complete testing of the assumed safety function. The 24 month Frequency is based on the need to perform portions of this surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the surveillance when performed at the 24 month Frequency.

TRS 3.3.6.6 The response time testing of Function 2.a is per FSAR Table 7.3-29.

REFERENCES

1.

FSAR Section 7.3.1

2.

NRC Inspection and Enforcement Manual, Part 9900: Technical Guidance, Standard Technical Specification Section 1.0 Definitions, Issue dated 12/8/96.

SUSQUEHANNA - UNIT 1 TRM / B 3.3-12 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation PPL Rev. 4 B 3.3.6 Table B 3.3.6-1 Primary Containment Isolation Valves (Page 1 of 1)

Isolation Signal Plant systems Valve Number Valve Description Function No.

(Table 3.3.6-1)

Nuclear HV-141FO22A MSIV 1.a Boiler HV-141FO22B MSIV 1.a HV-141F022C MSIV 1.a HV-141FO22D MSIV l.a HV-141FO28A MSIV 1.a HV-141FO28B MSIV l.a HV-141F028C MSIV l.a HV-141F028D MSIV 1.a HV-141F016 MSL Drain Isolation Valve 1.a HV-141F019 MSL Drain Isolation Valve 1.a Reactor HV-143F019 Reactor Coolant Sample Valve 2.a Recirculation HV-143F020 Reactor Coolant Sample Valve 2.a RHR HV-151F022 RHR - Reactor Vessel Head Spray Valve 3.a RHR HV-1 51 F022 RHR - Reactor Vessel Head Spray Valve 3.a HV-151 F023 RHR - Reactor Vessel Head Spray Valve 3.a HV-151F008 RHR Shutdown Cooling Valve 3.a HV-151F009 RHR Shutdown Cooling Valve 3.a SUSQUEHANNA - UNIT 1 TRM / B 3.3-13 EFFECTIVE DATE 01/07/2011