ML110060492

From kanterella
Jump to navigation Jump to search

Acceptance Review of Auxiliary Building Overhead Crane
ML110060492
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/06/2011
From: Farideh Saba
Plant Licensing Branch II
To: Westcott D
Florida Power Corp
Saba F, NRR/DORL/LPL2-2, 301-415-1447
Shared Package
OCIO-045 List:
References
TAC ME5208
Download: ML110060492 (1)


Text

From:

Saba, Farideh Sent:

Thursday, January 06, 2011 12:10 PM To:

Westcott, Daniel Cc:

Lingam, Siva; Boyle, Patrick

Subject:

Acceptance Review of Crystal River Unit 3 LAR # 310, Auxiliary Building Overhead Crane (TAC NO. ME5208)

Dan, The NRC staff has completed its acceptance review of Florida Power Corporation (the licensee)

License Amendment Request (LAR) # 310 for Crystal River Unit 3 (CR3) (Docket No. 50-302, License No. DPR-72), regarding "Method of Evaluation for the Auxiliary Building Overhead Crane and Revisions to Associated Commitments." The NRC staff finds that the licensee has adequately included the information requested in Appendix B, Guide for Performing Acceptance Reviews, as addressed in Section 3.1.2, Technical Staff Criteria, and Section 3.2.3, Acceptable for Review of the LIC-109 Acceptance Review Procedures, Revision 1, July 20, 2009. Therefore, the NRC staff finds that the LAR, as transmitted in the licensee's letter dated December 20, 2010 (TAC NO. ME5208), includes sufficient information for the NRC staff to proceed in conducting a detailed technical review.

The acceptance review may result in some questions that will need to be addressed informally or formally prior to the completion of the NRC staff's final assessment of the amendment.

Thanks, Farideh E. Saba, P.E.

Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV