Job Performance Measure A Facility: Vogtle Task No: V-LO-TA-60038 Task

Title:

Recover Dropped Control Bank Rod JPM No: V-LO-JP-18003-001 K/A

Reference:

003AA2.01 (RO 3.7 / SRO 3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: Control Bank rod H-8 dropped 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a blown lift coil fuse. Initial power level was 100%. Repairs have been completed.

Prior to the rod drop the unit was at 100% power for previous 30 days. Core burnup is 10,560 MWD/MTU. Control Bank D step counters read 156 steps.

Task Standard: Following the dropped rod retrieval attempt, control bank D lift coil disconnect switches are re-closed, the control bank D group step counters are reset to 156 steps, and the bank select switch is placed in manual.

Required Materials: AOP 18003-C, Rod Control System Malfunction Initiating Cue: Recover rod H-8 starting with step AlO of AOP 18003-C, Rod Control System Malfunction.

Time Critical Task: No Validation Time: 15 minutes 1

SIMULATOR SETUP:

Simulator Setup:

1. ResettolC#81 forHL-l5RNRCexam.

Simulator Setup from Scratch:

1. Reset to 1C08 (50% power BOL)
2. Insert malfunction RDI3I to drop rod H-8.
4. Complete steps Al through A9 of AOP 18003-C.
4. DO NOT Remove malfunction RD 131
5. Open lift coil disconnect switch on rod H-8.

Setup time: 5 minutes 2

Performance Information Critical steps denoted with an asterisk AlO. Check if rod retrieval should be initiated:

a. Time of dropped rod known
b. Direct cause of dropped Rod known and corrective actions taken.
c. Dropped rod withdrawal will be initiated within the following time limits:

Within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for cycle burnup less than 10,000 MWD/MTU.

-OR-Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for cycle burnup greater than or equal to 10,000 MWD/MTU.

Standard: Determines that dropped rod meets all withdrawal requirements Comment:

Al 1. Prior to initiating Rod retrieval, reduce Thermal Power to the most limiting of the following:

65% (10% belowTS 3.1.4 restriction)

-OR-10% below most limiting power distribution restriction:

  • AFD
  • QPTR Standard: Determines thermal power < 65% and AFD and QPTR are within limits Comment:

3

A12. Maintain power level during recovery: (Continuous Action)

Less than 75%.

Less than power distribution restrictions:

  • AFD
  • QPTR Standard: Power, AFD, QPTR remain within limits.

Comment:

Al 3. Maintain Tavg within 3 °F of Tref during recovery. (Continuous Action)

Standard: Tavg maintained within 3 °F of Tref during recovery Comment:

  • A14 Position the ROD BANK SELECTOR SWITCH to the affected bank.

Standard: Control Bank D selected on HS-40041 Comment:

4

  • A15. Reset the affected group step counter to zero.

Standard: Control Bank D group 2 step counter is reset to 000 using the RS or DN buttons.

Comment:

  • A16. Reconnect dropped Rod lift coil.

CUE: If asked, the extra RO has assumed the OATC functions.

Standard: Lift coil disconnect switch for rod H-8 placed in the connect position.

Comment:

  • A17. Disconnect all lift coils in the affected bank except for the dropped Rod Standard: Lift coil disconnect switches for the foflowing rods are in the disconnect position:

D4, M12, D12, and M4 Comment:

A18. Check Rod being realigned GROUP 1 CONTROL OR SHUTDOWN BANK ROD Standard: Determines Rod H-8 is in group 2 using DRPI panel.

Comment:

5

Al 8 RNO. Go to Step A20 Standard: Goes to step A20.

Corn ment:

A20. Check Unit operation at or above 75% for at least 72 cumulative hours in a 7 day period.

Standard: Deterrnines reactor power was at 100% for the last 30 days from the initial conditions given.

Comment:

A21. Record the affected banks group step counter positions in the Unit Control Log.

CUE: The SS has recorded Control Bank D step counter readings of 156 steps in the Unit Control Log.

Standard: 156 / 000 is recorded in the Unit Control Log.

Comment:

6

NOTE:

  • ALB1O-B06 ROD CONTROL URGENT FAILURE will illuminate when withdrawal of dropped Rod is initiated (unless Shutdown Bank C, D, or E Rod).
  • Per 10000-C, CONDUCT OF OPERATIONS, the 3 step rod withdrawal limitation may be suspended during abnormal conditions.

Standard: Determines that both notes are applicable.

Comment:

A22. Withdraw the Rod in Bank Select to the affected banks current position.

Standard: IN-HOLD-OUT switch (HS-40040) is placed in the OUT position with the BANK SELECT SWITCH (HS-40041) in the CONTROL BANK D position.

After student reports rod 11-8 will not move:

CUE: l&C reports the lift coil fuse for rod H-8 has blown again.

Comment:

7

  • A22 RNO IF the Rod falls to move, THEN:
  • a. Connect lift coils opened in Step A17
  • b. Reset the step counter to value recorded in Step A21
c. Continue applicable action items of TS 3.1.4 CUE: The SS will continue applicable actions of LCO 3.1.4
  • d. Reset Rod Control Urgent Failure alarm using IHS-40039 ROD CONTROL ALARM RESET
  • e Place ROD BANK SELECTOR SWITCH in MAN
f. Return to Step AlO CUE: The extra operator will complete this procedure.

Standard: a. Lift coils disconnect switches D4, M12, D12, and M4 closed (down)

b. Control Bank D group 2 step counter set to 156 with UP pushbutton
d. Rod Control Urgent Alarm is reset
e. Rod Bank Selector Switch rotated counter clockwise to the MAN position.

Comment:

Terminating cue: Student returns initiating cue sheet 8

Verification of Completion Job Performance Measure No. V-NRC-JP-18003-OO1 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

9

Initial Conditions: Control Bank rod H-B dropped 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a blown lift coil fuse. Initial power level was 100%. Repairs have been completed.

Prior to the rod drop the unit was at 100% power for previous 30 days. Core burnup is 10,560 MWDIMTU. Control Bank D step counters read 156 steps.

Initiating Cue: Recover rod H-8 starting with step AlO of AOP 18003-C, Rod Control System Malfunction.

Job Performance Measure B Facility: Vogtle Task No: V-LO-TA-60030 Task

Title:

Respond to Failure of PRZR Level Instrumentation JPM No: V-NRC-JP-18001-007 K/A

Reference:

028AA1.08 028AA1 .05 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is at 100% power.

Task Standard: Excess Letdown placed in service without a PRZR high level reactor trip.

Required Materials: 1. AOP-i 8001 ,Section D Failure or PRZR Level Instrumentation.

2. SOP-i 3006, CVCS
3. SOP-i 3008, Excess Letdown General

References:

None Initiating Cue: The SS has directed you to Assume the duties of the OATC.

Time Critical Task: No Validation Time: 20 minutes 1

SIMULATOR SETUP:

Simulator Setup:

1. Reset to IC # 82 for HL-1 5R NRC Exam Simulator Setup from Scratch:
1. ResettolC#14(100%MOL)
2. Insert the following malfunction:

PRO3A at 0% with an 8 second time delay.

3. Insert the following override:

LV-459 closed with a 10 second time delay.

4. Select the following hand switch positions:

Ll-459 as controlling PRZR level channel.

5. Ack/Reset alarms
6. Freeze simulator Setup time from scratch: 4 minutes 2

Performance Information Critical steps denoted with an asterisk and bolded.

Student determines that 18001, Section D is applicable.

Standard: Section D of 18001 referenced.

Comment:

Student recognizes PRZR level instrument LI-459 has failed low:

Standard: Recognizes alarms and indications, enters AOP-1 8001, Section D.

Comment:

Dl Initiate the Continuous Actions Page.

Standard: References Continuous Actions Page for section D.

Comment:

D2 Check PRZR level - TRENDING TO PROGRAM LEVEL.

Standard: Determines PRZR level is rising due to the letdown auto isolation:

Comment:

3

  • D2 RNO IF PRZR level instrument fails low, THEN maintain charging flow approximately 10 gpm greater than total seal flow.

Standard: Student uses FIC-121, Charging Flow Controller and HIC-182, Seal Water Flow Controller to adjust charging flow to 10 gpm > seal injection flow.

NOTE to examiner: Charging flow will probably be 40 50 gpm depending on seal flows.

CUE: IF the CVCS auto makeup initiates, An extra RO will monitor the auto makeup.

Comment:

  • D3 Maintains Seal Injection flow to all RCPs 8 to 13 GPM.

Standard: Student uses FIC-121 and HIC-182 to maintain seal flows within range.

Comment:

D4 Select an unaffected channel on LS-459D, PRZR LVL CNTL SELECT.

Standard: Student places LS-459D to the 461 I 460 position.

Comment:

D5 Select same channel on LS-459E, PRZR LVL REC SEL as selected on LS-459D.

Standard: Student places PRZR level recorder LS-459E to the 461 position.

Comment:

4

D6 Restore letdown flow by initiating 13006, CHEMICAL AND VOLUME CONTROL SYSTEM, if required.

CUE: IF, the student asks, The SS desires to put Letdown back in service at 120 gpm.

Standard Student utilizes SOP-i 3006 section 4.4.2 for Restoring Normal Charging and Letdown to Service.

Comment:

NOTE: The following steps are in SOP-i 3006, section 4.4.2.

4.4.2.1 Step is not applicable since a charging pump is in service.

Standard: Student may sign off or N/A the step..

Comment:

NOTES: Prior to step 4.4.2.2 for returning normal charging and letdown to service following SI termination and establishing letdown as soon as possible after initiating flow through a Charging Nozzle.

Standard: Student reviews NOTES prior to step 4.4.2.2.

Comment:

4.4.2.2 IF NCP in service, verify NCP MINIFLOW i-HV-8109 is open.

Standard: Student opens 1-HV-8109.

Red light LIT Green light OFF.

Comment:

5

4.4.2.3.a Close LETDOWN ORIFICE Isolation Valves.

NOTE to examiner: Valves will have closed on the instrument failure.

Standard Student ensures LETDOWN ORIFICE Isolation Valves closed.

1-HV-8149A Red light OFF, green light LIT.

1-HV-8149B Red light OFF, green light LIT 1-HV-8149C Red light OFF, green light LIT Comment:

4.4.2.3.b Close LETDOWN ISOLATION VLV UPSTREAM AND DOWNSTREAM valves.

NOTE to examiner: 1 -LV-459 should have closed on instrument failure, 1 LV-460 should still be open.

Standard Student ensures LETDOWN ISOLATION VLV UPSTREAM AND DOWNSTREAM valves are closed by closing 1-LV-460 1-LV-459 Red light OFF, green light LIT.

1-HV-460 Red light OFF, green light LIT Comment:

4.4.2.3.c Close PZR AUX SPRAY VALVE 1-HV-8145.

NOTE to examiner: 1-LV-8145 will already be closed.

Standard Student ensures PZR AUX SPRAY VALVE 1-HV-8145 is closed.

1-H V-81 45 Red light OFF, green light LIT.

Comment:

6

4.4.2.3.d Open CVCS LETDOWN PIPE BREAK PROT ISOLATION 1-H V-i 5214.

NOTE to examiner: 1-HV-1 5214 will still be open.

Standard Student ensures CVCS LETDOWN PIPE BREAK PROT ISOLATION 1-HV-15214 is still open.

1HV-i 5214 Red light LIT, green light OFF Comment:

4.4.2.3.e Open RCS LETDOWN LINE ISO VLV IRC 1-HV-8i60.

NOTE to examiner: 1-HV-8i60 will still be open.

Standard Student ensures CVCS LETDOWN PIPE BREAK PROT ISOLATION 1-HV-8160 is open.

i-HV-8160 Red light LIT, green light OFF.

Comment:

4.4.2.3.f Open RCS LETDOWN LINE ISO VLV ORC 1-HV-8152.

NOTE to examiner: i-HV-8152 will still be open.

Standard Student ensures CVCS LETDOWN PIPE BREAK PROT ISOLATION i-HV-8152 is open.

i-HV-8152 Red light LIT, green light OFF.

Comment:

7

4.4.2.3.g Place Letdown Pressure Controller 1 P10-131 in MAN and adjust output to between 50% and 75%.

Standard Student places 1PIC-131 in MAN and adjusts output to 50% to 75%.

Manual light LIT on 1PIC-131.

Up and down arrows adjust until demand meter indicates between 50%-75%.

Comment:

4.4.2.3.h Place LETDOWN HX OUTLET TEMP 1TIC-130 in MAN and adjust output to the most current position as recorded on the Control Room Rounds Sheets.

NOTE to examiner: This is kept marked up on the white dry erase board on the front of the SS throne.

For 75 gpm letdown = 22%, for 120 gpm letdown = 48%.

Standard Student places TIC-i 30 in MAN and adjusts output to 22% or 48% as appropriate for the letdown flow.

Manual light LIT on 1TIC-130.

Up and down arrows adjust until demand meter indicates 22% or 48% as appropriate for the letdown flow.

Comment:

4.4.2.3.i Verify PRESSURIZER LEVEL 1 LR-459 greater than 17%.

NOTE to examiner: PRZR level will be much> 17% due to loss of letdown.

Standard Student verifies PRZR level> 17% on 1 LR-459.

Student may also use the PRZR LI-460 and 461 for the non-failed channels.

Comment:

8

NOTE Prior to step 4.4.2.3.j regarding IF Charging and Letdown are returned to service from section 4.4.15.

Standard Student reviews NOTE.

Comment:

4.4.2.3.j Verify one of the following are OPEN:

NORMAL CHARGING TO LOOP 4 1-HV-8146 OR ALTERNATE CHARGING TO LOOP 4 1HV-8147 NOTE to examiner: One of the valves will already be open.

Standard Student verifies either valve above is open.

1-HV-8146, Red light LIT, green light OFF OR 1-HV-8147, Red light LIT, green light OFF Comment:

4.4.2.4. Verify CHARGING TO RCS ISOLATION Valves are OPEN:

. 1-HV-8106

. 1-HV-8105 NOTE to examiner: The valves will already be open.

Standard Student verifies valves are open.

. 1-HV-81 06, red light LIT, green light OFF

. 1-HV-8105, red light LIT, green light OFF Comment:

9

  • 4.4.2.5 Simultaneously perform the following:
  • Adjust IHC-182 output to maintain between 8 and 13 gpm to each RCP.
  • Adjust IFIC-121 to raise CHG FLOW IFI-121A to between 80 & 90 gpm.

CUE: IF the CVCS auto makeup initiates, An extra RO will monitor the auto makeup.

Standard Student adjusts 1 HC-1 82 and 1 FIC-1 21 to obtain:

  • 1-Fl-i 82 reading 8 to 13 gpm
  • i-FI-121A reading 80 to 90 gpm.

Comment:

4.4.2.6 Open LETDOWN ISOLATION VLV UPSTREAM AND DOWNSTREAM Valves by holding their hand switches in OPEN UNTIL the valves are fully open:

  • 1 -LV-459 1 HS-459 Standard Student determines that 1-LV-459 will not open and Letdown cannot be placed in service.
  • 1-LV-459, green light LIT, red light OFF.

Comment:

10

NOTE to examiner: The following steps are back in AOP-i 8001, section D.

  • Continuous Actions: This step is critical if PRZR level is not controlled resulting in a high PRZR level reactor trip.

Maintain charging 10 gpm above seal injection and seal injection 8 to 13 gpm.

Standard Student adjusts 1 HO-i 82 and 1 FIC-i 21 to obtain:

  • i-Fl-i 82 reading 8 to 13 gpm
  • i-Fl-121A reading 40 to 50 gpm Comment:

D6.a RNO Establish Excess Letdown by initiating 13008, CHEMICAL AND VOLUME CONTROL SYSTEM EXCESS LETDOWN.

Standard Student initiates Excess Letdown per 13008 Comment:

NOTE to examiner: The following steps are in 13008, CVCS Excess Letdown section 4.1 4.1 .i Verify that a Charging Pump is running.

CUE: IF asked, the SS desires to direct Excess Letdown flow to the Seal Return Header.

Standard Checks the NCP is still running.

Red light LIT, green light OFF, amber light OFF.

Comment:

ii

4.1.2 Verify CLOSED RX HEAD VENT TO EXCESS LETDOWN ISOLATION 1 -HV-8098 NOTE to examiner: This valve will already be closed.

Standard Student verifies 1-H V-8098 is closed.

Green light LIT, red light OFF Comment:

4.1.3 Verify flow controller EXCESS LETDOWN 1 HC-123 set to closed (0% demand).

NOTE to examiner: This controller will already be closed.

Standard Student verifies demand at 0% on 1 HC-1 23.

Comment:

4.1.4 Verify OPEN RCPs Seal Leakoff Isolation valves:

  • 1-HV-8100, RCPS SEAL LEAKOFF CRC ISOLATION
  • 1-HV-8112, RCPS SEAL LEAKOFF IRC ISOLATION NOTE to examiner: These valves will already be open.

Standard: Student verifies HV-81 00 and HV-81 12 to OPEN

  • 1-HV-8100 Red light LIT, green light OFF
  • 1-HV-81 12 Red light LIT, green light OFF Comment:

12

4.1.5 Verify EXCESS LETDOWN TO VCT, 1HS-8143 is in the OPEN VCT position.

NOTE to examiner: Open VCT is the normal alignment.

Standard: Student verifies 1 HS-81 43 in OPEN VCT position.

  • 1-HS-8143 Red light LIT for OPEN VCT
  • 1 HS-81 43 Amber light OUT for OPEN RCDT Comment:

4.1.6 Verify Reactor power is maintained < 3622.6 MWT while Excess Letdown is in service and LEFM is in service. IF LEFM is NOT in service, maintain power <

3562 MWT per guidance of 12004-C.

CUE: The unit operator will maintain MWT < 3622.6 MWT.

Standard: Not applicable.

Comment:

  • 4.1.7 Open EXCESS LETDOWN LINE Isolation Valves.
  • 1-HV-8153 EXCESS LETDOWN LINE ISO VLV
  • 1-HV-8154 EXCESS LETDOWN LINE ISO VLV Standard: Student places 1-HV-8153 and 1-H V-81 54 in the open position.
  • 1-HS-8153 Red light LIT, green light OFF.
  • 1-HS-8154 Red light LIT, green light OFF.

Comment:

13

4.1.8 Record the following:

  • Pressure on indicator EXCESS LETDOWN HX OUTLET, 1PI-124.
  • Temperature on indicator EXCESS LETDOWN HX OUTLET, lTl-122.

Standard: Student records data.

  • Grease pencil marking on 1 P1-124 or records on paper.
  • Grease pencil marking on 1TI-122 or records on paper.

Comment:

  • 4.1.9 While establishing excess letdown, perform the following:
  • Monitor pressure on indicator EXCESS LETDOWN HX OUTLET, lPl-124 and verify it remains less than 50 psig above pressure recorded in step 4.1.8.
  • Monitor temperature on indicator EXCESS LETDOWN HX OUTLET, ITI-122 and verify it remains less than 165 degrees.
  • 4.1.10 Slowly adjust output flow controller EXCESS LETDOWN IHC-123 to establish maximum allowable flow (estimated to be approximately 30 gpm).

° NOTE TO EXAMINER: From exam review week, only temperature < 165 F is critical.

CUE: IF asked, Establish max allowable flow.

Standard: Student uses 1HC-123 to maintain pressure and temperature below the limits.

  • Grease pencil marking on 1 P1-124 or records on paper.
  • Grease pencil marking on 1TI-122 or records on paper.

Comment:

14

4.1.11 Perform the following as required to maintain desired pressurizer level:

  • Adjust charging using CHARGING LINE CONTROL, 1FIC-121
  • Adjust seal injection using SEAL FLOW CONTROL, 1 HC-1 82.
  • NOTE to examiner: IF, the Reactor trips on high PRZR level, this step becomes critical.

Standard: Student should adjust 1FIC-121 and 1HC-182 to control PRZR level.

  • PRZR level stable or lowering.
  • PRZR level maintained below the high level trip set point of 92%.

Comment:

4.1.12 IF, normal letdown is isolated, align the outlet of the Seal Water Heat Exchanger to the Volume Control Tank spray nozzle as follows: (IV REQUIRED).

a. Unlock and open CVCS SEALS SEAL WATER HX OUTLET TO VCT, 1-1 208-U6-1 04 (KEY 1OP2-281)(RA-26)
b. Close CVCS SEALS SEAL WATER HX OUTLET TO NCP SUCTION, 1-1 208-U6-1 06. (RA-26)

CUE: When requested, C & T will have an SO perform step 41.12, an IV will be performed.

Standard: Student requests C & T to perform step 4.1.12 and requests an IV.

Comment:

NOTE: The student should return to AOP-1 8001, section D at this time.

CUE: Another operator will complete the AOP steps.

Terminating Cue: The operator informs the SS that Excess Letdown has been place in service or returns initiating cue sheet back to the examiner.

15

Verification of Completion Job Performance Measure No. V-RQ-JP-18001-007.

Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

16

Initial Conditions: The plant is at 100% power.

Initiating Cue: The SS has directed you to Assume the duties of the OATC.

Job Performance Measure C Facility: Vogtle Task No: V-LO-TA-37009 Task

Title:

Transfer ECCS Pumps to Hot Leg Recirculation with Failure of Train A RHR and SI Alignments JPM No: V-NRC-JP-19014-003 KJA

Reference:

WE1 1 EA1 .3 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: A large break LOCA occurred 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ago. The crew is at step 31 of 19010-C, Response to Loss of Reactor or Secondary Coolant.

Task Standard: ECCS pumps operating in the hot leg recirculation mode.

Required Materials: 1. 19014-C, Transfer to Hot Leg Recirculation.

2. Replacement copies of 19014-C need to be printed and in simbooth for quick replacement.

General

References:

None Initiating Cue: The SS has directed you to Transfer the ECCS pumps to hot leg recirculation using 19014.

Time Critical Task: No Validation Time: 8 minutes 1

SIMULATOR SETUP:

Simulator Setup:

1. Reset to IC #83 for HL-15R NRC Exam.

Simulator Setup from Scratch:

1. Resetto IC#14(100% MOL).
2. Place all ECCS Lockout switches to ON.
3. Insert malfunction RCO3C (DBA LOCA).
4. Trip all RCPs.
5. Use Remote Function TKO9 © 100,000 gpm to transfer RWST mass to the CNMT sumps.
6. Verify RWST level © 29% and set TKO9 to 0 gpm, then delete it..
7. Perform 19013-C steps 1 and 2, Attachment A, then steps 3 through 15.
8. Use malfunction CV-17118 for LOCAL control of LV-1 12D and E.
9. Override HS-8716A to CLOSE.
10. Override HS-8802A to CLOSE.
11. Ack/Resetalarms
12. Freeze simulator Setup time from scratch: 20 minutes 2

Performance Information Critical steps denoted with an asterisk and bolded.

Student determines that 19014 Transfer to Hot Leg Recirculation is applicable.

Standard: 19014 referenced.

Comment:

l.a. Aligns RHR Train A for Hot Leg Recirculation as follows:

1) Close HV-8809A RHR PMP-A TO COLD LEG 1 & 2 ISO VLV
2) Open HV-8716A - RHR TRAIN A TO HOT LEG CROSSOVER ISO Standard: Closes HV-8809A and determines HV-8716A will NOT open.
1) HV-8809A, green light LIT, red light OFF
2) HV-8716A, green light remains LIT, red light remains OFF Comment:
  • 1.a RNO IF RHR Train A can NOT be aligned for Hot Leg Recirculation, THEN realign for Cold Leg recirculation.
2) Open HV-8809A RHR PM P-A TO COLD LEG I & 2 ISO VLV NOTE to examiner: The candidate may perform substep 1) but is technically not required to, valve HV-8716A did not open and is in the proper position already.

Standard: Student places hand switch for HV-8809A to the open position:

2) HV-8809A red light LIT, green light OFF Comment:

3

  • 1.b. Aligns RHR Train B for Hot Leg Recirculation as follows:
1) Close HV-8809B RHR PM P-B TO COLD LEG 3 & 4 Iso VLV
2) Open HV-8716B RHR TRAIN B TO HOT LEG CROSSOVER ISO Standard: Places hand switch to close for HV-8809A and to open for HV-8716B.
1) HV-8809B, green light LIT, red light OFF
2) HV-8716B, red light LIT, green light OFF Comment:

I .c At least one Train of RHR realigned for Hot Leg recirculation.

Standard: Student determines RHR Train B aligned for Hot Leg recirculation.

Comment:

Standard: Student place HS-8840 to the open position.

HV-8840, red light LIT, green light OFF.

Comment:

2 Consults TSC before starting or realigning CCPs or SIPs that have been stopped or realigned to normal charging.

Standard: Students determines this step is not applicable as CCPs and SIPs have not been realigned at this time.

Comment:

4

  • 3 Align SI Train A flow path for Hot Leg recirculation.
  • a. Stop SI pump A.
c. Open SI PMP-A TO HOT LEG 1 & 4 ISO VLV HV-8802A.

Standard: Students places HS for SI Pump A to Stop, closes HV-8821A, and determines that HV-8802A will NOT open.

a. SI pump A hand switch, green light LIT, red light OFF.
b. HV-8821A hand switch, green light LIT, red light OFF.
c. HV-8802A hand switch, green light remains LIT, red light remains OFF.

Comment:

  • 3* RNO 1) Stop SI Pump A CUE: If student looks at CSFSTs: Another operator will evaluate the CSFSTs.
2) Shut SI PMP-A TO HOT LEGS 1 & 4 ISO VLV HV-8802A
3) Verify open CL INJ FROM SIS HV-8835.
  • 5) Start SI Pump A.

Standard Student aligns checks HV-8835 open, places hand switch for HV-8821A to open, and places hand switch for SI Pump A to start.

1) SI pump A hand switch, green light remains LIT, red light remains OFF.
2) HV-8802A, green light remains LIT, red light remains OFF.
3) HV-8835, red light remains LIT, green light remains OFF.
4) HV-8821A, red light LIT, green light OFF.
5) SI Pump A hand switch, red light LIT, green light OFF, amber light OFF.

5

Comment:

4. Check SI Pump A flow GREATER THAN 100 GPM.

Standard: Student checks that SI pump A discharge flow reads> 100 gpm.

SI Pump Aflow> 100 gpm Corn ment::

  • 5* Align SI Train B flow path for Hot Leg recirculation.
a. StopSlPumpB
b. Shut SI PMP-B TO COLD LEG ISO VLV HV-8821B.
c. Open SI PM P-B TO HOT LEG 2 & 3 ISO VLV HV-8802B
d. Start SI Pump B Standard: Student stops SI pump B, shuts HV-8821A, opens HV-8802B, and then restarts SI Pump B.
a. SI Pump B hand switch rotated to STOP, green light LIT, red light OFF
b. HV-8821 B placed to CLOSE, green light LIT, red light OFF
c. HV-8802B placed to OPEN, red light LIT, green light OFF.
d. SI Pump B hand switch rotated to START, red light LIT, green and amber lights OFF Comment:
6. Check SI Pump B flow GREATER THAN 100 GPM.

Standard: Student checks that SI pump B discharge flow reads> 100 gpm.

SI Pump B flow>100 gpm.

Comment:

6

7. Complete SI alignment.
a. Check both SI trains ALIGNED TO HOT LEG RECIRCULATION Standard: Student determines both SI trains are NOT aligned to hot leg recirculation.

Comment:

  • 7 RNO a. Consult TSC for actions to realign second SI train to Hot Leg recircu lation Go to Step 8 CUE: If asked, The SS will consult the TSC.
  • NOTE to examiner: Closure of HV-8835 would be a failure of the JPM as this would shut off all SI pump flow to the Cold Legs.

Standard: Consults TSC for appropriate actions.

Goes to step 8, does NOT close HV-8835.

Returns to procedure and step in effect.

Comment:

Terminating cue: Student returns initiating cue sheet and I or informs SS that the alignment to Hot Leg recirculation is complete.

NOTE: Student may inform the SS of the Train A failure to realign to Hot Leg recirculation but this is not required to pass the JPM.

7

Verification of Completion Job Performance Measure No. V-RQ-JP-19014-003 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

8

Initial Conditions: A large break LOCA occurred 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ago. The crew is at step 31 of 19010-C, Response to Loss of Reactor or Secondary Coolant.

Initiating Cue: The SS has directed you to Transfer the ECCS pumps to hot leg recirculation using 19014.

Job Performance Measure D Facility: Vogtle Task No: V-LO-TA-37009 Task

Title:

Respond to RHR Pump Trip in Mode 4 JPM No: V-NRC-JP-18019-001 K/A

Reference:

025G2.4.10 025G2.4.1 1 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is in Mode 4 with RHR pump A providing shutdown cooling.

Task Standard: 18019-C, performed correctly and an RCP started per Attachment E.

Required Materials: 1. 18019-C Loss of Residual Heat Removal.

General

References:

None Initiating Cue: The SS has directed you to assume the position of the OATC.

Time Critical Task: No Validation Time: 25 minutes 1

SIMULATOR SETUP:

Simulator Setup:

1. Reset to IC #84 for HL-15R NRC Exam.

Simulator Setup from Scratch:

1. Reset to IC # 27 (Mode 4 on RHR)
2. Place RHR Train A in shutdown cooling mode
3. Place RHR Train B in standby for injection mode.
4. Stop all Reactor Coolant Pumps.
5. Stabilize cool down rate < 50°F per hour on steam dumps or ARVs.
6. Insert malfunction RHO1A on Trigger 1.
7. Ack I Reset alarms
8. Freeze simulator Setup time from scratch: 120 minutes

( (It takes an extremely long time for RHRIRCS cooldown rate to stabilize after stopping the RCPs.)

2

Performance Information Critical steps denoted with an asterisk and bolded.

Student determines that 18019, Loss of Residual Heat Removal is applicable.

Standard: 18019, section A for Loss of RHR Capability in Mode 4 referenced.

CUE: When automatic makeup occurs: The UO will monitor for proper automatic VCT make up.

Comment:

NOTE: Notes regarding system status information on loss of RHR, Figures 1 through 5 Standard: Student reviews NOTE regarding system status of RHR regarding figure 1 through 5.

Comment:

Al. Initiate the Continuous Actions Page.

Standard: Student initiates Continuous Actions Page for section A:

Comment:

A2 Check excessive RCS leakage DOES NOT EXIST Standard: Student determines RHR pump trip is not due to leakage.

Comment:

3

A3 Monitor RCP support parameters WITHIN LIMITS.

  • No. 1 Seal minimum differential pressure 200 psid.
  • Minimum No. 1 Seal Leakoff as obtained from Figure 6.
  • No. 1 Seal temperatures less than 220°F.
  • Maintain Seal Injection flow 8 TO 13 GPM.

Standard: Student determines RCP support parameters WITHIN LIMITS.

  • Seal dP using QMCB meter.
  • Seal Leakoff from Figure 6 of 18019 using QMCB meters for seal leakoff and RCS pressure.
  • Seal temperatures < 220°F using IPC RCP computer points.
  • Uses FIC-121 and HO-i 82 to control seal injection 8 to 13 gpm referencing QMCB instruments.

Comment:

A4 Check RHR pumps NONE RUNNING.

Standard: Student determines no RHR pumps are running. The procedure does not delineate how, some possible methods but not all inclusive.

  • RHR pump A, green and amber lights LIT, red light OFF.
  • RHR pump B, green light LIT, red and amber lights OFF.

Comment:

4

  • A5 Adjust charging to stabilize PRZR level.

NOTE to examiner: PRZR level will be rising as RHR letdown flow is lost.

Standard: Student uses FIC-121 and HO-I 82 to minimize charging and control seal injection to stabilize PRZR level. The procedure does not delineate methods.

Expected method listed below but not all inclusive.

  • FIC-121, auto-manual MANUAL light lit, down arrow depressed to reduce charging flow. Modulate up-down arrows as necessary to stabilize.
  • HC-182, modulate up and down arrows to control seal injection 8 to 13 gpm.

Comment:

A6 Check tripped RHR pump power supply ENERGIZED Standard. Student determines 4160 1E bus AAO2 is energized and RHR pump hand switch has power, the procedure does not delineate how. The following is some possible methods but not all inclusive.

  • 1AAO2 bus potential lights LIT.
  • RHR pump A hand switch green and amber lights LIT.

Comment:

A7 Check RCS temperature GREATER THAN 250°F.

Standard: Student checks RCS to determine > 250°F. The procedure does not delineate how. The following is some possible methods but not all inclusive.

  • RCS QMCB WR temperature indications, Thot or Tcold.
  • IPC WR temperature indications, Thot or Tcold.

Comment:

5

A8 Check at least one RCS Loop available for RCS cooling.

a. Check RCPs AT LEAST ONE RUNNING.

Standard: Determine that RCPs are all stopped. The procedure does not delineate how.

Possible methods below but not all inclusive.

RCP 1 through 4, green lights LIT, red lights OFF, blue lights OFF.

RCS Loops 1 through 4 flow indicators all downscale LOW on the QMCB.

Comment:

A8 RNO a. Performs the following:

1) Attempt to start an RCP using ATTACHMENT E.

Standard: Student references ATTACHMENT E, STARTING A REACTOR COOLANT PUMP.

Comment::

NOTE to examiner. The following steps are from ATTACHMENT E of 18019-C.

CAUTIONS: Do not use this attachment if RCP seal # 1 temperature is> 220°F.

If RCP seal injection has been lost and ACCW cooling to RCP thermal barrier has been lost, the RCP should not be started prior to a status evaluation.

Standard: Student determines both CAUTIONS are not applicable at this time.

. Student may check # 1 seal temperature on RCP IPC computer points.

Comment:

6

Establish initial conditions:

a. 13.8 KV power available to RCP.
b. # 1 Seal dP greater than or equal to 200 psig.
c. Seal injection flow 8 gpm to 13 gpm.
d. Seal leakoff flow within FIGURE 6.

Standard. Verifies initial conditions are met.

a. 1NAA and 1NAB potential lights LIT.
b. > 200 psig on QMCB delta P meter.
c. Seal injection between 8 to 13 gpm on QMCB meter.
d. Seal leak off flow within FIGURE 6 using QMCB seal leakoff and RCS pressure meters.

Comment:

7

2. Check the following alarms clear or establish conditions to clear those alarms for the RCP to be started:
a. RCP LOWER OIL RSVR HI/LO LEVEL.
b. RCP UPPER OIL RSVR HI/LO LEVEL.
c. VOLUME CONTROL TANK OUTLET TEMP HI.
d. VCT HI/LO PRESS.
e. RCP STNDPIPE LO LEVEL.
f. RCP STNDPIPE HI LEVEL.
g. RCP MTR OVERLOAD.
h. RCP NO 2 SEAL LKOFF HI FLOW.

ACCW RCP CLR OUTLET HI TEMP.

j. ACCW RCP CLR LO FLOW.
k. ACCW RCP THRM BARRIER HX HI FLOW.

ACCW RCP THRM BARRIER HI PRESS.

Standard. Determines all annunciators CLEAR.

. Annunciator window lights OFF Comment:

8

3 Verify all RCP ACCW thermal barrier isolation valves open.

a. Supply
b. Return:
  • HV-1 9051 ACCW RCP-1 THERMAL BARRIER RTN VLV
  • HV-1 9053 ACCW RCP-2 THERMAL BARRIER RTN VLV
  • HV-1 9055 ACCW RCP-3 THERMAL BARRIER RTN VLV
  • HV-1 9057 ACCW RCP-4 THERMAL BARRIER RTN VLV HV-2041 ACCW RCPS THERMAL BARRIER RTN VLV Standard: Checks all the above listed valves are open.

Listed valves, red lights LIT, green lights OFF Comment:

  • 4 Start the associated RCP oil lift pump.

NOTE to examiner: It is expected but not required that RCP # 4 would be started in order to facilitate better PRZR spray control. RCP # I would be the 2 nd choice.

Standard: Rotates hand switch for the selected RCP lift pump to the start position.

Lift pump hand switch, red light LIT, green light OFF.

Comment:

9

CAUTIONS Two hot starts of an RCP are allowed if the pump coasts to a stop between starts. (approximately 2 mintues)

Subsequent hot starts are allowed if the pump has been running for 20 minutes or idle for 45 minutes.

Standard: Student reviews CAUTIONS and determines they are not applicable.

Comment:

After two minutes of lift pump operation, start the RCP.

CUE: The lift pump has been operating for 2 minutes Standard: Verifies lift pump start interlock met, then rotates selected RCP hand switch to the START position.

RCP lift pump hand switch, red light ON, blue interlock light ON, green light OFF.

RCP hand switch, red light ON, green light OFF, amber light OFF.

Comment:

6. After approximately one minute, check the following alarms clear:
a. RCP LOW FLOW ALERT
b. RCP SHAFT VIBRATION ALERT
c. RCP FRAME VIBRATION ALERT
d. Those alarms listed in step 2.

Standard: Students determines alarms listed in step 6 and step 2 are clear.

Annunciator window lights OFF.

Comment:

10

7. After one minute of RCP operation, stop the oil lift pump.

Standard: Students waits one minute, then stops the RCP oil lift pump.

Rotates hand switch to the STOP position.

Green light ON, red light OFF, blue light goes OFF.

Comment:

NOTE to examiner: The following step A8.b is back in the body of 18019-C.

A8.b Check SG NR levels - GREATER THAN OR EQUAL TO 10%.

Standard: Student checks SG NR levels> 10%.

QMCB SG NR level indicators checked.

Comment:

A8.c Maintain or reduce RCS temperature using Steam Dumps or ARVs.

CUE: The Unit Operator will control RCS temperature and complete the procedure starting with step A18.

Standard: Not applicable.

Comment:

11

Terminating cue: Student returns initiating cue sheet and / or informs SS that the actions of AOP-1 8019-C have been completed.

NOTE: Student may inform the SS of the RCP start.

12

Verification of Completion Job Performance Measure No. V-NRC-JP-18019-OO1 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

13

Initial Conditions: The plant is in Mode 4 with RHR pump A providing shutdown cooling.

Initiating Cue: The SS has directed you to assume the position of the OATC.

Job Performance Measure E Facility: Vogtle Task No: V-LO-TA-29013 Task

Title:

Dilute Containment With Service Air JPM No: V-NRC-JP-13130-001 K/A

Reference:

028A4.01 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: A LOCA has occurred on Unit 1. The crew is performing 19010-C.

The TSC has requested that Service Air be aligned to Containment to reduce the Hydrogen concentration of the Containment atmosphere.

Task Standard: Containment dilution using service air is properly initiated per 13130-1.

Required Materials: 1. 13130, Post Accident Hydrogen Control.

NOTE: Replacement pages needed for 13130-1.

General

References:

None Initiating Cue: The SS has directed you to Dilute the Containment hydrogen concentration using service air per 13130-1.

Time Critical Task: No Validation Time: 8 minutes

SIMULATOR SETUP:

Simulator Setup:

1. Reset to IC # 85 for HL1 SR NRC Exam.

Simulator Setup from Scratch:

1. ResettolC#14(MOL100%)
2. Insert malfunction RCO5C at 100% (Hot Leg Break).
3. Throttle AFW flow to 600 gpm.
4. Use Remote Function EDO8 to set CNMT 2 H at 8%.

S. Use Remote Function EDO7 to override CNMT H .

2

6. Use Remote Function EDO6 to set CNMT pressure at 15 psig.
7. Use Remote Function EDOS to override CNMT pressure.
8. Trip RCPs.
9. Verify RCS pressure rising.
10. Reset SI.
11. StopRHRpumps.
12. Place both CNMT H 2 monitors in service per 13130.
13. Ack/Reset alarms.
14. Freeze simulator Setup time from scratch: 20 minutes 2

Performance Information Critical steps denoted with an asterisk and bolded.

Student determines that 13130-1, Post-Accident Hydrogen Control is applicable.

Standard: Student selects 13130-1, section 4.4.2 for Diluting Containment Hydrogen Concentration Using The Service Air System.

Comment:

NOTE: Note stating Containment design pressure is 52 psig.

CAUTION: Do not perform this section if containment pressure is greater than 40 psig unless so directed by the Emergency Director.

Standard: Student reviews NOTE and CAUTION prior to step 4.4.2.1 and determines that they are not applicable.

Comment:

  • 4.4.2.1 Reset CIA by taking the following hand switches to RESET and observe ALBO6-E06 extinguished.
  • IHS-40120
  • IHS-40122 Standard: Student rotates 1 HS-40120 to the RESET position.

Student rotates 1HS-40122 to the RESET position.

Student verifies annunciator ALBO6-E06 orange window light is OFF.

(CNMT ISO PHASE A ACTUATION)

Comment:

3

  • 4.4.2.2 Open SERVICE AIR CNMT HDR ISOL 1-HV-9385 as follows:
a. Place 1-HS-9385A on Main Control Room Panel QPCP to OPEN.
b. Hold 1-HS-9385B on Panel QPCP in OPEN until 1-HV-9385 is fully open.

NOTE to examiner: The student must manipulate the hand switches in the proper sequence stated above or the valve will not open. It is a single valve with a dual hand switch.

Standard: Student manipulates HV-9385 in proper sequence to open the valve.

a. 1-HS-9385A rotated to OPEN first.
b. 1 HS-9385B rotated to OPEN and HELD until valve opens.
c. HV-9385, red light LIT, green light OFF.

Comment:

4

NOTE to Simbooth Operator: Use remote function EDO6 to control containment pressure from 15 psig to 17 psig with a ramp time of 600 seconds once a 9380 valve is opened.

This will allow verification of air to containment. Use malfunction 1A02 at 5% to simulate air flow out of service air system. Expect AICs in standby to start.

  • 4.4.2.3 Open one SERVICE AIR CNMT POST LOCA PURGE using its Control Switch on QPCP and install caution tag.

I -HV-9380A OR I -HV-9380B CUE: When asked, the SS will install a caution tag.

Standard: Student rotates either 1-HV-9380A or 1-HV-9380B to the open position.

1-HV-9380A red light LIT, green light OFF OR 1-HV-9380B red light LIT, green light OFF.

Student requests a caution tag to be installed on the hand switch operated.

Comment:

4.4.2.4 Check Service Air Header 1-Pl-9377 and Instrument Air Dryer to SOS Equipment 1-PI-9361 pressures on Main Control Room Panel QMCB.

Standard: Student checks Service and Instrument air pressures on referenced instruments.

Comment:

5

4.4.2.5 IF air pressures fall to 80 psig or less, SERVICE AIR DRYER SUPPLY OUTLET ISO 1 -PV-9375 isolates service air to dryers; restore purge air flow as follows:

a. Reset 1-PV-9375 per 13710-1 to restore Service Air Supply.
b. Throttle Service Air Dryer Bypass Valve 1-2401-U4-551, as necessary and install caution tag, to maintain air pressure 1-PI-9377 and 1-PI-9361 greater than 85 psig.

Standard: Student determines has remained above 80 psig and this step is not applicable.

  • 1-PI-9377, Service Air Header pressure remain > 80 psig.
  • 1-PI-9361 Instrument Air Header pressure remains> 80 psig.

Comment:

4.4.2.6 Monitor containment hydrogen concentration through sampling and per Section 4.2.1 and/or 4.2.2 of this procedure.

CUE: An extra RO will initiate monitoring of H2 concentration, the SS will notify Chemistry to begin sampling.

Standard: Student informs SS of necessity for sampling.

Comment:

4.4.2.7 Monitor containment pressure 1-PI-0934, 1-PI-0935, 1-PI-0936, and 1-PI-0937.

IF, containment pressure rises to 40 psig OR to the value specified by the Emergency Director, terminate dilution per step 4.4.2.8.

CUE: After student observes Containment pressure <

40 psig, an extra RO will continue monitoring of Containment pressure.

Standard: Student observes Containment pressure is < 40 psig on Containment pressure instruments.

Comment:

6

Terminating cue: Student returns initiating cue sheet and I or informs SS that the Containment has been diluted with Service Air per 131 30-1.

C 7

Verification of Completion Job Performance Measure No. V-NRC-JP-13130-OO1 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

8

Initial Conditions: A LOCA has occurred on Unit 1. The crew is performing 19010-C.

The TSC has requested that Service Air be aligned to Containment to reduce the Hydrogen concentration of the Containment atmosphere.

Initiating Cue: The SS has directed you to Dilute the Containment hydrogen concentration using service air per 13130-1.

Job Performance Measure F Facility: Vogtle Task No: V-LO-TA-31 008 Task

Title:

Synchronize Main Generator to the Grid JPM No: V-NRC-JP-13830-001 K/A

Reference:

K/A: 062A4.07 (RO 3.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The System Operator has given approval to synchronize to the grid.

Main Generator field excitation has already been established by the previous shift.

Task Standard: Main Turbine is tripped when no generator current is observed on phase B.

Required Materials: 13830-1, Main Generator Synchronizing Switches NOTE: Replacement pages for 13830 will be required.

Initiating Cue: Synchronize the Main Generator to the power grid, and assume 60 to 80 MWe using 13830-1.

Time Critical Task: No Validation Time: 20 minutes

SIMULATOR SETUP:

Simulator Setup:

1. Reset to IC # 86 for HL-15R NRC exam.

WARNING TO SIMBOOTH OPERATOR: On reset, insert CMO3B EVERY TIME, this RF will not hold in the snap.

INSERT CMO3A and CMO3C on Trigger I each time you reset for this JPM CAUTION TO SIM BOOTH OPERATOR: Make sure after reset that all Generator Synch positions are correct. The simulator does not switch check these in the snaps, it is imperative to make sure these are in the correct position to ensure the operator has to perlorm all the critical steps as required by the JPM.

WARNING TO SIM BOOTH OPERATOR: Phase A and C amps need to be set to 4% to ensure the meters come off bottom peg. This is necessary so the students will have a clear indication that phase A and C are showing amps and phase B is not. This is a critical step to ensure the operator will have proper indication requiring a turbine trip.

Simulator Setup from Scratch:

1. Reset to lCl 7 (20% power EOL ready to synch).
2. Establish main generator field excitation using 13830-1 section 4.1.2.
3. Insert remote function CMO3B.
4. Override phase B ammeter 11-40128 to zero.
5. Trigger Phase A and C ammeters to read 4% after main generator is synchronized.
6. Ensure Generator synch switch positions are correct, they do not switch check.

Setup time: 10 minutes 2

Performance Information Critical steps are denoted with an asterisk Section 4.1.3 of 13830-1 selected Standard: 13830-1 is opened to section 4.1.3.

Comment:

4.1.3.1 Select one PCB for synchronizing:

230kV PCB NORM SPLYTO BUS-i 161710 230kV PCB NORM SPLY TO GOS-WHT (3)161810 CUE: Use PCB 161710 Standard: PCB 161710 is selected for synchronizing.

Comment:

4.1.3.2 Place the Synchronize Switch for the selected PCB in the R (running) position:

  • PCB 161710 1-SS-BUS I PCB 161810 1-SS-GOS WHT (3)

Standard: PCB 161710 synchronizing switch is placed in the R (running) position.

Comment:

3

  • 4.1.3.3 Place Unit I Synchronize Switch 1-SS-U1 in the I (incoming) position.

Standard: 1-SS-U1 in the I (Incoming) position.

Comment:

4.1.3.4 Verify rotation of 230kV System Synchroscope 1SI-40125.

Standard: 1SI-40125 is rotating Comment:

4.1.3.5 Using the 230kV Voltage/Frequency Selector Switch 1-VS-US 1:

a. Select the PCB to be closed and note the 230kV System voltage (1 El-40124)._________________________

System Voltage PCB-161710 BUS-i PCB-1 61810 GOS-WHT (3)

Standard: PCB-161710 is selected on 1-VS-US1 and system voltage is recorded in the Sop.

Comment:

4

4.1.3.5 Using the 230kV Voltage/Frequency Selector Switch 1-VS-US1:

b. Select Unit 1 position and note the Unit 1 230kV voltage (1 El-40124)._________________________

Unit 1 Voltage Standard: 1-VS-US1 placed in the Unit 1 position and 1EI-40124 voltage is recorded in the Sop.

Comment:

  • 4.1.3.6 Use the VoltsNARs RAISE/LOWER Pushbutton on the COl display to slowly adjust Unit 1 230kV voltage to read between zero and 1.0kV higher than 230kV System voltage for selected PCB.

CV Standard: Unit 1 voltage is between 0 and 1 .0 kV higher than 230 kV system voltage.

Comment:

  • 4.1.3.7 Adjust Turbine speed using the INCREASE LOAD and DECREASE LOAD Pushbuttons until ISI-40125 Pointer is rotating very slowly in FAST (clockwise) direction.

CV Standard: 1SI-40125 is rotating clockwise Comment:

5

4.1.3.8 IF automatic synchronizing is desired:

CUE: Automatic synchronizing is desired

  • a. Position Synch Mode Sel Switch 1-TS-USI to the PCB selected for synchronizing:
  • PCBI 61710 PCB-16 1810 Standard: 1-TS-US1 in the PCB-161710 position Comment:
b. Monitor 230kV System Synchroscope 1 Sl-401 25.

Standard: 1SI-40125 voltage is monitored Comment:

c. Verify the Synchroscope Pointer is rotating very slowly (approximately 10 to 15 second rotation) in the FAST (clockwise) direction.

CV Standard: Synchroscope period is 10 to 15 seconds in FAST (clockwise) direction Comment:

6

d. WHEN the Synchroscope Pointer nears the 12 oclock (straight up) position, observe the red AUTO SYNC PERMISSIVE light illuminates.

Standard: Red auto sync permissive light on near 12 oclock Comment:

  • e. As the Synchroscope Pointer passes the 11 oclock position, depress and release the Automatic Synchronizing Pushbutton for the selected PCB:
  • BUSI AUTO SYNC PERMISSIVE PCB 161710 SIMBOOTH CUE:

Activate Trigger I as soon as breaker 161710 is closed.

GOS-WHT (3) AUTO SYNC PERMISSIVE PCB 161810 Standard: AUTO SYNC PERMISSIVE PCB 161710 depressed at 11 oclock Comment:

7

f. Verify the selected PCB closes by observing the following:
  • Red light indication on the selected PCB handswitch.
  • Current indicated on amp meter on each phase of Main Generator output or on IPC Computer Points:

IPC Point Amp Meter J2832 111-40127 J2833 111-40128 J2834 111-40129 Standard: Red light indication observed for PCB 161710. No current is indicated on phase B (J2833 & 111-40128)

Comment:

  • g IF current is NOT indicated on all three phases, THEN trip the Turbine and initiate 18011-C, Turbine Trip Below P-9.

CUE: The extra operator will perform 1801 1-Ce Standard: Turbine Trip Push button depressed, and all stop valves verified closed.

Comment:

Terminating cue: Student returns initiating cue sheet 8

Verification of Completion Job Performance Measure No. V-NRC-JP-13830-OO1 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

9

Initial Conditions: The System Operator has given approval to synchronize to the grid.

Main Generator field excitation has already been established by the previous shift.

Initiating Cue: Synchronize the Main Generator to the power grid, and assume 60 to 80 MWe using 13830-1.

Job Performance Measure G Facility: Vogtle Task No: V-LO-TA-60039 Task

Title:

Respond to FHB High Radiation JPM No: V-NRC-JP-13320-001 K/A

Reference:

O61AA1.01 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: THIS IS A TIME CRITICAL JPM The plant is at 100% power, the other unit is in a refueling outage.

Task Standard: Manually align the FHB HVAC system for the Emergency Filtration Mode per 13320-C section 4.2 (or section 4.8 if the student uses).

Required Materials: 1. 13320-C, Fuel Handling Building HVAC.

2. 17102-1, Annunciator Response Procedure for the SRDC.

NOTE: Replacement pages required for 17012-1 and 13320-C.

General

References:

None Initiating Cue: The SS directs you to assume the duties of the Unit Operator.

Time Critical Task: Yes, (9 minutes)

Validation Time: 11 minutes 1

SIMULATOR SETUP:

Simulator Setup:

1. Reset to IC #87 for HL-15R NRC Exam.

Simulator Setup from Scratch:

1. ResettolC#14(MOL100%)
2. Override AHS-2532A and AHS-2533A to NORMAL.

(Panel Map HVAC-2 section HV-L5)

3. Insert Malfunctions ES21A and ES21 B.

NOTE: Simbooth operator, ramp in each of these malfunctions at different rates versus just failing high so as not to cause the student to think these are some sort of RM system failure versus actual high radiation alarms.

4. Insert Malfunction RMO8 on Trigger 1.

Insert Malfunction RM2532A on Trigger 1.

Insert Malfunction RM2532B on Trigger 1.

Insert Malfunction RM2533A on Trigger 1.

Insert Malfunction RM2533B on Trigger 1.

Ramp these malfunctions over slightly different times to simulate high rad event in FHB.

5. Ack/Reset alarms.
6. Freeze simulator Setup time from scratch: 7 minutes 2

Performance Information Critical steps denoted with an asterisk and bolded.

SIMBOOTH INSTRUCTOR: Initiate Trigger I after student takes the shift.

Student determines that HIGH radiation has been received for the Fuel Handling Building.

Standard: Student references ARP-1 7102, for the Safety Related Display Console (SRDC).

  • ARE-2532A I B
  • ARE-2533A I B NOTE to examiner: The ARP actions are the same for each monitor. It is not necessary to look at all 4 rad monitor ARPs. But the student may look at them all.

Comment:

NOTE to examiner: The following steps are from ARP-17102 for the HIGH radiation alarms.

NOTE: For other than HIGH conditions see pages 5 and 6.

1.0 PROBABLE CAUSE

1. High airborne radioactivity in the Fuel Handling Building.
2. Equipment malfunction.

Standard: Student determines from multiple radiation monitor indications that a real radiological event is in progress and not equipment malfunction and reviews NOTE prior to step 1.0.

  • ARE-2532A HIGH Radiation on IPC or SRDC.
  • ARE-2532B HIGH Radiation on IPC or SRDC.
  • ARE-2533A HIGH Radiation on IPC or SRDC.
  • ARE-2533B HIGH Radiation on IPC or SRDC.

Comment:

3

2.0 AUTOMATIC ACTIONS Switches the Normal Fuel Handling Building Ventilation to Accident Mode Ventilation.

Standard: Student notes FHB HVAC should be in the Accident Mode.

Comment:

  • 3.0 INITIAL OPERATOR ACTIONS Evacuate the Fuel Handling Building CUE: If student attempts to inform SS of need to evacuate FHB, you are the only person in the control room at this time.

Standard: The student makes a page announcement to evacuate the Fuel Handling Building:

Comments:

4

TIME CRITICAL START (Once student determines FHB ACTUATION has NOT occurred as required).

4.0 SUBSEQUENT OPERATOR ACTIONS

1. Verify Fuel Handling Building is in the Accident Mode of ventilation.

NOTE to examiner: It is EXPECTED the student will pull SOP-i 3320 and go around back to the HVAC panel to check the status of the FHB Accident Mode. However, the student could go to the panel first and then come back and get the procedure. It is NOT EXPECTED he will drop the ARP on the floor and just manually align hand switches to align the HVAC system.

Standard: Student checks status of Fuel Handling Building HVAC and uses procedure to properly align the system.

SOP-i3320, Section 4.2 is expected.

SOP-i 3320, Section 4.8 could be used IF, section 4.8 used, skip to page 16 of this JPM.

Comment:

NOTE to examiner: The following steps are from 13320-C, section 4.2 for Manual Actuation of Fuel Handling Building Isolation:

NOTE to examiner: IF the student uses 13320-C, section 4.8, skip to page 16 of this JPM.

NOTES and CAUTION prior to step 4.2.1 Standard: The student reviews the 5 notes and caution prior to step 4.2.1.

Comment:

5

4.2.1 Actuate FHB ISOLATION by momentarily placing either trains hand switch to ACTUATE position.

FHB ISOLATION MANUAL ACTUATION AHS-2532A (A54)

FHB ISOLATION MANUAL ACTUATION AHS-2533A (A55)

Standard: The student should attempt to rotate both hand switches to the ACTUATE position.

AHS-2532A, green light remains LIT, red light remains OFF.

AHS-2533A, green light remains LIT, red light remains OFF.

Comment:

4.2.2 Verify FHB Isolation

a. FHB Isolation actuated:

Red Light at FHB ISOLATION MANUAL ACTUATION, AHS-2532A (A54) LIT.

Red Light at FHB ISOLATION MANUAL ACTUATION, AHS-2533A (A55) LIT.

Standard: Student determines FHB actuation has NOT occurred.

AHS-2532A, green light remains LIT, red light remains OFF.

AHS-2533A, green light remains LIT, red light remains OFF.

Comment:

6

  • 422 b. POST ACCIDENT FILTIEXH FANS:

Train A: A-1542-N7-OO1 (C54) RUNNING Train B: A-1542-N7-002 (C55) RUNNING Standard: Student rotates both Train A and Train B fans to the start position.

A-i 542-N7-OOi, red light LIT, green light OFF, amber light OFF.

A-1542-N7-002, red light LIT, green light OFF, amber light OFF.

Comment:

4.2.2 c. Verify Post Accident FILT/EXH FAN dampers open:

  • Fan-i INLET AHV-i2510 (AZLB-62) OPEN
  • Fan-i EXH AH V-i 2512 (AZLB-62) OPEN
  • Fan-2 INLET AHV-i25ii (AZLB-64) OPEN
  • Fan-2 INLET AH V-i 2513 (AZLB-64) OPEN Standard: Student checks all AZLBs above and determines they are open.

Listed AZLBs, red lights LIT, green lights OFF.

Comment:

7

  • 422 d. FHB NORM HVAC SPLY DMPRS
  • A-HV-2529 AHS-2529 (A56) CLOSED
  • A-HV-2528 AHS-2528 (A57) CLOSED Standard: The student rotates both hand switches to the closed position.
  • AHS2529, green light LIT, red light OFF.
  • AHS-2528, green light LIT, red light OFF.

Comments:

  • 422 e. NORM HVAC UNIT SPLY HDR DMPRS:

o A-HV-2535 AHS-2535 (B56) CLOSED

  • A-HV-2534 AHS-2534 (A57) CLOSED Standard: The student rotates both hand switches to the closed position.
  • AHS-2535, green light LIT, red light OFF.
  • AHS-2534, green light LIT, red light OFF.

Comment:

  • 422 f. FHB ISO DMPRS TO NORM EXH:
  • A-HV-12479 AHS-12479 (D56) CLOSED
  • A-HV-12480 AHS-12480 (D57) CLOSED Standard: The student rotates both hand switches to the closed position.
  • AHS-1 2479, green light LIT, red light OFF.
  • AHS-12480, green light LIT, red light OFF.

Comment:

8

  • 4.2.2. g. FHB ISO DMPRS TO STACK:
  • A-HV-12481 AHS-12481 (C56) CLOSED
  • A-HV-12482 AHS-12482 CD57) CLOSED STOP TIME CRITICAL_____________

Standard: The student rotates both hand switches to the closed position.

  • AHS-12481, green light LIT, red light OFF.
  • AHS-l 2482, green light LIT, red light OFF.

Comment:

4.2.3 Record the filter unit started in the Control Room Log.

CUE: The SS will record the filter start times in the Control Room Log.

Standard: Student states he would record start times.

Comment:

4.2.4 Verify the FHB Normal Supply Units STOPPED:

  • FHB NORMAL SPLY UNIT FAN-i AHS-2520 (A52)
  • FHB NORMAL SPLY UNIT FAN-2 AHS-252i (B52)

NOTE to examiner: These fans should auto trip on low air flow, however, the student may manually stop them before they trip, this is acceptable.

Standard: Student checks both normal supply fans stopped.

  • AHS-2520 (A52), green light LIT, amber light LIT, red light OFF
  • AHS-252i (B52), green light LIT, amber light LIT, red light OFF Comment:

9

4.2.5 Verify the FHB Normal Exhaust Units STOPPED:

  • FHB NORMAL EXH UNIT FAN-i AHS-1 2534 (A53)
  • FHB NORMAL EXH UNIT FAN-2 AHS-1 2536 (B53)

NOTE to examiner: These fans should auto trip when the supply units trip, however, the student may manually stop them before they trip, this is acceptable.

Standard: Student checks both normal supply fans stopped.

  • AHS-2520 (A52), green light LIT, red light OFF
  • AHS-252i (B52), green light LIT, red light OFF Comment:

NOTE: If a FHB Isolation Signal is still present and either trains hand switch is taken to reset, then that Trains Isolation logic is rendered inoperable. A corresponding white light will be LIT on AHS-2532B (AHS-2533B), and a corresponding alarm is received on the Unit One and Unit Two SSMP panels and will bring in annunciators on Both Unit One and Unit Two (1I2ALBO4-EO1 (E02).

Standard: Student reviews the note prior to step 4.2.6.

Comment:

10

4.2.6 Reset FHB Isolation on QHVC if required as follows:

Note to examiner: Due to the malfunction entered, the white lights will not illuminate.

a. Momentarily place the desired RH isolation reset hand switch to the RESET OVERRIDE position and release.

Train A AHS-2532B (B54) RESET OVERRIDE Train B AHS-2533B (B55) RESET OVERRIDE Standard: Student rotates both AHS-2532B and AHS-2533B to RESET OVERRIDE.

Comment:

4.2.7 Verify the FHB Isolation has been reset by observing a green light indication.

NOTE to examiner: The green lights will already be lit due to the malfunction present.

FHB ISOLATION MANUAL ACTUATION, AHS-2532A (A54), green light LIT.

FHB ISOLATION MANUAL ACTUATION, A-HS-2533A (A55), green light LIT.

Standard: Student verifies FHB Isolation is reset.

A-HS-2532A, green light LIT.

A-HS-2533A, green light LIT.

Comment:

11

NOTE: If section 4.6 Post Accident Cleanup of the FHB Using The Normal Exhaust Units is to be performed, Train B FHB post accident filter unit should be secured.

CUE: IF asked, the SS does not desire to perform section 46.

Standard: Student reviews note prior to step 4.2.8.

Comment:

  • 4.2.8 As directed by the SS, stop one of the Post Accident FiItIExh Unit Fans:

Train A: A-1542-N7-OO1 AHS-2540 (C54)

Train B A-1542-N7-002 AHS-2541 (C55)

CUE: IF asked, the SS desires to stop Flit I Exhaust Fan #2.

Standard: Student stops one of the Filter I Exhausts Unit Fans.

AHS-2540, green light LIT, red light OFF.

OR AHS-2541, green light LIT, red light OFF.

Comment:

12

4.2.9 Verify Post Accident Filter Fan dampers close for the fan stopped.

Fan-i INLET AHV-i 2510 (AZLB-62) CLOSED Fan-i EXH AHV-i25i2 (AZLB-62) CLOSED Fan-2 INLET AHV-i 2511 (AZLB-64) CLOSED Fan-2 EXH AH V-i 2513 (AZLB-64) CLOSED Standard: Student verifies the two dampers on the fan stopped go closed.

Green lights LIT, red lights OFF.

Comment:

NOTE: If Normal HVAC System is returned to service within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after shutdown, FHB temperature monitoring per the following step need not be completed.

Standard: Student reviews note prior to step 4.2.10 Comment:

13

4.2.10 Initiate area temperature monitoring for the fuel handling building Units 1 and 2, per 14915, Special Conditions Surveillance Logs.

CUE: The SS will ensure performance of room temperature monitoring.

Standard: Student informs SS or requests initiation of temperature monitoring.

Comment:

4.2.11 Reset annunciators 1ALBO39-D02 (D03) by resetting Amber lights on Fuel Handling Building Normal Supply and Exhaust units handswitches as required.

  • FHB NORM EXH UNIT FAN-i AHS-1 2534 (A53)
  • FHB NORM EXH UNIT FAN-2 AHS-1 2536 (B53)
  • FHB NORM HVAC UNIT-i FAN-i AHS-2520 (A52) o FHB NORM HVAC UNIT-2 FAN-2 AHS-2521 (B52)

Note to examiner: If the units auto tripped, the amber lights would need resetting. If the student manually stopped the units before they auto tripped, the amber lights would not be LIT.

Standard: Student resets amber lights which are lit.

Green lights LIT, amber lights OFF, red lights OFF.

Comment:

4.2.12 Verify associated annunciators 1ALBO54-Ai and IALBO54-A2 have extinguished.

Standard: Student verifies or resets the annunciators.

Annunciator window lights OFF.

Comment:

14

Terminating cue: Student returns initiating cue sheet and I or informs SS that the FHB HVAC is operating in the Accident Mode.

15

NOTE to examiner: IF the student opted to perform section 4.8 of 13320-C. The step by step sequence is listed starting below.

CAUTIONS: Prior to step 4.8.1 the are two cautions regarding:

  • Shutdown of all FHB HVAC will render the FHB Post Accident Ventilation Rad Monitors inoperable per Tech Specs.
  • RE-i 2444 and RE-i 2442 minimum temperature for OPERABILITY is 87oF if Heat Trace Panel i-i817-U3-007A is INOPERABLE and the FHB Post Accident Filter Units are in service.

Standard: Student reviews cautions prior to the step.

Comment:

4.8.1 Check status of Heat Tracing Panels i-1817-U3-007A and refer to 17104-i ARP for heat tracing panel 1 NCQARHT for necessary action if INOPERABLE.

CUE: The heat tracing panel is OPERABLE.

Standard: Student reviews step for heat tracing panel.

Comment:

4.8.2 Suspend all operations involving irradiated fuel or crane operation with loads over irradiated fuel prior to stopping the running Normal FHB Exhaust unit in the following steps. (TR13.9.5 and TR 13.3.6) Other activities in the FHB or either fuel pool NOT involving irradiated fuel may continue.

CUE: The SS has suspended all fuel movement.

Standard: Student reviews step and informs SS the fuel handling activities need to be suspended.

Comment:

16

  • 4.8.3 If running, stop the FHB Normal Supply Unit:

FHB NORM HVAC UNIT-I FAN-I AHS-2520 (A52)

FHB NORM HVAC UNIT-2 FAN-2 AHS-2521 (B52)

Standard: Student stops the running FHB Normal Supply:

AHS-2520 (A52), green light LIT, red light OFF, amber light OFF.

AHS-2521 (B52), green light LIT, red light OFF, amber light OFF.

Comment:

  • 4.8.4 IF running, stop the FHB Normal Exhaust Unit:

FHB NORM EXH UNIT FAN-I AHS-12534 (A53)

FHB NORM EXH UNIT FAN-2 AHS-12536 (B53)

Standard: Student stops the running FHB Normal Exhaust Unit:

AHS-1 2534 (A53), green light LIT, red light OFF.

AHS1 2536 (B53), green light LIT, red light OFF.

Comment:

17

  • 4.8.5 Verify the Normal HVAC System Isolation Dampers closed:
  • FHB NORM HVAC SPLY AHS-2528 (A57)

DMPR A-HV-2528

  • FHB NORM HVAC SPLY AHS-2529 (A56)

DMPR A-HV-2529

  • NORM LHVAC UNIT SPLY AHS-2534 (B57)

HDR ISO DMPR A-HV-2535

  • NORM HVAC UNIT SPLY AHS-2535 (B56)

HDR ISO DMPT A-HV-2535

  • FHB ISO DMPR TO NORM AHS-12479 (D56)

EXH TRN-B A-HV-12479

  • FHB ISO DMPR TO NORM AHS-12480 (D57)

EXH TRN-B A-HV-12480

  • FHB ISO DMPR TO STACK AHS-12481 (C56)

TRN-A A-HV-12481

  • FHB ISO DMPR TO STACK AHS-12482 (C57)

TRN-B A-HV-12482 Standard: Student closes all the valves in the list above.

  • FHB valves, green lights LIT, red lights OFF.

Comment:

  • 4.8.6 Verify FHB RECIRC ISOL DMPR A-HV-12553, at AHS-12553 (E56) is closed.

Standard: Student closes A-HV-12553.

A-HV-i 2553, green light LIT, red light OFF.

Comment:

18

NOTES: The following notes are prior to step 4.8.7.

  • Post Accident Filter Units may be started and stopped as required.
  • When starting a Post Accident Filter Unit, ALB31-D02 GEN Volt REG MODE CHANGE ALARM may be momentarily received. No action per procedure 1703-1(2) is required.

Standard: Student reviews NOTES prior to step 4.8.7.

Comment:

  • 487 Start desired Post Accident Filter Unit(s):

POST ACCIDENT FLTIEHX AHS-2540 (C54)

UNIT FAN A-1542-N7-OO1 POST ACCIDENT FLT/EXH AHS2541 (C55)

UNIT FAN A-1542-N7-002 STOP TIME CRITICAL_________________

CUE: IF requested how many units to start, the SS desires to run filter Unit # I.

Standard: Student starts at least one or both Post Accident Filter Unit(s):

AHS-2540, red light LIT, green light OFF, amber light OFF.

AHS-2541, red light LIT, green light OFF, amber light OFF.

Comment:

19

4.8.8 Verify associated Post Accident FILT/EX FAN dampers open for fan started.

FAN-i INLET AHV.-12510 (AZLB-62) OPEN FAN-i EXH AHV-i25i2 (AZLB-62) OPEN FAN-2 INLET AHV-1251i (AZLB-64) OPEN FAN-2 EXH AHV-125i3 (AZLB-64) OPEN Standard: Student verifies the exhaust dampers open for the fan(s) started.

Dam pers listed above, red lights UT, green lights OFF.

Comment:

NOTE: If the Normal FHB HVAC System if returned to service within i 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after shutdown, FHB temperature monitoring per the following step need not be completed.

Standard: Student reviews note prior to step 4.8.9.

Comment:

4.8.9 Verify annunciator 1ALBO54-AOi and/or iALBO54-A02 has reset.

Standard: Student verifies one or both annunciators have reset.

Comment:

4.8.iO Initiate are temperature monitoring for the fuel handling building Units i and 2, per 14915, Special Conditions Surveillance Logs.

CUE: The SS will initiate area temperature monitoring.

Standard: Student requests SS to initiate area temperature monitoring.

Comment:

20

Terminating cue: Student returns initiating cue sheet and I or informs SS that the FHB HVAC is operating in the Accident Mode.

21

Verification of Completion Job Performance Measure No. V-NRC-JP-1332OOO1 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

22

TIME CRITICAL Initial Conditions: The plant is at 100% power, the other unit is in a refueling outage.

Initiating Cue: The SS directs you to assume the duties of the Unit Operator.

Job Performance Measure H Facility: Vogtle Task No: V-LO-TA-21005 Task

Title:

Transfer Steam Dumps to Steam Pressure Mode JPM No: V-NRC-JP-18009-O01 K/A

Reference:

041A4.03 (RO 3.0 I SRO 3.1)

Exam inee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The Reactor has been shutdown due to a tube leak on Steam Generator #1.

Task Standard: Tavg controlled by SG ARVs.

Required Materials: 18009-C step 14 NOTE: Replacement page needed for step 14 of 18009-C.

Initiating Cue: You have been directed to complete step 14 of AOP 18009-C.

Time Critical Task: NO Validation Time: 5 minutes I

SIMULATOR SETUP:

Simulator Setup:

1. Reset to IC #88 for HL-15R NRC Exam.

Simulator setup from scratch.

1. ResettolCl4
2. Manually trip the reactor
3. Throttle AFW flow to 150 GPM/loop
4. Perform step 12 of 18009-C
5. Freeze the simulator after parameters stabilize.

Setup time: 5 minutes 2

Performance Information Critical steps denoted with an asterisk CAUTION Use of SG ARVs should be avoided to preclude an unmonitored radioactive release to the environment.

Standard: Student reviews caution.

Comment:

14. Maintain RCS temperature AT 557 F:
a. Check Steam Dumps in Steam Pressure Mode.

Standard: Notes that the steam dump mode selector switch HS-500C is in the Tave Mode Comment:

RNO

a. Transfer steam dumps to STEAM PRESSURE mode:
1) Check Condenser-AVAILABLE.

Standard: Student notes BPLB C-9 status light -LIT Comment:

  • _2) Place PIC-507 STEAM DUMP CONTROL in MAN.

Standard: Depresses either the up or down arrow on PIC-507. Auto light goes out, manual light goes on.

Comment:

3

  • 3) Match Demand on PIC-507 and Ul-500 STEAM DUMP DEMAND.

Standard: Depresses up or down arrow on PlC 507 until demand meter on PIC-507 is equal to UI-500.

Comment:

  • 4) Place HS-500C STEAM DUMP CONTROL MODE SELECT in STM PRESS.

Standard: HS-500C placed in STM PRESS SIMULATOR OPERATOR CUE:

Override HS-500A to OFF when student places HS-500C to Steam Pressure.

Comment:

b. Maintain RCS temperature using Steam Dumps:

Manual control.

-OR Place P10-507 in AUTO at desired setpoint Standard: Notes that steam dumps will not open in either manual or automatic mode and performs RNO.

Comment:

4

RNO

  • _b. Maintain RCS temperature using SG ARVs on the UNAFFECTED SGs Standard: Uses SG ARVs on loops 2, 3, or 4 to control RCS temperature.

Comment:

Terminating cue: Student returns initiating cue sheet 5

Verification of Completion Job Performance Measure No. V-NRC-JP-18009-OO1 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

6

Initial Conditions: The Reactor has been shutdown due to a tube leak on Steam Generator #1.

Initiating Cue: You have been directed to complete step 14 of AOP 18009-C.

Job Performance Measure I Facility: Vogtle Task No: V-LO-TA-37051 Task

Title:

Bypass Containment Hi-I following a Loss of Heat Sink JPM No: V-NRC-JP-13509-O01 K/A

Reference:

012A4.03 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: While responding to a Loss of Heat Sink on Unit 2, Containment pressure reached the Hi-I set point. The crew is preparing to establish feed water flow in accordance with step 19 of 19231-C.

Task Standard: Student locates and bypasses Containment Hi-i pressure channel bistables 2-PB936B and 2-PB9358 per SOP 13509-C Required Materials: 1. SOP 13509-C (2 copies of section 4.2.1 needed)

2. NSSS protection cabinet key
3. 2 BTI panel bypass keys General

References:

None Initiating Cue: The SS has directed you to Bypass Containment Hi-I pressure channels 2-PB936B and 2-PB935B by initiating 13509-C.

Time Critical Task: No Validation Time: 10 minutes

Performance Information Critical steps denoted with an asterisk Student determines that section 4.2.1 of 13509-C is applicable Standard: Section 4.2.1 referenced Comment:

Student reviews 1 3509-C precautions and limitations:

2.1.2 Multiple BTI Keys may also be used as needed to respond to abnormal or emergency plant conditions.

2.1.4 The NSSS and BOP BTI Annunciators will illuminate when the Key Lock is placed in BYPASS ENABLE OR a BTI switch is placed in the BYPASS position.

NSSS/BOP BTI switch LEDs will illuminate when the Key Lock is in BYPASS ENABLE AND individual BTI switch is in BYPASS.

2.1.6 To provide a reasonable assurance that a channel has been bypassed, the BTI annunciator (on ALBO4 or ALBO5) and the BTI switch LEDs must be illuminated.

If a channel will be tripped or is already tripped, the TSLB should remain extinguished while bypassed.

Standard: N/A Comment:

Student notes CAUTION at beginning of section 4.2.1 for LCO 3.0.3 CUE: If asked, The SS will address all LCO requ irements

  • 4.2.1.1 Circle the bistable(s) to be bypassed, on Checklist 1 (2, 3, 4) for the applicable channel.

Standard: Student circles PB-936B on checklist 2 and PB-935B on checklist 3 Comment:

2

4.2.1.1 For l&C surveillances. Refer To l&C procedure Step 3.2 or 3.3.

Standard: Student marks this step as N/A Comment:

4.2.1.2 For the bistable(s) circled on Checklist 1 (2, 3, 4), obtain the SS authorization to bypass,. Document on Checklist 1 (2, 3, 4).

CUE: The SS has authorized bypass of 2-PB935B and 2-PB936B and signed the appropriate checklists.

Standard: Student requests SS to sign the SS AUTH. Block on Checklist 2 for PB936B and Checklist 3 for PB-935B Comment:

  • 4.2.1.3 Obtain the BTI Enable Key from the SS.

Standard: Requests BTI enable key from the SS.

NOTE: Student may also request NSSS protection cabinet key if these panel doors are locked. These keys are held by the control room operators.

Comment:

3

Reviews precautions 2.1.1 and 2.1.2 as directed by a note in the procedure 2.1.2 Except as identified in 2.1.1, during Modes 1-4, only one BTI Enable key per unit will normally be issued for use and each SS will be responsible for the control and use of this key. An additional key per unit may be obtained from the SS gpjy for use with surveillance testing or corrective maintenance on Power Range NIS. Multiple BTI Keys may also be used as needed to respond to abnormal or emergency plant conditions.

CUE: If asked, The SS will ensure the requirements for step 2.1.1 are maintained.

Standard: Determines last sentence in precaution 2.1.2 is applicable.

Comment:

4.2.1.4 Except as noted in 2.1 .1, verify no other channel NSSS AND BOP BTI Panels are in the bypass condition WHEN in Modes 1-4.

Standard: Requests a concurrent verification and Verifies all NSSS and BOP BTI annunciator windows are dark.

CUE: All annunciator windows are dark.

NSSS BTI annunciators are ALBO5 windows A02, B02, 002, and D02.

BOP BTI annunciators are ABLO4 windows BOl, 001, and DOl.

Comment:

4

Reviews NOTE prior step 4.2.1.5 4.2.1.5 On the BTI Panel on which bypassing is desired, verify all BTI switches are in the NORMAL position.

CUE: All BTI switches are pointing to the NORMAL (down) position.

Standard: Verifies all switches on either BTI channel 2 or 3 panel are in the normal (down) position Comment:

4.2.1.6 On the Bli NSSS Panel on which bypassing is desired:

a. Verify the circuit breaker is in the ON position, AND
b. Verify power LED is illuminated.

CUE: The circuit breaker is ON with the power LED illuminated.

Standard: Verifies BTI circuit breaker is on (upper portion of rocker switch in flush with panel) and the LED inside the switch is illuminated.

Comment:

5

Notes that ALB05B02 (002) NSSS PROT GR 11(111) BYPASS alarm is expected in the following step 4.2.t7 Perform the following:

a. *lnse the BTI Enable Key in the Key Lock,
b. *place in the BYPASS ENABLE position, AND
c. Verify LED illuminates.

Standard: Inserts BTI key into the bypass enable switch for channel 11(111) panel and rotates the switch clockwise. Verifies LED immediately above the bypass enable switch illuminates.

Comment:

4.2.1.8 Verify the annunciator for the applicable BTI NSSS Channel enabled illuminates:

NSSS PROT GR II BYPASS (ALB-05-B02)

OR NSSS PROT GR Ill BYPASS (ALB-05-C02)

CUE: The annunciator is illuminated.

Standard: Verifies NSSS PROT GR 11(111) BYPASS window is alarming Comment:

6

4.2.1.9 Notify the SS that performance of the next step may require entry into one or more functional units of TS LCOs 3.3.1 AND/OR 3.3.2.

CUE: The SS has been notified of the possible Tech Spec entry.

Standard: Notifies SS Comment:

  • 4.2.1.10 Place BTI NSSS Switch(es) circled in Step 4.2.1.1 to the BYPASS position.

Document on Checklist 1 (2, 3, 4). (CV REQUIRED)

Standard: Requests a concurrent verification and then moves toggle switch 34 for PB-9366 (PB-935B) to the up position.

Comment:

4.2.1.11 Verify BTI Switch LEDs are illuminated for Switch(es) in the BYPASS position.

CUE: The LED is illuminated.

Standard: Request concurrent verification and verifies LED immediately above toggle switch 34 for PB-936B (PB-935B) is illuminated.

Comment:

7

4.2.1.12 For the channel bistable(s) bypassed on Checklist 1(2, 3, 4), verify the TSLB(s) is extinguished.

CUE: The TSLB is extinguished.

Standard: Verifies TSLB 4, 10.2 (10.3) is extinguished.

Comment:

4.2.1.13 Notify SS to document the time of channel bypass in the Shift Supervisor Logbook.

Standard: SS notified to document time channel was bypassed.

Comment:

4.2.1.14 WHEN surveillance testing is complete OR plant conditions require, restore the BTI NSSS Channel Switch(es) to NORMAL per Section 4.2.4 Standard: Student determines this step should not be performed until channel no longer requires bypassing.

If this step is performed, then it becomes critical and is unsatisfactory.

Comment:

8

Student repeats section 4.2.1 for the second channel to be bypassed.

4.2.1.1 For I&C surveillances, Refer To I&C procedure Step 3.2 or 3.3.

Standard: Student marks this step as N/A Comment:

4.2.1.2 For the bistable(s) circled on Checklist 1 (2,3, 4), obtain the SS authorization to bypass, Document on Checklist 1 (2, 3, 4).

Standard: Student requests SS to sign the SS AUTH. Block on Checklist 2 for PB-936B or Checklist 3 for PB-935B if not obtained when bypassing the first channel.

Comment:

  • 4.2.1.3 Obtain the BTI Enable Key from the SS.

Standard: Requests Bli enable key from the SS.

NOTE: Student may also request NSSS protection cabinet key if these panel doors are locked. These keys are held by the control room operators.

Comment:

Reviews precautions 2.1.1 and 2.1.2 as directed by a note in the procedure Standard: N/A Comment:

9

4.2.1.4 Except as noted in 2.1 .1, verify no other channel NSSS AND BOP BTI Panels are in the bypass condition WHEN in Modes 1-4.

Standard: Requests a concurrent verification and Verifies only the NSSS GR II (Ill) annunciator window is lit and all BOP BTI annunciator windows are dark.

Comment:

Reviews NOTE prior step 4.2.1.5 4.2.1.5 On the BTI Panel on which bypassing is desired, verify all BTI switches are in the NORMAL position.

Standard: Verifies all switches on either BTI channel 2 or 3 panel are in the normal (down) position Comment:

4.2.1.6 On the BTI NSSS Panel on which bypassing is desired:

a. Verify the circuit breaker is in the ON position, AND
b. Verify power LED is illuminated.

Standard: Verifies BTI circuit breaker is on (upper portion of rocker switch in flush with panel) and the LED inside the switch is illuminated.

Comment:

10

Notes that ALBO5-B02 (002) NSSS PROT GR 11(111) BYPASS alarm is expected in the following step 4.2.1.7 Perform the following:

a. *lnse the BTI Enable Key in the Key Lock,
b. *place in the BYPASS ENABLE position, AND
c. Verify LED illuminates.

Standard: Inserts BTI key into the bypass enable switch for channel 11(111) panel and rotates the switch clockwise. Verifies LED immediately above the bypass enable switch illuminates.

Comment:

4.2.1.8 Verify the annunciator for the applicable BTI NSSS Channel enabled illuminates:

NSSS PROT GR II BYPASS (ALB-05-B02)

OR NSSS PROT GR Ill BYPASS (ALB-05-C02)

Standard: Verifies NSSS PROT GR 11(111) BYPASS window is alarming Comment:

4.2.1.9 Notify the SS that performance of the next step may require entry into one or more functional units of TS LCOs3.3.1 AND/OR 3.3.2.

Standard: Notifies SS Comment:

11

  • 4.2.1.10 Place BTI NSSS Switch(es) circled in Step 4.2.1.1 to the BYPASS position.

Document on Checklist 1 (2, 3, 4). (CV REQUIRED)

Standard: Requests a concurrent verification and then moves toggle switch 34 for PB-936B (PB-935B) to the up position.

Comment:

4.2.1.11 Verify BTI Switch LEDs are illuminated for Switch(es) in the BYPASS position.

Standard: Request concurrent verification and verifies LED immediately above toggle switch 34 for PB-936B (PB-935B) is illuminated.

Comment:

( 4.2.1.12 For the channel bistable(s) bypassed on Checklist 1(2, 3, 4), verify the TSLB(s) is extinguished.

Standard: Verifies TSLB 4, 10.2 (10.3) is extinguished.

Comment:

4.2.1.13 Notify SS to document the time of channel bypass in the Shift Supervisor Logbook.

Standard: SS notified to document time channel was bypassed.

Comment:

12

4.2.1.14 WHEN surveillance testing is complete OR plant conditions require, restore the BTI NSSS Channel Switch(es) to NORMAL per Section 4.2.4 Standard: Student determines this step should not be performed until channel no longer requires bypassing.

If this step is performed, then it becomes critical and is unsatisfactory.

Comment:

Terminating cue: Student returns initiating cue sheet 13

Verification of Completion Job Performance Measure No. V-RQ-JP-13509.-OO1 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

14

Initial Conditions: While responding to a Loss of Heat Sink on Unit 2, Containment pressure reached the Hi-I set point. The crew is preparing to establish feed water flow in accordance with step 19 of 19231-C.

Initiating Cue: The SS has directed you to Bypass Containment Hi-I pressure channels 2-PB936B and 2-PB935B by initiating 13509-C.

Job Performance Measure J Facility: Vogtle Task No: V-LO-TA-20016 Task

Title:

Locally Start the TDAFW Pump JPM No: V-NRC-JP-18038-014 K/A

Reference:

068EA1.02 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: Unit I control room has been evacuated due to a fire.

Task Standard: TDAFW pump operating and delivering flow to all SGs.

Required Materials: 1. AOP-18038-1, Attachment A, TDAFW Pump Operation From Shutdown Panel C.

General

References:

None Initiating Cue: The SS has dispatched you to Shutdown Panel C (TDAFW Control Panel) on Unit I and directed you to initiate 18038 Attachment A and establish aux feed flow to all steam generators from the TDAFW pump.

Time Critical Task: No Validation Time: 10 minutes 1

Performance Information Critical steps denoted with an asterisk Student determines that 18038 Attachment A is applicable.

Standard: Attachment A of 18038 referenced.

Comment:

Student reviews 18038 CAUTIONS:

The TDAFW pump steam supply valve,HV-5106, will not automatically open on a pump start signal after control has been transferred to the Shutdown Panel.

If an SG fed by the MDAFW pump is also being fed from the TDAFW pump, one of the MDAFW pumps throttle valves or its miniflow valve must remain fully open to maintain minimum miniflow requirements.

Standard: N/A Comment:

  • Step I Transfer control of the TDAFW pump steam supply isolation valves, HV-3009 and HV-3019 to LOCAL.

Standard: Student places LOCAL-REMOTE transfer switches to LOCAL for:

HV-3009 HV-301 9 NOTE to examiner: This step is critical in order for the student to verify the proper valve status.

Comment:

2

Step 2 Verify at least one steam supply isolation valve is open.

CUE: The red light is LIT, the green light is OFF.

Standard: Student will check for the red lights only LIT on:

HV-3009 HV-301 9 Comment:

Step 3 Transfer control of the TDAFW Pump Room Outside Air Damper, HV-1 2010 to LOCAL and open it.

CUE: The red light is LIT, the green light is OFF.

Standard: Student places LOCAL-REMOTE hand switch for HV-1 2010 to LOCAL and checks valve status as open.

NOTE to examiner: This valve should normally be open.

Comment:

  • Step 4 Enable differential pressure controller PDIC-5180B by placing transfer switch HS-5180 in LOCAL.

Standard: Student places LOCAL-REMOTE hand switch HS-5180B to LOCAL.

CUE: IF student requests, indicate the auto manual pushbutton AUTO light is LIT and the DELTA P light is LIT.

Comment:

3

  • Step 5 Transfers control of the TDAFW Pump AFW Throttle Valves HV-5120, HV 5122, HV-5125, and HV-5127 to LOCAL.

Standard: Student places the valves LOCAL-REMOTE transfer switches to LOCAL.

HV-51 20 HV-51 22 HV-5125 HV-51 27 CUE: IF the student requests, the green lights are LIT and the red lights are OF F.

Comment:

Step 6 Verify TDAFW pump Trip/Throttle Valve PV-15129 is reset by verifying the motor operator is OPEN and the valve is latched and OPEN.

Standard: Checks T & T valve panel and notes the red light is LIT for the motor operator and the red light is LIT for the valve position.

NOTE: The student could possibly look at the manual valve position and latching mechanism for the valve, the motor operator checked on the panel.

CUE: IF student checks T & T panel for motor operator and valve status, inform them the motor operator red light is LIT, and the valve position red light is LIT.

CUE IF student checks the T & T valve latching mechanism and valve indicate the T & T valve is latched and the valve position indicator is up.

Comment:

4

  • Step 7 Verify differential pressure controller PDIC-5180B is in SPEED Control and adjust its CONTROL signal to 100% demand.

CUE: The DELTA P light is lit and the demand meter indicates 30%.

Standard Student depresses the SPEED I DELTA P pushbutton to place in SPEED control and depresses the up arrow to raise demand to 100%.

CUE: The SPEED light is LIT and the demand meter is 100%.

Comment:

  • Step 8 Start the TDAFW pump by placing HS-5106C in LOCAL and opening HV-51 06.

Standard: Places HS-51 06 LOCAL-REMOTE switch to LOCAL.

CUE: The hand switch green light is LIT.

Standard Rotates HS-5106 to the OPEN position.

CUE: The red light is LIT, and the green light is now OFF.

Comment:

5

Step 9 Verify that pump speed and discharge pressure begin rising.

Standard: Student checks pump speed and discharge pressure rising on local panel. The candidate may also check local speed and discharge pressure indicators in the room.

CUE: The pump speed and discharge pressures are rising.

Comment:

Step 10 Monitor AFW flow to each SG using Fl-51500, Fl-5151C, FI-5152C, and Fl-51530.

CUE: The flows instruments are reading downscale, 0 gpm.

Standard: Checks the referenced flow indicators.

NOTE to examiner: There are additional flow indicators on the panel that were used for startup testing. These would never indicate flow., these are Fl-5286, Fl-5287, FI-5288, and FI-5289.

Comment:

6

  • Step 11 Monitor SG levels and adjust TDAFW pump AFW throttle valves as necessary to maintain SG WR level 65% to 70%.

CUE: When student indicates that he would use the AFW throttle valves to adjust flow, AFW flow is now 300 gpm.

SG WR levels indicate 67%.

Standard AFW flow valves throttled to control SG WR levels 65% to 70%.

Comment:

Terminating cue: Student returns initiating cue sheet 7

Verification of Completion Job Performance Measure No. V-RQ-JP-18038-014 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

8

Initial Conditions: Unit I control room has been evacuated due to a fire.

Initiating Cue: The SS has dispatched you to Shutdown Panel C (TDAFW Control Panel) on Unit I and directed you to initiate 18038 Attachment A and establish aux feed flow to all steam generators from the TDAFW pump.

Job Performance Measure K Facility: Vogtle Task No: V-LO-TA-37018 Task

Title:

Locally Isolate RCP Seals (NOTE: This JPM requires an RCA entry)

JPM No: V-NRC-JP-19100-005 K/A

Reference:

055G2.4.34 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance Classroom Simulator Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The crew is responding to a loss of all AC power on Unit I per 19100. Power has been lost for 12 minutes and is not expected to be restored in the near future.

Task Standard: RCP seal injection isolation valves, RCP seal return isolation CRC all closed, ARV power supplies in Aux. Building all OFF.

Required Materials: 1. EOP-19100-C, Loss of All AC Power, Attachment E

2. RWP and associated dosimetry.
3. Hearing Protection / Safety glasses / Gloves General

References:

None Initiating Cue: Per Attachment E of 19100-C, the SS has directed you to close the Seal Injection and Return Isolation valves on Unit I outside Containment and open the ARV 480V breakers on Unit 1.

Time Critical Task: No Validation Time: 20 minutes 1

Performance Information Critical steps denoted with an asterisk Student determines that 19100-C, Attachment E is applicable.

Standard: Attachment E of 19100-C referenced.

NOTE: These are bulleted steps and may be performed in any order.

Comment:

  • Close Seal Injection and Return Isolation Valves on affected unit outside Containment.

Standard: Student locates the following valves on the correct unit and engages the manual declutching level and rotates valves hand wheels in the clockwise direction:

CUE: IF, student requests the limit switch position indication is showing closed or point at the closed limit switch indication on the valve.

NOTE: Due to radiological conditions in the penetration rooms, the students may use the appropriate wall drawing outside the room to indicate the valve location and describe the actions to close the valves.

Unit I Unit 2

_HV-8103A (AB-A09) (AB-A103)

HV-8103B (AB-A09) (AB-A103)

_HV-8100 (AB-A09) (AB-A103)

HV-8103C (FHB-AIO) (FHB-A01)

HV-8103D (FHB-AIO) (FHB-A01)

Comment:

2

  • Close ACCW Supply Isolation Valve on affected unit outside Containment.

NOTE: This valve is outside the RCA in the South Main Steam Valve Room.

Uniti Unit2 HV-1979 (AB-A12) (AB-A105)

Standard: Clutch level depressed, hand wheel turned clockwise until no further motion can be obtained, and local position indicator points to closed.

CUE: If proper actions taken, MOV local indicator points to the shut indication.

Comment:

  • Open ARV 480V breakers in anticipation of local manual ARV operation.

CUE: Give indication that the breaker is showing open or off on the MCC position indicator.

Standard: 480V MCC breakers turned off on the following Unit 1 MCCs.

Uniti Unit2 ABB-25, PV-3000 (AB-118) (AB-149)

_BBB-25, PV-3010 (AB-116) (AB-147)

BBB-26, PV-3020 (AB-116) (AB-147)

ABB-26, PV-3030 (AB-118) (AB-149)

Terminating cue: Student informs SS of completion of 19100-C, Attachment E or returns the cue sheet.

3

Verification of Completion Job Performance Measure No. V-RQ-JP-19100-005 Examinees Name:

Examiners Name:

Date Performed:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners signature and date:

4

Initial Conditions: The crew is responding to a loss of all AC power on Unit I per 19100. Power has been lost for 12 minutes and is not expected to be restored in the near future.

Initiating Cue: Per Attachment E of 19100-C, the SS has directed you to close the Seal Injection and Return Isolation valves on Unit I outside Containment and open the ARV 480V breakers on Unit I.