Similar Documents at Surry |
---|
Category:- No Document Type Applies
MONTHYEARML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21342A1412021-12-0909 December 2021 Enclosure - List of Attendees for the Public Meeting in Tarrytown, Ny, Re Indian Point Units 1, 2, and 3 PSDAR ML21130A0532019-09-30030 September 2019 Appendix C: Criticality Analysis Checklist ML19105B0552019-04-15015 April 2019 Superseded Pages Per Revision No. 01 to Environmental Sampling Program ML19095A6002019-04-0202 April 2019 Enclosure 1 - Topics That Require a SLRA Supplement ML19011A1712019-01-0404 January 2019 Enclosures 1 to 3 - EAL Scheme Revisions Enclosure Summary, Discussion of Change and Mps EAL Scheme Revisions-Supporting Documents ML17038A2702016-12-14014 December 2016 Non-Proprietary Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) ML16277A1882016-10-0303 October 2016 2016301 Final SRO Written Examination ML15097A1172015-04-0707 April 2015 Soarca Surry 2004 Meteorological File ML15065A2382015-02-0606 February 2015 Acord Certificate of Liability Insurance ML14162A5772014-06-25025 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushim Dai-ichi Nuclear Power Plant Accident ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1019301942010-06-0909 June 2010 Onsite Ground/Surface Water Monitoring Questionnaire for Surry ML1011005512010-04-20020 April 2010 Public Meeting Attendees (4/13/10) ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0931004632009-11-0404 November 2009 E-mail Attachment Revised Dominion Draft Response to NRC GL 04-02 RAI Question #4 ML12024A0732009-03-31031 March 2009 Don Dube Comments; Soarca Secy and Associated Enclosures ML12024A0742009-03-0909 March 2009 RES Response Comments; Don Dube Comments: Soarca Secy and Associated Enclosures ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0730400302007-10-0101 October 2007 Sign-In Roster for Public Meeting with Dominion Nuclear ML0634705992006-12-14014 December 2006 Plant Service List ML0513005392005-05-0505 May 2005 Attachment 1, Response to Requests for Additional Information on Nuclear Facility Quality Assurance Program Description ML0513005442005-05-0505 May 2005 Attachment 2, Response to Requests for Additional Information Re Proposed Technical Specifications Changes Associated with Nuclear Facility Quality Assurance Program Description ML0513005592005-05-0505 May 2005 Enclosure 5, Response to Requests for Additional Information Replacement Discussion of Changes ML0513005562005-05-0505 May 2005 Enclosure 4, Response to Requests for Additional Information Marked Up Discussion of Changes ML0631805182004-06-0101 June 2004 Tragis Routing Engine Version 1.4.15, from Surry to Yucca Mountain ML0414803912004-05-0707 May 2004 Halon System, Emergency Switchgear Room and Fire Protection Drawings ML0410701372004-04-0808 April 2004 Attachment 1, List of Attendees for Surry Annual Assessment Meeting Dated 04/08/04 ML0404104922004-02-20020 February 2004 Order EA-03-009 Service List ML0505404692004-02-10010 February 2004 Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004 ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0505402642003-10-22022 October 2003 Summary of EB1 Findings (07-09/03) ML0403502122003-08-13013 August 2003 DRS Open Items Status ML0403506872003-08-0505 August 2003 DRS Open Item Status ML0224003322002-08-27027 August 2002 Outline for Phone Calls with Licensees for: Davis-Besse, H.B. Robinson, North Anna Unit 2 and Surry Unit 2 ML0213304862002-04-29029 April 2002 Dominion'S SBO Supplemental Response, Final Draft Dated 04/29/2002 ML0201003882002-01-24024 January 2002 Enclosufigures Depicting the Locations of the Surry and North Anna Power Stations and Their Associated Transmission Lines ML19093A4871989-07-24024 July 1989 Generic Letter 89-06, Re SPDS Photographs, Which Is Made Up of Series of Colorgraphic Displays Arranged in a Hierarchical Manner ML19105B0471982-06-28028 June 1982 06/28/1982 Superseded Pages Per Revision 3 to Response to NUREG 0737 Post TMI Requirements ML19105B0481981-12-0909 December 1981 12/09/1981 Superseded Pages Per Revision 2 to Response to NUREG 0737 Post TMI Requirements ML19105B0501981-06-18018 June 1981 06/18/1981 Superseded Pages Per Revision 1 to Response to NUREG 0737 Post TMI Requirements 2022-02-16
[Table view] |
Text
.4 O*NSITE GROUND/SURFACE WATER MONITORING A,QUESTIONNAIRE Surry Power Station
- Onsite RadiologicalEffluent/REMP Monitoring Program Phase I !Near term response)
Yes No
- 1. Does the licensee have radioactive groundwater monitoring wells onsite?
[] C If YES: How many wells: One Where ar6Tthey located (e.g., distributed around/throughout the site, in a particularregion of the site and/or near particular buildings/structures, etc.)
(a!)) within the Protected Area C
(b.) within the Radiologically Restricted Area C
(c.) within the owner-controlled area C
(d.Jt what frequency does the licensee sample/analyze the wells Quarterly (eW.hfor what radionuclides does the licensee monitor Gamma emitters (gamma Spec) (
C If Yes - at what MDA I to 60 pCi&L Tritium
[] C If Yes - at what MDA 2,000 pCi/L Gross Beta C []
If Yes - at what MDA Other: C [
If Yes - at what MDA
- 2. If the licensee does NOT have an onsite radioactive groundwater monitoring program:
(a.) Does the licensee plan to implement a groundwater monitoring program?. C C If Yes, when and to what extent (b.) Does the licensee plan to take other measures to assure they can identify radioactive groundwater contamination C C
- 3. Does the licensee have a french drain system surrounding the main reactor facility and auxiliary structures ? C (a.) is the system analyzed for radionuclides?
C (b.),at what frequency does the licensee sample/analyze the wells Weekly
/5
(c)for what radionuclides does the licensee monitor Gamma emitters (gamma Spec)
C If Yes - at what MDA 5e-7 itCi/ml Tritium C
If Yes - at what MDA le-5 itCi/ml Gross Beta If Yes - at what MDA
- 4. Does*thý licensee have a surveillance program to periodically:
(a.) walkdown outside areas around the site to look for potential leaks
' d spills?
M C (b.) prebsurize buried radwaste lines to evaluate structural integrity and evaiuate potential for leaks and spills? C
- 5. Does'the licensee perform any other onsite monitoring (e.g. soil sampling) to identify unexpected radioactive releases C
- 6. Does the licensee's radioactive liquid discharge line traverse any non-licensee owned areas (e.g., it is on a right-of-way surrounded by C private properties)?
Yes No
- 7. If the licensee has a discharge pipe that runs underground or any underground piping that carries radioactive liquids, does the licensee C M perform monitoring along the discharge pathway to identify potential leakage.
If YES, How frequently is the sampling performed:
Phase II (Longer Term Response)
Yes No
- 8. Historical Onsite Radioactive Contamination:
(a.) Does the licensee have any history of radioactive spills and/or leaks C
Are they documented in 10 CFR 50.75g file?
C (b.) Has tlhe licensee identified onsite radioactive groundwater M]
contamination? C If YES: ,
When was it identified - IF known:
Dltes:
LER/Abnormal Event Report/Condition Report Nos:
___(If available)
To whýa"t extent - IF known [square footage, estimated ground depth of the
W4. U.ý contamination, estimated quantity (volume / concentration), etc.]
Has the cqntamination moved outside the Restricted Area or C C the owner-controlled area mments: Continuation of question 3c: Gross alpha le-7 piCi/ml MDA, Sr-89/90 5e-8 pCi/ml and Fe-55 le-6 pCi/mi MDA.
iestion #1: One onsite monitoring location, REMP sample location Surry Station iestion #3: Referring to Storm Drains. Strom Drains are fed by turbine, containment & fuel buildings sub-surface drains. Part of Rad Effluent program.
iestion #4a: Considered yes by Ops & Eng because it is part of an Operators watch station to be observant for leaks &.spills.
iestion #4b: Per Eng., radwaste lines are not code piping that requires testing.
A'
/,I A
4