.4 O*NSITE GROUND/SURFACE WATER MONITORING A

,QUESTIONNAIRE Surry Power Station

  • Onsite Radiological Effluent/REMP Monitoring Program Phase I !Near term response)
1.

Does the licensee have radioactive groundwater monitoring wells onsite?

If YES: How many wells:

One Where ar6Tthey located (e.g., distributed around/throughout the site, in a particularregion of the site and/or near particular buildings/structures, etc.)

(a!))

within the Protected Area (b.) within the Radiologically Restricted Area (c.) within the owner-controlled area (d.Jt what frequency does the licensee sample/analyze the wells (eW.hfor what radionuclides does the licensee monitor Gamma emitters (gamma Spec)

(

If Yes - at what MDA Tritium Yes No

[]

C C

C C

Quarterly C

I to 60 pCi&L

[]

C 2,000 pCi/L C

[]

Gross Beta If Yes - at what MDA If Yes - at what MDA Other:

C

[

If Yes - at what MDA

2.

If the licensee does NOT have an onsite radioactive groundwater monitoring program:

(a.) Does the licensee plan to implement a groundwater monitoring program?.

If Yes, when and to what extent (b.) Does the licensee plan to take other measures to assure they can identify radioactive groundwater contamination

3.

Does the licensee have a french drain system surrounding the main reactor facility and auxiliary structures ?

(a.) is the system analyzed for radionuclides?

(b.),at what frequency does the licensee sample/analyze the wells C

C C

C C

C Weekly

/5

(c)for what radionuclides does the licensee monitor Gamma emitters (gamma Spec)

If Yes - at what M Tritium DA C

5e-7 itCi/ml C

le-5 itCi/ml If Yes - at what MDA Gross Beta If Yes - at what MDA

4.

Does* thý licensee have a surveillance program to periodically:

(a.) walkdown outside areas around the site to look for potential leaks

' d spills?

(b.) prebsurize buried radwaste lines to evaluate structural integrity and evaiuate potential for leaks and spills?

5.

Does'the licensee perform any other onsite monitoring (e.g. soil sampling) to identify unexpected radioactive releases

6.

Does the licensee's radioactive liquid discharge line traverse any non-licensee owned areas (e.g., it is on a right-of-way surrounded by private properties)?

7.

If the licensee has a discharge pipe that runs underground or any underground piping that carries radioactive liquids, does the licensee perform monitoring along the discharge pathway to identify potential leakage.

M C

C C

C Yes No C

M If YES, How frequently is the sampling performed:

Phase II (Longer Term Response)

Yes No

8.

Historical Onsite Radioactive Contamination:

(a.) Does the licensee have any history of radioactive spills and/or leaks Are they documented in 10 CFR 50.75g file?

(b.) Has tlhe licensee identified onsite radioactive groundwater contamination?

If YES:

When was it identified - IF known:

Dltes:

LER/Abnormal Event Report/Condition Report Nos:

___(If available)

To whýa"t extent - IF known [square footage, estimated ground depth of the C

C C

M]

W4.

U.

ý contamination, estimated quantity (volume / concentration), etc.]

Has the cqntamination moved outside the Restricted Area or C

the owner-controlled area C

mments: Continuation of question 3c:

Gross alpha le-7 piCi/ml MDA, Sr-89/90 5e-8 pCi/ml and Fe-55 le-6 pCi/mi MDA.

iestion #1: One onsite monitoring location, REMP sample location Surry Station iestion #3: Referring to Storm Drains. Strom Drains are fed by turbine, containment & fuel buildings sub-surface drains. Part of Rad Effluent program.

iestion #4a: Considered yes by Ops & Eng because it is part of an Operators watch station to be observant for leaks &.spills.

iestion #4b: Per Eng., radwaste lines are not code piping that requires testing.