University of Utah - Retraction of the Power Uprate Request from the University of Utah License Renewal Application
ML101760346
Person / Time
Site: University of Utah
Issue date: 07/06/2010
From: Geoffrey Wertz
Division of Policy and Rulemaking
To: Jevremovic T
Univ of Utah
Wertz G, NRR/DPR/PRLB, 301-415-0893
References
TAC ME1599
Download: ML101760346 (4)


Text

July 6, 2010 Dr. Tatjana Jevremovic Director, Utah Nuclear Engineering Program Joseph Merrill Engineering Building 50 Central Campus Drive, Room 2298 University of Utah Salt Lake City, UT 84112

SUBJECT:

UNIVERSITY OF UTAH - RETRACTION OF THE POWER UPRATE REQUEST FROM THE UNIVERSITY OF UTAH LICENSE RENEWAL APPLICATION (TAC NO. ME1599)

Dear Dr. Jevremovic:

The U. S. Nuclear Regulatory Commission (NRC) received your letter dated May 27, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101600188), retracting the power uprate portion of your license renewal application (LRA) and requesting the LRA review under the existing power level of 100 kilowatts (kW) for Facility Operating License No. R-126, for the University of Utah TRIGA Reactor (UUTR). Since you are no longer requesting a power uprate, the NRC will review your LRA in accordance with the method described in the Interim Staff Guidance (ISG) on the Streamlined Review Process for License Renewal for Research Reactors (ADAMS ML092240244).

The NRC requests that you provide an updated safety analysis report, including technical specifications, consistent with a power level of 100 kW. Additionally, we ask that you continue work toward completion of the responses to the request for additional information (RAI) provided in NRC letter dated February 22, 2010 (ADAMS Accession No. ML100360411). However, since the RAIs were written to reflect the power uprate condition, a few changes are necessary: RAIs 39 and 60.2 are no longer necessary. Also, the power level referenced in RAIs 21.1, 21.2, 45.1, 59.6, and 60.1 should be changed from 250kW to 100kW.

If you have any questions, please contact me by telephone at 301-415-0893 or by e-mail at geoffrey.wertz@nrc.gov.

Sincerely,

/RA JQuichocho for/

Geoffrey Wertz, Project Manager Research & Test Reactor Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-407

University of Utah TRIGA Reactor Docket No. 50-407 cc:

Mayor of Salt Lake City 451 South State Room 306 Salt Lake City, UT 84111 Dr. Thomas Parks Vice President for Research 201 S. Presidents Circle, Room 210 University of Utah Salt Lake City, UT 84112 Ms. Karen Langley Director, University of Utah Radiological Health 100 OSH, University of Utah Salt Lake City, UT 84112 Dr. Cynthia Furse Associate Vice President for Research 201 Presidents Circle, Room 210 University of Utah Salt Lake City, UT 84112 Test, Research, and Training Reactor Newsletter Universities of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 Director, Division of Radiation Control Dept. Of Environmental quality 168 North 1959 West P.O. Box 144850 Salt Lake City, UT 84114-4850

ML101760346 *concurrence via e-mail NRR-106 OFFICE PRLB:PM*

PRLB:LA PRLB:BC PRLB:PM*

NAME GWertz gw GLappert gkl JQuichocho jq GWertz gw DATE 6/ 29 /10 6/28/2010 7/1/2010 7/6/2010