IR 05000261-10-008; 02/08/2010 - 02/26/2010; H.B. Robinson Steam Electric Plant, Unit 2; Post Approval Site Inspection for License Renewal
ML100970495
Person / Time
Site: Robinson Duke energy icon.png
Issue date: 04/07/2010
From: Mark Franke
NRC/RGN-II/DRS/EB3
To: Mccartney E
Carolina Power & Light Co
References
IR-10-008
Download: ML100970495 (53)


See also: IR 05000261/2010008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

April 07, 2010

Carolina Power and Light Company

ATTN: Mr. Eric McCartney

Vice President - Robinson Plant

H. B. Robinson Steam Electric Plant, Unit 2

3851 West Entrance Road

Hartsville, SC 29550

SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT - NRC POST-APPROVAL SITE

INSPECTION FOR LICENSE RENEWAL INSPECTION REPORT

05000261/2010008

Dear Mr. McCartney:

On February 26, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a Post-

Approval Site Inspection for License Renewal at your H.B. Robinson Steam Electric Plant,

Unit 2. The enclosed report documents the inspection findings, which were discussed on

February 26, 2010, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter,

its enclosure, and your response (if any), will be available electronically for public inspection in

the NRC Public Document Room or from the Publicly Available Records System (PARS)

component of NRC's Agencywide Documents Access and Management System (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA/

Mark Franke, Chief

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-261

License No. DPR-23

Enclosure: Inspection Report 05000261/2010008

w/Attachment: Supplemental Information

cc w/encl: see Page 2

CP&L 2

cc w/encl: David T. Conley

Eric McCartney Associate General Counsel

Vice President Legal Dept.

H. B. Robinson Steam Electric Plant Unit 2 Progress Energy Service Company, LLC

Carolina Power & Light Company Electronic Mail Distribution

Electronic Mail Distribution

John H. O'Neill, Jr.

R. J. Duncan, II Shaw, Pittman, Potts & Trowbridge

Vice President 2300 N. Street, NW

Nuclear Operations Washington, DC 20037-1128

Carolina Power & Light Company

Electronic Mail Distribution Susan E. Jenkins

Director, Division of Waste Management

Brian C. McCabe Bureau of Land and Waste Management

Manager, Nuclear Regulatory Affairs S.C. Department of Health and

Progress Energy Carolinas, Inc. Environmental Control

Electronic Mail Distribution Electronic Mail Distribution

Christos Kamilaris Scott Saunders

Director Plant General Manager

Fleet Support Services Carolina Power & Light Company

Carolina Power & Light Company Electronic Mail Distribution

Electronic Mail Distribution

Robert P. Gruber

Curt A. Castell Executive Director

Supervisor Public Staff - NCUC

Licensing/Regulatory Programs 4326 Mail Service Center

Carolina Power & Light Company Raleigh, NC 27699-4326

Electronic Mail Distribution

W. Lee Cox, III

B. C. White Section Chief

Manager Radiation Protection Section

Support Services - Nuclear N.C. Department of Environmental

Carolina Power & Light Company Commerce & Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

S. D. West Public Service Commission

Superintendent Security State of South Carolina

H. B. Robinson Steam Electric Plant P.O. Box 11649

Progress Energy Columbia, SC 29211

Electronic Mail Distribution

R. Mike Gandy

Joseph W. Donahue Division of Radioactive Waste Mgmt.

Vice President S.C. Department of Health and

Nuclear Oversight Environmental Control

Carolina Power and Light Company Electronic Mail Distribution

Electronic Mail Distribution

(cc w/encl contd - See page 3)

CP&L 3

(cc w/encl contd)

Chairman

North Carolina Utilities Commission

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

H. B. Robinson Steam Electric Plant

2112 Old Camden Rd

Hartsville, SC 29550

________________ X SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS RII:DCI RII:DRS RII:DRS RII:DRP RII:DRP RII:DRS

SIGNATURE JER6 LFL CAJ ECM2 REW1 GJK2 by email RXM1 MEF1

NAME JRivera-Ortiz LLake CJulian by email EMichel RWilliams GKolcum RMusser MFranke

DATE 04/05/10 04/01/10 04/07/10 04/01/10 04/05/10 04/05/10 04/06/10 04/07/10

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO

U.S. NUCLEAR REGULATORY COMMISSION

REGION II

Docket No: 50-261

License No: DPR-23

Report No: 05000261/2010008

Licensee: Carolina Power & Light Company

Facility: H.B. Robinson Steam Electric Plant, Unit 2

Location: 3581 West Entrance Road

Hartsville, SC 29550

Dates: February 2, 2010 - February 26, 2010

Inspectors: Joel Rivera-Ortiz, Senior Reactor Inspector (Lead)

Caudle Julian, Senior Construction Inspector

Eric Michel, Senior Reactor Inspector

Louis Lake, Senior Reactor Inspector

Gregory Kolcum, Resident Inspector - Brunswick

Robert Williams, Reactor Inspector

Accompanying Jonathan Kent, Construction Inspector Trainee

Staff:

Approved by: Mark Franke, Chief

Engineering Branch 3

Division of Reactor Safety

Enclosure

SUMMARY OF FINDINGS

IR 05000261/2010008; 02/08/2010 - 02/26/2010; H.B. Robinson Steam Electric Plant, Unit 2;

Post Approval Site Inspection for License Renewal.

The report covers a team inspection conducted by six regional inspectors in accordance with

NRC Manual Chapter 2516 and NRC Inspection Procedure 71003.

The inspectors determined that commitments, license conditions, and regulatory requirements

associated with the issuance of the renewed operating license were either being met or, where

commitment actions had not been completed, that the licensee had generated tasks in their

Action Request system to track their completion before the period of extended operation.

The team identified one Unresolved Item and eight observations, for which corrective actions

were initiated.

The NRCs program for overseeing the safe operation of commercial nuclear power reactors is

described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.

A. NRC-Identified and Self-Revealed Findings

None

B. Licensee-Identified Violations

None

Enclosure

REPORT DETAILS

4. OTHER ACTIVITIES

4OA5 Other Activities

.1 Post-Approval Site Inspection for License Renewal - IP 71003

a. Inspection Scope

(1) Implementation of License Conditions and Commitments, including Aging Management

Programs and Time-Limited Aging Analyses

The inspectors reviewed supporting documents including implementing procedures,

work orders, inspection reports, engineering evaluations, condition reports, and

completed surveillance records; conducted interviews with licensee staff; performed

visual inspection of structures, systems, and components (SSCs); and observed a

sample of licensee activities related to license renewal commitments to verify the

licensee completed the necessary actions to comply with the license conditions

stipulated in the renewed facility operating license. The inspectors verified that the

licensee met the commitments associated with the Aging Management Programs

(AMPs) and time-limited aging analyses (TLAAs) described in NUREG-1785, Safety

Evaluation Report (SER) Related to the License Renewal of H.B. Robinson Steam

Electric Plant, Unit 2, in accordance with Title 10 of the Code of Federal Regulations

(CFR) Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power

Plants. For each AMP and TLAA, the inspectors verified that future activities due prior

to the period of extended operation (i.e. July 31st, 2010) were implemented as described

in the Updated Final Safety Analysis Report (UFSAR) supplement submitted pursuant to

10 CFR 54.21(d). For those license renewal action items that were not completed at the

time of this inspection, the team verified that there was reasonable assurance that such

action items were on track for completion prior to the period of extended operation.

The inspectors reviewed licensee actions that were completed (or scheduled) to meet

the commitment items discussed below, which are referenced to Appendix A of the SER.

Specific documents reviewed are listed in the report attachment.

Item 1 - Quality Assurance Program

Commitment Item 1 specified that the existing Quality Assurance Program will be

credited for license renewal. The inspectors reviewed a copy of the current NRC

approved Quality Assurance Program and verified that it contained adequate information

to meet this license renewal commitment.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 1.

Item 2 - 10 CFR 54.37(b) Requirements

Commitment Item 2 specified that upon issuance of the renewed license guidance will

be incorporated into the administrative control procedures that manage the Robinson

Enclosure

4

Nuclear Plants (RNPs) configuration control process to ensure that the requirements of

10 CFR 54.37(b) are met.

The inspectors reviewed the licensing basis and procedures for configuration control to

verify that the licensee implemented the guidance described in the commitment. The

inspectors also reviewed three licensee evaluations performed to identify new in-scope

SSCs since the renewed operating license was issued. The inspectors interviewed the

responsible plant personnel regarding these documents, especially on the methodology

used to identify any new SSCs in scope of license renewal. Additionally, the inspectors

reviewed scheduled tasks in the licensee Action Request (AR) system to verify that the

licensee continuously conduct a review of newly identified SSCs concurrent with the

FSAR update required by 10 CFR 50.71(e).

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 2.

Item 3 - NUREG-1801 GALL Report

Commitment Item 3 specified that prior to the period of extended operation a statement

will be incorporated into the UFSAR license renewal supplement to document

consistency of RNPs AMPs with programs defined in NUREG-1801, Generic Aging

Lessons Learned (GALL) Report. For RNPs programs that are consistent with

NUREG-1801, the program description will be revised to state This program is

consistent with the corresponding program described in the GALL Report.

The inspectors reviewed the current version of the UFSAR to verify that this commitment

was implemented in accordance with the license renewal application (LRA) and the

corresponding SER. At the time of this inspection, this commitment item was partially

completed and additional tasks were pending to be implemented prior to the period of

extended operation. The inspectors conducted interviews with plant personnel in charge

of the UFSAR and reviewed the licensees AR system to verify that this commitment

item was adequately tracked to completion.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 3.

Item 4 - ASME Section XI, Subsection IWB, IWC, and IWD Program

Commitment Item 4 specified that the existing American Society of Mechanical

Engineers Boiler and Pressure Vessel Code (ASME BPVC),Section XI Inservice

Inspection, Subsections IWB, IWC, and IWD aging management program will be part of

the Inservice Inspection (ISI) program. The program provides identification of signs of

degradation, and establishment of corrective actions for condition monitoring of reactor

coolant pressure retaining piping and components within the scope of license renewal.

The inspections will be implemented in accordance with 10 CFR 50.55(a).

The inspectors reviewed the program basis documents, implementing procedures, non-

destructive examination (NDE) records, and related AR records; and interviewed the

Enclosure

5

responsible plant personnel regarding these documents to verify that the program was

implemented as stated in the commitment. The inspectors verified that the licensee

incorporated the statement This program is consistent with the corresponding program

described in the GALL Report into the UFSAR, as required with the clarifications

described in request for additional information (RAI) B.1-1 (d).

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 4.

Item 5 - Water Chemistry Program

Commitment Item 5 specified that the existing Water Chemistry Program will be credited

for license renewal. The inspectors reviewed four current procedures implementing the

Water Chemistry Program and verified that they contained adequate information to meet

this license renewal commitment.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 5.

Item 6 - Reactor Head Closure Studs Program

Commitment Item 6 specified that the existing Reactor Head Closure Studs aging

management program will provide for condition monitoring and preventive activities to

manage stud cracking. The program is implemented through station procedures based

on the examination and inspection requirements specified in ASME Section XI, Table

IWB-2500-1. While RNP is not committed to Regulatory Guide 1.65, "Materials and

Inspection for Reactor Vessel Closure Studs," the preventive measures are consistent

with the regulatory guide. The program is consistent with the ten elements of aging

management program XI.M3, "Reactor Head Closure Studs" specified in NUREG-1801.

The inspectors reviewed the program basis documents, implementing procedures, NDE

records, and related AR records; and interviewed the responsible plant personnel

regarding these documents to verify that the program was implemented as stated in the

commitment. The inspectors also verified that the licensee incorporated the statement

This program is consistent with the corresponding program described in the GALL

Report into the UFSAR, as required with the clarifications described in RAI B.1-1.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 6.

Item 7 - Steam Generator Tube Integrity Program

Commitment Item 7 specified that the existing Steam Generator (SG) Tube Integrity

aging management program will be credited for aging management of the steam

generator tube bundle, tube plugs, tube support plate and anti-vibration bars in the

steam generators at RNP.

Enclosure

6

The program is implemented through station procedures based on the examination and

inspection requirements specified in the SG Tube Integrity Program. The program

specifies inspection scope, frequency, and acceptance criteria for the plugging and

repair of flawed SG tubes in accordance with plant technical specifications and the

guidance of Nuclear Energy Institute (NEI) 97-06, Steam Generator Program

Guidelines. In response to RAI B.2.4-3, RNP will continue to evaluate and implement

new guidance provided by future revisions of NEI 97-06. The program is continually

updated based on industry experience and self-assessment programs.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, NDE records, and related AR records; and interviewed the responsible plant

personnel regarding these documents to verify that the program was implemented as

stated in the commitment. The inspectors also verified that the licensee incorporated the

statement This program is consistent with the corresponding program described in the

GALL Report into the UFSAR, as required with the clarifications described in RAI B.1-1

(d).

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 7.

Item 8 - Closed-Cycle Cooling Water System Program

Commitment Item 8 specified that the existing Closed-Cycle Cooling Water System will

be credited for license renewal and that no changes are required.

The inspectors reviewed the licensing basis, Closed-Cycle Cooling Water System

program basis document, implementing procedures, chemistry results, and related AR

records; and interviewed the responsible plant personnel regarding these documents to

verify that the program was implemented as stated in the commitment.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 8.

Item 9 - ASME Section XI, Subsection IWF Program

Commitment Item 9 specified that the existing ASME BPVC,Section XI, Subsection IWF

Program will be credited for aging management of Class 1, 2, and 3 component supports

(including piping supports) for loss of material due to general corrosion. The existing

program is a condition monitoring program that provides for the implementation of ASME

Code Section XI, Subsection IWF, in accordance with the provisions of 10 CFR 50.55a.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, and related AR records to verify that the program was implemented as

stated in the commitment. The inspectors verified that program documents were

administratively updated to reflect their applicability to license renewal commitments.

Additionally, the inspectors interviewed the responsible plant personnel regarding these

documents and verified that no outstanding tasks remained open for this commitment.

Enclosure

7

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 9.

Item 10 - 10 CFR 50, Appendix J Program

Commitment Item 10 specified that the existing 10 CFR 50, Appendix J Program will be

credited for license renewal with no planned changes. The existing program detects

degradation of the containment pressure boundary through inspections of accessible

surfaces of the containment and monitoring of leakage rates through containment

liner/welds, penetrations, fittings and access openings. This program directs the

performance of Type A, B and C leak rate tests and meets the requirements of Option A

of 10 CFR 50, Appendix J, Section III for Type B and C tests and Option B of 10 CFR

50, Appendix J, Section III for Type A tests. This program is implemented in accordance

with 10 CFR 50, Appendix J, Regulatory Guide 1.163, Performance-Based Containment

Leak-Test Program and NEI 94-01, Industry Guideline for Implementing Performance-

Based Option of 10 CFR Part 50, Appendix J, Revision 0.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, and related AR records to verify that the program was implemented as

stated in the commitment. The inspectors verified that program documents were

administratively updated to reflect their applicability to license renewal commitments.

Additionally, the inspectors interviewed the responsible plant personnel regarding these

documents, verified that no outstanding tasks remained open for this commitment and

reviewed recent local leak rate test (LLRT) results.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 10.

Item 11 - Flux Thimble Eddy Current Inspection Program

Commitment Item 11 specified that the existing Flux Thimble Eddy Current Inspection

Program will be credited for license renewal with no planned changes. The existing Flux

Thimble Eddy Current Inspection Program determines the amount of wear on the flux

thimbles and whether the amount of wear expected to occur during the next inspection

interval will cause the total amount of wear to exceed the ASME standards specified for

the examination. The Flux Thimble Eddy Current Inspection Program was implemented

to satisfy NRC Bulletin 88-09 requirements that a thimble tube wear inspection

procedure be established and maintained for Westinghouse-supplied reactors that use

bottom mounted flux thimble tube instrumentation.

The inspectors reviewed program implementing procedure EST-108, Flux Thimble Eddy

Current Inspection (Specified Refueling Outages), Revision 8 and verified that it

contained adequate information to meet this license renewal commitment. Additionally,

the inspectors examined records of the last thimble tube eddy current inspection

conducted in September 2005. Based on past positive results, RNP has currently

extended the frequency of inspection to every third refueling outage.

Enclosure

8

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 11.

Item 12 - Fire Protection Program

Commitment Item 12 specified that prior to the period of extended operation the existing

Fire Protection Program will be credited and will be enhanced to note that concrete

surface inspections performed under structures monitoring procedures are credited for

inspection of fire barrier walls, ceilings, and floors. The required enhancement was

originally added to the System Walkdown Procedure, TMM-104. The inspectors found

that the enhancement was being moved to the Structural Inspection Procedure, EGR-

NGGC-0351. The licensee was tracking this action through Procedure Revision

Request (PRR) 353128 and AR item 365673-09.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation. The inspectors reviewed the existing procedures and draft proposed

procedures to verify that the program was implemented as stated in the commitment.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 12.

Item 13 - Boric Acid Corrosion Program

Commitment Item 13 specified that prior to the period of extended operation the scope of

the Boric Acid Corrosion Control Program (BACCP) will be expanded to ensure that the

mechanical, structural and electrical components in scope for license renewal are

addressed and to identify additional areas in which components are susceptible to

exposure from boric acid. The existing BACCP manages the aging effects for

susceptible materials of structures and components exposed to the effects of borated

water leaks. The program consists of visual inspections of external surfaces potentially

exposed to borated water leakage, timely discovery of leak path and removal of boric

acid residues, damage assessment, and follow-up inspections for adequacy of corrective

actions. This program is implemented in response to NRC Generic Letter 88-05, Boric

Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR

Plants.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, program assessments, and related AR records to verify that the program

was implemented as stated in the commitment. The inspectors verified that program

documents were administratively updated to reflect their applicability to license renewal

commitments, interviewed the responsible plant personnel regarding these documents,

and verified that no outstanding tasks remained open for this commitment and that the

required procedural updates listed in the commitment were implemented.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 13.

Enclosure

9

Item 14 - Flow-Accelerated Corrosion Program

Commitment Item 14 specified that prior to the period of extended operation the Flow-

Accelerated Corrosion (FAC) Program will be modified to: (1) include additional

components potentially susceptible to flow-accelerated corrosion and/or erosion, and (2)

clarify when condition reports shall be initiated. In its response to RAI B.3.3-2b, the

licensee stated that the components to be added to the program as a result of the aging

management review (AMR) were the steam nozzles, feedwater nozzles, SG nozzle

thermal sleeves, and temperature elements (thermowells). The licensee also stated that

the program will be enhanced to inspect for erosion wear in locations deemed to be

susceptible by the system engineer. In addition, the licensee stated that the FAC

program will be revised to add a section dedicated specifically to valves. An additional

requirement will be added to program procedures to require material alloy analysis for

potentially susceptible valves. For corrective actions, the FAC Program procedure will

be revised to state that a condition report shall be initiated in accordance with the

Corrective Action Program for through-wall failures, or when actual wall thickness is

found to be substantially less than the expected value.

The inspectors reviewed the licensing basis, program basis documents, AR records, and

implementing procedures; and interviewed the responsible plant personnel regarding

these documents to verify that the program was implemented as stated in the

commitment. The inspectors verified that the licensee implemented the program

changes in accordance the LRA and the corresponding SER.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 14.

Item 15 - Bolting Integrity Program

Commitment Item 15 specified that prior to the period of extended operation the

administrative controls of the Bolting Integrity Program will be modified to prohibit the

use of molybdenum disulfide compounds in high-strength bolting applications. In

addition, the commitment stated that an inspection and evaluation will be performed on

high-strength bolting used on CVC-381, reactor coolant pump seal water return isolation

valve, to address susceptibility to cracking. The existing Bolting Integrity Program will be

credited for license renewal and consists of the preventive and condition monitoring of

pressure retaining bolted joints for piping and components for age-related degradation to

discover and correct conditions that could lead to a loss of intended function. The

existing program activities consist of visual inspections for degradation and leakage that

are implemented through various station procedures, preventive maintenance and

routine observation activities.

The inspectors reviewed the licensing basis, the Bolting Integrity Program basis

documentation, implementing procedures, planned and completed work orders, related

corrective action documents, and interviewed responsible program personnel regarding

Enclosure

10

these documents to verify that the program was implemented as stated in the

commitment.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 15.

Item 16 - Open Cycle Cooling Water System Program

Commitment Item 16 specified that prior to the period of extended operation the existing

Open-Cycle Cooling Water System program will be credited for license renewal and the

program will be enhanced by scheduling an activity in the site Preventive Maintenance

Program to replace cooling coils in the emergency core cooling system room coolers

with a material resistant to erosion/corrosion on a prescribed frequency.

The inspectors reviewed the licensing basis, the Open-Cycle Cooling Water System

program basis document, planned and completed work orders, AR records, and

inspection procedures to verify that the program was implemented as stated in the

commitment.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 16.

Item 17 - Inspection of Overhead Heavy Load and Light Load Handling

Commitment Item 17 specified that prior to the period of extended operation the

administrative controls for the inspection of overhead heavy load and light load handling

will be enhanced to: (1) include requirements for inspecting the turbine gantry crane in

addition to other cranes that require inspection, (2) note that cranes are to be inspected

using the attribute inspection checklist for structures, and (3) revise the attribute

inspection checklist for structures to include GALL terminology such as wear. The

existing program manages the effects wear on the rail systems and the effects of

general corrosion on the following cranes: the polar crane, the spent fuel cask crane, the

spent fuel bridge crane and the turbine gantry crane. The listed cranes are inspected

using guidance from NUREG-0612, Control of Heavy Loads at Nuclear Power Plants

and to satisfy American National Standard Institute (ANSI) B30.2, Overhead and Gantry

Cranes requirements for inspection attributes such as steel member corrosion,

damaged members or connections, and missing parts amongst others.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, previous inspection reports, and related AR records to verify that the

program was implemented as stated in the commitment. The inspectors verified that

program documents were administratively updated to reflect their applicability to license

renewal commitments. Additionally, the inspectors interviewed the responsible plant

personnel regarding this program, verified that the above listed license renewal cranes

Enclosure

11

were properly scoped to comply with the maintenance rule requirements provided in 10

CFR 50.65, verified that the inspection frequencies were properly translated into

procedures and that the required procedural updates were implemented.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 17.

Item 18 - Fire Water System Program

Commitment Item 18 specified that the existing Fire Water System Program will be

credited and will be enhanced for license renewal. The Fire Protection Sprinkler

Systems will be modified to include the following: (1) for sprinkler heads in service for 50

years either sprinkler head replacement or sampling field service testing of heads in

accordance with National Fire Protection requirements and, (2) prior to the period of

extended operation, either full flow testing of portions of fire protection wet pipe sprinkler

systems through the system cross mains, which are not routinely subject to flow, at the

greatest flow and pressure allowed by the design of the systems or alternatively

inspections or ultrasonic (UT) testing of a representative sample of these systems.

Results from initial tests or inspections, reflecting 40 years of service, will be used to

determine the scope and subsequent test/inspection intervals. The intervals are not

expected to exceed 10 years.

Commitment Item 18 also specified that prior to the period of extended operation UT

inspections will be performed on a representative sampling of the above ground fire

protection piping (Fire Protection Suppression Piping) normally containing water. Each

sampling will include different sections of piping. Alternatively, internal inspections may

be conducted on a representative sampling of these piping systems. Results from initial

tests or inspections, reflecting 40 years of service, will be used to determine the scope

and subsequent test/inspection intervals. The intervals are not expected to exceed 10

years.

Furthermore, Commitment Item 18 specified that for Halon/Carbon Dioxide Fire

Suppression Systems, the NRC staff guidance with respect to Halon/Carbon Dioxide fire

suppression systems will be implemented prior to the period of extended operation. The

guidance is documented in a letter from C. Grimes (NRC) to A. Nelson (NEI) and D.

Lochbaum (Union of Concerned Scientists): Proposed Staff Guidance on Management

of Fire Protection Systems for License Renewal, dated January 28, 2002.

The inspectors found that the licensee has performed various inspections and additional

inspections are scheduled to be completed prior to the period of extended operation.

Among the completed inspections, Work Order (WO) 1120123 previously cut into the

main piping to the component cooling water (CCW) sprinkler system to allow a new

branch line to be installed. Licensee engineering staff performed an internal inspection

of the removed piping and the condition was documented as satisfactory. In addition, an

internal inspection of the Fuel Handling Building piping has already been completed

under WO 706919-02.

The inspectors also noted that the following inspection activities were scheduled to meet

this commitment: (a) Work Order 1549734 will replace the sprinkler heads in the CCW

Pump Room which are the oldest set of inservice sprinkler heads. Other WOs have

Enclosure

12

been prepared to replace newer sprinkler heads as they approach the 50 year age, (b)

WO 1519261 will perform an UT thickness examination on various piping segments

based on the inservice date of the affected systems. The UT inspections of the above

ground segments of Fire Water piping include a sampling at five locations within the

power block, (c) WO 1605254 will perform UT inspections on a section of the Auxiliary

Building supply piping and hose station supply piping near hose station FH-78 on pipe

line 2-FP-18, and (d) Turbine Building piping and Auxiliary Building/CV piping will be

inspected under the Transformer Replacement Project during refueling outage (RO)-26.

The transformer deluge piping represents original plant piping and will be inspected and

replaced. Periodic inspections will be established under Preventive Maintenance

Requests (PMRs) 348790 and 348792.

The proposed Staff guidance of January 28, 2002 gave the Staffs position that a valve

lineup inspection, charging pressure inspection, and automatic mode of operation

verification are operational activities and are not aging management related. NUREG-

1801, GALL Report, was revised by the NRC in September of 2005 to remove the

Halon/Carbon Dioxide system inspections for charging pressure, valve lineups, and

automatic mode of operation. The inspectors found that RNPs practices conform to that

guidance.

The licensee has numerous fire water piping inspections to be completed prior to the

period of extended operation. These items appeared to be identified and scheduled to

be accomplished in the remaining time period before the start of the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 18.

Item 19 - Buried Piping and Tanks Surveillance Program

Commitment Item 19 specified that prior to the period of extended operation a review will

be conducted to determine the need to update administrative controls for the Buried

Piping and Surveillance program to ensure consistency with National Association of

Corrosion Engineers (NACE) Standard RP-0169-96. In particular, the cathodic

protection program and additional leak testing measures for underground piping are to

be evaluated.

The inspectors reviewed the licensing basis, implementing procedures, related work

orders, contractor surveys, associated engineering change package, and related ARs;

and interviewed the responsible plant personnel regarding these documents. The

inspectors verified that the licensees cathodic protection program incorporated the

requirements of NACE Standard SP-0169-2007. The inspectors also verified the

licensee had conducted an adequate evaluation to ensure consistency between RP-

0169-96, and the most recently published version, SP-0169-2007.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Enclosure

13

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 19.

Item 20 - Above Ground Carbon Steel Tanks Program

Commitment Item 20 specified that the existing Above-Ground Carbon Steel Tanks

program will be credited for license renewal with enhancements. Prior to the period of

extended operation administrative controls for the Above Ground Carbon Steel Tanks

Program will be revised to indicate that the external surfaces of the fuel oil tanks are to

be inspected periodically and to incorporate corrective action requirements.

The inspectors reviewed the licensing basis, the Above-Ground Carbon Steel Tanks

program basis documentation, implementing procedures, scheduled and completed

work orders, related ARs, engineering changes, and evaluations to verify that the

program was implemented as stated in the commitment. The inspectors also conducted

a plant walkdown to observe the present condition of the above ground tanks. The

inspectors identified a discrepancy associated with the operating procedure for the

Alternate Fuel Oil Storage Tank. This issue is discussed in details in the Findings and

Observation section of this inspection report.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, the administrative controls in place to track pending actions,

and the corrective actions initiated for the inspectors observations, the inspectors

determined that there was reasonable assurance that the licensee would complete the

necessary actions to meet Commitment Item 20.

Item 21 - Fuel Oil Chemistry Program

Commitment Item 21 specified that prior to the period of extended operation the

administrative controls for the fuel oil chemistry program will be enhanced to improve

sampling and de-watering of selected storage tanks, formalize existing practices for

periodically draining and filling the diesel fuel oil storage tank (FOST), formalize bacteria

testing for fuel oil samples from various tanks, and incorporate quarterly trending of fuel

oil chemistry parameters.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, and related AR records; and interviewed the responsible plant personnel

regarding these documents. The inspectors verified that the licensee appropriately

modified their procedures to improve the sampling and de-watering of identified fuel oil

storage tanks in their monthly surveillance procedure; formalized existing practices for

draining and filling the diesel FOST at an interval not to exceed 10 years; initiated

actions to formalize bacteria testing; and ensured fuel oil chemistry will be trended

quarterly by the appropriate system engineer.

Enclosure

14

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 21.

Item 22 - Reactor Vessel Surveillance Program

Commitment Item 22 specified that prior to the period of extended operation the

administrative controls for the Reactor Vessel Surveillance Program will be revised to

require surveillance test samples to be stored in lieu of optional disposal. The Reactor

Vessel Surveillance Program administrative controls are implemented through Section

5.3.1.6 of the UFSAR, Material Surveillance.

The inspectors reviewed the licensing basis, program basis documents, AR records, and

implementing procedures; and interviewed the responsible plant personnel regarding

these documents. The inspectors verified that the licensee implemented the

commitment in the applicable section of the UFSAR in accordance the LRA and the

corresponding SER.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 22.

Item 23 - Buried Piping and Tanks Inspection Program

Commitment Item 23 specified that prior to the period of extended operation the Buried

Piping and Tanks Inspection program will be enhanced to: (1) require that an appropriate

as-found pipe coating and material condition inspection is performed whenever buried

piping within the scope of this program is exposed, (2) add precautions to ensure backfill

with material that is free of gravel or other sharp or hard material that can damage the

coating, (3) require that the coating inspection be performed by qualified personnel to

assess its condition, and (4) require that a coating engineer assist in evaluation of any

coating degradation noted during the inspection.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures; and interviewed the responsible plant personnel regarding these

documents. The inspectors verified that the licensee modified their excavation and

backfill procedure (MNT-NGGC-0024) to inspect buried piping as the piping is exposed,

ensured that backfill material selection does not include gravel or other hard material,

verified qualified personnel perform coating inspections, and that a coating engineer will

assist in evaluating coating degradation.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 23.

Enclosure

15

Item 24 - ASME Section XI, Subsection IWE Program

Commitment Item 24 specified that prior to the period of extended operation the

administrative controls for the ASME BPVC,Section XI, Subsection IWE Program will be

enhanced to specify the requirements for conducting reexaminations and to document

that repairs meet the specified acceptance standards. The existing program conducts

periodic visual, surface and volumetric inspections of the steel containment components

to detect signs of degradation, assess any damage and correct deficiencies. The

program provides for the implementation of ASME Code Section XI, Subsection IWE, in

accordance with the provisions of 10 CFR 50.55a. Containment pressure retaining seals

and gaskets were excluded from this program based upon a relief request granted by

the NRC. This request states that VT-3 examinations of seals and gaskets required by

Table IWE-2500-1, Category E-D, Items E5.10 and E5.20 are not required to be

performed. Instead, 10 CFR 50, Appendix J, Type B testing is used for the seals and

gaskets. The licensee also identified One-time Inspection Programs for completing the

inspection of inaccessible portions of the containment liner and the moisture barrier

inside the containment at the liner plate/floor concrete interface.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, and related AR records to verify that the program was implemented as

stated in the commitment. The inspectors verified that program documents were

administratively updated to reflect their applicability to license renewal commitments.

The inspectors reviewed a sample of engineering evaluations for the metal containment

liner thickness and ensured that any areas of less than the minimum required thickness

were properly dispositioned and repaired, if necessary. Additionally, the inspectors

interviewed the responsible plant personnel regarding this program and verified that no

outstanding tasks remained open for this commitment.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 24.

Item 25 - ASME Section XI, Subsection IWL Program

Commitment Item 25 specified that the ASME BPVC,Section XI, Subsection IWL

Program will be enhanced to: (1) require supervisors to notify civil/structural design

engineering of the location and extent of proposed excavations of foundation concrete,

(2) require inspection of below-grade concrete when excavated for any reason to

monitor for potential effects, and (3) inspect above-grade accessible concrete and

include trending requirements for structures based on aggressive ground water. The

existing program is a condition monitoring program that provides for the implementation

of the ASME Code Section XI, Subsection IWL, in accordance with the provisions of 10

CFR 50.55a with the exception that the grouted tendon system used in the RNPs

containment is outside the scope of Subsection IWL.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, and related AR records to verify that the program was implemented as

stated in the commitment. The inspectors verified that program documents were

administratively updated to reflect their applicability to license renewal commitments,

interviewed the responsible plant personnel regarding this program and verified that the

required procedural updates listed in the commitment were implemented.

Enclosure

16

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 25.

Item 26 - Structures Monitoring Program

Commitment Item 26 specified that prior to the period of extended operation the

administrative controls for the Structures Monitoring Program will be enhanced to: (1)

include buildings, structures and their associated acceptance criteria, in scope for

license renewal but outside the scope of Maintenance Rule, (2) identify interfaces

between structures monitoring inspections of concrete surfaces and the Fire Protection

Program requirements for barriers, (3) state clearly the boundary definition between

systems and structures, (4) revise administrative controls to provide inspection criteria

for portions of systems covered by structures monitoring and require a condition report

be initiated for all inspection attributes found to be unacceptable, (5) expand system

walkdown inspection criteria to include observation of adjacent components, (6) inspect

above-grade accessible concrete, (7) revise personnel responsibilities to include: (a)

providing assistance in evaluating structural deficiencies when requested by the

Responsible Engineer, (b) inspecting excavated concrete, and (c) notifying

civil/structural design engineering of the location and extent of proposed excavations,

and (8) to include trending requirements for structures based on aggressive ground

water and lake water. The existing program consists of periodic inspection and

monitoring of the condition of structures and structure component supports to ensure

that aging degradation leading to the loss of intended functions will be detected and that

the extent of degradation will be determined. The inspection criteria are based on

American Concrete Institute (ACI) 349.3R-96, American Society of Civil Engineers

(ASCE) 11-90, Institute of Nuclear Power Operations (INPO) Good Practice Document

85-033, NEI 96-03 and Nuclear Management and Resources Council (NUMARC) 93-01.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, and related AR records. The inspectors verified that program documents

were administratively updated to reflect their applicability to license renewal

commitments, interviewed the responsible plant personnel regarding this program and

verified that the required procedural updates listed in the commitment were

implemented. Additionally, the inspectors accompanied plant personnel during a

structures monitoring walkdown of sections of the auxiliary feedwater (AFW) system.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 26.

Item 27 - Dam Inspection Program

Commitment Item 27 specified that prior to the period of extended operation the

administrative controls for the Dam Inspection Program system monitoring will be

Enclosure

17

enhanced to: (1) identify the Recommended Guidelines for Safety Inspection of Dams

as the required management program document for the dam, (2) require the responsible

system engineer to review the inspection report and initiate corrective actions for any

unacceptable attributes, (3) include Recommended Guidelines for Safety Inspections of

Dams as the applicable inspection guidance in the inspection procedure for RNP, (4)

inspect above-grade accessible concrete, (5) inspect submerged spillway concrete on a

frequency not to exceed ten years, and (6) include trending requirements for structures

based on aggressive ground and lake water. The existing Dam Inspection Program

manages aging effects for the Lake Robinson Dam and its associated concrete and steel

structures. This program is currently implemented by an independent inspection using

the Federal Energy Regulatory Commission (FERC)/U.S. Army Corps of Engineers

Recommended Guidelines for Safety Inspection of Dams.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, prior inspection results, and related AR records. The inspectors verified that

program documents were administratively updated to reflect their applicability to license

renewal commitments, interviewed the responsible plant personnel regarding this

program and verified that the required procedural updates listed in the commitment were

implemented.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 27.

Item 28 - Systems Monitoring Program

Commitment Item 28 specified that prior to the period of extended operation the

administrative controls of the existing Systems Monitoring Program will be enhanced to:

(1) include aging effects identified in the AMRs, (2) identify inspection criteria in checklist

form, (3) include guidance for inspecting connected piping/components, (4) require that

the extent of degradation be recorded and that appropriate corrective action(s) be taken,

(5) add a section specifically addressing corrective actions, and (6) ensure Loss of

Material due to Wear is specifically included as an aging effect/mechanism identified in

the system walkdown checklist. The first five items were included in the LRA while the

sixth item was a commitment included in the licensees response to RAI B.3.17-1.

The inspectors reviewed the licensing basis, current program procedures, reviewed a

sample of documented results of system walkdowns, and discussed the program with

licensee representatives to verify that the program was implemented as stated in the

commitment. The inspectors identified three examples where the licensee did not fully

implement certain attributes of the commitment. These issues are discussed in the

Findings and Observations section of this inspection report.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and corrective actions generated for the observations

identified by the team, the inspectors determined that there was reasonable assurance

that the licensee would complete the necessary actions to meet Commitment Item 28.

Enclosure

18

Item 29 - Preventive Maintenance Program

Commitment Item 29 specified that prior to the period of extended operation the existing

Preventive Maintenance (PM) Program will be enhanced to: (1) include aging

effects/mechanisms identified in the AMRs, and (2) incorporate specific aging

management activities identified in the AMRs into the program.

The inspectors reviewed the licensing basis and implementing procedures to verify that

the program was implemented as stated in the commitment. The inspectors verified that

the program procedures contained adequate information to meet this commitment item.

In 2008 the licensee performed a self assessment of license renewal implementation

and concluded that the preventive maintenance program needed enhancement.

Corrective action document NCR 365671 was initiated to document that PM and model

work orders were not specific enough for the aging mechanism to be inspected. Action

tasks have been identified to enhance various PMs and all have due dates in July 2010

before the period of extended operation. The inspectors counted 22 open work items to

be completed for enhancement of procedures and PM activities.

The inspectors noted that the licensee has numerous procedure revisions pending

completion to implement enhancements related to this license renewal commitment.

These items appeared to be identified and scheduled to be accomplished in the

remaining time period before the start of the period of extended operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 29.

Item 30 - Metal Fatigue of Reactor Coolant Pressure Boundary (Fatigue Monitoring

Program) and Item 43 - TLAA: Metal Fatigue

Commitment Items 30 and 43 specified that prior to the period of extended operation the

Fatigue Monitoring Program (FMP) load/unload transient limit will be reduced to provide

the margin needed for consideration of reactor water environmental effects. In its

response to RAI B.3.19-3, the licensee stated that the FMP will account for

environmental effects prior to the period of extended operation. As stated in section

3.0.3.1 of the SER, environmental fatigue calculations were performed for the seven

locations specified in NUREG/CR-6260 and for the seven locations inside the

pressurizer using the Fen methodology contained in NUREG/CR-6583 for carbon/low-

alloy steel material and in NUREG/CR-5704 for stainless steel material. The number of

load/unload cycles used as an input to one of the environmental fatigue calculations was

reduced from 29,000 to 19,000, and the licensee planned to reduce the FMP limit for

load/unload cycles accordingly, thereby incorporating the environmental fatigue

calculations into the FMP.

Commitment Item 43 also specified that based upon the most recent fatigue analysis

performed for the three AFW-to-feedwater (FW) line connections downstream of the

steam-driven pump, transient limits have been reduced in the RNPs FMP. These

reduced limits are based upon inputs used in the analysis and are more conservative

Enclosure

19

than the original limits. The reduced limits will remain in effect until the connections are

further analyzed, repaired, or replaced to assure the connections remain within their

design basis through the period of extended operation.

Section 4.3.2.3 of the SER, Environmentally Assisted Fatigue Evaluation and

Commitment Item 43 also states that the pressurizer surge line components for which

the environmentally assisted fatigue (EAF)-adjusted cumulative usage factor (CUF)

would exceed 1.0 during the period of extended operation will be managed using one or

more of the following options: (1) further refinement of the fatigue analyses to maintain

the EAF-adjusted CUF below 1.0, (2) repair of the affected locations, (3) replacement of

the affected locations, or (4) management of the effects of fatigue through the use of an

augmented ISI program that has been reviewed and approved by the NRC.

The inspectors reviewed the licensing basis, program basis documents, AR records,

implementing procedures and environmental fatigue evaluations for the pressurizer; and

interviewed the responsible plant personnel regarding these documents. The inspectors

verified that the licensee implemented the load/unload transient limits in the

implementing procedures; including the transient limits for the AFW-to-FW line

connections, in accordance the LRA and the corresponding SER. In addition, the

inspectors verified which option the licensee selected to manage environmentally

assisted fatigue in the pressurizer surge line. The inspectors noted that the licensee

opted for further refinement of the pressurizer surge line fatigue analysis to maintain the

EAF-adjusted CUF below 1.0.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Items 30 and 43.

Item 31 - Nickel-Alloy Nozzles and Penetrations Program

Commitment Item 31 specified that the Nickel-Alloy Nozzles and Penetrations Program

is a new program that will incorporate the following: (1) evaluations of indications will be

performed under the ASME BPVC,Section XI program, (2) corrective actions for

augmented inspections will be performed in accordance with repair and replacement

procedures equivalent to those requirements in ASME BPVC,Section XI, (3) RNP will

maintain its involvement in industry initiatives and will systematically assess for

implementation applicable programmatic enhancements, that are agreed upon between

the NRC and the nuclear power industry to monitor for, detect, evaluate, and correct

cracking in the vessel head penetration (VHP) nozzles, specifically as the actions relate

to ensuring the integrity of VHP nozzles in the RNP upper reactor vessel head during the

extended period of operation, and (4) RNP will submit, for review and approval, its

inspection plan for the Nickel-Alloy Nozzles and Penetrations Program, as it will be

implemented from the licensees participation in industry initiatives, prior to July 31,

2009.

The inspectors reviewed the licensing basis, program basis documents, AR records,

implementing procedures; and interviewed the responsible plant personnel regarding

these documents. The inspectors verified that the licensee implemented the

commitment items related to the evaluation of indications, the corrective actions for

augmented inspections, and continuous involvement in industry initiatives into the

implementing procedures. In addition, the inspectors verified that the licensee submitted

Enclosure

20

the inspection plan for NRC review and approval in accordance with the LRA and the

corresponding SER. The inspectors identified a discrepancy in the aforementioned

inspection plan with regard the schedule of non-visual examinations for the VHP

nozzles. The inspectors also noted a discrepancy with regard the referenced regulatory

requirements for the inspection of upper VHP nozzles. Both issues are discussed in

details in the Findings and Observations section of this inspection report.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and corrective actions initiated to address the inspectors

observations, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 31.

Item 32 - Thermal Aging Embrittlement and Cast Austenitic Stainless Steel Program

Commitment Item 32 specified that prior to the period of extended operation the licensee

will implement the Thermal Aging Embrittlement and Cast Austenitic Stainless Steel

(CASS) Program, which is applied to CASS components within Class 1 boundaries of

the reactor coolant system (RCS) and connected systems where operating temperature

exceeds the threshold criterion. This program will be credited for managing loss of

fracture toughness due to thermal embrittlement of the CASS materials. Specifically, the

program covers primary coolant loop piping, valves, and pump casings. This program is

implemented through the examination requirements in Table IWB-2500-1 of the ASME

BPVC,Section XI.

The inspectors reviewed the licensing basis, program basis documents, AR records,

implementing procedures; and interviewed the responsible plant personnel regarding

these documents. The inspectors verified that the licensee implemented the

examination requirements of Table IWB-2500-1 in the implementing procedures,

including the ISI Inspection Plan for the current Interval in accordance the LRA and the

corresponding SER. The inspectors found a discrepancy in the implementing

procedures for this commitment with regard the description of components within the

scope of the program. This issue is discussed in details in the Findings and

Observations section of this inspection report.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the corrective actions initiated for the inspectors

observations, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 32.

Item 33 - Pressurized Water Reactor Vessel Internals Program

Commitment Item 33 specified that the Pressurized Water Reactor Vessel Internals

Program (PWR VIP) will be instituted as a new program which will require the licensee

Enclosure

21

to: (1) continue participation in industry programs to investigate aging effects and

determine the appropriate AMP activities to address baffle and former assembly issues,

and to address change in dimensions due to void swelling; (2) as appropriate, evaluate

and implement the results of Westinghouse Owners Group (WOG) and Electric Power

Research Institute/Materials Reliability Program (EPRI/MRP) research projects as they

are completed; and (3) implement an augmented inspection during the license renewal

term. Augmented inspections, based on required program enhancements resulting from

industry programs, will become part of the ASME Code,Section XI program. Corrective

actions for augmented inspections will be developed using repair and replacement

procedures equivalent to those requirements in ASME Code,Section XI. The licensee

will submit, for review and approval, its inspection plan for the PWR VIP, as it will be

implemented from the licensees participation in industry initiatives, 24 months prior to

the augmented inspection.

The inspectors reviewed the licensing basis, program basis documents, implementing

procedures, and related AR records; and interviewed the responsible plant personnel

regarding these documents to verify that the program was implemented as stated in the

commitment. Specifically, the inspectors reviewed ADM-NGGC-0012, Reactor Coolant

System Material Integrity Management Program, Revision 2 and verified the

commitment to continue participation in industry programs, as well as the commitment to

implement appropriate results of WOG and EPRI/MRP research projects. The

inspectors also reviewed documentation and interviewed responsible personnel to

evaluate the licensees plans to implement an augmented inspection program as part of

the ASME Section XI program, including the requirement to conduct repair and

replacement activities in accordance with Section XI repair/replacement activities. The

inspectors also verified the PWR VIP inspection plan, based on documents MRP-227

and MRP-228, was submitted to the NRC 24 months prior to this inspection.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 33.

Item 34 - One-Time Inspection Program

Commitment 34 specified that prior to the period of extended operation the One Time

Inspection Program AMP will require one-time inspections of selected plant equipment to

be performed to verify that current plant AMPs are effective in managing the effects of

aging prior to the period of extended operation. The One-Time inspection program

provides for examinations of representative materials in environments that are not

expected to experience aging effects. The licensee established separate one-time

inspection programs covering the following specific SSCs listed in the SER for this

commitment.

(a) CCW heat exchanger tubing - Inspection of CCW heat exchanger tubing will be

performed to assure that potential degradation due to erosion is managed.

During RO-25, the B CCW heat exchanger was re-tubed. A population of the

Enclosure

22

existing tubes were pulled and measured to obtain the as-found condition of the

tube wall. From this inspection, the licensee determined that the remaining CCW

heat exchanger A will be re-tubed in RO-26. In addition preventative

maintenance activities have been established to perform eddy current testing for

both heat exchangers on a maximum of 6 year frequency.

(b) Steam and Power Conversion Systems - Representative locations in

miscellaneous piping in steam and power conversion systems protected by the

Water Chemistry Program will be inspected. The licensee performed 21

inspections of steam and power conversion systems in 2004 during RO-22. An

additional 13 inspections are scheduled for RO-26. The inspection locations

were selected based on material and environments that would represent leading

indicators of aged related degradation.

(c) Small Bore RCS piping - The small bore RCS and connected piping will be

inspected to verify the effectiveness of the water chemistry system. The licensee

selected the components based on accessibility exposure levels, nondestructive

examination techniques, and locations identified in NRC Information Notice 97-

46, Unisolable Crack in High-Pressure Injection Piping. A total of 131 welds are

within the inspection scope. Seven welds were ultrasonically examined during

RO-25 and an additional 20 examinations are planned for RO-26 in 2010.

(d) Emergency Diesel Generator (EDG) Exhaust Silencers - EDG exhaust silencers

were inspected and cleaned in 2006. The results of the inspection were

satisfactory. In lieu of performing periodic inspections, the licensee established a

plan for preventive maintenance and replacement of the silencers in RO-26.

(e) Inaccessible Areas of Containment Liner Plate and Moisture Barrier -

Inaccessible areas of the containment liner plate and moisture barrier were

inspected during RO-22. Although only a portion of the moisture barrier was

degraded, the moisture barrier was removed and replaced. Inspection of the

moisture barrier is routinely examined as part of the Section XI IWE Program.

(f) Diesel Fire Pump Fuel Oil Tank - Internal inspections and ultrasonic

examinations were satisfactorily completed in November of 2006.

(g) Steam generator feed ring/J-nozzles - The steam generator feed water ring and

J nozzles were satisfactorily examined as follows: SG-A in September 1999, SG-

B in 2007, and SG-C in October 2002. The SG feed water rings and J nozzles

are routinely examined as part of the SG Tube Integrity Program.

The inspectors reviewed the program basis document, implementing procedures,

inspection results, and related AR records; and interviewed the responsible plant

personnel regarding these documents to verify that the program was implemented as

stated in the commitment. The inspectors verified that the licensee had documented the

results of the one-time inspections and had followed up appropriately when aging effects

were identified.

The inspectors determined that the licensee had performed a substantial portion of the

inspections, and the remaining inspections, required by this commitment, were

scheduled to be completed prior to the period of extended operation.

Enclosure

23

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 34.

Item 35 - Selective Leaching of Materials Program

Commitment Item 35 specified that prior to the period of extended operation the

Selective Leaching of Materials Program will be a new program to determine the

properties of selected components that may be susceptible to selective leaching. The

program will ascertain whether loss of material is occurring and whether the process will

affect the ability of the components to perform their intended function for the period of

extended operation.

The inspectors found that this program was being implemented by conducting one-time

visual inspections of a sample of materials susceptible to selective leaching of materials

prior to the period of extended operation. The scope of the visual inspections included

susceptible components that are exposed to chemically treated water, demineralized

water, raw water, ground water, and moist ventilation and gas environments. The

inspectors observed the licensee perform an inspection of the interior of a fire water

control valve FR 412 for selective leaching. The inspection was performed adequately

and no indication of selective leaching was observed.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 35.

Item 36 - Non-Environmentally Qualified Insulated Cables and Connections Program

Commitment Item 36 specified that the Non-Environmentally Qualified (Non-EQ)

Insulated Cables and Connections Program will be a new program and involves

inspecting accessible power and instrument and control cables at least once every 10

years. This Commitment Item also states that prior to the period of extended operation

the licensee will define the technical basis for selecting a sample of cables to be

inspected. The sample locations consider cables inside and outside containment, as

well as any known adverse localized environments. The licensee defined an adverse

localized environment as a condition in a limited plant area that is significantly more

severe than the specified service condition for the electrical cable or connection. The

Non-EQ Insulated Cables and Connections Program will be credited for aging

management of cables and connections that are not included in the RNPs EQ Program.

The Non-EQ insulated cables and connections managed by this program include those

used for power, instrumentation, control, and communication, including cables sensitive

to reduction in insulation resistance such as radiation monitoring and nuclear

instrumentation. The program involves periodic visual inspections of accessible cables

and connections installed in adverse localized environments to detect embrittlement,

Enclosure

24

cracking, melting, discoloration, or swelling that could lead to reduced insulation

resistance or electrical failure.

The inspectors reviewed the licensing basis, the program basis document for the Non-

EQ Insulated Cables and Connections AMP, implementing procedures and records of

walkdowns for determining adverse localized environments, and visual inspections for

cables to verify that the program was implemented as stated in the commitment. The

inspectors also reviewed corrective action documents, which addressed and identified

cable issues and their corresponding corrective actions.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 36.

Item 37 - Aging Management Program for Non-EQ Electrical Cables Used in

Instrumentation Circuits

Commitment Item 37 specified that prior to the period of extended operation the AMP for

Non-EQ Electrical Cables Used in Instrumentation Circuits will be a new program to

manage aging of cables used in the containment vessel high-range radiation monitoring

instrumentation circuits at least once every 10 years. In this aging management

program, calibration results or findings of surveillance testing programs are used to

identify the potential existence of aging degradation. Exposure of electrical cables to

adverse localized environments caused by heat, radiation, or moisture can result in

reduced insulation resistance.

The inspectors reviewed the licensing basis, the program basis document for the Non-

EQ Electrical Cables Used in Instrumentation Circuits AMP, implementing procedures,

planned and completed work orders, and related AR records to verify that the program

was implemented as stated in the commitment. The inspectors verified that all the

above programmatic activities were satisfactory implemented.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 37.

Item 38 - Aging Management Program for Neutron Flux Instrumentation Circuits

Commitment Item 38 specified that prior to the period of extended operation the AMP for

Neutron Flux Instrumentation Circuits will be a new program that will employ insulation

resistance or other testing to identify the potential existence of aging degradation of

cables in neutron monitoring circuits at least once every 10 years. This program applies

to the cables used for the Source Range, Intermediate Range, Power Range, and

Gamma-Metrics circuits of the Excore Nuclear Instrumentation System. In this aging

management program, an appropriate test, such as insulation resistance tests, time

Enclosure

25

domain reflectometry tests, or I/V (current/voltage) testing will be used to identify the

potential existence of a reduction in cable insulation resistance.

The inspectors reviewed the licensing basis, the program basis document for Neutron

Flux Instrumentation Circuits AMP, implementing procedures, planned and completed

work orders, and related AR records to verify that the program was implemented as

stated in the commitment.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 38.

Item 39 - Aging Management Program for Fuse Holders

Commitment Item 39 specified that prior to the period of extended operation the AMP for

Fuse Holders will be a new program that focuses on the metallic clamp (or clip) portion

of the fuse holder at least once every 10 years. The parameters monitored include

thermal fatigue in the form of high resistance caused by ohmic heating, thermal cycling

or electrical transients, mechanical fatigue caused by frequent manipulation of the fuse

itself or vibration, chemical contamination, corrosion, and oxidation. The program

utilizes thermography or other appropriate testing to identify the potential existence of

aging degradation such as high contact resistance. The program applies to fuse holders

located outside of active devices. Fuse holders inside an active component, such as

switchgear, power supplies, inverters, battery chargers, control panels, and circuit

boards, are considered to be parts of the larger assembly. Since piece parts and

subcomponents in such an enclosure are inspected regularly and maintained as part of

the plants normal maintenance and surveillance activities, they are not within the scope

of this program.

The inspectors reviewed the licensing basis, the program basis document, implementing

procedures, planned and completed work orders, and related AR records to verify that

the program was implemented as stated in the commitment.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 39.

Item 40 - Aging Management Program for Bus Duct

Commitment Item 40 specified that prior to the period of extended operation the AMP for

Bus Ducts will be a new program that focuses on periodically inspecting the iso-phase

bus duct, as well as all non-segregated 4.16 KV and 480 V bus ducts at least once every

10 years. The program will check a sampling of bolted connections of bus ducts. The

sample of accessible bolted connections will be checked for loose connections by using

thermography or by measuring connection resistance using a low-range ohmmeter.

Visual inspections of the bus ducts for signs of cracks, corrosion, foreign debris,

excessive dust buildup, evidence of water intrusion or discoloration, which may indicate

overheating, will also be performed to identify the potential existence of aging

degradation. Industry experience has shown that the bus ducts exposed to appreciable

ohmic or ambient heating during operation may experience loosening of bolted

Enclosure

26

connections related to repeat cycling of connected loads or the ambient temperature

environment.

The inspectors reviewed the licensing basis, the program basis document, implementing

procedures, planned and completed work orders, and related AR records to verify that

the program was implemented as stated in the commitment.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Item 40.

Item 41 - Environmental Qualification of Electric Equipment Program

Commitment Item 41 specified that the existing Environmental Qualification of Electric

Equipment Program will be credited and prior to the period of extended operation, the

EQ Documentation Packages (EQDP) will be revised to incorporate increased radiation

values resulting from power uprate. EQ program activities establish, demonstrate and

document the level of qualification, qualified configuration, maintenance, surveillance

and replacement requirements necessary to meet 10 CFR 50.49.

The inspectors reviewed the licensing basis document, current program procedures and

a sample of various existing EQDPs to verify that the program was implemented as

stated in the commitment. The inspectors observed that all of the EQDPs reviewed had

been adequately updated to reflect power uprate and the period of extended operation.

Based on the review of the timeliness and adequacy of the licensees actions and

assessment for the program, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 41.

Item 42 - TLAA: Reactor Vessel Neutron Embrittlement

Commitment Item 42 specified that the TLAA for Reactor Vessel Neutron Embrittlement

is an existing analysis that will be credited for the period of extended operation. As part

of the LRA review process, the NRC staff reviewed TLAAs for (1) upper-shelf energy, (2)

pressurized thermal shock, and (3) heatup and cooldown (pressure-temperature limits)

curves and low temperature over pressure (LTOP) setpoints to ensure that the reactor

vessel has adequate fracture toughness to prevent brittle failure during normal and off-

normal operating conditions. The NRR staff also reviewed these TLAAs to determine if

the licensee had demonstrated that the TLAAs for parameters related to structural

integrity had been adequately projected to the end of the period of extended operation

for RNP, as required by 10 CFR 54.21(c)(1)(ii). As stated in the SER, the NRC staff

concluded that the licensee provided an acceptable demonstration, pursuant to 10 CFR

54.21(c)(1)(ii), that, for the RV neutron embrittlement TLAA, the analyses have been

projected to the end of the period of extended operation.

Enclosure

27

The inspectors reviewed the licensing basis documents, portions of the TLAAs, and

interviewed the responsible plant personnel regarding these documents to verify that the

analysis was consistent with the LRA and the corresponding SER.

Based on the review of licensee actions completed at the time of this inspection and the

timeliness of those actions, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 42.

Item 43 - TLAA: Metal Fatigue

See discussion for Commitment Item 30 above.

Item 44 - TLAA: Environmental Qualification

Commitment Item 44 specified that in accordance with the requirements of the

Environmental Qualification Program, any component that is not qualified through the

period of extended operation will be refurbished or replaced prior to exceeding its

qualified life. Prior to the period of extended operation, certain motor-operated valve

(MOV) actuators will either be reevaluated to demonstrate acceptable wear cycle

qualifications or they will be replaced.

The inspectors reviewed the current procedure EST-012, Engineering Periodic

Verification of EQ Component Replacements with Qualified Life Less then 60 years,

Revision 4. The inspectors reviewed a sample of EQDPs for components within the

scope of 10 CFR 50.49. The inspectors verified that these EQDPs were updated to

include environmental conditions associated with extended power uprate implementation

along with an extended operating period of 60 years. The inspectors also verified that

where EQDPs concluded that a qualified life of 60 years could not be achieved; PMs had

been created to replace components before end of the qualified life.

The inspectors reviewed Engineering Change (EC) 72274, Reevaluate EQ Limitorque

MOV Number of Strokes/Cycles for 60 Years Plant Life, Revision 0. That EC

documented the basis for concluding that installed MOVs would be capable of continued

service for the 60 years plant life.

Based on the review of the timeliness and adequacy of the licensees actions and

assessment for the program, the inspectors determined that the licensee completed the

necessary actions to meet Commitment Item 44.

Item 45 and 46 - TLAA: Containment Tendon Loss of Prestress

Commitment Items 45 and 46 specified that testing (at integrated leak rate test pressure)

similar to the Structural Integrity Test performed in 1992 will be scheduled to coincide

with the Appendix J containment integrated leak rate testing (ILRT) conducted during the

period of extended operation. The monitoring criteria for these tests will be limited to

deformations and cracking associated with the vertical prestressed tendons, and will not

include radial monitoring. Guidelines for performing the IWL examinations for these

tests will include additional emphasis on looking for a pattern of horizontal cracks and

additional cracking in the discontinuity areas. Additionally, information from the

licensees response to RAI 4.5-1 will be incorporated into Section 3.8.1.4.7 of their

UFSAR.

Enclosure

28

The inspectors reviewed the licensing basis, program basis documents, design

calculations, and related AR records to verify that the commitment was implemented as

stated in the SER. The inspectors found that the licensee scheduled the development of

implementing procedures for this program to occur 18 months prior to the first scheduled

Appendix J containment ILRT. The inspectors verified that the Appendix J program

documents were administratively updated to reflect their applicability to license renewal

commitments and interviewed the responsible plant personnel regarding this program.

At the time of this inspection, this commitment item was partially completed and

additional tasks were pending to be implemented prior to the period of extended

operation.

Based on the review of licensee actions completed at the time of this inspection, the

timeliness of those actions, and the administrative controls in place to track pending

actions, the inspectors determined that there was reasonable assurance that the

licensee would complete the necessary actions to meet Commitment Items 45 and 46.

Item 47 - TLAA: Aging of Boraflex in Spent Fuel Pool

Commitment Item 47 specified that prior to the period of extended operation the Boraflex

Monitoring Program will be modified to: (1) include neutron attenuation testing, called

blackness testing, to determine gap formation in Boraflex panels; (2) include trending the

results for silica levels by using the EPRI RACKLIFE predictive code or equivalent, and

(3) include measurements of boron areal density by techniques such as the BADGER

device. Additionally, the commitment states that RNP requested, by letter dated May 28,

2003, Serial: RNP-RA/03-0038, an amendment to the Technical Specifications to

eliminate the need to credit Boraflex neutron absorbing material for reactivity control.

The Boraflex Monitoring Program will be eliminated upon NRC approval of this

amendment or upon implementation of another option (such as re-racking the spent fuel

pool) which eliminates the need to credit Boraflex for reactivity control.

The NRC issued Amendment 198, Elimination of Neutron Absorption Credit for

Boraflex, to Facility Operating License Number DPR-23 for the H.B. Robinson Steam

Electric Plant, Unit No. 2. This amendment changed the Technical Specifications in

response to a request dated May 28, 2003, as supplemented on October 8, 2003. The

amendment eliminated the need to credit Boraflex neutron-absorbing material for

reactivity control in the spent fuel storage pool. The licensee proposed to take credit for

a combination of soluble boron and controlled fuel loading patterns in the spent fuel pool

to maintain the required subcriticality margins. The programs for monitoring the

condition of the Boraflex and the silica content in the water were also eliminated in

Technical Specification 3.7.13, Fuel Storage Pool Boron Concentration.

Based on the review of the timeliness and adequacy of the licensees actions, the

inspectors determined that the licensee completed the necessary actions to meet

Commitment Item 47.

(2) License Renewal Commitment Changes

As part of the review of the commitments identified in Appendix A of the SER, the

inspectors reviewed license renewal commitment change documents to verify the

Enclosure

29

licensee followed the guidance in NEI 99-04, Guidelines for Managing NRC

Commitment Changes, for any change to the commitments, including their elimination.

The inspectors verified that the licensee properly evaluated, reported, and approved

where necessary, changes to license renewal commitments listed in the UFSAR in

accordance with 10 CFR 50.59.

The inspectors also reviewed the licensees procedures for commitment revision to

ensure that future changes to (or elimination of) license commitments would follow the

guidance in NEI 99-04, and would properly evaluate, report, and approve changes to

license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59.

The inspectors did not identify any examples where commitment changes were not

consistent with the guidance in NEI 99-04.

(3) Newly Identified SSCs

After the renewed license is issued, the FSAR update required by 10 CFR 50.71(e) must

include any SSCs newly indentified that would have been subject to an aging

management review or time-limited analysis in accordance with 10 CFR 54.21. The

FSAR update must describe how the effects of aging are managed such that the

intended function(s) in 10 CFR 54.4(b) will be effectively maintained during the period of

extended operation.

The inspectors discussed the identification of new SSCs under the purview of 10 CFR

54.37(b), with the licensees license renewal staff. The licensee personnel indicated that

no components had been identified that should have been within the scope of its license

renewal program due to discovering components in the plant that were not accurately

reflected in the database used to originally generate the application for a renewed

license. Additionally, the inspectors reviewed a sample of modifications implemented

since the LRA was submitted to the NRC until the date the renewed operating license

was issued to identify any potential new SSCs that should had been subject to aging

management review at the time the NRC was reviewing the LRA. The inspectors also

reviewed the licensees evaluation of Regulatory Issue Summary 2007-16 to verify that

the newly SSCs identified in that generic communication were considered in the scope

of RNPs license renewal.

The inspectors determined that the licensee took appropriate actions to assure newly

identified structures, systems, and components were properly identified and evaluated

for management of aging affects. The inspection team did not identify any potential new

SSCs that were subject to the provisions of 10 CFR 54.37(b).

The inspectors also contacted the Office of Nuclear Reactor Regulation, Division of

License Renewal (NRR/DLR) staff for information on any applicable generic NRC

communications naming newly identified systems, structures, and components. The

NRR/DLR staff advised the inspectors that besides Regulatory Issue Summary 2007-16,

the NRC has not specified additional SSCs that the licensee must evaluate and include

as applicable in its next UFSAR update in accordance with 10 CFR 54.37(b).

Enclosure

30

(4) Description of AMPs and TLAAs in the UFSAR Supplement

As part of the review of AMPs and TLAAs approved by the NRC in the SER, the

inspectors reviewed their UFSAR descriptions to confirm the implemented programs

were consistent with the SER. The inspectors also verified that changes caused by the

inclusion of newly identified SSCs were included in the UFSAR supplement. With the

exception of one example described in the Findings and Observations section of this

inspection report, the inspectors did not identify inconsistencies between the AMPs or

TLAAs approved in the SER and the UFSAR supplement.

The inspectors also verified that the UFSAR supplement submitted pursuant 10 CFR

54.21(d) was included in the next update to the UFSAR following the issuance of the

renewed license as required by license condition 3.K of the Renewed Facility Operating

License Number DPR-23. Additionally, the inspectors reviewed changes made to the

programs and activities in the UFSAR supplement from the date the renewed license

was issued to the next scheduled UFSAR update to verify that changes were evaluated

against the criteria in 10 CFR 50.59. The inspectors found that the aforementioned

supplement was included in the UFSAR as required and changes to the programs and

activities were evaluated in accordance with 10 CFR 50.59.

b. Findings and Observations

(1) Introduction: The inspectors identified an Unresolved Item related to the Emergency

Operations Facility/Technical Support Center (EOF/TSC) Diesel Generator Main Storage

Tank (buried diesel fuel oil tank), for which additional information and discussion was

needed to determine if a performance deficiency existed, if the performance deficiency

was more than minor, or if the issue of concern constituted a violation of NRC

requirements.

Description: The inspectors noted that Table 2.3-25 of the LRA lists the components in

the Fuel Oil System that require aging management review. This table shows that the

results of the AMR for the EOF/TSC Main Storage Tank are documented in Table 3.3-1

and Table 3.3-2 of the LRA.

Table 3.3-1 specifies that aging management for the diesel fuel oil tanks made of carbon

steel in the diesel fuel oil system and the EDG system will be implemented through the

Fuel Oil Chemistry Program.

Table 3.3-2 specifies that the EOF/TSC Main Storage Tank is a buried tank made of

fiberglass reinforced polyester. The licensee stated in this table that no aging effects

or AMP applies to this tank. Additionally, section B.3.12 of the LRA, Buried Piping and

Tanks Inspection Program states that this AMP does not contain buried tanks. In RAI

B.3.12-1, the NRR staff requested confirmation that no buried tanks were covered under

the Buried Piping and Tanks Inspection Program. In its response to this RAI dated April

28, 2003, the licensee stated that the program does not contain buried tanks.

During the review of AMR documents for LR commitments, the inspectors identified that

the EOF/TSC Main Storage Tank is made of carbon steel covered with 1/8 nominal

exterior coating of fiberglass reinforced polyester. The inspectors noted that the

description of the tank in Table 3.3-2 did not include carbon steel.

Enclosure

31

The inspectors questioned the licensee with regard to the basis for excluding this buried

tank from the scope of the Buried Piping and Tanks Inspection Program. According to

the licensee, the combination of tank material and environment (i.e. buried carbon steel

tank covered with fiberglass reinforced polyester) is not specifically addressed in Table

VII.H1 of the GALL Report and therefore the licensee treated this tank as a component

that is different from the GALL Report.

The inspection team remained concerned whether the exclusion of the EOF/TSC Main

Storage Tank from the Buried Piping and Tanks Inspection Program was appropriate

and whether the AMP selected by the licensee to manage aging on the tanks surfaces

was adequate. This issue required further review. Therefore, this issue will be tracked

as an unresolved item (URI 5000261/2010008-01).

(2) Observation for Commitment Item 20, Above Ground Carbon Steel Tanks: Based on

discussions with the licensee staff the inspectors found that the Alternate Fuel Oil

Storage Tank was excluded from the license renewal scope by dedicating this tank to a

function that did not require aging management in accordance with 10 CFR 54.

However, the inspectors identified that the operating procedure for this tank (OP-909)

contradicted this purpose by allowing the tank to be used for an additional function

during maintenance activities. The licensee stated that this contradiction was the result

of an inadequate procedure revision. The licensee initiated NCR 00380767 to correct

the aforementioned operating procedure.

(3) Observation for Commitment Item 28, Systems Monitoring Program: Enhancement

number 6 of the Commitment states that "loss of material due to wear" will be specifically

included as an aging effect/mechanism in the system walkdown checklist. The

inspectors noted that this enhancement was not included in the UFSAR section 18.1.25,

Systems Monitoring Program. Following discussions with the licensee staff, the

inspectors found that absence of this item in the UFSAR was an error. When the FSAR

was updated to include the license Renewal Commitments, the list of commitments used

from the LRA was used rather than the complete list from Appendix A of the NRC SER.

The licensee initiated NCR 382852 to document this deficiency in their corrective action

program.

Additionally, section 3.K of the renewed license states The Updated Final Safety

Analysis Report supplement, as revised, shall be included in the next scheduled update

to the Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4) following

issuance of this renewed license. This requirement was not completely accomplished,

in that enhancement number 6 of Commitment Item 28 was not included in the UFSAR.

(4) Observation for Commitment Item 28, Systems Monitoring Program: Enhancement

number 6 of the Commitment states that "loss of material due to wear" will be specifically

included as an aging effect/mechanism in the system walkdown checklist. This

commitment item was implemented in site procedure TMM-104, System Walkdown

Procedure, Revision 22. Specifically, the enhancement was implemented as loss of

material due to wear (AR 84967) in section 2.a of Attachment 10.2 - System Inspection

Checklist for Quarterly Walkdowns. The Action Request number in parenthesis is

intended to flag the line item in the implementing procedure as a license renewal

commitment to prevent inadvertent deletion during future revisions. However, procedure

TMM-104 was replaced with corporate wide procedure EGR-NGGC-0026, System

Walkdown Procedure, Revision 0 and this particular enhancement was not included in

Enclosure

32

the corporate procedure. The licensee initiated NCR 382858 to document this

deficiency in their corrective action program.

(5) Observation for Commitment Item 28, Systems Monitoring Program: Enhancement

number 5 of the Commitment states that a section specifically addressing corrective

actions will be added to the licensees system walkdown procedure. The inspectors

noted that procedure TMM-104, System Walkdown Procedure, Revision 22 contained

section 8.4 titled Corrective Actions (AR 84967, AR 84947, AR 84964) to implement

enhancement five. However, procedure TMM-104 was replaced with corporate wide

procedure EGR-NGGC-0026, System Walkdown Procedure, Revision 0 and this

particular enhancement was deleted from the new corporate procedure. The new

corporate procedure still addresses corrective actions in certain procedure steps.

However, the inspectors concluded that implementation of this enhancement in the new

corporate procedure did not fully meet the commitment in that the procedure did not

include a section specifically addressing corrective actions. The licensee included this

issue in NCR 382858 to document this deficiency in their corrective action program.

(6) Observation for Commitment Item 31, RVH Nickel Alloy Program: The inspection plan

required by this commitment item was submitted to NRR under licensee letter RNP-

RA/09-0067. This letter states that the Code Case N-729-1 non-visual inspection of the

upper VHPs is scheduled for RO-27. However, the inspectors identified that the ISI plan

shows this inspection as scheduled for RO-29 in 2014. The licensee initiated NCR

380373 to address this discrepancy and found that the inspection date submitted on the

letter to the NRC was based on the original Alloy 600 upper VHPs. The licensee

replaced the upper reactor vessel head in 2005, which was made of Alloy 690 VHPs. It

appeared that licensee personnel may not have updated their schedule when they

submitted the letter to the NRC. The inspectors determined that the inspection schedule

shown on the licensees ISI plan met the requirements of Code Case N-729-1.

(7) Observation for Commitment Item 31, RVH Nickel Alloy Program: The inspectors noted

that the UFSAR section on Nickel Alloy Nozzles references NRC Order EA-03-009 as

the regulatory requirement driving the inspection of upper VHP nozzles. The NRC Order

for the examination of upper VHP nozzles has been superseded by 10CFR 50.55a, with

the incorporation of Code Case N-729-1. The inspectors found that neither the UFSAR

nor the commitment has been revised to reflect the new regulatory requirements.

However, the inspectors determined that the licensees ISI plan showed an adequate

implementation of the Code Case N-729-1 requirements with regard the schedule of

visual and non-visual inspections. The licensee initiated NCR 0380367 to address this

issue.

(8) Observation for Commitment Item 32, Thermal Aging and CASS Program: The

inspectors noted that the implementing procedures do not contain a program description

that was fully consistent with the LRA, the UFSAR, and the SER. The SER states that

the Thermal Aging and CASS Program applies to cast austenitic stainless steels in RCS

"piping, valves, and pump casings." However, the implementing procedures state that

the program applies to Class 1 cast austenitic stainless steels in RCS "piping, valves,

and fittings." The inspectors questioned whether this created the vulnerability for

missing the CASS pump casing inspections stipulated in the license renewal

commitment. The licensee generated NCR 381872 to correct the implementing

procedures. Although this discrepancy existed in the implementing procedures, the

Enclosure

33

inspectors found that the current ISI Plan included the inspections of Class 1 CASS

pump casings as stated in the commitment.

(9) Observation on Tracking of License Renewal Tasks: The inspectors noted that the

implementation of license renewal commitments was tracked through a series of Nuclear

Tasks Management (NTM) items in the licensees AR system. Each commitment had an

NTM with one or more assignments to track the complete implementation of the

commitment item. Additional tasks such as procedure revisions, preventive

maintenance request, and work orders were created to implement each of the NTMs

tracking the commitments. However, all these tasks had not been cross-referenced to

the main NTM tracking the commitment item. The inspectors questioned whether this

created the vulnerability for closing a commitment while other associated actions are still

pending.

The inspectors found that the failure to cross-reference the license renewal commitment

items was not consistent with License Renewal Program procedure EGR-NGGC-0501,

which specifically requires that license renewal NTMs be cross-referenced with

associated tasks. The licensee generated NCR 380471 to address this issue. The

licensee established the required cross-reference between NTMs and associated tasks

before the end of this inspection.

c. Overall Conclusions

The inspectors determined that the licensee had completed, or was on track to

complete, the necessary tasks to meet the license renewal commitments, license

conditions, and regulatory requirements associated with the issuance of the renewed

operating license at the H.B. Robinson Steam Electric Plant Unit 2. Some commitments

had pending actions remaining, for which task items existed in the Action Request

system to track their completion. Based on the review of completed actions to meet

license renewal commitments, the corrective actions initiated for the observations

discussed above, and the administrative controls in place to track pending license

renewal actions, the inspectors determined that there was reasonable assurance that

the licensee would complete the remaining actions to meet the license renewal

commitments prior to the period of extended operation.

4OA6 Management Meetings

Exit Meeting Summary

On 02/26/2010, the inspectors presented the inspection results to the Mr. Eric

McCartney and other members of the licensee staff. The licensee acknowledged the

issues presented. The inspectors confirmed that none of the potential report input

discussed was considered proprietary. Proprietary material received during the

inspection was returned to the licensee.

ATTACHMENT: SUPPLEMENTAL INFORMATION

Enclosure

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

T. Bardauskas, Site License Renewal Manager

M. Heath, Corporate License Renewal Manager

G. Sanders, Licensing Engineer

LIST OF ITEMS OPENED, CLOSED AND DISCUSSED

Opened

05000261/2010008-01 URI Aging Management Program for exterior

surface of EOF/TSC Main Storage Tank

(Section 4OA5.1)

Closed

None

Discussed

None

Attachment

2

LIST OF DOCUMENTS REVIEWED

The following is a list of documents reviewed during the inspection. Inclusion on this list does

not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that

selected sections of portions of the documents were evaluated as part of the overall inspection

effort. Inclusion of a document on this list does not imply NRC acceptance or endorsement of

the document or any part of it.

Commitment Item 1

AR 00084897, LR Commitment #1

NGGM-PM-0007, Quality Assurance Program Manual, Revision 16

Commitment Item 2

AP-044, Procedure Process Enhancements, Revision 23

AR 363977, SA 305571 D1: License Renewal Process for UFSAR Updates

EGR-NGGC-0005, Engineering Change, Revision 29

EGR-NGGC-0514, License Renewal Implementation Procedure, Revision 0

Model WO 01674547, Perform Review Required by 10CFR 54.37(b) (License Renewal)

NTM 00092130, LR Commitment #2 Requirements Met of 10 CFR 54.37(b)

PMQR 00088958, Perform Review Required by 10CFR 54.37(b) (License Renewal)

PRO-NGGC-0204, Procedure Review and Approval, Revision 16

REG-NGGC-0010, 10 CFR 50.59 and Selected Regulatory Reviews, Revision 12

RNP-L/LR-0009, UFSAR Updates for Post Renewed License - Newly Identified SSCs, Revision

0

RNP-L/LR-0009, UFSAR Updates for Post Renewed License - Newly Identified SSCs, Revision

1

RNP-L/LR-0009, UFSAR Updates for Post Renewed License - Newly Identified SSCs, Revision

2

Commitment Item 3

AR 00092135-01, Commitment 3 and License Condition 3.K, UFSAR Supplement

Commitment Item 4

AR 00084907, Incorporate changes into procedures to indicate credit for R AMP

NRC Request for Additional Information RAI B.1-1

PLP-025, Revision 20, Inservice Inspection Programs

RNP-L/LR-0606, Aging Management Program ASME Section XI, Subsections IWB, IWC, and

IWD Inservice Inspection Program

Robinson Nuclear Plant License Renewal Application, Appendix B, Section B.2.1, ASME

Section XI, Subsection IWB, IWC, and IWD Program

TMM-015, Inservice Repair and Replacement

TMM-020, revision 17, Inservice Pressure Testing Program

TMM-038, Revision 14, Inservice Inspection Program

Commitment Item 5

AR 00084912, LR Commitment #5

CP-001 Chemistry Monitoring Program, Revision 96

CP-005 Secondary Chemistry Corrective Action Program, Revision 34

CP-200 Chemistry Program Implementation, Revision 16

OM-001-13 Plant Chemistry, Revision 13

RNP-L/LR-0600, Aging Management Program Water Chemistry Program, Revision 11

Attachment

3

Commitment Item 6

AR 00084913, LR Commitment #6 Reactor Head Closure Studs Program

MRP-003, Revision 35, Reactor Vessel Stud Removal and Installation

NRC Request for Additional Information RAI B.1-1

NRC Request for Additional Information RAI B.1-1

PLP-025, Revision 20, Inservice Inspection Program

RNP-L/LR-0619, Aging Management program Reactor Head Stud Program

Robinson Nuclear Plant License Renewal Application, Appendix B, Section B.2.1, Reactor Head

Closure Studs Program.

TMM-038, Revision 15, Inservice Examination Program

Commitment Item 7

AR 00084915, LRA Commitment #7, Steam Generator Tube Integrity Program

AR 00185319, Perform procedure technical review

ERG-NGGC-0208, Revision 7, Steam Generator Integrity Program

NRC Request for Additional Information RAI B.1-1

Plant Technical Specifications, 5.5.9, Steam Generator Program

RNP-L/LR-0604, Revision 1, Aging Management Program Steam Generator Tube Integrity

Program

Robinson Nuclear Plant License Renewal Application, Appendix B, Section B.2.4 Steam

Generator Tube Integrity Program

TMM-112, Revision 18, team Generator Inspection (Refueling Outage).

TMM-112-1, Revision 6, Steam Generator Eddy Current Analysis Guidelines

Commitment Item 8

0ST-910, Dedicated Shutdown Diesel Generator (Monthly)

AR 00084897, LR Commitment #8

AR 00210085, Three tubes plugged in the B CCW Heat Exchanger

AR 00221280, Three tubes plugged in the A CCW Heat Exchanger

AR 00246999, Small Pieces of Concrete Found in the B CCW HX

AR 00339413, Increase in CCW system Leakage

CP-001, Chemistry Monitoring Program

CP-200, Chemistry Program Implementation

OST-405, TSC/EOF/PAP Diesel Generator (Semiannual)

OST-406, TSC/EOF/PAP Diesel Generator (monthly except when OST-405 is scheduled)

OST-409-1, EDG A Fast Speed Start

OST-409-2, EDG B Fast Speed Start

OST-410, Emergency Diesel Generator A (Twenty-Four Hour Load Test)

OST-411, Emergency Diesel Generator B (Twenty-Four Hour Load Test)

OST-908, Component Cooling System Component Test

PM-025, EOF/TSC Emergency Diesel Generator Inspection Number 1

PM-108, Dedicated Shutdown Diesel Twenty Four (24) Month Inspection

PMR 00016866-01, Cleaning and Inspection of A CCW Heat Exchanger

PMR 00016866-02, Clean and Repair the Coating on the Tube Sheet and Housing On A CCW

PMR 00016866-03, Eddy Current Test A CCW Heat Exchanger

PMR 00016867-01, Cleaning and Inspection of B CCW Heat Exchanger

PMR 00016867-02, Cleaning and Inspection of B CCW Heat Exchanger

PMR 00016867-03, Eddy Current Test B CCW Heat Exchanger

RNP-L/LR-0627, Aging Management Program Closed Cycle Cooling Water System, Revision 2

WO 00054467, Cleaning and Inspection of A CCW Heat Exchanger

Attachment

4

WO 00054468, Clean and Repair the Coating on the Tube Sheet and Housing on A CCW

WO 00054470, Cleaning and Inspection of B CCW Heat Exchanger

WO 00058469, Cleaning and Inspection of B CCW Heat Exchanger

WO 01073453, Eddy Current Test A CCW Heat Exchanger

WO 01073544, Eddy Current Test B CCW Heat Exchanger

Commitment Item 9

AR 00084918, LR Commitment Item 9, ASME Section XI, Subsection IWF

PLP-025, Inservice Inspection Programs, Revision 20

RNP-L/LR-0618, Aging Management Program ASME Section XI, Subsection IWF Program,

Revision 3

TMM-015, Inservice Repair and Replacement, Revision 34

TMM-038, Inservice Examination Program, Revision 14

Commitment Item 10

AR 00084919, LR Commitment Item 10, 10CFR Appendix J Program

EGR-NGGC-0015, Containment Inspection Program, Revision 3

EST-062 Procedure Performance Results, 7/29/09

EST-062, Local Leak Rate Test of Containment Instrument Air Header Isolation Valves

(Refueling Shutdown, Not to Exceed 2 Years), Revision 17

EST-064, Containment Isolation Valve Local Leakage Rate Survey (Refueling Interval Not to

Exceed 2 Years), Revision 12

EST-064, Attachment 10.2, Containment Isolation Valve Local Leakage Rate Survey, 7/29/09

PLP-025, Inservice Inspection Programs, Revision 20

RNP-L/LR-0615, Aging Management Program 10 CFR Part 50, Appendix J Program, Revision

1

TMM-005, 10CFR50, Appendix J Testing Program, Revision 28

Commitment Item 11

EST-108 Flux Thimble Eddy Current Inspection (Specified Refueling Outages) Revision 8

Eddy Current Inspection Results from September 2005

RNP-L/LR-0609, Aging Management Program Flux Thimble Eddy Current Inspection Program,

Revision 1

Commitment Item 12

AR 00084923-01, LR Commitment #12

EGR-NGGC-0351 Condition Monitoring of Structures, Revision 15 - draft revision under PPR

353128

FP-013 Fire Protection Systems Surveillance Requirements Revision 10

RNP-L/LR-0612, Aging Management Program Fire Protection Program, Revision 5

TMM-104, System Walkdown Procedure, Revision 21

WO 1038781 replace flex hoses reserve CO2 bank 2009.

WO 1038782 replace flex hoses main CO2 bank 2009.

WO 1038786 replace flex hoses for the cable vault pilot control valves 2009.

WO 303032 replace all the flex hoses on the Cable Vault C02 System 6195 2004

Commitment Item 13

AR 00084924, LR Commitment Item 13, BACCP

AR 00068113, Boric Acid Corrosion Control Program Assessment

EGR-NGGC-0207, Boric Acid Corrosion Control, Revision 3

EST-083-1, Inservice Inspection Pressure Retaining VT-2 Bolting Examinations of the Reactor

Coolant System (Refueling Shutdown Interval), Revision 5

Attachment

5

EST-083-2, Inservice Inspection Pressure Testing of the Reactor Coolant System (Refueling

Shutdown Interval), Revision 5

OST-051, Reactor Coolant System Leakage Evaluation (Every 72 Hours during Steady State

Operation and Within 12 Hours after Reaching Steady State Operation), Revision 41

OST-052, RCS Leakage Test and Examination Prior To Startup Following an Opening of the

Primary System (Refueling and/or Startup Interval), Revision 23

OST-51, Attachment 10.2, Leakage Evaluation Calculation Sheet, Revision 41, 2/19/10

RNP-L/LR-0601, Aging Management Program Boric Acid Corrosion Control Program, Revision

5

TMM-104, System Walkdown Procedure, Revision 22

Commitment Item 14

EGR-NGGC-0202, Flow Accelerated Corrosion Monitoring Program, Revision 10

Flow Accelerated Corrosion (FAC) Program Document System Elimination Analysis, Revision 5,

January, 2010

AR 00084931, Commitment in RNP-RA/03-0031 Flow-Accelerated Corrosion Program

RNP-L/LR-0603, Aging Management Program Flow Accelerated Corrosion Program, Revision 5

Commitment Item 15

1039252, Disassemble, repair, and reassemble CVC-381

AR 00084833-2, LR Commitment #15

AR 84933-02, Inspection of high strength bolting used in valve CVC-381

MMM-016, Torquing Procedure

RNP-L/LR-0625, Aging Management Program Bolting Integrity Program, Revision 2

Commitment Item 16

AR 00084935, LR Commitment #16

AR320264, Change processes not followed for license renewal commitment

CM-201, Safety Related and Non-Safety Related Heat Exchanger Maintenance

CP-001, Chemistry Monitoring Program

CP-009, Chlorination

EC 49207, Cooling coil replacement in HVH-6A/B, HVH-7A/B, and HVH-8A/B

EST-116, Service Water Piping Inspection

OST-151-1, Safety Injection System Components Test - Pump A

OST-151-2, Safety Injection System Component Test - Pump B

OST-201-1, MDAFW System Component Test - Train A

OST-201-2, MDAFW System Component Test - Train B

PMR 17986, Assist Contractor With Performing Eddy Current on HVH-6B

PMR 17985, Assist Contractor With Performing Eddy Current on HVH-6A

PMR 17987, Assist Contractor With Performing Eddy Current on HVH-7A

PMR 17988, Assist Contractor With Performing Eddy Current on HVH-7B

PMR 17989, Assist Contractor With Performing Eddy Current on HVH-8A

PMR 17990, Assist Contractor With Performing Eddy Current on HVH-8B

PMR 190631, SI, RHR and AFW room cooler heat exchangers must be eddy current tested

RNP-L/LR-0602, Aging Management Program Open Cycle Cooling Water System Program,

Revision 7

Commitment Item 17

AR 00084937-01, License Renewal Commitment Item 17, Inspection of Overhead Heavy Loads

and Light Loads Handling

AR 00220518, Turbine crane gear wear

Attachment

6

AR 00347161, Spent fuel cask crane flex couplings not in PM program

EGR-NGGC-0351, Condition Monitoring of Structures, Revision 15

RNP-L/LR-0628, Aging Management Program Inspection of Overhead Heavy Load and Light

Load Handling Systems Program, Revision 2

TMM-104, System Walkdown Procedure, Revision 22

TMM-104, System Walkdown Report - 4th Quarter 2008

TMM-104, System Walkdown Report - Inspection July 2008

TMM-104, System Walkdown Report - Inspection July 2008

TMM-104, System Walkdown Report - RO-025 Inspection Sept-Nov 2008

Commitment Item 18

AR 00084942-1, LR Commitment #18

PMR 348790

PMR 348792

RNP-L/LR-0611, Aging Management Program Fire Water System Program, Revision 7

WO 1120123

WO 1519261

WO 1549734

WO 1605254

WO 706192-02

Commitment Item 19

AR 00373580, Independent Vendor Assessment of Cathodic Protection System

AR 84944-02, Buried Piping and Tank Surveillance Program (Cathodic Protection System)

License Renewal Commitment Implementation

Evaluation / Adjustment Survey Cathodic Protection Systems Units No. 1 and 2 Underground

Fuel System Piping H.B. Robinson Plant, Progress Energy Hartsville, South Carolina,

Prepared by CORRPRO Companies, October, 2009

NACE RP0169-1996, Standard Practice, Control of External Corrosion on Underground or

Submerged Metallic Piping Systems

NACE SP0169-2007, Standard Practice, Control of External Corrosion on Underground or

Submerged Metallic Piping Systems

NCR 374152, Attachment 4, Equipment Reliability Form

PM-403, Cathodic Protection System Rectifier Inspection and Cleaning, Revision 11

PM-417, Cathodic Protection System Soil to Structure Potential Measurement Test, Revision 9

PM-467, Fuel Oil Transfer Pressure Test, Revision 8

Resurvey Report Cathodic Protection System Units No. 1 and 2 Underground Fuel System

Piping H.B. Robinson Plant, Progress Energy Hartsville, South Carolina, January, 2009

Work Order Package 01399645-14, Install EC 65116

Work Order Package 01480838-01, Perform Cathodic Protection System Inspection (PM-417)

Commitment Item 20

AR 00084947-01, LR Commitment #20

EGR-NGGC-0026, System Walkdown Procedure

PMR 8735701, EDG fuel storage tank

PMR 1729203, DSD fuel storage tank

PMR 368289, Security diesel day tank

PMR 368829, Unit 1 fuel storage tanks

PMR 8600001, Fire pump fuel tank

RNP-L/LR-0630, Aging Management Program Above Ground Carbon Steel Tanks Program,

Revision 4

Attachment

7

TMM-104, System Walkdown Procedure

Commitment Item 21

AR 380782, CP-039

AR 380788, CP-001

AR 380897, OST-405 TSC/EOF/PAP Diesel Generator (Semiannual)

CP-00, Chemistry Monitoring Program, Revision 97

CP-039, Bacteria in Fuel Oil, Revision 0

CP-116, Chemistry Data Tracking and Trending Program, Revision 13

AR 00084951, Commitment in RNP-RA/03-0031 Fuel Oil Chemistry Program

OST-023, Monthly Surveillances, Revision 26

RNP-L/LR-0631, Aging Management Program Fuel Oil Chemistry Program, Revision 4

Commitment Item 22

H.B. Robinson Steam Electric Plant Unit 2 - Updated Final Safety Analysis Report, Revision 22,

Section 5.3.1.6, Material Surveillance

Model WO 00053419, FSAR 5.3 Perform Reactor Vessel Surveillance Capsule Testing

AR 00084955, Commitment 22 and License Condition 3.L, RV Surveillance Program

PMID 13444, FSAR 5.3 Perform Reactor Vessel Surveillance Capsule Testing

RNP-L/LR-0613, Aging Management Program Reactor Vessel Surveillance Program, Revision

2

WCAP-15805, Analysis of Capsule X from the Carolina Power & Light Company H.B. Robinson

Unit 2 Reactor Vessel Radiation Surveillance Program, March 2002

Commitment Item 23

AR 00084959-01, LR Commitment #1

EGR-NGGC-0209, Buried Piping Program, Revision 0

EGR-NGGC-0351, Structures Monitoring Program, Revision 14

MNT-NGGC-024, Excavation and Backfill, Revision 0

RNP-L/LR-0634, Aging Management Program Buried Piping and Tanks Inspection Program,

Revision 4

Commitment Item 24

NGG RNP IWE/IWL Program Health Report, 12/31/2009

AR 00084960-01, LR Commitment Item 24, ASME Section XI, Subsection IWE

CM-764, Inspection and Repair of CV Liner and Insulation, Revision 8

EC-47701, CV Liner Thickness Acceptance Criteria, Revision 6

EC-72699, Evaluation of Containment Building Liner, Insulation, Sheathing, and Coatings,

Revision 0

EGR-NGCC-0351, Condition Monitoring of Structures, Revision 15

EST-064, Containment Isolation Valve Local Leakage Rate Survey (Refueling Interval Not to

Exceed 2 Years), Revision 12

EST-150, Containment Inspection (IWE/IWL), Revision 9

PLP-025, Inservice Inspection Programs, Revision 20

RNP-L/LR-0616, Aging Management Program ASME Section XI, Subsection IWE, Revision 1

TMM-015, Inservice Repair and Replacement, Revision 34

TMM-124, Inservice IWE/IWL Program, Revision 9

Commitment Item 25

AR 00084961-01, LR Commitment Item 25, ASME Section XI, Subsection IWL Program

EST-150, Containment Inspection (IWE/IWL), Revision 9

Attachment

8

MMM-051, Plant Excavation, Backfill, Core Drilling, and Cutting Concrete/Masonry, Revision

15

MNT-NGGC-0024, Excavation and Backfill, Revision 0

PLP-025, Inservice Inspection Program, Revision 20

RNP-L/LR-0617, Aging Management Program ASME Section XI, Subsection IWL, Revision 3

TMM-015, Inservice Repair and Replacement, Revision 34

TMM-104, System Walkdown Procedure, Revision 22

TMM-124, Inservice IWE/IWL Program, Revision 9

Commitment Item 26

AR 00084964-02, LR Commitment Item 26, Structures Monitoring Program

AR 00365673-16, Adequate progress has not been made on the license renewal commitment

for the structural monitoring program

EGR-NGCC-0351, Condition Monitoring of Structures, Revision 15

Inspection Attributes for Structural Monitoring Program: Air Compressor Enclosure, 1/22/10

Inspection Attributes for Structural Monitoring Program: Diesel Fire Pump FO Tank & Control

Panel; Manholes M-50A & M-50B, 1/22/10

Inspection Attributes for Structural Monitoring Program: DSDG Enclosure, Tank, Charger,

Cooler 1/22/10

MNT-NGGC-0024, Excavation and Backfill, Revision 0

RNP-L/LR-0608, Aging Management Program Structures Monitoring Program, Revision 3

Commitment Item 27

AR 00084965-01, LR Commitment Item 27, Dam Inspection Program

AR 00245643-20, Based on the material condition of the Lake Robinson Dam Spillway Tainter

Gates recorded during a recent system walkdown, corrective maintenance is required to insure

that the functionality and/or structural integrity is not compromised.

EGR-NGCC-0351, Condition Monitoring of Structures, Revision 15

Progress Energy Carolinas H.B. Robinson Steam Electric Plant Cooling Lake Dam and Ash

Pond Dike Hartsville, South Carolina Mactec Project No. 6468-05-0992(05) Five-Year

Independent Consultant Inspection, 12/20/05

Report of 2008 Limited (Annual) Field Inspection Cooling Lake Dam and Ash Pond Dam H.B.

Robinson Steam Electric Plant Hartsville, South Carolina Mactec Project 6468-08-2087(05),

11/11/08

RNP-L/LR-0636, Aging Management Program Recommended Guidelines for Safety Inspection

of Dams, Revision 5

Work Order #00852383, Lake Robinson Dam Inspection & Report

Commitment Item 28

AR 00084967, LR Commitment #28

EGR-NGGC-0026 System Walkdown Procedure, Revision 0

TMM-104, System Walkdown Procedure, Revision 22

Commitment Item 29

AR 00084999, LR Commitment #29

AR/NCR 365671 PM and model work orders not specific to aging mechanism

EGR-NGGC-0512 Licensing renewal Aging Management Activities, Revision 4

RNP-L/LR-0642 Aging Management program for Preventive Maintenance Program

Commitment Items 30 and 43

AR 00092151, Commitment in RNP-RA/03-0074 TLAA Metal Fatigue

Attachment

9

AR 00085003, LR Commitment No. 30 Fatigue Monitoring Program

PLP-109, Cycle and Transient Monitoring, Revision 9

RNP-M/MECH-1593, Feedwater (FW) Branch Connection Reinforcement Pad Plate Design &

Fatigue CUF Calculation for H.B. Robinson - Unit 2, Revision 1

RNP-M/MECH-1594, Stress and Fatigue Analysis for AFW to FW Tie-In Thermal Fatigue

Concerns, Revision 1

RNP-L/LR-0502, Thermal Fatigue TLAA Review for H.B. Robinson - Unit 2, Revision 4

RNP-L/LR-0605, Aging Management Program for Metal Fatigue of Reactor Coolant Pressure

Boundary (Fatigue Monitoring Program), Revision 4

WCAP-16694-P, Environmental Fatigue Evaluations for H.B. Robinson Unit 2 Pressurizer and

Surge Line, April 2007 (Westinghouse Proprietary Class 2 Document)

Commitment Item 31

ADM-NGGC-0112, Reactor Coolant System Material Integrity Management Program, Revision

2

Fourth Ten-Year Interval Inservice Inspection Plan, Section E-11, Volume 190

Fourth Ten-Year Interval Inservice Inspection Program, Volume 180

AR 00085005, Commitment in RNP-RA/03-0074 Nickel-Alloy Nozzles & Penetrations

PLP-025, Inservice Inspection Programs, Revision 20

RNP-L/LR-0620, Aging Management Program Nickel-Alloy Nozzles and Penetrations Program,

Revision 2

RNP-RA/09-0067, Nickel Alloy Nozzles and Penetrations Program Inspection Plan, 07/29/09

TMM-015, Inservice Repair and Replacement, Revision 34

TMM-020, Inservice Pressure Testing Program, Revision 18

TMM-038, Inservice Examination Program, Revision 15

Commitment Item 32

H.B. Robinson Steam Electric Plant, Unit No. 2, Fourth Ten-Year Interval Inservice Inspection

Program, Revision 13

H.B. Robinson Steam Electric Plant, Unit No. 2, Fourth Ten-Year Interval Inservice Inspection

Plan, Revision 16

AR 00085006, Commitment in RNP-RA/03-0031 Cast Austenitic Stainless Steel

PLP-025, Inservice Inspection Programs, Revision 20

RNP-L/LR-0621, Aging Management Program Thermal Aging Embrittlement of Cast Austenitic

Stainless Steel (CASS) Program, Revision 2

TMM-038, Inservice Examination Program, Revision 15

Commitment Item 33

AR 00085009-01, LR Commitment #33

ADM-NGGC-0112, Reactor Coolant System Material Integrity Management Program, Revision

2

Letter Serial RNP-RA/09-0081, From H.B. Robinson Steam Electric Plant, Unit No. 2, To

USNRC, Subj: Reactor Vessel Internals Aging Management Program Inspection Plan, Sep 24,

2009

RNP-L/LR-0614, Aging Management Program PWR Vessel Internals Program, Revision 2

SD-058, Robinson Nuclear Training, Operations Training, Reactor Vessel and Internals System,

Revision 6

WCAP-17077-NP, PWR Vessel Internals Program Plan for Aging Management of Reactor

Internals at Robinson Nuclear Plant, July 2009

Attachment

10

Commitment Item 34

AR00085012, LR Commitment Item 34

NRC Information Notice 97-46, Unisolable Crack in High-Pressure Injection Piping

RNP-L/LR-0632, Aging Management Program One Time Inspection Program, Revision 6

Robinson Nuclear Plant License Renewal Application, Appendix B, Section B.4.4, One Time

Inspection Program.

WO 0083077, Perform as-found Tube Measurements for License Renewal

WO 01537084, Perform and inspect valves and piping in condensate system for LR

Commitment prior to period of extended operation.

WO 01537087, Perform and inspect valves and piping in feed water system for LR Commitment

prior to period of extended operation.

WO 01537098, Perform and inspect valves and piping in auxiliary feed water system for LR

Commitment prior to period of extended operation.

WO 01537102, Perform and inspect valves and piping in steam generator blow down system for

LR Commitment prior to period of extended operation.

Commitment Item 35

RNP-L/LR-0633, Selective Leaching of Materials Program

AR 00085018, LR Commitment Item 35

WO 388899 Inspection of MDAFWP lube oil cooler 1/29/04

WO 410468 Inspection of SDAFWP lube oil heat exchanger 9/20/04

WO 652567 Inspection & replace service water valve SW-6 4/20/07

WO 759603 Inspect V6-33E SW booster pump A 4/20/07

WO 615770 Replace SW-8 SW D pump discharge 10/14/08

WO 1122995 Inspect valve V6-16C turbine building isolation 10/28/08

WO 1016122 Inspect valve DG-9A DG A jacket water HX tube side drain

WO 355999 Inspect valve FP-75 EDFP relief valve

WO 608534 Tie in new line 10-FP-374 to 10-FP-358 5/5/05

WO 831096 Replace potable water line cable spread/battery room 2/25/09

Commitment Item 36

AR00085019, LR Commitment Item 36

AR 366618, List required by EGR-NGGC-0108 not available

AR311293-04, Self Assessment RNP Cable Aging Management Program

EGR-NGGC-0507, Cable Aging Management Program

EPRI Technical Report 1003317, Cable System Aging Management (April 2002)

EPRI Technical Report 1003663, Integrated Cable System Aging Management Guidance -

Low Voltage Cable (January 2003)

EPRI Technical Report 1007933, Aging Assessment Field Guide (December 2003)

EPRI Technical Report 109619, Guideline for the Management of Adverse Localized

Equipment Environments (June 1999)

PMR 11777, Walkdown Non-Eq cable in the Turbine Building

PMR 18064, Walkdown Non-Eq cable in the Aux Building

PMR 72802, Walkdown Non-Eq cable in CV

RNP-L/LR-0390, Aging Management Review of Electrical Commodities for License Renewal,

Revision 4

WO 01126106-01, inspect cables in R025 in CV

WO 01126106-02 inspect cables in R025 in Aux Bldg

WO 01126106-03, inspect cables in R025 in Turbine Bldg

WO 01447552-01, Lighting panel intake structure

WO 01447565-01, Lighting panel outside charging pump room

Attachment

11

WO 01447567-01, Lighting panel 24A spent fuel pit

WO 01447569-01, Lighting panel spent fuel pit

WO 01447572-01, Lighting panel hot machine shop

WO 01447573-01, Lighting panel turbine area mezzanine floor

WO 01447576-01, Lighting panel turbine area ground floor

WO 01541004, Engineering Inspection of Pressurizer Relief Valve Wiring

Commitment Item 37

AR00092137-01, LR Commitment Item 37

LP-256, Containment High Range Radiation Monitor (AREA) RMS 32A & 32B

PRR 287488

RNP-L/LR-0390, Aging Management Review of Electrical Commodities for License Renewal,

Revision 4

WO 01410926, R31A & B review calibration results for age degradation

WO 082332-01, R-32A & B Review calibration results for age degradation

Commitment Item 38

AR 316141, Unexpected degradation of NIS Power Range N-42, N-43, and N-44 detectors

AR 92139-02, Aging Management Program for Neutron Flux Instrumentation

PM-496, Source Range Cable/Connector/Detector Condition Monitoring (Shutdown)

PM-497, Intermediate Range Cable/Connector/Detector Condition Monitoring (Shutdown)

PM-498, Power Range Cable/Connector/Detector Condition Monitoring (Shutdown)

PMR 10603-02, N-31

PMR 10604-02, N-32

PMR 14160-04, N-35

PMR 14161-04, N-36

PMR 14163-03, N-41

PMR 14164-03, N-42

PMR 14165-03, N-43

PMR 14166-03, N-44

PMR 79175-01, NE-51

PMR 79176-01, NE-52

RNP-L/LR-0390, Aging Management Review of Electrical Commodities for License Renewal,

Revision 4

WO 01038843-01, Condition monitoring N-31

WO 01038846-01, Condition monitoring N-32

WO 01038875-01, Condition monitoring N-41

WO 01038876-01, Condition monitoring N-35

WO 01038877-01, Condition monitoring N-36

WO 01038879-01, Condition monitoring N-42

WO 01038880-01, Condition monitoring N-43

WO 01038882-01, Condition monitoring N-44

WO 01286606-01, Condition monitoring NE-51

WO 01286866-01, Condition monitoring NE-52

Commitment Item 39

AR00092145-01, LR Commitment Item 39

PMR 80661, Perform thermography on DSDG fuse

RNP-L/LR-0390, Aging Management Review of Electrical Commodities for License Renewal,

Revision 4

WO 01351332-01, Perform thermography on DSDG fuse

Attachment

12

Commitment Item 40

AR00092147-01, LR Commitment Item 40

AR 302117, E1 non-segregated bus degradation

EC 72328, License Renewal Commitment Number 40, Aging Management Program for Bus

Duct

PM-013, 480V Nonseg Bus Duct Inspection

PM-128, Main Generator Isophase Bus Duct Inspection

PM-143, Auxiliary Transformer Bus Duct Inspection

PM-144, Startup Transformer Bus Duct Inspection

PMID 11457, Generator bus duct

PMID 14146, Thermography - plant transformers

PMID 86588-01, Perform Thermal Imaging on EDG A Nonseg Bus Duct

PMID 86590-01, Perform Thermal Imaging on EDG B Nonseg Bus Duct

PMID 88097-01, Perform Thermal Imaging on MG Set A and B Bus Work

PMID 88098-01, Perform Thermal Imaging on DS Bus Work And Nonseg Bus

PMID 88099-01, Perform Thermal Imaging on System 5175 Non Segregated Bus

PMID 88100-01, Perform Thermal Imaging on Bus Duct Buses E1 & E2 Tie

PMR 264977

PMR 318169

PMR 318518

PMR 321962

PMR 321967

PMR 322527

PMR 322538

PMR 322648

PMR 322649

PMR 322654

PMR 374675

RNP-L/LR-0390, Aging Management Review of Electrical Commodities for License Renewal,

Revision 4

WO 01130871-01, Inspect isophase bus de -Ionizing Baffle

WO 01455219

WO 1039856-01

WO 1152110

WO 1152123

WO 1152124, Remove 480V Bus Duct Panels And Perform Inspection

WO 1152125

WO 1455216

WO 1455221

WO 1496235

WO 1588504-01, Perform Thermography, Plant Transformers

WO 1588504-01, Thermography, Plant Transformers

WO 1619364-01

WO 1625326-01,

WO 1636173-01, Perform Thermal Imaging on DS Bus Work And Nonseg Bus

WO 1636174-01, Perform Thermal Imaging On System 5175 Non Segregated Bus

WO 1636312-01, Perform Thermal Imaging On MG Set A and B Bus Work

WO 1688116-01

WO 59553-02, Perform Inspection Of Generator Isolated Phase Bus Duct

WO 59747, Perform Meggaring Of Generator Isolated Phase Bus Duct

Attachment

13

WO1152136, Remove 480V Bus Duct Panels And Perform Inspection

Commitment Item 41 and 44

AR00092148-01, LR Commitment Item 41

AR00092152-01, LR Commitment Item 44

Engineering Change 72274, Reevaluate EQ Limitorque MOV Number of Strokes/Cycles for 60

Years Plant Life, Revision 0

EQDP - 2.0 - Limitorque MOV actuators outside CV, Revision 10

EQDP - 2.1 - Limitorque MOV actuators outside CV, Revision 9

EQDP - 37.0 - Minco RTDs for RVLIS, Revision 6

EST-012 Engineering Periodic Verification of EQ Component Replacements with Qualified Life

Less then 60 years, Revision 4.

Commitment Item 42

WCAP-15828, Evaluation of Pressurized Thermal Shock for H.B. Robinson Unit 2, Revision 0

Engineering Change 51708R2, RCS Operating Limits

Commitment Item 45 and 46

AR00092154-01, LR Commitment Item 45 TLAA Containment Tendon Loss of Pre-stress

AR00092155, LR Commitment Item 46

EST-064, Containment Isolation Valve Local Leakage Rate Survey (Refueling Interval Not to

Exceed 2 Years, Revision 12

EST-085, Containment Integrated Leak Rate Test, Revision 16

PMID 10563-02, License renewal commitment structural integrity test

RNP-C-CONT-1004, Calculation for Prestress Tendon Loading, Revision 0

RNP-L/LR-0506, Prestressed Steel Tendons Time-Limited Aging Analysis Review, Revision 1

Commitment Item 47

AR00092156, LR Commitment Item 47

Amendment 198, Elimination of Neutron Absorption Credit for Boraflex, to Facility Operating

License No. DPR-23 for the H.B. Robinson Steam Electric Plant, Unit No. 2

Other Documents

AP-007, Generic Procedure Writers Instructions, Revision 24

AR 247243, RIS 2007-16 - Implementation of 10 CFR 54.37(b) for holders of Renewed

Licenses

EGR-NGGC-0201, NGG Standard Procedure Writers Guide, Revision 19

EGR-NGGC-0501, Nuclear Plant License Renewal Program, Revision 13

EGR-NGGC-0512, License Renewal Aging Management Activities, Revision 5

List of Engineering Changes Categorized as MODIFIED between 06/01/2002 and 05/01/2004

H.B. Robinson Steam Electric Plant Unit 2 - Updated Final Safety Analysis Report, Revision 19,

Chapter 18, Aging Management Programs and Activities

H.B. Robinson Steam Electric Plant Unit 2 - Updated Final Safety Analysis Report, Revision 20,

Chapter 18, Aging Management Programs and Activities

H.B. Robinson Steam Electric Plant Unit 2 - Updated Final Safety Analysis Report, Revision 21,

Chapter 18, Aging Management Programs and Activities

H.B. Robinson Steam Electric Plant Unit 2 - Updated Final Safety Analysis Report, Revision 22,

Chapter 18, Aging Management Programs and Activities

NCR 00380367, FSAR Chapter 18 Update for Vessel Head Inspections

NCR 00380376, MMM-016 Clarification to Define "High Strength" Bolting

NCR 00380471, Tracking of Open License Renewal Commitments

Attachment

14

NCR 00380649, License Renewal Commitments for FAC Program

NCR 00380767, Discrepancy in OP-909 Concerning LR Commitment for AFOST

NCR 00381173, PLP-037 Requirements for NIS Maintenance

NCR 00381872, Difference in Words between LR Commitment and Procedures

NCR 00382852, License Renewal Commitment Not Fully Described in the UFSAR

NCR 00382858, Part of License Renewal Commitment Lost in Procedure Revision

NRC 00380373, Letter RNP-RA/09-0067 was Identified with a Discrepancy

NUREG-1785, Safety Evaluation Report (SER) Related to the License Renewal of H.B.

Robinson Steam Electric Plant, Unit 2

PRO-NGGC-0204, Procedure Review and Approval, Revision 16

RNP-RA/04-0143, H.B. Robinson Steam Electric Plant Unit 2 - Submittal of Updated Final

Safety Analysis Report, Revision 19, 11/24/2004

RNP-RA/06-0036, H.B. Robinson Steam Electric Plant Unit 2 - Submittal of Updated Final

Safety Analysis Report, Revision 20, 04/17/2006

RNP-RA/08-0015, H.B. Robinson Steam Electric Plant Unit 2 - Submittal of Updated Final

Safety Analysis Report, Revision 21, 06/22/2008

RNP-RA/09-0039, H.B. Robinson Steam Electric Plant Unit 2 - Submittal of Updated Final

Safety Analysis Report, Revision 22, 05/06/2009

Attachment

15

LIST OF ACRONYMS USED

ACI American Concrete Institute

ADAMS Agencywide Document Access Management System

AFW Auxiliary Feedwater

AMP Aging Management Program

AMR Aging Management Review

ANSI American National Standard Institute

AR Action Request

ASCE American Society of Civil Engineers

ASME American Society of Mechanical Engineers

BACCP Boric Acid Corrosion Control Program

BPVC Boiler and Pressure Vessel Code

CASS Cast Austenitic Stainless Steel

CCW Component Cooling Water

CFR Code of Federal Regulations

CUF Cumulative Usage Factor

EAF Environmentally Assisted Fatigue

EC Engineering Change

EDG Emergency Diesel Generator

EOF Emergency Operations Facility

EPRI Electric Power Research Institute

EQ Environmental Qualification or Environmentally Qualified

EQDP Environmental Qualification Documentation Package

FAC Flow-Accelerated Corrosion

FERC Federal Energy Regulatory Commission

FMP Fatigue Monitoring Program

FOST Fuel Oil Storage Tank

GALL NUREG-1801 Generic Aging Lessons Learned

ILRT Integrated Leak Rate Test

IMC Inspection Manual Chapter

INPO Institute of Nuclear Power Operations

IP Inspection Procedure

IR Inspection Report

ISI Inservice Inspection

LLRT Local Leak Rate Test

LRA License Renewal Application

LTOP Low Temperature Over-Pressure

MOV Motor-Operated Valve

NACE National Association of Corrosion Engineers

NCR Nuclear Condition Report

NDE Non-Destructive Examination

NEI Nuclear Energy Institute

NRC U.S. Nuclear Regulatory Commission

NUMARC Nuclear Management and Resources Council

PARS Publicly Available Records

PRR Procedure Revision Request

RAI Request for Additional Information

RCS Reactor Coolant System

RNP Robinson Nuclear Plant

RO Refueling Outage

Attachment

16

SER Safety Evaluation Report

SG Steam Generator

SSC Structures, Systems, and Component

TLAA Time Limited Aging Analysis

TSC Technical Support Center

UFSAR Updated Final Safety Analysis Report

URI Unresolved Item

UT Ultrasonic Testing

VHP Vessel Head Penetration

WO Work Order

Attachment