Letter Sequence Request |
---|
|
|
MONTHYEARML0928004262009-10-16016 October 2009 RAI Related to License Amendment Request to Modify Clinton Power Station in Support of the Use of Isotope Test Assemblies Project stage: RAI ML0928003742009-10-16016 October 2009 RAI Related to License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies Project stage: RAI ML0930302182009-11-0202 November 2009 Request for Additional Information Related to License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies Project stage: RAI RS-09-150, Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies2009-11-0404 November 2009 Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies Project stage: Request RS-09-146, Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Lsotope Test Assemblies2009-11-17017 November 2009 Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Lsotope Test Assemblies Project stage: Request RS-09-160, Additional Information Supporting the Request for a License Amendment to Modify the Operating License in Support of the Use of Lsotope Test Assemblies2009-11-20020 November 2009 Additional Information Supporting the Request for a License Amendment to Modify the Operating License in Support of the Use of Lsotope Test Assemblies Project stage: Request ML0931706632009-11-23023 November 2009 Withholding Information from Public Disclosure, ME1643 Project stage: Other ML0931706902009-11-23023 November 2009 Request for Withholding Information from Public Disclosure - Ltr. Dated 11/12/2009 Project stage: Withholding Request Acceptance ML0932208462009-12-0202 December 2009 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing and Order Project stage: Other RS-09-167, Supplemental Safety Analysis Report Information Supporting the Request for a License Amendment to Modify Operating License in Support of the Use of Isotope Test Assemblies2009-12-0909 December 2009 Supplemental Safety Analysis Report Information Supporting the Request for a License Amendment to Modify Operating License in Support of the Use of Isotope Test Assemblies Project stage: Supplement RS-09-179, Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Lsotope Test Assemblies2009-12-16016 December 2009 Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Lsotope Test Assemblies Project stage: Request ML0934800502009-12-17017 December 2009 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance RS-09-181, Submittal of Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies2009-12-28028 December 2009 Submittal of Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies Project stage: Request RS-10-010, Additional Information Supporting the Request for a License Amendment to Modify Operating License in Support of the Use of Lsotope Test Assemblies2010-01-11011 January 2010 Additional Information Supporting the Request for a License Amendment to Modify Operating License in Support of the Use of Lsotope Test Assemblies Project stage: Request ML1002000052010-01-15015 January 2010 License Amendment, Modify CPS License Condition 2.B.(6) and Create New License Conditions 1.J, 2.B.(7) and 2.C.(25) as Part of a Pilot Program to Irradiate Cobalt (Co)-59 Target to Produce Co-60 Project stage: Other ML1002607272010-02-0101 February 2010 Public Version - Correction Letter for License Amendment 190 Request to Modify Facility Operating License in Support of the Use of Isotope Test Assemblies (Tac ME1643) Project stage: Approval RS-12-082, Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA)2012-05-14014 May 2012 Reports Associated with Results of Post-Irradiation Examination (Pie) of Global Nuclear Fuel (Gnf) GE14i Isotope Test Assembly (ITA) Project stage: Other 2009-12-17
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. RS-24-005, Additional Information Supporting Request for Partial Site Release2024-02-0808 February 2024 Additional Information Supporting Request for Partial Site Release RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2022-09-29029 September 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-067, Constellation Radiological Emergency Plan Addendum and Procedure Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum and Procedure Revision RS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan2022-04-18018 April 2022 Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Va RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-013, Request to Transfer 10 CFR Part 71 Quality Assurance Program Approval for Radioactive Material Packages Under the Common Exelon Quality Assurance Program Approval No. 71-0008, to the Common Constellation Quality Assurance Program Approval2022-02-0909 February 2022 Request to Transfer 10 CFR Part 71 Quality Assurance Program Approval for Radioactive Material Packages Under the Common Exelon Quality Assurance Program Approval No. 71-0008, to the Common Constellation Quality Assurance Program Approval N RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-09-29029 September 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements 2024-09-09
[Table view] |
Text
Nuelear 10 CFR 50.90 November 17,2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of lsotope Test Assemblies
References:
- 1. Letter from Mr. Jeffrey L. Hansen (Exelon Generation Company, LLC) to U. S. NRC, "License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of lsotope Test Assemblies," dated June 26, 2009
- 2. Letter from U. S. NRC to Mr. Charles G. Pardee (Exelon Generation Company, LLC), "Clinton Power Station, Unit No. 1 - Request for Additional lnformation Related to License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of lsotope Test Assemblies (TAC No. ME1643)," dated October 16,2009
- 3. Letter from Mr. Jeffrey L. Hansen (Exelon Generation Company, LLC) to U. S. NRC, " Additional lnformation Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the ijse of lsotope Test Assemblies," dated November 4, 2009 in Reference 1, Exeion Generation Company, LLC (EGC) requested an amendment to the facility operating license for Clinton Power Station (CPS), Unit 1. Specifically, the proposed change would modify CPS License Condition 2.8.(6) and create new License Conditions 1.J and 2.B.(7) as part of a pilot program to irradiate Cobalt (Co)-59 targets to produce Co-60. In addition to the proposed license condition changes, EGC also requests an amendment to Appendix A, Technical Specifications (TS), of the CPS Facility Operating License. This proposed change would modify TS 4.2.1, "Fuel Assemblies," to describe the lsotope Test Assemblies (ITAs) being used.
November 17,2009 U. S. Nuclear Regulatory Commission Page 2 In Reference 2, the NRC requested that EGC provide additional information in support of their review of Reference 1. EGC provided the NRC requested additional information in Reference 3, with the exception of the response to NRC Question 2. It was noted in Reference 3 that the response to NRC question 2 would be provided at a later date. The EGC response to this question is provided in Attachment 1 to this letter.
EGC has reviewed the information supporting a finding of no significant hazards consideration that was previously provided to the NRC in Reference 1. The additional information provided in this submittal does affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. The revised No Significant Hazards Consideration Determination is provided as part of the RAI response included in Attachment 1.
A new regulatory commitment is established by this submittal and documented in Attachment 2 to this letter.
If you have any questions concerning this letter, please contact Mr. Timothy A. Byam at (630) 657-2804.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 17thday of November 2009, Respectfully, Manager - Licensing Exelon Generation Company, LLC Attachments Attachment 1: Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies Attachment 2: Summary of Regulatory Commitments
ATTACHMENT 1 Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of lsotope Test Assemblies NRC RA1 2: , Section 4.3, Reference 1 In the section for "No Significant Hazards Consideration" of Altachment I , it stated that:
"the effects on the spent fuel pool are minimal; post-irradiation handling of the assemblies and the isotope rods will be performed under approved procedures, by experienced personnel." of the application (NEDC-33505P, Section 4.7.1) indicates that the maximum incident (gamma) radiation due to a GE14i bundle placed one foot from the spent fuel pool (SFP) wall is approximately 7.2+10 IM~V/C&-sec,so concrete heating due to gamma would be significant. At 4 feet, it has been shown that the energy deposition rate of 1.4+8 M~v/c&-sec is well below that required to cause significant concrete heating. Therefore, in order to minimize the effect of gamma heating on the SFP concrete walls, the irradiated fuel storage procedures are modified to specify that the GEl4i fuel bundles be stored at least 4 feet from the pool walls with no limitation on the amount of time a GE14i bundle may remain in the pool.
The applicant should modify the section on "No Significant Hazards Consideration," the significant heating effect of gamma on the SFP and procedures adopted to mitigate the heating effect.
Response 2:
Exelon Generation Company, LLC (EGC) agrees that the No Significant Hazards Consideration Determination needs to be revised to address the gamma heating conditions present in the Clinton Power Station (CPS) SFP due to placing the irradiated GE14i bundles near the SFP walls. As noted in the above RAI and in Reference 1, EGC plans to revise the applicable SFP procedures to require storage of the irradiated GE14i bundles at least four feet from a wall of the SFP. EGC has documented this commitment in Attachment 2 to this letter. The following revised No significant Hazards Consideration reflects the addition of heating effects of gamma radiation on the SFP walls.
No Significant Hazards Consideration In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (EGC) requests an amendment to Facility Operating License No. NPF-62 for Clinton Power Station (CPS),
Unit 1. Specifically, the proposed change modifies CPS License Condition 2.6.(6) and creates new License Conditions 1.J and 2.6.(7) as part of a pilot program to irradiate Cobalt (Co)-59 targets to produce Co-60. The (20-60 would ultimately be sold to licensed users in the medical industry for use in cancer treatments, blood and instrument sterilization, radiography and security industry for imaging, and to the food industry for cold pasteurization or irradiation sterilization. In addition to the proposed license condition changes, EGC also requests an amendment to Appendix A, Technical Specifications (TS), of the CPS Facility Operating License. This proposed change would modify TS 4.2.1, "Fuel Assemblies," to describe the lsotope Test Assemblies (ITAs) being used.
Page 1 of 5
AnACHMENT 1 Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of lsotope Test Assemblies EGC has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes to the license conditions provide clarification and do not impact plant operation in any way. The handling of byproduct material (i.e., Co-
- 60) will continue to be done in accordance with the requirements of 10 CFR 30 and the requirements of the CPS Facility Operating License. The proposed change to TS 4.2.1 also provides clarification and additional description of the proposed lTAs to be used in the CPS core. These changes provide clarification and do not involve an increase in the probability or consequences of an accident previously evaluated.
The use of the GE14i ITAS, has been evaluated for impact on the previously evaluated transients and design basis accidents for CPS. GE-Hitachi report:
NEDC-33505P, "Safety Analysis Report to Support Introduction of GE14i lsotope Test Assemblies (ITAS) in Clinton Power Station," dated June 2009, documents the results of the analyses completed to demonstrate the impact on operation following introduction of the ITAs in the CPS core. The use of these ITAs does not adversely affect accident initiators or precursors nor alter the design assumptions, conditions, and configuration or the manner in which the plant is operated and maintained. The Cycle 13 (i.e., the first cycle of operation with the GE14i assembly) core, and subsequent cores, will be designed so that the ITAs will be placed in non-limiting locations with respect to thermal limit margins and shutdown margins. The ITAs do not adversely affect the ability of any structures, systems or components (SSCs) to perform their intended safety function to mitigate the consequences of an initiating event within the assumed acceptance limits.
In addition to evaluation of the impact to operation with the introduction of the GE14i assemblies, EGC has also evaluated the effects of these assemblies on post-irradiation conditions. The additional heat from the (20-60 decay is insignificant when compared to the total heat from a normal refueling discharge.
The small amount of extra heat added by the cobalt isotope rods poses no additional risk of spent fuel pool (SFP) local boiling over that previously analyzed.
The maximum incident radiation due to an irradiated GE14i bundle placed one foot from the spent fuel pool walls is in excess of the radiation that would result in significant gamma heating of the concrete. However, analysis has demonstrated that at four feet, the energy deposition rate is well below that required to cause significant concrete heating. CPS procedures exist to guide placement of irradiated fuel bundles in the SFP to avoid gamma heating of the wall concrete.
These procedures will be modified to specify that the irradiated GE14i bundles be stored at least four feet from the pool walls. With the four foot distance Page 2 of 5
AnACHMENT 1 Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies requirement in effect, there is no limitation on the amount of time an irradiated GE14i bundle may remain in the pool.
Handling of the licensed transfer casks will be in accordance with the guidance in NUREG 0612, "Control of Heavy Loads at Nuclear Power Plants," using the Fuel Building Crane. These precautions will support safe movement of the casks within the Fuel Building.
The consequences of a previously analyzed event are dependent on the initial conditions assumed in the analysis, the availability and successful functioning of equipment assumed to operate in response to the analyzed event, and the setpoints at which these actions are initiated. The consequences of a previously evaluated accident are not significantly increased by the proposed change. As documented in NEDC-33505P, the proposed change does not affect the performance of any equipment credited to mitigate the radiological consequences of an accident. Evaluation of operation with the GE14i assemblies in the CPS core, demonstrated that the licensing basis radiological analyses are not impacted by the introduction of eight GE14i assemblies at CPS.
This includes the analyses done for transients and design basis accident events.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previousiy evaiuated.
Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed revision to the CPS license conditions and TS 4.2.1 will not introduce any new or modified equipment since these changes are intended to provide clarification only. These clarifications will not result in operation of the facility in a different way than currently operated.
While the proposed ITA program does result in the introduction of several modified fuel assemblies (i.e., the GE14i assembly), these assemblies are essentially the same as the GE14 assemblies currently in use in the CPS core.
The only difference being the use of a number of isotope rods in place of fuel rods. The GE14i assembly was designed for mechanical, nuclear, and thermal-hydraulic compatibility with the GE14 fuel design. The details of the design differences between the GE14 and GE14i are documented in NEDC-33505P.
Use of the proposed lTAs does not involve the addition or modification of any plant equipment other than the assemblies modified to include the cobalt target rods. Also, use of the proposed ITAs will not alter the design configuration or method of operation of plant equipment beyond its normal functional capabilities.
The ITA program does not create any new credible failure mechanisms, malfunctions or accident initiators.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
Page 3 of 5
ATTACHMENT I Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The proposed change to the CPS operating license conditions are intended to provide clarification as to how the generation of byproduct material in the CPS reactor core meets the requirements of 10 CFR Part 30. The proposed change to TS 4.2.1 also provides clarification and additional description of the proposed lTAs to be used in the CPS core. These proposed changes would not affect the design or operation of any equipment important to safety. In addition, since the proposed changes to the license conditions and TS provide clarification only, these changes do not affect the results of any safety calculations.
Cycle specific analyses will be performed for CPS Reload 12 Cycle 13 to establish fuel operating limits for the lTAs that assure compliance with regulatory limits. Results of these analyses will be documented in the CPS Reload 12 Cycle 13 Supplemental Reload Licensing Report. Furthermore, licensing analyses will he perf~rmedfor the I?As for each cyc!e of their operation, wherein the effect of the lTAs is considered for each of the appropriate licensing events and anticipated speratisnai occurrences (AOOs) to establish the appropriate reactor thermal limits for operation.
The proposed introduction of the ITAs has no impact on equipment design or fundamental operation, other than the modifications made to the fuel assembly as part of the program. There are no changes being made to safety limits or safety system allowable values that would adversely affect plant safety as a result of the proposed ITAs. The performance of the systems important to safety is not significantly affected by the use of the proposed ITAs. The margin of safety can be affected by the thermal limits existing at the time of the postulated accident; however, the ITA design has been evaluated and demonstrated to have no significant effect on the calculated thermal limits as described above. The proposed change does not affect safety analysis assumptions or initial conditions and therefore, the margin of safety in the original safety analyses is maintained.
As documented above, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, EGC concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.
Page 4 of 5
ATTACHMENT 1 Additional Information Supporting the Request for a License Amendment to Modify Clinton Power Station Facility Operating License in Support of the Use of lsotope Test Assemblies
References:
- 1. Letter (RS-09-074)from Exelon Generation Company (J. L. Hansen) to US NRC with attachments, "License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of lsotope Test Assemblies," Exelon Nuclear, June 26, 2009 Page 5 of 5
SUMMARY
OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Exelon Generation Company, LLC (EGC) in this document. Any other statements in the submittal are provided for information purposes and are not considered to be regulatory commitments.
COMMITMENT TYPE COMMITMENT "OUTAGE" (Y es/No) (Y eslNo) wall of the SFP.