ML093100662

From kanterella
Jump to navigation Jump to search
Confirmation of Requested Initial Operator License Examinations for Plant Saint Lucie
ML093100662
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/06/2009
From: Kennedy K
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
L-2009-191
Download: ML093100662 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 November 6, 2009 Mr. Mano Nazar Senior Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR PLANT SAINT LUCIE

Dear Mr. Nazar:

In a letter dated August 13, 2009, L-2009-191, your staff responded to Regulatory Issue Summary 2009-011 and requested we schedule initial license operator examinations for Plant Saint Lucie. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:

Plant / 2010 2011 Station Date Applicants Date Applicants Saint Lucie 1/4 11 1/31 24 On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change.

Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.

If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.

A supplementary letter will be sent to each stations training manager approximately 120 days prior to the initial examination. The letter will provide the training manager with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch, at 404-562-4550.

FP&L 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Kriss M. Kennedy, Director Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 cc: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE MTW OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE PGC /RA/ MTW /RA/ KMK /RA/

NAME PCapehart MWidmann KKennedy DATE 11/03/2009 11/04/2009 11/06/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FP&L 3 cc w/encl: Vice President and Associate General Gordon L. Johnston Counsel Site Vice President Florida Power & Light Company St. Lucie Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution William A. Passetti Robert J. Hughes Chief Plant General Manager Florida Bureau of Radiation Control St. Lucie Nuclear Plant Department of Health Electronic Mail Distribution Electronic Mail Distribution Mark Hicks Ruben D. Almaguer Operations Manager Director St. Lucie Nuclear Plant Division of Emergency Preparedness Electronic Mail Distribution Department of Community Affairs Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Fleet Organizational J. Kammel Support Radiological Emergency Planning Florida Power & Light Company Administrator Electronic Mail Distribution Department of Public Safety Electronic Mail Distribution Eric Katzman Licensing Manager Mano Nazar St. Lucie Nuclear Plant Senior Vice President and Chief Nuclear Electronic Mail Distribution Officer Florida Power & Light Company Abdy Khanpour Electronic Mail Distribution Vice President Engineering Support Richard L. Anderson Florida Power and Light Company Vice President P.O. Box 14000 Nuclear Plant Support Juno Beach, FL 33408-0420 Florida Power & Light Company Electronic Mail Distribution McHenry Cornell Director Faye Outlaw Licensing and Performance Improvement County Administrator Florida Power & Light Company St. Lucie County Electronic Mail Distribution Electronic Mail Distribution Alison Brown Jack Southard Nuclear Licensing Director Florida Power & Light Company Public Safety Department Electronic Mail Distribution St. Lucie County Electronic Mail Distribution Marjan Mashhadi Senior Attorney Seth Duston Florida Power & Light Company Training Manager Electronic Mail Distribution St. Lucie Nuclear Plant Mitch S. Ross Electronic Mail Distribution

FP&L 4 Letter to Mano Nazar from Kriss M. Kennedy dated November 6, 2009

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR PLANT SAINT LUCIE Distribution w/encl:

RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ORA, RII K. Kennedy H. Christensen M. Widmann P. Capehart J. Vincent M. Sykes J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing