ML082980381

From kanterella
Jump to navigation Jump to search
Nasa Plum Brook Reactor Facility Master Inspection Plan - Fiscal Year 2009
ML082980381
Person / Time
Site: Plum Brook
Issue date: 10/22/2008
From: Christine Lipa
NRC/RGN-III/DNMS/DB
To: Whitlow W
US National Aeronautics & Space Admin (NASA), John H. Glenn Research Ctr at Lewis Field
References
Download: ML082980381 (2)


Text

October 22, 2008 Dr. Woodrow Whitlow, Jr., Director NASA Glenn Research Center at Lewis Field 21000 Brookpark Road M.S. 3-2 Cleveland, OH 44135

SUBJECT:

NASA PLUM BROOK REACTOR FACILITY MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2009

Dear Dr. Whitlow:

In accordance with U.S. NRC Inspection Manual Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the Plum Brook Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site from October 2008 through September 2009 (FY2009). The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities.

Because the FY2009 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2009, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2009 MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Plum Brook Reactor FY2009 MIP.

We currently project the Region will conduct two inspections at the Plum Brook Reactor during FY2009. We are planning an inspection in November or December 2008 to evaluate work activities under your new contractor, and an inspection will also be scheduled to coincide with the remediation of the Pentolite Ditch. Additional inspections may be warranted, depending on decommissioning activities. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.

Inspection Procedure Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors

W. Whitlow In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Christine Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos.: 50-30 and 50-185 License Nos.: TR-3 and R-93 cc: Radiation Health Program Director, Ohio Department of Health (ODH)

S. Helmer, ODH M. Rubadue, ODH Ohio Environmental Protection Agency, Division of Planning K. Peecook, NASA, Plum Brook Station DISTRIBUTION:

Docket File R. Tadesse, FSME C. Glen, FSME N. Orlando, FSME S. Reynolds, RIII A. Barker, RIII RIII PRR DOCUMENT NAME: G:\SEC\Work in progress\NASA Rx FY2009 MIP Draft.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII C RIII RIII RIII NAME WGSnell:mb CLipa DATE 10/16/08 10/22/08 OFFICIAL RECORD COPY