ML103060324
| ML103060324 | |
| Person / Time | |
|---|---|
| Site: | Plum Brook File:National Aeronautics and Space Administration icon.png |
| Issue date: | 10/27/2010 |
| From: | Peecook K US National Aeronautics & Space Admin (NASA) |
| To: | Document Control Desk, NRC/FSME |
| References | |
| Download: ML103060324 (2) | |
Text
- .
J National Aeronautics and Space Administration John H. Glenn Research Center Lewis Field Plurh Brook. Station Sandusky, OH 44870
/
October 27, 2010 Reply to Attn of:
QD U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Revised Final Status Survey Report, Attachments 1, 2, 3, 5, and 6, for the Plum Brook Reactor Facility, Licenses Nos. TR-3, Docket No. 50-30 and R-93, Docket No, 50-185 As a result of comments from the NRC Staff received via electronic mail on September 16, 2010, we have revised the previously submitted Attachments 1, 2, 3, 5, and 6 of the Final Status Survey Report for the Plum Brook Reactor Facility.
Our written response to the staffs comments was submitted under a separate cover letter dated October 25, 2010. Enclosed for your review are the revised attachments incorporating our responses to your comments.
Should you have any questions or need additional information, please contact me at NASA Plum Brook Station, 6100 Columbus Avenue, Sandusky, Ohio 44870, or by telephone at (419) 621-3277.
Sincerely, NASA Decommissioning Program Manager Enclosures (5)
- 1. Plum Brook Reactor Facility Final Status Survey Report, Attachment 1, Reactor Office and Laboratory Building, Revision 1, dated October 25, 2010
- 2. Plum Brook Reactor Facility Final Status Survey Report, Attachment 2, Service and Equipment Building (Building 1131), Revision 1, dated October 25, 2010
- 3. Plum Brook Reactor Facility Final Status Survey Report, Attachment 3, Fan House (Building 1132), Revision 1, dated October 25, 2010
- 4. Plum Brook Reactor Facility Final Status Survey Report, Attachment 5, Hot Retention Area (Building 1155), Revision 1, dated October 25, 2010
- 5. Plum Brook Reactor Facility Final Status Survey Report, Attachment 6, Waste Handling Building (Building 1133), Revision 1, dated October 25, 2010
.AI
,3,)u
~J't
'I/
cc:
USNRC/C. J. Glenn (FSME) - CDROM Copy USNRC/J. Webb (FSME) - CDROM Copy USNRC/J. Tapp RIII/DNMS/DB - CDROM Copy ODHIM. J. Rubadue - CDROM Copy