Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML0204507012002-02-11011 February 2002 Unit - Request for Additional Information Re Tritium Production Program Interface Issue 7 Project stage: RAI ML0205800822002-02-19019 February 2002 Response to Request for Additional Information Re Tritium Production - Holtec Analysis. Submits New non-proprietary Version (Revision 3) of Holtec International Report HI-2012620 Project stage: Response to RAI ML0205806122002-02-21021 February 2002 License Amendment, FSAR Change for Revised Spent Fuel Cooling Analysis Methodology - TAC Nos. MB1807 and MB1884 Project stage: Other ML0205800052002-02-21021 February 2002 Responses to RAI Regarding Tritium Producing Burnable Absorber Rods (TPBARS) Project stage: Response to RAI ML0205804302002-02-21021 February 2002 Tennessee Valley Authority Response to NRC Request for Additional Information Re Tritium Producing Burnable Absorber Rods (TPBARS) at Watts Bar Nuclear Plant Project stage: Response to RAI ML0210003612002-04-0505 April 2002 Response to Request for Additional Information Re Tritium Production - Interface Issue Number 2 - Procurement and Fabrication Issues Project stage: Response to RAI ML0211905572002-04-25025 April 2002 Second Request for Additional Information Tritium Production Program Interface Issue 7 Project stage: RAI ML0212806302002-05-0808 May 2002 Request for Additional Information Re Tritium Production Program Interface Issue 5 Project stage: RAI ML0214401522002-05-21021 May 2002 Request for Additional Information Regarding Tritium Production - Interface Issue Number 7 Light Load Handling Systems Project stage: Request ML0214401422002-05-21021 May 2002 Request for Additional Information Re Tritium Production - Interface Issue Number 7 - Light Load Handling Systems Project stage: Request ML0214401352002-05-21021 May 2002 Request for Additional Information Re Tritium Production - Interface Issue Number 5 - Control Room Habitability Systems Project stage: Request ML0214901392002-05-23023 May 2002 Response to Request for Additional Information Re Radiological Impact Project stage: Response to RAI ML0221004492002-07-29029 July 2002 Request for Additional Information Tritium Production Program Project stage: RAI ML0221401972002-07-30030 July 2002 Tritium Production -- Post-LOCA Hot Leg Emergency Core Cooling System (ECCS) Recirculation Time -- Supplemental Information Project stage: Supplement ML0222601522002-08-0909 August 2002 Request for Risk-Informed Information Tritium Production Program Project stage: Request ML0831800942002-08-0909 August 2002 Plants - Request for Risk-Informed Information Tritium Production Program Project stage: Request ML0223209052002-08-20020 August 2002 Environmental Assessment and Finding of No Significant Impact for Incore Irradiation Services for the U. S. Department of Energy'S Tritium Production Program Project stage: Other ML0225409252002-09-23023 September 2002 Amendment No. 40, Irridiate Up to 2304 Tritium-Producing Burnable Absorber Rods in the Reactor Core Project stage: Acceptance Review ML0227502952002-09-23023 September 2002 Technical Specification Pages for Amendment No. 40, Irradiated Up to 2304 Tritium Producing Burnable Absborber Rods in the Reactor Core Project stage: Other ML0735205462008-01-18018 January 2008 Issuance of License Amendment 67 Regarding the Maximum Number of Tritium Producing Burnable Assembly Rods in the Reactor Core Project stage: Approval ML0802203782008-01-18018 January 2008 Tech Spec Pages for Amendment 67 Regarding the Maximum Number of Tritium Producing Burnable Assembly Rods in the Reactor Core Project stage: Other ML0821800942008-07-31031 July 2008 WCAP-16932-NP, Rev. 1, Control Rod Insertion Following a Cold Leg LOCA for Watts Bar Unit 1. Project stage: Request ML0821800932008-08-0101 August 2008 Watt'S Bar, Unit 1, Technical Specifications Change - Revision of Boron Requirements for Cold Leg Accumulators and Refueling Water Storage Tank. Project stage: Request ML0827502132008-10-0606 October 2008 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 (Tac No. MD9396) Project stage: Withholding Request Acceptance ML0828314472008-10-14014 October 2008 Request for Additional Information Regarding Analysis in Support of Control Rod Insertion Following a Cold Leg Loss-of -Coolant Accident (Tac MD9396) Project stage: RAI ML0829401702008-10-28028 October 2008 Request for Additional Information - Watts Bar Emergency Core Cooling System Boron Requirements Project stage: RAI ML0830401042008-11-0707 November 2008 Request for Additional Information - Watts Bar Emergency Core Cooling System Boron Requirements Project stage: RAI ML0833601912008-11-25025 November 2008 Response to Request for Additional Information Analysis in Support of Control Rod Insertion Following a Cold Leg Loss-of-Coolant Accident Project stage: Response to RAI ML0834303042008-12-0909 December 2008 Potential Schedule Impact Regarding Revision of Technical Specifications, Revision of Boron Requirements for Cold Leg Accumulators and Refueling Water Storage Tank. Project stage: Other ML0835101022008-12-19019 December 2008 Withdrawal of Questions Number 6 from Letter Dated October 28, 2008, Regarding Proposed Amendment to Revise Technical Specifications for Boron Requirements for the Cold Leg Accumulations and Refueling Water Storage Tank Project stage: Withdrawal ML0902202552008-12-31031 December 2008 Response to Request for Additional Information Emergency Core Cooling System Boron Requirements Project stage: Response to RAI ML0900900442008-12-31031 December 2008 Revised Technical Specifications Change WBN-TS-08-04 - Revision to the Maximum Number of TPBARS That Can Be Irradiated in the Reactor Core Per Cycle Project stage: Other ML0933507402009-01-0505 January 2009 Request for Information Regarding the Tritium Producing Burnable Absorber Rods (Tac No. ME2775) Project stage: RAI ML0900600402009-01-26026 January 2009 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 Project stage: Withholding Request Acceptance ML0909205062009-05-0404 May 2009 Issuance of Amendment Regarding the Maximum Number of Tritium Producing Burnable Assembly Rods in the Reactor Core Project stage: Approval ML1004703202010-02-0909 February 2010 Clarification Regarding the Number of Tritium Producing Burnable Absorber Rods in Operating Cycle 10 and Program Update Project stage: Other CNL-14-053, Notification of the Number of Tritium Producing Burnable Absorber Rods for the Operating Cycle 13 Reactor Core2014-04-0808 April 2014 Notification of the Number of Tritium Producing Burnable Absorber Rods for the Operating Cycle 13 Reactor Core Project stage: Other ML15030A5082015-01-30030 January 2015 Tritium Production Program, Updated Plans for Cycle 13 Operation and Updated Evaluation of the Radiological Impacts of Tritium Permeation Into the Reactor Coolant System Project stage: Other 2008-10-14
[Table View] |
|
---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] |
Text
October 6, 2008 Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR WATTS BAR NUCLEAR PLANT, UNIT 1 (TAC NO. MD9396)
Dear Mr. Campbell:
By letter dated August 1, 2008 (ML082180093), the Tennessee Valley Authority (TVA) submitted a request for a proposed amendment to revise technical specifications for boron requirements for the cold leg accumulators and refueling water storage tank. As part of the proposed amendment request, TVA submitted an affidavit CAW-08-2434, dated June 6, 2008, executed by J. A. Gresham on behalf of the Westinghouse Electric Company LLC, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
WCAP-16932-P, Revision 1, Control Rod Insertion Following a Cold Leg LOCA
[Loss-of-coolant Accident] for Watts Bar Unit 1 (Proprietary), July 2008 A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room (ML082180094).
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
W. Campbell, Jr. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3100.
Sincerely,
/RA/
John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390 cc: J. A. Gresham, Westinghouse Plant Mailing List
ML082750213 OFFICE LWBSP/PM LWBSP/LA EMCB/BC LWBSP/BC NAME JLamb BClayton KManoly LRaghavan DATE 10 / 06 /08 10 / 02 /08 10 / 06 /08 10 / 06 /08 William R. Campbell, Jr.
Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:
Mr. Gordon P. Arent Mr. Larry E. Nicholson, General Manager New Generation Licensing Manager Performance Improvement Tennessee Valley Authority Tennessee Valley Authority 5A Lookout Place 3R Lookout Place 1101 Market Street 1101 Market Street Chattanooga, TN 37402-2801 Chattanooga, TN 37402-2801 Mr. Ashok S. Bhatnagar Mr. Michael D. Skaggs Senior Vice President Site Vice President Nuclear Generation Development Watts Bar Nuclear Plant and Construction Tennessee Valley Authority Tennessee Valley Authority P. O. Box 2000 6A Lookout Place Spring City, TN 37381 1101 Market Street Chattanooga, TN 37402-2801 Mr. Michael A. Purcell Senior Licensing Manager Vice President Nuclear Power Group Nuclear Support Tennessee Valley Authority Tennessee Valley Authority 4K Lookout Place 3R Lookout Place 1101 Market Street 1101 Market Street Chattanooga, TN 37402-2801 Chattanooga, TN 37402-2801 Ms. Beth A. Wetzel, Manager Mr. Michael J. Lorek Corporate Nuclear Licensing and Vice President Industry Affairs Nuclear Engineering & Technical Services Tennessee Valley Authority Tennessee Valley Authority 4K Lookout Place 3R Lookout Place 1101 Market Street 1101 Market Street Chattanooga, TN 37402-2801 Chattanooga, TN 37402-2801 Mr. Masoud Bajestani, Vice President General Counsel Watts Bar Unit 2 Tennessee Valley Authority Watts Bar Nuclear Plant 6A West Tower Tennessee Valley Authority 400 West Summit Hill Drive P.O. Box 2000 Knoxville, TN 37902 Spring City, TN 37381 Mr. John C. Fornicola, Manager Mr. Michael K. Brandon, Manager Nuclear Assurance Licensing and Industry Affairs Tennessee Valley Authority Watts Bar Nuclear Plant 3R Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381
Mr. Gregory A. Boerschig, Plant Manager County Executive Watts Bar Nuclear Plant 375 Church Street Tennessee Valley Authority Suite 215 P.O. Box 2000 Dayton, TN 37321 Spring City, TN 37381 County Mayor Senior Resident Inspector P. O. Box 156 Watts Bar Nuclear Plant Decatur, TN 37322 U.S. Nuclear Regulatory Commission 1260 Nuclear Plant Road Mr. Lawrence E. Nanney, Director Spring City, TN 37381 Division of Radiological Health Dept. of Environment & Conservation Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532