Draft Amendment to Facility Operating License
ML082750055
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/23/2008
From: Leeds E
Office of Nuclear Reactor Regulation
To:
AmerGen Energy Co
Shared Package
ML082750532 List:
References
TAC MD9014
Download: ML082750055 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 AMERGEN ENERGY COMPANY, LLC DOCKET NO. 50-289 THREE MILE ISLAND NUCLEAR STATION, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

License No. DPR-50

1. The Nuclear Regulatory Commission (the Commission or NRC) has found that:

A. The application for amendment by AmerGen Energy Company, LLC (the licensee), dated June 20, 2008, as supplemented by letter dated July 17, 2008, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

-2

2. Accordingly, the license is amended as indicated in the attachment to this license amendment.
3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Eric J. Leeds, Director Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License Date of Issuance:

ATTACHMENT TO LICENSE AMENDMENT NO.

FACILITY OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289 Replace the following pages of the Facility Operating License with the revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert Page 1 Page 1 Page 2 Page 2 Page 3 Page 3 Page 4 Page 4 Page 8 Page 8 Page 9 Page 9

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY, LLC (Three Mile Island Nuclear Station, Unit 1)

DOCKET NO. 50-289 FACILITY OPERATING LICENSE

1. The Atomic Energy Commission (the Commission) having found that:
a. Tile application for license filed by the applicant complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1 and all required notifications to other agencies or bodies have been duly made;
b. Construction of the Three Mile Island Nuclear Station, Unit 1 (the facility) has been substantially completed in conformity with Construction Permit No: CPPR-40, the application, as amended, the provisions of the Act and the rules and regulations of the Commission;
c. The facility will operate in conformity with the application, as amended, the provisions of the Act and the rules and regulations of the Commission;
d. There is a reasonable assurance: (1) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission;
e. Exelon Generation Company, LLC (Exelon Generation Company) is technically and financially qualified to engage in the activities authorized by this operating license in accordance with the rules and regulations of the Commission; Amendment No. 207, 218,

-2

f. Exelon Generation Company has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations;
g. The issuance of this operating license will not be inimical to the common defense and security or to the health and safety of the public;
h. After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available alternatives, the issuance of Facility Operating License No. DPR-50 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and
i. The receipt, possession, and use of source, byproduct and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40, and 70, including 10 CFR Section 30.33, 40.32, 70.23 and 70.31.
2. Facility Operating License.No. DPR-50 is hereby issued to Exelon Generation Company to read as follows:
a. This license applies to the Three Mile Island Nuclear Station, Unit 1, a pressurized water reactor and associated equipment (the facility), owned and operated by Exelon Generation Company. The facility is located in Dauphin County, Pennsylvania, and is described in the "Updated Final Safety Analysis Report" as supplemented and amended and the Environmental Report as sl!pplemented and amended.
b. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1) Exelon Generation Company, pursuant to Section 104b of the Act and 10 CFR Part 50, "Licensing of Production and Utilization Facilities," to possess, use, and operate the facility in accordance with the procedures and limitations set forth in this license; Amendment No. 207, 218 222,

-3 (2) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30,40 and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as reactor fuel, sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required for reactor operation; (3) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess at either TMI-1 or TMI-2, and use in amounts as required for TMI-1 any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis, testing, instrument calibration, or associated with radioactive apparatus or components. Other than radioactive apparatus and components to be used at TMI Unit 2 in accordance with the TMI-2 License, the radioactive apparatus and components that may be moved from TMI Unit 1 to TMI Unit 2 under this provision shall be limited to: (1) outage-related items (such as contaminated scaffolding, tools, protective clothing, portable shielding and decontamination equipment); and (2) other equipment belonging to TMI Unit 1 when storage of such equipment at TMI-2 is deemed necessary for load handling or contamination control considerations; (4) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess at the TMI Unit 1 or Unit 2 site, but not separate, such byproduct and special nuclear materials as may be produced by the operation of either unit. Radioactive waste may be moved from TMI Unit 2 to TMI Unit 1 under this provision for collection, processing (including decontamination), packaging, and temporary storage prior to disposal. Radioactive waste that may be moved from TMI Unit 1 to TMI Unit 2 under this provision shall be limited to: (1) dry active waste (DAW) temporarily moved to TMI Unit 2 during waste collection activities, and (2) contaminated liquid contained in shared system piping and tanks. Radioactive waste that may be moved from TMI Unit 1 to TMI Unit 2 under this provision shall not include spent fuel, spent resins, filter sludge, evaporator bott.:>ms, contaminated oil, or contaminated liquid filters.

The storage of radioactive materials or radwaste generated at TMI Unit 2 and stored at TMI Unit 1 shall not result in a source term that, if released, would exceed that previously analyzed in the UFSAR in terms of off-site dose consequences.

The storage of radioactive materials or radwaste generated at TMI Unit 1 and stored at TMI Unit 2 shall not result in a source term that, if released, would exceed that previously analyzed in the PDMS SAR for TMI Unit 2 in terms of off-site dose consequences.

c. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is sUbjE:ct to the additional conditions specified or incorporated below:

(1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at steady state reactor core power levels not in excess of 2568 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. are hereby incorporated in the license. The Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

Amendment 1\10.

-4 (3) Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR50.54(p).

The combined set of plans 1, submitted by letter dated May 17, 2006, is entitled: Three Mile Island Nuclear Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21.

(4) Fire Protection Exelon Generation Company shall implement and maintain in effect all provisions of the Fire Protection Program as described in the Updated FSAR for TMI-1.

Changes may be made to the Fire Protection Program without prior approval by the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. Temporary changes to specific fire protection features which may be necessary to accomplish maintenance or modifications are acceptable provided that interim compensate measures are implemented.

(5) The licensee shall implementa secondary water chemistry monitoring program to inhibit steam generator tube degradation.

This program shall include:

a. Identification of a sampling schedule for the critical parameters and control points for these parameters;
b. Identification of the procedures used to measure the values of the critical parameters; 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Amendment No. 207, 218, 222, Revised by letter dated January 18, 2007

-8 (14) DELETED (15) Exelon Generation Company shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application, the requirements of the Order Approving Transfer of License and Conforming Amendment, dated and the related Safety Evaluation dated (16) DELETED (17) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders Amendment No. +92; 207,218,228,249, Revised ey letter dated July 18, 2007

-9 (18) Upon implementation of Amendment No. 264 adopting TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered air in leakage as required by Specification 4.12.1.5, in accordance with TS 6.20.c.(i), the assessment of CRE habitability as required by Specification 6.20.c.(ii), and the measurement of CRE pressure as required by Specification 6.20.d, shall be considered met. Following implementation:

(a) The first performance of Specification 4.12.1 .5, in accordance with Specification 6.20.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of Specification 1.25, as measured from August 21,2000, the date of the most recent successful tracer gas test, as stated in the December 9, 2003, letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.

(b) The first performance of the periodic assessment of CRE habitability, Specification 6.20.c.(ii), shall be within 3 years, plus the 9-month allowance of Specification 1.25, as measured from August 21, 2000, the date of the most recent successful tracer gas test, as stated in the December 9, 2003, letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.

(c) The first performance of the periodic measurement of CRE pressure, Specification 6.20.d, shall be within 24 months, plus the 180 days allowed by Specification 1.25, as measured from December 9, 2006, the date of the most recent successful pressure measurement test, or within 180 days if not performed previously.

(19) At the time of the closing of the transfer of TMI-1 and the respective license from AmerGen Energy Company, LLC (AmerGen) to Exelon Generation Company, AmerGen shall transfer to Exelon Generation Company ownership and control of AmerGen TMI NQF, LLC; and AmerGen Consolidation, LLC shall be merged into Exelon Generation Consolidation, LLC. Also at the time of the closing, decommissioning funding assurance provided by Exelon Generation Company, using an additional method allowed under 10 CFR 50.75 if necessary, must be equal to or greater than the minimum amount calculated on that date pursuant to, and required by 10 CFR 50.75 for TMI-1. Furthermore, funds dedicated for TMI-1 prior to closing shall remain dedicated to TMI-1 following the closing. The name of AmerGen TMI NQF, LLC shall be changed to Exelon Generation TMI NQF, LLC at the time of the closing.

6. This license is effective as of the date of issuance and shall expire at midnight, April 19, 2014.

FOR THE ATOMIC ENERGY COMMISSION IRA!

Original Signed by A. Giambusso A. Giambusso, Deputy Director for Reactor Projects Director of Licensing

Attachment:

Appendix A Technical Specifications Date of Issuance: April 19, 1974 Amendment No. 264, Revised by letter dated July 18, 2007