ML17079A040

From kanterella
Jump to navigation Jump to search

Correction to License Page 4 Issuance of Amendment No. 289 Dated October 1, 2015
ML17079A040
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/21/2017
From: Justin Poole
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Nuclear
Poole J, NRR/DORL/LPLI, 301-415-2048
References
CAC MF6504
Download: ML17079A040 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 21, 2017 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - CORRECTION TO LICENSE PAGE 4 RE: ISSUANCE OF AMENDMENT NO. 289 DATED OCTOBER 1, 2015 (CAC NO. MF6504)

Dear Mr. Hanson:

By letter dated October 1, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15225A158), the U.S. Nuclear Regulatory Commission issued Amendment No. 289 to Renewed Facility Operating License No. DPR-50. License page 4 attached to that amendment was missing text at the end of the third paragraph of the page, as follows, after "Amendment No. 275": "and modified by License Amendment No. 288." That text change occurred in the issuance of License Amendment No. 288 on July 30, 2015 (ADAMS Accession No. ML15153A282).

A corrected page 4 is enclosed. This correction does not change any of the conclusions in the safety evaluation associated with these license amendments.

We apologize if this error has caused any inconvenience. If you have any questions, please contact me at (301) 415-2048 or Justin.Poole@nrc.gov.

Docket No. 50-289

Enclosure:

Corrected License Page 4 cc w/enclosure: Distribution via Listserv Sincerely,

/,..,*-----)

/

/

.I

,,,.>"'~,//

L---

~/ ~~~-.

(__

    • ~--

Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ENCLOSURE Corrected License Page 4 (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 289 are hereby incorporated in the license. The Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

(3) Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, submitted by letter dated May 17, 2006, is entitled: "Three Mile Island Nuclear Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21.

Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Exelon Generation Company CSP was approved by License Amendment No. 275 and modified by License Amendment No. 288.

(4) Fire Protection Exelon Generation Company shall implement and maintain in effect all provisions of the Fire Protection Program as described in the Updated FSAR for TMl-1.

Changes may be made to the Fire Protection Program without prior approval by the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. Temporary changes to specific fire protection features which may be necessary to accomplish maintenance or modifications are acceptable provided that interim compensate measures are implemented.

(5) The licensee shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

a. Identification of a sampling schedule for the critical parameters and control points for these parameters;
b. Identification of the procedures used to measure the values of the critical parameters;
c.

Identification of process sampling points;

d. Procedure for the recording and management of data; 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Amendment No. 289 Renewed Operating License No. DPR-50

ML17079A040 LPLI R/F RidsNrrDssStsb Resource RidsNrrLALRonewicz Resource RidsRgn1 MailCenter Resource BPurnell, NRR OFFICE DORL/LPL 1 /PM DORL/LPL 1 /LA DORL/LPL 1/BC NAME JPoole LRonewicz Joanna DATE 03/20/2017 03/20/2017 03/20/2017