(U GPU Nuclear Inc.

Three Mile Island Nuclear Station

-N UCLEAR Route-441-S-outht-- ---- ............

Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8461 February 14, 2008 5928-08-20031 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, 'D. C. 20555 THREE-MILE ISLAND NUCLEAR STATION UNIT2-(TMI-2)

POSSESSION ONLY LICENSE NO. DPR-73 DOCKET NO: 50ý320

SUBJECT:

BIENNIAL 10 CFR 50.59 AND PDMS SAR REPORT Attached is the biennial report for Three Mile Island Nuclear Station, Unit 2 (TMI-2) for years 2006 and 2007. This report is being submitted in accordance with TMI-2 Technical Specification 6.8.1.4 and the requirements of 10 CFR 50.59.

Sincerely, Joseph J. an President & Chief Nuclear Officer JJH/awm Attachment cc: USNRC TMI-2 Region I Inspector USNRC TMI-2 Project Manager.

USNRC Region I Administrator File 08012

,s (

592S-08-2003 I Biennial 10 CFR 50.59 and PDMS SAR Report Pagel of12 TMI-2 PDMS ACTIVITIES DURING 2006 AND 2007

--TMt- 2-remainedin-a-safe-and-stable-co ndition-durin-g-calen-rdaTyears 2006-a-id-2007.

Activities included rad waste processing, routine surveillances, equipment repair and modification, and structural repairs. A limited number of modifications were made, as described in the PDMS SAR, to increase equipment reliability and to simplify plant maintenance and operation.

PDMS SAFETY ANALYSIS REPORT CHANGES The PDMS SAR was updated (Update 7) and submitted to the NRC in GPU Nuclear letter, 5928-07-20169, dated August 22, 2007. PDMS Update 7 revises the PDMS SAR to reflect the current plant configuration and administrative, processes.

PROCEDURE CHANGES The typical categories of procedures that were changed in 2006 and 2007 were administrative, ventilation, electrical distribution, rad waste processing, fire protection, compressed air, and Technical Specification surveillance. All procedure changes at TMI-2 are made using the AmerGen 10 CFR 50.59 Review Process, which provides a screening process to determine if the change requires a written evaluation. During 2006 and 2007 there were no procedure changes which required a written evaluation.

TESTS AND-EXPERIMENTS No tests or experiments not described in the PDMS SAR were performed at TMI-2 during 2006 and 2007.

5928-08-20031 Biennial 10 CFR 50.59 and PDMS SAR Report Page 2 of 2 FACILITY MODIFICATION Activities included in this section were performed without prior approval of the NRC in accordance-with-the-provisions-of--0C-GFR- 50.59- -The facility modifications are provided in Update 7 of the PDMS SAR. As a result of the non-operating and defueled status of the TMI-2 plant there are no structures, systems, or. components in TMI-2 that perform a safety function. All facility modifications are made using the AmerGen 10 CFR 50.59 Review Process, which provides a screening process to determine if the change requires a written safety evaluation. This screening process is based on, and incorporates in its entirety, the implementation guidance provided in NEI 96-07, Revision 1. During 2006 and 2007 there were no facility modifications, which require a written safety evaluation.