IR 05000289-08-002 on 01/01/08 - 03/31/08 for TMI, Unit 1
ML081160408
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/25/2008
From: Bellamy R
NRC/RGN-I/DRP/PB6
To: Pardee C
AmerGen Energy Co, Exelon Generation Co
BELLAMY, RR
References
IR-08-002
Download: ML081160408 (25)


See also: IR 05000289/2008002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PA 19406-1415

April 25, 2008

Mr. Charles G. Pardee

Chief Nuclear Officer (CNO) and Senior Vice President

Exelon Generation Company, LLC

Chief Nuclear Officer (CNO)

AmerGen Energy Company, LLC

200 Exelon Way

Kennett Square, PA 19348

SUBJECT: THREE MILE ISLAND STATION, UNIT 1 - NRC INTEGRATED

INSPECTION REPORT 5000289/2008002

Dear Mr. Pardee:

On March 31, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated

inspection at your Three Mile Island, Unit 1 (TMI) facility. The enclosed inspection report

documents the inspection results, which were discussed April 18, 2008, with Mr. Bill Noll and

other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

On the basis of the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its

enclosure, and your response (if any) will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

We appreciate your cooperation. Please contact me at 610-337-5200 if you have any questions

regarding this letter.

Sincerely,

/RA/

Ronald R. Bellamy, Ph.D., Chief

Projects Branch 6

Division of Reactor Projects

Docket No: 50-289

License No: DPR-50

2

Enclosure: Inspection Report 05000289/2008002

w/Attachment: Supplemental Information

cc w/encl:

Executive Vice President and Chief Operating Officer, Exelon Generation

Site Vice President - TMI Unit 1, AmerGen

Plant Manager - TMI, Unit 1, AmerGen

Regulatory Assurance Manager - TMI, Unit 1 AmerGen

Senior Vice President - Nuclear Services, AmerGen

Senior Vice President - Mid-Atlantic Operations, AmerGen

Senior Vice President - Operations Support, AmerGen

Vice President - Licensing and Regulatory Affairs, AmerGen

Director Licensing - AmerGen

Manager Licensing - TMI, AmerGen

J. Fewell, Esq., Associate General Counsel, Exelon Nuclear

Correspondence Control Desk - AmerGen

Chairman, Board of County Commissioners of Dauphin County

Chairman, Board of Supervisors of Londonderry township

R. Janati, Director, Bureau of Radiation Protection, State of PA

J. Johnsrud, National Energy Committee

E. Epstein, TMI-Alert (TMIA)

D. Allard, PADEP

J. Powers, Director, PA Office of Homeland Security

R. French, Director, PA Emergency Management Agency

3

Mr. Charles G. Pardee

Chief Nuclear Officer (CNO) and Senior Vice President

Exelon Generation Company, LLC

Chief Nuclear Officer (CNO)

AmerGen Energy Company, LLC

200 Exelon Way

Kennett Square, PA 19348

SUBJECT: THREE MILE ISLAND STATION, UNIT 1 - NRC INTEGRATED

INSPECTION REPORT 5000289/2008002

Dear Mr. Pardee:

On March 31, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your

Three Mile Island, Unit 1 (TMI) facility. The enclosed inspection report documents the inspection results, which were

discussed April 18, 2008, with Mr. Bill Noll and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the

Commissions rules and regulations and with the conditions of your license. The inspectors reviewed selected

procedures and records, observed activities, and interviewed personnel.

On the basis of the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your

response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the

NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

We appreciate your cooperation. Please contact me at 610-337-5200 if you have any questions regarding this letter.

Sincerely,

Ronald R. Bellamy, Ph.D., Chief /RA/

Projects Branch 6

Division of Reactor Projects

Distribution w/encl: (VIA EMAIL)

S. Collins, RA

M. Dapas, DRA

D. Lew, DRP

J. Clifford, DRP

R. Bellamy, DRP

S. Barber, DRP

A. Rosebrook, DRP

D. Kern, DRP, Senior Resident Inspector

J. Brand, DRP, Resident Inspector

C. LaRegina, DRP, Resident OA

S. Williams, RI, OEDO

H. Chernoff, NRR

J. Lubinski, NRR

P. Bamford, PM, NRR

G. Miller, NRR

J. Lubinski, NRR

ROPreportsResource@nrc.gov

Region 1 Docket Room (with concurrences)

ML081160408

SUNSI Review Complete AAR (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH6a\+++Three Mile Island\TMI Inspection Reports\TMI 08- 002.doc

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: C= Copy without attachment/enclosure E=Copy with

attachment/enclosure, N=No copy

OFFICE RI/DRP RI/DRP RI/DRP RI/DRS

NAME DKern/ AAR for ARosebrook/ AAR SBarber/ SB RBellamy/RRB

DATE 4 /24 /08 4/24 /08 4/25 /08 4/ 25 /08

OFFICIAL RECORD COPY

1

U.S. NUCLEAR REGULATORY COMMISSION

REGION 1

Docket No: 05000289

License No: DPR-50

Report No: 05000289/2008002

Licensee: AmerGen Energy Company, LLC (AmerGen)

Facility: Three Mile Island Station, Unit 1

Location: PO Box 480

Middletown, PA 17057

Dates: January 1 - March 31, 2008

Inspectors: David M. Kern, Senior Resident Inspector

Javier M. Brand, Resident Inspector

Jeffrey Bream, Reactor Engineer

Danté Johnson, Physical Security Inspector

Kevin Mangan, Senior Reactor Inspector

Ronald M. Nimitz, Senior Health Physicist

Approved by: Ronald R. Bellamy, Ph.D., Chief

Projects Branch 6

Division of Reactor Projects (DRP)

Enclosure

2

TABLE OF CONTENTS

SUMMARY OF FINDINGS.......................................................................................................... 3

1. REACTOR SAFETY ........................................................................................................... 4

1R01 Adverse Weather Protection ................................................................................... 4

1R04 Equipment Alignment ............................................................................................. 4

1R05 Fire Protection ........................................................................................................ 5

1R11 Licensed Operator Requalification Program ........................................................... 6

1R12 Maintenance Effectiveness ..................................................................................... 6

1R13 Maintenance Risk Assessments and Emergent Work Control ................................ 7

1R15 Operability Evaluations ........................................................................................... 8

1R18 Plant Modifications ................................................................................................. 8

1R19 Post Maintenance Testing ...................................................................................... 9

1R22 Surveillance Testing ............................................................................................. 10

2. RADIATION SAFETY ....................................................................................................... 11

20S1 Access Controls .................................................................................................... 11

2OS2 ALARA Planning and Controls .............................................................................. 12

2OS3 Radiation Monitoring Instrumentation and Protective Equipment .......................... 14

2PS2 Radioactive Material Processing and Transportation ............................................ 14

4. OTHER ACTIVITIES......................................................................................................... 15

4OA1 Performance Indicator Verification ........................................................................ 15

4OA2 Identification and Resolution of Problems ............................................................. 15

4OA6 Meetings, Including Exit......................................................................................... 18

ATTACHMENT: SUPPLEMENTAL INFORMATION ................................................................ 18

SUPPLEMENTAL INFORMATION......................................................................................... A-1

KEY POINTS OF CONTACT.................................................................................................. A-1

LIST OF ITEMS OPENED, CLOSED AND DISCUSSED ....................................................... A-1

LIST OF ACRONYMS ............................................................................................................ A-4

Enclosure

3

SUMMARY OF FINDINGS

IR 05000289/2008002; 1/1/2008 - 3/31/2008; AmerGen Energy Company, LLC; Three Mile

Island, Unit 1; Routine integrated report.

The report covered a 13-week period of inspection by resident inspectors and announced

inspections by regional inspectors. No findings of significance were identified. The NRCs

program for overseeing the safe operation of commercial nuclear power reactors is described in

NUREG-1649, Reactor Oversight Process, Rev. 3, dated July 2000.

A. NRC-Identified and Self-Revealing Findings

No findings of significance were identified.

B. Licensee Identified Violations

None.

Enclosure

4

REPORT DETAILS

Summary of Plant Status

Three Mile Island, Unit 1 (TMI) operated at approximately 100 percent rated thermal power for

the entire inspection period.

1. REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity

1R01 Adverse Weather Protection (71111.01 - 1 site sample)

a. Inspection Scope

Winter storms, including heavy rains and winds, elevated the Susquehanna River level

above flood stage and affected river conditions from March 5 to 11, 2008. The

inspectors reviewed procedures, conducted interviews, and performed various

inspections to verify that operator actions to address adverse river conditions maintained

the readiness of the various river water systems. Operators closely monitored National

Weather Service flood projections and entered procedure 1202-32, Flood, Rev. 65 when

the 36-hour forecast projected river level to reach flood stage (286.1 feet at the intake

screen house (issue report (IR) 745543). The inspectors walked down the intake screen

house which houses the fire protection system pumps and safety related cooling water

pumps for the decay heat removal system, nuclear service water system, and reactor

river water system. Additionally, after river level receded below flood stage, the

inspectors walked down the flood dike which surrounds the entire power plant in

accordance with procedure 3301-SA1, Dike Inspection, Rev. 12 to determine whether

the flood barrier had been damaged or needed repair (IRs 734215, 747638). The

inspectors evaluated the adequacy of various emergency and surveillance procedures

associated with river water and intake systems to assess AmerGen=s protection from

storms and adverse river conditions.

b. Findings

No findings of significance were identified.

1R04 Equipment Alignment (71111.04)

a. Inspection Scope

Partial System Walkdowns (71111.04Q - 3 samples)

The inspectors performed three partial system walkdown samples on the following

systems and components:

  • On February 12, 2008, the inspectors walked down portions of the A decay heat

removal and reactor building spray systems while the plant was in an unplanned

orange risk condition due to an unexpected electrical breaker fault which made the

B decay river water pump inoperable.

Enclosure

5

  • On February 21, the inspectors walked down portions of the B reactor building spray

system while the plant was in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> limiting condition of operation for scheduled

A emergency safeguards and actuation load sequence testing.

  • On February 27 and 28, the inspectors walked down portions of the remote safe

shutdown panel, while engineers and technicians were performing inspections of the

engineered safeguards and actuation system relays.

The partial system walkdowns were conducted on the redundant and standby equipment

to ensure that trains and equipment relied on to remain operable for accident mitigation

were properly aligned. Additional documents reviewed are listed in the attachment.

Complete System Walkdown (71111.04S - 1 sample)

On March 3 and 4, 2008, the inspectors performed one complete system walkdown

sample on the B and C makeup and purification system trains, while the A system

train was in a scheduled maintenance outage. The inspectors conducted a detailed

review of the alignment and condition of the system using the applicable one-line

diagram 302-560, Makeup and Purification, Rev. 44. In addition, the inspectors

reviewed and evaluated the corrective action program reports for impact on system

operation, interviewed the system engineer, and interviewed control room operators.

b. Findings

No findings of significance were identified.

1R05 Fire Protection (71111.05)

a. Inspection Scope (71111.05Q - 8 samples)

The inspectors conducted fire protection inspections for several plant fire zones,

selected based on the presence of equipment important to safety within their boundaries.

The inspectors conducted plant walkdowns and verified the areas were as described in

the TMI Fire Hazard Analysis Report, and that fire protection features were being

properly controlled per surveillance procedure 1038, Administrative Controls-Fire

Protection Program, Rev. 69. The plant walkdowns were conducted throughout the

inspection period and included assessment of transient combustible material control, fire

detection and suppression equipment operability, and compensatory measures

established for degraded fire protection equipment in accordance with procedure OP-

MA-201-007, Fire Protection System Impairment Control, Rev. 5. In addition, the

inspectors verified that applicable clearances between fire doors and floors met the

criteria of Attachment 1 of Engineering Technical Evaluation CC-AA-309-101,

Engineering Technical Evaluations, Rev. 9. Fire zones and areas inspected included:

  • Fire Zone AB-FZ-2A, Auxiliary Building Elevation 281, Makeup and Purification

Pump A;

  • Fire Zone AB-FZ-2B, Auxiliary Building Elevation 281, Makeup and Purification

Pump B;

  • Fire Zone AB-FZ-3C, Auxiliary Building Elevation 281, Makeup and Purification

Pump C;

  • Fire Zone DG-FA-1, Diesel Generator Building Elevation 305, Diesel Generator A;
  • Fire Zone DG-FA-2, Diesel Generator Building Elevation 305, Diesel Generator B;
  • Fire Zone TB-FA-1, Turbine Building Elevation 305

Enclosure

6

  • Fire Zone TB-FA-1, Turbine Building Elevation 322
  • Fire Zone TB-FA-1, Turbine Building Elevation 355

b. Findings

No findings of significance were identified.

1R11 Licensed Operator Requalification Program (71111.11Q - 1 sample)

a. Inspection Scope

On March 18, 2008, the inspectors observed licensed operator requalification training at

the control room simulator for the E operator crew. The inspectors observed the

operators simulator drill performance and compared it to the criteria listed in TMI

Operational Simulator Scenario Number 12, Condenser Vacuum Leak, Stuck Rod, Loss

of Offsite Power with Diesel and Emergency Feedwater Failures, Rev. 12. The

inspectors reviewed the operators ability to correctly evaluate the simulator training

scenario and implement the emergency plan. The inspectors observed supervisory

oversight, command and control, communication practices, and crew assignments to

ensure they were consistent with normal control room activities. The inspectors

observed operator response during the simulator drill transients. The inspectors

evaluated training instructor effectiveness in recognizing and correcting individual and

operating crew errors. The inspectors attended the post-drill critiques in order to

evaluate the effectiveness of problem identification. The inspectors verified that

emergency plan classification and notification training opportunities were tracked and

evaluated for success in accordance with criteria established in Nuclear Energy Institute

(NEI) 99-02, Regulatory Assessment Performance Indicator Guideline, Rev. 5.

Additional documents reviewed are listed in the attachment.

b. Findings

No findings of significance were identified.

1R12 Maintenance Effectiveness (71111.12Q - 2 samples)

a. Inspection Scope

The inspectors evaluated the listed samples for Maintenance Rule (MR) implementation

by ensuring appropriate MR scoping, characterization of failed structures, systems, and

components (SSCs), MR risk categorization of SSCs, SSC performance criteria or goals,

and appropriateness of corrective actions. Additionally, extent of condition follow-up,

operability, and functional failure determinations were reviewed to verify they were

appropriate. The inspectors verified that the issues were addressed as required by 10

CFR 50.65, Requirements for Monitoring the Effectiveness of Maintenance at Nuclear

Power Plants; Nuclear Management and Resources Council (NUMARC) 93-01, Industry

Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, Rev.

2; and AmerGen procedure ER-AA-310, Implementation of the Maintenance Rule, Rev.

6. The inspectors verified that appropriate corrective actions were initiated and

documented in IRs, and that engineers properly categorized failures as maintenance

rule functional failures and maintenance preventable functional failures, when applicable.

Enclosure

7

  • IR 735277 describes the failure of DR-P-1B to start from the control room. AmerGen

identified the failure as a Maintenance Rule Functional Failure. Since the cause of

the failure was attributed to an isolated manufacturing defect, AmerGen determined

that it was not a Maintenance Preventable Functional Failure. As such, the 10 CFR

50.65 a(2) determination remains valid.

  • The inspectors reviewed the TMI hydrogen monitoring system to ensure it was being

effectively controlled and maintained such that the system remained capable of

performing its intended function. This inspection sample was based on an NRC

maintenance rule finding identified in March 2007, at another nuclear power plant

regarding ineffective controls of the performance and condition of the hydrogen

monitoring system.

b. Findings

No findings of significance were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control (71111.13 - 5 samples)

a. Inspection Scope

The inspectors reviewed the scheduling, control, and restoration during the following

maintenance activities to evaluate their effect on plant risk. This review was against

criteria contained in AmerGen Administrative Procedure 1082.1, TMI Risk Management

Program, Rev. 7 and WC-AA-101, On-Line Work Control Process, Rev. 14.

  • From December 27, 2007 thru January 4, 2008, the TMI sodium hydroxide (NaOH)

chemical used to achieve a uniform pH in containment post accident was changed to

trisodium phosphate per modification ECR 07-174. The online maintenance risk

profile remained green during this evolution (Risk Document 1254, Rev. 3).

  • On January 22, 2008, emergency feedwater valve EFW-V-30B was taken out of

service for scheduled overhaul of the air actuator. The condition elevated the online

maintenance risk profile to yellow (Risk Document 1020, Rev. 4).

  • On February 12, the B decay river water pump (DR-P-1B) failed to start due to a

faulted starting relay (IRs 735277 and 735778). The condition elevated the online

maintenance risk profile to orange (Risk Document 1195, Rev. 3).

  • On February 12, the C makeup pump auxiliary lubricating oil pump (MU-P-2C) did

not auto start as expected during a scheduled surveillance test due to a failed

pressure switch (IR-735063). This condition did not affect operability of MU-P-1C.

On February 13, after DR-P-1B was returned to service and the on-line risk had been

returned to green, technicians replaced the failed pressure switch. This work

elevated the online maintenance risk profile to yellow (Risk Document 1066, Rev. 2).

  • On February 27, a contact for a reactor building emergency cooling and isolation

relay 63X-RB6B was replaced due to intermittent indication. The online maintenance

risk profile remained green during this evolution (Risk Document 551, Rev. 8).

Enclosure

8

b. Findings

No findings of significance were identified.

1R15 Operability Evaluations (71111.15 - 3 samples)

a. Inspection Scope

The inspectors verified that degraded conditions in question were properly characterized,

operability of the affected systems was properly evaluated in relation to Technical

Specification (TS) requirements, applicable extent of condition reviews were performed,

and no unrecognized increase in plant risk resulted from the equipment issues. The

inspectors referenced NRC Inspection Manual Chapter (IMC) Part 9900, Operability

Determinations & Functionality Assessments For Resolution of Degraded or

Nonconforming Conditions Adverse to Quality or Safety and AmerGen procedure OP-

AA-108-115, Operability Determinations, Rev. 5, to determine acceptability of the

operability evaluations. The inspectors reviewed operability evaluations for the following

degraded equipment issues:

  • On December 4, 2007, NS-P-1A breaker operating mechanism became bound

during breaker inspection (WO-R2039072). This condition occurred after the breaker

had been cycled satisfactorily eight times. An analysis performed by the

manufacturer determined that this condition affected only the manual closure of the

breaker which is used for maintenance and would not come into play during normal

auto electrical operation of the breaker. Therefore, NS-P-1A operability was not

impacted (IRs 707261 and 730312).

  • On December 11, SF-P-1A inadvertently tripped during surveillance testing per 1303-

4.19, HPI/LPI Analog Channel test, Rev. 26. Engineers determined the cause was a

misaligned contact in ESAS load shed relay 63Z1B-RC2A. Operability of SF-P-1A

was not affected because the relay function to trip the pump upon an ESAS actuation

was not affected (IR-710133).

  • On January 2, 2008, operators and technicians identified that the reactor building

emergency cooling and isolation system channel RB2A failed to actuate during

performance of ESAS surveillance testing. Engineers determined that this condition

only affected the test circuit and not the safety portion of the circuit (IRs-717254 and

725846).

b. Findings

No findings of significance were identified.

1R18 Plant Modifications (71111.18 - 1 sample)

a. Inspection Scope

The inspectors reviewed the following modification to determine whether it was designed

and/or implemented as required by CC-AA-102, Design Input and Configuration Change

Impact Screening, Rev. 14 and CC-AA-103, Configuration Change Control, Rev. 17.

The inspectors verified the modification supported plant operation as described in the

Enclosure

9

Updated Final Safety Analysis Report (UFSAR) and complied with associated TS

requirements. The inspectors reviewed the function of the changed component, the

change description and scope, and the associated 10 CFR 50.59 screening evaluation.

  • Engineering Change Request (ECR) # 06-595, Decay River Strainer, Rev. 0 was

installed to replace the funnel type strainer media with a flat metal disc media to

reduce the potential for clogging by filamentous algae. This algae caused

excessive strainer clogging in May 2006 due to a bloom associated with lower than

usual river levels. The inspectors also reviewed IR-588605 which evaluated a

higher than expected differential pressure result during post installation testing of

the new media. Engineers determined that the higher differential pressure was due

to improper design of the media (lesser number of holes). The evaluation also

determined that this media did not affect operability of the strainer and decay river

system. The inspectors verified corrective actions including revision to the ECR to

specify the correct number of holes for the media. In addition, actions to replace

the existing media with the proper design are scheduled for May 2008.

b. Findings

No findings of significance were identified.

1R19 Post Maintenance Testing (71111.19 - 7 samples)

a. Inspection Scope

The inspectors reviewed and/or observed the following post-maintenance test (PMT)

activities to ensure: (1) the PMT was appropriate for the scope of the maintenance work

completed; (2) the acceptance criteria were clear and demonstrated operability of the

component; and (3) the PMT was performed in accordance with procedures.

  • On December 12, 2007, operators performed post maintenance testing in

accordance with 1303-4.19, HPI/LPI Analog Channel Test, Interim Change 24193,

following replacement of a misaligned contact that caused an inadvertent trip of SF-

P-1A (Ref: Section 71111.15). The inspectors reviewed the PMT scope adequacy

and results to ensure the PMT addressed the results of additional relay failure

analysis performed in January 2008.

  • On January 23, 2008 operators performed post maintenance testing in accordance

with OP-TM-424-212, IST of EF-V-30s and EF-V-52s, Rev.2, following replacement

of the actuator for EFW-V-30B.

  • On January 24, operators performed post maintenance testing in accordance with

1303-4.13, RB Emergency Cooling and Isolation System Analog Test, Rev. 40, and

Interim Change 24192, following replacement of multiple components to address a

relay (T2/RB2A) failure to de-energize (IR-725846).

  • On February 13, operators performed post maintenance testing of DR-P-1B in

accordance with Work Order C2016938 following replacement of a faulted X-relay

within electrical circuit breaker DR-P-1B-BK.

Enclosure

10

  • Control building chiller AH-C-4B was degraded, due to developing insufficient oil

pressure upon starting from a standby condition. Technicians implemented a

complex troubleshooting plan including oil samples, auxiliary oil pump voltage and

current readings, replacement of the auxiliary pump and motor, and borescope

inspection of the auxiliary oil system and compressor work order C2016844. Post

maintenance tests were performed from February 15 to March 11, using C2016844

and E-108, Control Building Chiller AH-C-4A/B Weekly, Quarterly, and Annual

Inspection, Interim Change 19851.

  • On February 27, operators performed post maintenance testing of ESAS relay 63X-

RB6B, in accordance with procedure 1303-4.14, RB 30 PSIG Analog Channels,

Interim Change 24839, following replacement of a contact that was providing

intermittent indication.

  • On March 27, CM-V-3 open and close strokes were successfully verified using

procedure 1300-3Q.5, Quarterly Inservice Testing of CM-V-1/2/3/4 Valves During

Normal Plant Operations, Rev. 1 following troubleshooting to address excessive

valve closure stroke time.

b. Findings

No findings of significance were identified.

1R22 Surveillance Testing (71111.22)

a. Inspection Scope (3 Inservice Testing Samples and 2 Routine Surveillance Samples)

The inspectors observed and/or reviewed the following operational surveillance tests to

verify adequacy of the test to demonstrate the operability of the required system or

component safety function. Inspection activities included review of previous surveillance

history to identify previous problems and trends, observation of pre-evolution briefings,

and initiation/resolution of related IRs for selected surveillances.

  • From December 27, 2007 to January 2, 2008, procedure OP-TM-214-211,

Verification of TSP, Rev. 0

  • On January 2, 2008, 1303-4.13, RB Emergency Cooling and Isolation System

Analog Test, Rev. 40 and Interim Change 24192.

Test, Rev. 0

  • On February 12, procedure OP-TM-211-251, Leakage Exam Of MU System, Interim

Change 23462

b. Findings

No findings of significance were identified.

1EP6 Drill Evaluation (71114.06)

a. Inspection Scope (1 Training Evolution Sample)

Enclosure

11

The inspectors observed an emergency event training evolution conducted on March 18,

2008, at the Unit 1 control room simulator to evaluate emergency procedure

implementation, event classification, and event notification. The event scenario involved

multiple safety-related component failures and plant conditions warranting simulated

Unusual Event and Alert emergency event declarations. The inspectors observed the

drill critique to determine whether the licensee critically evaluated drill performance to

identify deficiencies and weaknesses. Additionally, the inspectors verified the

Drill/Exercise performance indicators were properly evaluated consistent with NEI 99-02,

Regulatory Assessment Performance Indicator Guideline, Rev. 5. Additional documents

reviewed are listed in the Attachment.

b. Findings

No findings of significance were identified.

2. RADIATION SAFETY

Cornerstone:Occupational Radiation Safety

20S1 Access Controls (71121.01 - 4 samples)

a. Inspection Scope

The inspectors reviewed selected activities and associated documentation in the below

listed areas. The evaluation of AmerGens performance in these areas was against

criteria contained in 10 CFR 20, applicable TSs, and applicable AmerGen procedures.

Plant Walkdowns, Radiation Work Permit Reviews, Job Reviews

The inspectors walked down selected radiological controlled areas and reviewed

housekeeping, material conditions, posting, barricading, and access controls to

radiological areas. The inspectors toured areas of the Auxiliary Building, Spent Fuel

Area, outdoor areas, and radioactive waste processing area. The inspectors conducted

selective independent radiation surveys, and verified the adequacy of: selected

radiological boundaries and postings; that engineering controls were in place; that air

samplers were properly located; and that TS locked High Radiation Areas (HRA) were

properly secured and posted.

The inspectors selectively reviewed the applied radiological controls for personnel entry

into the Unit 1 reactor building containment at power on March 3, 2008, and movement

of concentrated radioactive waste on March 6, 2008. The reviews included evaluation of

the adequacy of all applied radiological controls including radiation work permits,

procedure adherence, radiological surveys, job coverage, airborne radioactivity sampling

and controls, and contamination controls. The reviews included, where applicable,

barrier integrity and the application of engineering controls for potential airborne

radioactivity areas and radioactive source-term, and radiation levels present. The

inspectors attended the briefing for workers involved in radioactive waste handling.

The inspectors also reviewed and discussed electronic dosimeter and

thermoluminescent dosimeter results to identify anomalies and licensee actions, as

applicable.

Enclosure

12

The inspectors reviewed and discussed internal dose assessments for 2007 to identify

any apparent actual occupational internal doses greater than 50 millirem committed

effective dose equivalent. The inspectors assessed the adequacy of evaluations for

selected dose assessments and included selected review of the program for evaluation

of potential intakes associated with hard-to-detect radionuclides (e.g., airborne

transuranics).

High Risk Significant, High Dose Rate HRA and Very High Radiation Area Controls

The inspectors conducted a selective review of HRA controls (e.g., adequate posting

and locking of entrances). The inspectors verified that locked HRAs were properly

secured and posted and that surrounding area dose rates met regulatory criteria. The

inspectors reviewed and observed controls used for ongoing work such as waste

transfer. The inspectors verified procedure adherence by observation, attendance at

briefings, and questioning radiation protection personnel and workers.

Radiation Worker/Radiation Protection Technician Performance and Radiation

Protection Technician Proficiency

The inspectors evaluated radiation protection technician performance and proficiency

relative to control of hazards and work activities, as applicable. In addition, the

inspectors reviewed issue reports to identify problems with worker or radiation protection

technician performance.

Problem Identification and Resolution

The inspectors selectively reviewed self-assessments and audits since the previous

inspection to determine if identified problems were entered into the corrective action

program for resolution. The inspectors evaluated the corrective action program

database for repetitive deficiencies or significant individual deficiencies to determine if

self-assessment activities were identifying and addressing the deficiencies.

The review included an evaluation of data to determine if any problems involved

performance indicator (PI) events with dose rates greater that 25 R/hr at 30 centimeters,

greater than 500 R/hr at 1 meter or unintended exposures greater than 100 millirem total

effective dose equivalent, 5 rem shallow dose equivalent, or 1.5 rem lens dose

equivalent. The inspectors also reviewed the corrective action database for non-PI

radiological incidents to determine if follow-up activities were being conducted in an

effective and timely manner consistent with radiological risk.

The inspectors reviewed selected issue reports since the last inspection which involved

potential radiation worker or radiation protection personnel errors to determine if there

was an observable pattern traceable to a similar cause. The review included an

evaluation of corrective actions, as appropriate. (Section 4OA2)

b. Findings

No findings of significance were identified.

2OS2 ALARA Planning and Controls (71121.02 - 2 samples)

a. Inspection Scope

Enclosure

13

The inspectors conducted the following activities to determine if AmerGen was properly

implementing operational, engineering, and administrative controls to maintain personnel

occupational radiation exposure as low as is reasonably achievable (ALARA).

Implementation of these controls was reviewed against the criteria contained in 10 CFR 20, applicable industry standards, and applicable AmerGen procedures.

Inspection Planning, Radiological Work Planning

The inspectors determined the plants current 3-year rolling average collective exposure.

The inspectors evaluated site specific trends in collective exposures (using NUREG-

0713 and plant historical data). The inspectors discussed proposed occupational

radiation exposure estimates for 2008.

Job Site Inspections and ALARA Controls

The inspectors observed ongoing work activities (e.g., radioactive waste handling) to

evaluate implementation of ALARA controls for the activities. The inspectors reviewed

exposures of individuals from selected work groups to identify significant exposure

variations which may exist among workers.

Verification of Dose Estimates and Exposure Tracking

The inspectors reviewed Station ALARA Committee and sub-committee meeting minutes

for the fall 2007 outage and post-outage to date. The inspectors compared aggregate

exposure sustained per work activity, with initial estimates, to evaluate effectiveness of

ALARA actions and accuracy of dose estimates. The inspectors compared results

achieved with the intended dose established for the work tasks reviewed.

Source-Term Reduction and Control

The inspectors reviewed and discussed AmerGens understanding of the Unit 1 plant

source-term, including knowledge of input mechanisms to reduce the source term, and

the source-term control strategy in place. The inspectors reviewed reactor coolant

chemistry data to evaluate the effectiveness of post shutdown source-term reduction

efforts including strategies employed such as system flushes, installation of temporary

shielding, and chemistry controls. The inspectors reviewed efforts to reduce Unit 1

reactor cavity and spent fuel pool radionuclide concentrations in support of ongoing work

activities.

Radiation Worker/Radiation Protection Technician Performance

The inspectors selectively observed radiation worker and radiation protection technician

performance in the area of ALARA practices during transfer of radioactive materials on

March 6, 2008. The inspectors selectively questioned workers and radiation protection

personnel in the field to evaluate their understanding of ambient radiological conditions.

The inspectors evaluated performance to determine whether the training/skill level was

sufficient with respect to the radiological hazards involved.

Problem Identification and Resolution

Enclosure

14

The inspectors selectively reviewed issue reports in this area since the last inspection to

determine if AmerGen was including ALARA deficiencies and issues in its corrective

action program. (See Section 4OA2)

The review included self-assessments, audits, and corrective action reports related to

the ALARA program since the last inspection to determine if the follow-up activities were

being conducted in an effective and timely manner commensurate with their importance

to safety and risk.

b. Findings

No findings of significance were identified.

2OS3 Radiation Monitoring Instrumentation and Protective Equipment (71121.03 - 1 sample)

a. Inspection Scope

The inspectors reviewed selected activities and associated documentation in the below

listed areas. The evaluation of AmerGens performance in these areas was against

criteria contained in 10 CFR 20, applicable TSs, and applicable station procedures.

Self-Contained Breathing Apparatus

The inspectors reviewed the functional testing and inspection of self-contained breathing

apparatus (SCBA) to ensure equipment was being properly maintained and inspected in

accordance with the manufacturers recommendations and applicable regulatory

requirements. The functional testing of three SCBA units, ready for use in the Unit 1

Control Room, was reviewed (Kit Nos. 1, 2, 3). The inspectors also visually inspected

the SCBA kits and additional mask units. The components of the three kits were also

checked against approved component lists published by the SCBA manufacturer and the

National Institute for Occupational Safety and Health. The inspectors reviewed periodic

testing of the SCBA units components (i.e., hydro testing of tank, maintenance and

testing of regulators, low pressure alarms) and reviewed conformance of the SCBAs with

published certification lists.

Problem Identification and Resolution

The inspectors reviewed issue reports in this area since the last inspection to determine

if AmerGen was including instrument deficiencies and issues in its corrective action

program (Section 4OA2). The review included self-assessments, audits, and corrective

action reports.

b. Findings

No findings of significance were identified.

Cornerstone: Public Radiation Safety

2PS2 Radioactive Material Processing and Transportation (71122.02 - 1 sample)

a. Inspection Scope

Enclosure

15

The inspectors selectively reviewed the packaging and shipment preparation of a non-

exempt radioactive material shipment (RS-08-029-1). Matters reviewed included:

packaging and vehicle radiation dose rates; placarding of vehicle; completion of

applicable shipping papers; qualification of personnel overseeing and processing

shipment; emergency instructions; general truck and trailer condition; closure and use

requirements.

The inspectors also selectively reviewed training provided for station personnel relative

to 49 CFR 172, and NRC Bulletin 79 -19.

b. Findings

No findings of significance were identified.

4. OTHER ACTIVITIES

4OA1 Performance Indicator Verification (71151 - 3 samples)

a. Inspection Scope

Cornerstone: Initiating Events

The inspectors reviewed selected station records to verify NRC PIs had been accurately

reported to the NRC as specified in NEI 99-02, Regulatory Assessment Performance

Indicator Guideline, Rev. 5. The three PI samples listed below were verified for the

period January to December 2007.

$ Unplanned Scrams per 7000 Critical Hours

$ Unplanned Scrams with Complications

$ Unplanned Power Changes per 7000 Critical Hours

The inspectors reviewed operator logs, licensee event reports, monthly station operating

reports, corrective action program database documents, calculation methods, definition

of terms, and use of clarifying notes. The inspectors also verified accuracy of the

number of reported critical hours used in the calculations.

b. Findings

No findings of significance were identified.

4OA2 Identification and Resolution of Problems (71152)

.1 Review of Issue Reports and Cross-References to Problem Identification and Resolution

Issues Reviewed Elsewhere

The inspectors performed a daily screening of items entered into the licensees

corrective action program. This review was accomplished by reviewing a list of daily IRs,

reviewing selected IRs, attending daily screening meetings, and accessing the licensees

computerized corrective action program database.

.2 Annual Sample: Access Control Deficiencies

Enclosure

16

a. Inspection Scope (1 sample)

The inspectors reviewed AmerGen=s actions in response to issue reports generated as a

result of multiple issues associated with access control deficiencies. The inspectors also

reviewed AmerGens procedures on searching personnel and process facility operations.

In addition, the inspectors interviewed applicable members of AmerGens staff including

site security officers and a corporate security system engineer.

b. Findings

No findings of significance were identified. The inspectors reviewed issue reports

documenting issues related to four access control deficiencies identified in 2007. In

each case, the actions taken to address the issues were appropriate. The inspectors

verified that the site has provided adequate training and guidance on process facility

operations to the security staff.

.3 Problem Identification and Resolution for Radiological Protection Activities

a. Inspection Scope

The inspectors reviewed issue reports and self-assessments to determine if identified

problems were entered into the corrective action program for resolution. The inspectors

selectively reviewed the reports to evaluate AmerGens threshold for identifying,

evaluating, and resolving problems (Apparent Cause 698893, NOS Audit 07-4Q,). The

review included a check of possible repetitive issues, such as worker or technician errors

(Issue Nos. 706402, 706624, 707298, 707789, 712475, 715167, 722282, 723723,

726821, 727146, 7377511, 740021, 689317, 695488, 689423, 689435, 689562, 696907,

692640, 707288, 744382, and 745372).

This review was against criteria contained in 10 CFR 20, Technical Specifications, and

station procedures.

b. Findings

No findings of significance were identified.

4OA5 Other Activities

.1 Temporary Instruction 2515/166 - Pressurized Water Reactor Containment Sump

Blockage (NRC Generic Letter 2004-02)

a. Inspection Scope

The inspectors performed an inspection in accordance with Temporary Instruction (TI)

2515/166, Pressurized Water Reactor Containment Sump Blockage, Rev. 1. The TI was

developed to support the NRC review of licensee activities in response to NRC Generic

Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump

Recirculation at Pressurized Water Reactors. Specifically, the inspectors verified that

the implementation of the modifications and procedure changes was consistent with the

actions committed to in AmerGens supplemental response to GL 2004-02, dated

December 28, 2007. The supplemental response provided the remaining information

Enclosure

17

regarding the actions and methodologies used at TMI to resolve the issues in the GL,

which included the downstream effects and chemical effects analyses.

Additionally, the inspectors reviewed the TS and the UFSAR, to verify that required

changes to the TS had been approved by the NRC and that the UFSAR had been or

was in the process of being updated to reflect the plant changes. Portions of the TI were

performed during the 2007 refueling outage to verify the containment sump

modifications; the results of that inspection were documented in Inspection Report No.

05000289/2007005.

b. Evaluation of Inspection Requirements

The TI requires the inspectors to evaluate and answer the following questions:

1. Did the licensee implement the plant modifications and procedure changes

committed to in their GL 2004-02 response?

The inspectors verified that AmerGen implemented the plant modifications and

procedure changes committed to in their GL 2004-02 responses. The inspection

performed in 2007 verified the implementation of the sump screen modifications

related to the GL. The inspectors verified that the modifications previously

installed met the assumptions of AmerGens completed analyses, which included

the chemical effects analysis. The inspectors reviewed changes to AmerGens

emergency operating procedures and verified that the procedures ensured the

assumptions described in the licensee supplemental response to the GL were

valid. Finally, the inspectors verified the modifications to address downstream

effects had been performed.

2. Has the licensee updated its licensing basis to reflect the corrective actions taken

in response to GL 2004-02?

The inspectors verified that AmerGen had either updated, or was in the process

of updating, the licensing basis to reflect the actions taken in response to GL 2004-02. Specifically, the inspectors verified that changes to the facility or

procedures as described in the UFSAR that were identified in the licensees GL 2004-02 responses were reviewed and documented in accordance with 10 CFR

50.59. The inspectors also verified that changes to the technical specifications

had been approved by the NRC, and that required changes to the UFSAR,

describing the changes to the plant, were in the process of being updated.

The inspection requirements of the Temporary Instruction are complete and the TI is

closed. The Office of Nuclear Reactor Regulation will perform a technical review of

AmerGens GL responses to ensure the licensee corrective actions adequately address

Generic Safety Issue 191, Assessment of Debris Accumulation on Pressurized Water

Reactor Sump Performance, and Generic Letter 2004-02. The NRC will document the

results of this review in a separate letter to AmerGen.

.2 Radiological Review of Steam Generator Replacement Transportation Plans (50001)

a. Inspection Scope

Enclosure

18

The inspectors selectively reviewed the preliminary plans for transport to, and storage of,

the replaced Unit 1 steam generators at the proposed storage facility. The inspectors

reviewed projected public dose calculations.

The review was against criteria contained in 10 CFR 20, site TSs, and the Offsite Dose

Calculation Manual.

b. Findings

No findings of significance were identified.

4OA6 Meetings, Including Exit

Exit Meeting Summary

On April 18, 2008, the resident inspectors presented the inspection results to Mr. Bill Noll

and other members of the TMI staff who acknowledged the findings. The regional

specialist inspection results were previously presented to members of AmerGen

management. The inspectors asked the licensee whether any of the material examined

during the inspection should be considered proprietary. No proprietary information was

identified.

ATTACHMENT: SUPPLEMENTAL INFORMATION

Enclosure

A-1

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

D. Atherholt Manager, Regulatory Assurance

C. Baker Manager, Chemistry

B. Carsky Director, Operations

T. Dougherty Plant Manager

E. Eilola Director, Site Engineering

R. Godwin Training

J. Heischman Director, Maintenance

W. Laudenbach System Engineer

A. Miller Regulatory Assurance

D. Mohre Manager, Security

P. Mussleman Security Supervisor

D. Neff Manager, Emergency Preparedness

W. Noll Site Vice President

T. Roberts Radiation Protection

D. Trostle Operations Security Analyst

L. Weir Manager, Nuclear Oversight Services

C. Wend Manager, Radiation Protection

R. West Vice President, TMI Unit 1

H. Yeldell Work Management

LIST OF ITEMS OPENED, CLOSED AND DISCUSSED

Opened & Closed

NRC TI 2515/166 Pressurized Water Reactor Containment Sump Blockage (NRC Generic

Letter 2004-02)

LIST OF DOCUMENTS REVIEWED

Section 1R04: Equipment Alignment

Procedures

1105-20, Remote Shutdown Systems, Rev. 14

1107-4, Electrical Distribution Panel Listing, Rev. 213

OP-TM-211-000, Makeup and Purification System, Rev. 16

OP-TM-212-000, Decay Heat Removal System, Rev. 11

OP-TM-214-000, Building Spray System, Rev. 8

OP-TM-533-000, Decay Heat River System, Rev. 9

OP-TM-541-000, Primary Component Cooling System, Rev. 6

OP-TM-543-000, Decay Heat Closed System, Rev. 7

Drawings

Dwg. 302-712, Reactor Building Spray, Rev. 49

Attachment

A-2

Section 1R011: Licensed Operator Requalification Program

Procedures

OP-TM-AOP-014, Loss of 1E 4160V Bus, Rev. 3

OP-TM-AOP-020, Loss of Station Power, Rev. 12

OP-TM-AOP-041, Loss of Seal Injection, Rev. 2

OP-TM-AOP-062, Inoperable Rod, Rev. 1

OP-TM-EOP-001, Reactor Trip, Rev. 9

OP-TM-EOP-004, Lack of Primary to Secondary Heat Transfer, Rev. 5

OP-TM-EOP-009, HPI Cooling - Recovery from Solid Operations, Rev. 5

EP-AA-1009, Radiological Emergency Plan Annex for TMI Station, Rev. 10

Section 1R012: Maintenance Rule

Procedures

Alarm Response Procedure MAP NN-1-8, Main Annunciator Panel NN, Rev.4

Alarm Response Procedure, HM, Hydrogen Monitor Pane, Rev. 0

1105-18, Containment Hydrogen Monitor, Rev. 12

1104-62, Hydrogen Recombiner, Rev. 22

OP-TM-EOP-008, LOCA Cooldown, Rev. 6

IC-252, Channel Test of Reactor building Post LOCA Hydrogen Monitor, Rev. 0

IC-253, Reactor Building Post-LOCA Hydrogen Monitoring Calibration, Rev. 1

Other Documents

IR-736664, Response to NRC Question On Hydrogen Recombiners And Monitoring System

System Health Report, Containment hydrogen Monitoring, dated December 2007

Section 1EP6: Drill Evaluation

Procedures

1202-33, High Winds, Rev. 28

EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev. 13

EP-AA-1009, Radiological Emergency Plan Annex for TMI Station, Rev. 10

OP-TM-EOP-001, Reactor Trip, Rev. 9

OP-TM-EOP-003, Excessive Primary to Secondary Heat Transfer, Rev. 5

OP-TM-EOP-004, Lack of Primary to Secondary Heat Transfer, Rev. 5

OP-TM-EOP-010, Abnormal Transients Guides, Rules, and Graphs, Rev. 9

Other Documents

Licensed Operator Drill Scenario No. 51, Low System Grid voltage, High Winds,

Generator/Turbine Trip, ATWS, Stem Leak in Containment Causing Excessive Primary to

Secondary Heat Transfer, Rev. 1

Section 2OS1, 2OS2, 2OS3, 2PS2: Occupational and Public Radiation Safety

Procedures

RP-TM-503-1001, Rev. 1, Volumetric Material Controls

RP-TM-460-1007, Rev. 5, Access to TMI -1 Reactor Building

RP-AA-400, Rev. 4, ALARA Program

RP-TM-605-1001, Rev. 1, TMI Waste Characterization

RP-TM-850, Rev. 0, Radiation Protection Emergency Equipment Readiness.

6610-OPS-4510.03, Rev. 2, Inspection and Maintenance of Respiratory Equipment

Other Documents

TMI Radiological Protection T1R17 Refueling Outage Report 2007

Primary Water Chemistry Sampling Results

Attachment

A-3

Fuel Transfer Tube Radiation Surveys November 2005

Self-contained Breathing Apparatus Vendor Manual

Section 4OA2: Problem Identification & Resolution

Issue Reports

00565138, Improper Verification of Protected Area Badge

00670299, Security Explosive Detector Failed to Alarm During Testing

00652352, Access Not Verified Prior to P/A Entry Through MAF

00685064, Access Not Verified Prior to P/A Entry MAF

00699966, Improper Response to Explosive Detector Alarm

Procedures

SY-AA-101-112, Searching Personnel, Vehicles, Packages and Cargo, Rev. 12

SY-TM-1005, Processing Center Operations, Rev. 11

Other Documents

VM-TM-0946, Entry Scan Explosives Detector Model 85, Rev. 4

NRC Generic Letter 91-10, Explosives Searches at Protected Area Portals, July 8, 1991

Section 4OA5: Other

Procedures

OP-TM-214-901, RB Spray Operation, Rev. 3

OP-TM-EOP-010, Emergency Procedures Rules, Guides and Graphs, Rev. 9

Other Documents

C-1101-210-E610-011, LPI BS Pump NPSH Margin Available from the RB Sump Following a

LBLOCA, Rev. 7

ECTM005-CALC-05, Hydraulic Analyses of the Reactor Building Recirculation Sump Strainer,

Rev. 3

Inspection Report 05000289/2007005, Three Mile Island Station, Unit 1 - NRC Integrated

Inspection Report

NRC Docket No. 50-289, Technical Specification Change Request No. 337 - Reactor Building

Emergency Sump pH control System Buffer Change

PC 22736, Ops Procedures due to RB Sump Mod per ECR-06-0207, 06-0205 &

06-0206

PC 24164, EOP/EP Revisions for TSP Mod (ECR-07-00174) and GL 2004-02

Three Mile Island Unit 1 Supplemental Response to NRC Generic Letter 2004-02, Potential

Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at

Pressurized-Water Reactors, dated December 28, 2007

TM 06-00256-000, Replace DH-V-19A/B Internals

TM-07-00743-000, Generic Letter 2004-02/GSI-191 Supplemental Response

Attachment

A-4

LIST OF ACRONYMS

ADAMS Agencywide Documents and Management System

ALARA As Low As is Reasonably Achievable

AmerGen AmerGen Energy Company, LLC

AR Action Request

CFR Code of Federal Regulations

DRP Division of Reactor Projects

ECR Engineering Change Request

ESAS Engineered Safeguards and Actuation System

GL Generic Letter

HRA High Radiation Area

IMC Inspection Manual Chapter

IR Issue Report

LOCA Loss of Coolant Accident

LPI Low Pressure Injection

MAF Main Access Facility

MR Maintenance Rule

NCV Non-Cited Violation

NEI Nuclear Energy Institute

NRC Nuclear Regulatory Commission

NUMARC Nuclear Management and Resources Council

P/A Protected Area

PADEP Pennsylvania Department of Environmental Protection

PARS Publicly Available Records

PI Performance Indicator

PMT Post-Maintenance Test

SCBA Self Contained Breathing Apparatus

SSC Structures, Systems, and Components

TI Temporary Instruction

TMI Three Mile Island, Unit 1

TS Technical Specifications

UE Unusual Event

UFSAR Updated Final Safety Analysis Report

Attachment