Submittal of Revision to LRA Table 2.2-3 Which Describes a New Steam Dryer Storage Facility Constructed
ML080510698
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/07/2008
From: Mckinney B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6310
Download: ML080510698 (4)


Text

Brltt T. McKinney PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 ppI4%

btmckinney@pplweb.com FEB 0 7 2008 TM U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop OP 1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION (SSES)

UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (LRA)

EXTENDED POWER UPRATE (EPU) IMPACTS ON LRA Docket Nos. 50-387 PLA-6310 and 50-388 References. 1) PLA-6110, Mr. B. T McKinney (PPL)to Document ControlDesk (USNRC),

"Applicationfor Renewed OperatingLicense Numbers NPF-14 and NPF-22,"

dated September 13, 2006.

2) Letterfrom (USNRC) to Mr. B. T. McKinney (PPL), "Susquehanna Steam Electric Station, Units 1 and 2 - Issuance ofAmendment Regardingthe 13-Percent Extended Power Uprate (TAC Nos. MD3309 and MD3310), "dated January 30, 2008.
3) PLA-62 71, Mr. B. T. McKinney (PPL)to Document ControlDesk (USNRC),"

Annual Amendment to the Applicationfor Renewed OperatingLicense Numbers NPF-14 and NPF-22 Pursuantto 10 CFR 54.21(b), "dated September 12, 2007.

In accordance with the requirements of 10 CFR 50, 51, and 54, PPL requested the renewal of the operating licenses for the Susquehanna Steam Electric Station (SSES)

Units 1 and 2 in Reference 1.

On January 30, 2008, the NRC approved the SSES Extended Power Uprate (EPU),

documented in Reference 2 as Unit 1 License Amendment 246 and Unit 2 License Amendment 224.

Our review of the EPU Safety Evaluation Report (SER) concluded that there are no impacts to the SSES License Renewal Application (LRA) as a result of EPU approval.

The LRA, Section 1.2, states that the evaluations which support the SSES LRA were performed at the conditions that support the EPU power level of 3952 megawatts thermal.

However, the attachment to this letter contains a revision to LRA Table 2.2-3 which describes a new steam dryer storage facility constructed on the SSES site. This facility was completed after we submitted the LRA annual update in Reference 3. This facility has been determined to be "Not In Scope" for License Renewal.

There are no new regulatory commitments contained herein as a result of this response.

Document Control Desk PLA-6310 If you have any questions, please contact Mr. Duane L Filchner at (610) 774-7819.

I declare, under penalty of perjury, that the foregoing is true and correct.

Executed on: - 22D -

B. T. McKinney

Attachment:

Revised LRA Table 2.2-3 Copy: NRC Region I Ms. E. H. Gettys, NRC Project Manager, License Renewal, Safety Mr. R. V. Guzman, NRC Sr. Project Manager Mr. R. Janati, DEP/BRP Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector Mr. A. L. Stuyvenberg, NRC Project Manager, License Renewal, Environmental

Attachment to PLA-6310 Revised LRA Table 2.2-3

Attachment to PLA-63 10 Page 1 of 1

'The following line item is added to LRA Table 2.2-3:

Table 2.2-3 (continued)

Structure Name In Scope? Comments / Screening Results Section Provides on-site storage for retired steam dryers. One story concrete structure with removable concrete roof plugs on a concrete foundation on grade.

Structure provides support for retired Steam Dryer Storage Facility No nonsafety-related equipment and equipment not required to support regulated events. None of the major components in this structure present a seismic lI/I situation.

The structure does not perform an intended function delineated in 10 CFR 54.4(a).