Category:Letter type:DCL
MONTHYEARDCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System 2024-09-09
[Table view] Category:NPDES Noncompliance Notification
[Table view] |
Text
Pacific Gas and Electric Companyo Diablo Canyon Power Plant P. 0. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2007-553 Certified/Return Receipt
- 7007-0220-0004-6735-9950 November 20, 2007 Joseph G. Cordaro Wildlife Biologist National Marine Fisheries Service 501 West Ocean Blvd., Suite 4200 Long Beach, California 90802-4213
Dear Mr. Cordaro:
Enclosed is a National Marine Fisheries Service (NMFS) Marine Mammal and Marine Turtle Stranding Report for a dead California sea lion (Zalophus californianus)discovered in the Diablo Canyon Power Plant (DCPP) intake structure. The sea lion was discovered by an Intake Operator on October 25, 2007 floating in the Unit-2 fish escape forebay.
As authorized in a letter dated June 3, 1994 from NMFS, DCPP staff removed the dead sea lion from the intake structure and towed it out to sea. The sea lion was estimated to be about four feet in length. The animal was partially decomposed, and the front part of the head was missing. This could be due to normal decomposition. There were no'obvious indications of the cause of death, nor indications that power plant operations were a contributing factor.
Verbal notification of this incident was reported to NMFS on October 25, 2007 as soon as DCPP Environmental Operations personnel confirmed the sea lion was in the plant intake forebay.
Should you have any questions or concerns regarding the enclosed repb'rt, or require additional information, please contact Jim Kelly of my staff at (805) 545-3194.
Since ely, James R. Becker Vice President- Diablo Canyon Operationsand Station Director 2007553/jlk/kmo Enclosure (1)
PG&E Letter DCL-2007-553 Joseph G. Cordaro, NMFS November 20, 2007 Page 2 cc: Alan B. Wang, NRR Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 7 El 11555 Rockville Pike Rockville, MD 20852-2738 Resident Inspector, Michael S Peck U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 U.S. Nuclear Regulatory Commission Document Control Desk Washington,, D.C. 20555 Kathy Hill California Department of Fish and Game 1416 9 th Street, Room 1341 Sacramento, CA 95814
ta MARINE MAMMAL AND MARINE TURTLE STRANDING REPORT SID#
(NMFS USE)
FIELD NO.:, NMFS REGISTRATION NO.
COMMON NAME:California Sea LionGENUS: Zalophus EXAMINER SPECIES: californianus I, Name: James L. Kelly Agency: Pacific Gas & Electric CO.Phone: (805) 545-3194 Address: P.O. Box 56, Avila Beach, Ca 93424 LOCATION San Luis LO)CATION San Luis TYPE OF OCCURRENCE State: CA County: Obispo Mass Stranding: (Yes) / (No) # Animals One (1)
Human Interaction: (Yes),' -'o) / (?)
City: Avila Beach Check one: 1. Boat collision
- 2. Shot Locality Details: 9-Miles NW of 4. Fishery interaction U75. OtherFound dead in Power Plant Intake Avila Beach - Diablo Canyon Power How determined:
Plant (DCPP).
I3ther Causes (if known):UUnknown cause of death.
- Latitude: N Sea Lion was most likely dead before enterinq intake.
- Longitude: W DATE OF INITIAL OBSERVATION: DATE OF EXAMINATION:
Yr 2007 Mo 10 Day 25 Yr 2007 Mo 10 Day 25 CONDITION: Check one:_l.Alive CONDITION: Check one:_l.Alive 2.Fresh dead 2.Fresh dead XY3.Moderate decomp. X--3.Moderate decomp.
4.Advanced decomp. 4.Advanced decomp.
5.Mummified 5.Mummified
? Unknown ? Unknown LIVE ANIMAL - Condition and Disposition: TAGS APPLIED?: (Yes) /N Check one l.Released at site TAGS PRESENT?: (Yes) or more: _2.Sick 3.Injured Dorsal Left Right
__4.Died
_5.Euthanized ag No.(s):
_6.Rehabilitated and released
_? Unknown Color(s):
Transported to: T e:
(Died) / (Released) Date: P acement Front/Rear Front/Rear CARCASS - Disposition, check one: MORPHOLOGICAL DATA:
Check one: _I.Left at site Sex - Check one: _l.Male 2.Buried 2.Female XT3 .Towed 7n? Unknown
__4.Sci. collection (see below)
_-5_Edu.
-6.Other collection (see below) Straight Length: 48 (cm)/vs
_? Unknog"_. PHOTOS TAKEN? (Yes) / SZ-3\
NECROPSIED? (Yes) / No REMARKS: None.
oISPOSITION OF TISSUE/SKELETAL MATERIAL: Allowed to decompose in natural environment.
It is estimated that completion OMB#0648'-0178 of this form requires 20 minutes.
.: -9052 Pacific Gas and Electric Company Diablo Canyon Power, Plant,,1 '. NfPINoq10W 5 PO. Box 56 Avila Beach, CA 93424 02 1A $ 00.410 Environmental Operations 0004372474 NOV21 2007 MS: DCPP 104/5/2A MAILED FROM ZIP CODE 93424 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001