Other: ML072470667, ML072540790, ML072540792, ML072540793, ML072540795, ML072540797, ML072540802, ML072540803, ML072540806, ML072540807, ML072540809, ML072540811, ML072540814, ML072540816, ML072540818, ML072540819, ML072540820, ML072550056, ML072550058, ML072550059, ML072680179, ML072680188, ML072680191, ML072680192, ML072740013, ML080660133
|
MONTHYEARML0725407921968-06-0404 June 1968 Drawing 11D-190, 6 Inch Roof Vent Project stage: Other ML0725408181974-10-22022 October 1974 Drawing M-79, Rev. 3, Main Steam Relief Valve Discharge Stack Modification Project stage: Other ML0725500591984-01-0606 January 1984 Drawing M-990, Rev. 0, General Arrangement 14 Dia. Intake Line from Top of Service Bldg. to the Mechanical Room Addition Project stage: Other ML0725407931989-01-30030 January 1989 Drawing C-18, Rev, 6, Erection Diagram. Sheet 67 Project stage: Other ML0725500581991-11-11011 November 1991 Drawing M-140, Rev. 7, Penetrations Containment Building Wall Project stage: Other ML0725408191994-06-21021 June 1994 Drawing M-113, Rev. 11, Heating & Ventilation Turbine Building Plan of Elev. - 625 - 0 Project stage: Other ML0725408141996-02-23023 February 1996 Drawing M-42, Rev. 32, Piping Drawing Area 3 Sections Project stage: Other ML0725408201996-04-24024 April 1996 Drawing M-119, Rev. 7, Heating and Ventilating Mechanical Room Roof Plan Sections and Details. Sheet 3 Project stage: Other ML0725408161997-01-17017 January 1997 Drawing M-65, Rev. 13, Piping Drawing Main Steam System Project stage: Other ML0725408111997-02-27027 February 1997 Drawing M-40, Rev. 29, Piping Drawing Area 3 Plan of El. 625 - 0 & Sections Project stage: Other ML0725408091997-11-0404 November 1997 Drawing M-29, Rev. 13, Piping Drawing Area 2 Plan of El. 625 - 0 Project stage: Other ML0725500561998-01-14014 January 1998 Drawing M-119, Rev. 8, Heating and Ventilation Mechanical Equipment Room Plan and Sections El. 629 -2. Sheet 4 Project stage: Other ML0725407971998-02-25025 February 1998 Drawing C-50, Rev. 20, Architectural Auxiliary & Reactor Buildings Floor Plan at El 625-0 Project stage: Other ML0725407951998-10-0505 October 1998 Drawing C-38, Rev. 6, Field Erected Tanks. Sheet 2 Project stage: Other ML0725408061998-10-12012 October 1998 Drawing C-141, Rev. 5, Containment Ventilation Stack Project stage: Other ML0725408031999-04-0808 April 1999 Drawing C-127, Rev. 2, Containment Vessel Typical Details Project stage: Other ML0725407902006-01-11011 January 2006 Drawing C-2, Rev. 16, Plant Area and Switchyard Plan. Sheet 1 Project stage: Other ML0726801792006-01-12012 January 2006 Drawing C-52, Rev. 15, Architectural Roof Plan Project stage: Other ML0725408022006-11-15015 November 2006 Drawing C-51, Rev. 30, Architectural Auxillary & Reacator Building Floor Plans at 639 - 0 and 649-0 Project stage: Other ML0727007542006-12-0505 December 2006 Draft RAI on Alternate Source Term Amendment Project stage: Draft RAI ML0725408072007-01-12012 January 2007 Drawing M-15, Rev. 12, Equipment Location Turbine Building Sections Project stage: Other ML0705800842007-02-26026 February 2007 Draft RAI on Proposed AST Amendment Project stage: Draft RAI ML0727002592007-03-29029 March 2007 Draft RAI on Alternate Source Term (AST) Amendment Project stage: Draft RAI ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 162007-06-15015 June 2007 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 Project stage: Request ML0726801882007-06-26026 June 2007 Drawing C-52, Rev. 23, Heating & Ventilation Auxiliary & Containment Plan at Elevation 639-0 & 649 -0 Project stage: Other ML0718005132007-06-29029 June 2007 Revision to Voluntary Response to NRC Regulatory Issue Summary 2006-15: Preparation and Scheduling of Operator Licensing Examinations Project stage: Request ML0718700072007-07-0505 July 2007 Request for Additional Information Re. Alternative Source Term Project stage: RAI ML0723203922007-08-20020 August 2007 Response to Request for Additional Information - License Amendment Request for Replacement of Containment Sump Buffer Project stage: Response to RAI ML0725407842007-09-0707 September 2007 Supplemental Information Regarding Alternative Source Term License Amendment Request Project stage: Supplement ML0726801912007-09-14014 September 2007 NAI Report Release - NAI-1149-002, Rev. 1, Determination of Atmospheric Dispersion Factors for Palisades, Enclosure 2, Revised Calculations Project stage: Other ML0726801922007-09-14014 September 2007 NAI Report Release - NAI-1 149-018, Rev. 2, Palisades Design Basis Main Steam Line Break AST Radiological Analysis, Revised Calculations Project stage: Other ML0726801762007-09-20020 September 2007 Transmittal of Supplemental Information Regarding Alternative Source Term License Amendment Request Project stage: Supplement ML0726406082007-09-21021 September 2007 Supplemental Information Regarding Alternative Source Term License Amendment Request Project stage: Supplement ML0727400132007-09-28028 September 2007 Technical Specifications, Implemented Alternative Radiological Source Term Project stage: Other ML0724706672007-09-28028 September 2007 License Amendment, Implemented Alternative Radiological Source Term Project stage: Other ML0806601332008-05-0707 May 2008 Alternative Radiological Source Term Correction Letter Project stage: Other 2006-01-11
[Table View] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway nt fgy' Covert, Ml 49043 September 20, 2007 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Supplemental Information Regarding Alternative Source Term License Amendment Request (TAC No. MD3087)
Dear Sir or Madam:
By letter dated September 25, 2006, Nuclear Management Company, LLC, the former licensee for the Palisades Nuclear Plant (PNP), requested Nuclear Regulatory Commission (NRC) review and approval of a license amendment request (LAR) for PNP. The LAR would modify the PNP licensing basis to adopt the alternative source term methodology. On June 15, 2007, Entergy Nuclear Operations, Inc., (ENO) responded to requests for additional information (RAI) on the LAR. On September 7, 2007, ENO provided a response to the RAI along with supplemental information.
In a September 12, 2007, telephone conference call discussion regarding the information provided in the September 7, 2007, submittal, the NRC requested additional information. Enclosure 1 provides drawings that show the locations of two recently identified release points. Enclosure 2 provides revised X/Q and main steam line break dose calculations that include those release locations. Enclosure 3 describes the differences between the original calculations provided in the September 25, 2006, request and the revised calculations.
No other information in the September 25, 2006, LAR is affected by this additional information. The No Significant Hazards Consideration and the Environmental Consideration provided in Enclosure 1 of the September 25, 2006, submittal are not affected by this additional information.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Document Control Desk Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on September 20, 2007.
Christopher J. Schwarz Site Vice President Palisades Nuclear Plant Enclosures (3)
CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ENCLOSURE 1 PLANT DRAWINGS The enclosed plant drawings provide the location of the turbine building feedwater exhaust fans V-22A and V-22B.
Drawing numbers:
C-52, Revision 15 M-1 20, Sheet 1, Revision 23 2 drawings follow
THIS PAGE IS AN OVERSIZED DRAWING OR
- FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:
DRAWING NO. C-52, REV. 15 "ARCHITECTURAL ROOF PLAN" WITHIN THIS PACKAGE... OR BY SEARCHING USING THE DOCUMENT/REPORT NO.
D-01
THIS PAGE IS AN OVERSIZED DRAWING OR
- FIGURE, THAT CAN BE VIEWED AT THE RECORD TITLED:
DRAWING NO. C-52, REV. 15 "HEATING & VENTILATION AUXILIARY & CONTAINMENT PLAN AT ELEVATION 639'-0' & 649' - 0' "
WITHIN THIS PACKAGE... OR BY SEARCHING USING THE DOCUMENT/REPORT NO.
D-02