Other: ML072470667, ML072540790, ML072540792, ML072540793, ML072540795, ML072540797, ML072540802, ML072540803, ML072540806, ML072540807, ML072540809, ML072540811, ML072540814, ML072540816, ML072540818, ML072540819, ML072540820, ML072550056, ML072550058, ML072550059, ML072680179, ML072680188, ML072680191, ML072680192, ML072740013, ML080660133
|
MONTHYEARML0725407921968-06-0404 June 1968 Drawing 11D-190, 6 Inch Roof Vent Project stage: Other ML0725408181974-10-22022 October 1974 Drawing M-79, Rev. 3, Main Steam Relief Valve Discharge Stack Modification Project stage: Other ML0725500591984-01-0606 January 1984 Drawing M-990, Rev. 0, General Arrangement 14 Dia. Intake Line from Top of Service Bldg. to the Mechanical Room Addition Project stage: Other ML0725407931989-01-30030 January 1989 Drawing C-18, Rev, 6, Erection Diagram. Sheet 67 Project stage: Other ML0725500581991-11-11011 November 1991 Drawing M-140, Rev. 7, Penetrations Containment Building Wall Project stage: Other ML0725408191994-06-21021 June 1994 Drawing M-113, Rev. 11, Heating & Ventilation Turbine Building Plan of Elev. - 625 - 0 Project stage: Other ML0725408141996-02-23023 February 1996 Drawing M-42, Rev. 32, Piping Drawing Area 3 Sections Project stage: Other ML0725408201996-04-24024 April 1996 Drawing M-119, Rev. 7, Heating and Ventilating Mechanical Room Roof Plan Sections and Details. Sheet 3 Project stage: Other ML0725408161997-01-17017 January 1997 Drawing M-65, Rev. 13, Piping Drawing Main Steam System Project stage: Other ML0725408111997-02-27027 February 1997 Drawing M-40, Rev. 29, Piping Drawing Area 3 Plan of El. 625 - 0 & Sections Project stage: Other ML0725408091997-11-0404 November 1997 Drawing M-29, Rev. 13, Piping Drawing Area 2 Plan of El. 625 - 0 Project stage: Other ML0725500561998-01-14014 January 1998 Drawing M-119, Rev. 8, Heating and Ventilation Mechanical Equipment Room Plan and Sections El. 629 -2. Sheet 4 Project stage: Other ML0725407971998-02-25025 February 1998 Drawing C-50, Rev. 20, Architectural Auxiliary & Reactor Buildings Floor Plan at El 625-0 Project stage: Other ML0725407951998-10-0505 October 1998 Drawing C-38, Rev. 6, Field Erected Tanks. Sheet 2 Project stage: Other ML0725408061998-10-12012 October 1998 Drawing C-141, Rev. 5, Containment Ventilation Stack Project stage: Other ML0725408031999-04-0808 April 1999 Drawing C-127, Rev. 2, Containment Vessel Typical Details Project stage: Other ML0725407902006-01-11011 January 2006 Drawing C-2, Rev. 16, Plant Area and Switchyard Plan. Sheet 1 Project stage: Other ML0726801792006-01-12012 January 2006 Drawing C-52, Rev. 15, Architectural Roof Plan Project stage: Other ML0725408022006-11-15015 November 2006 Drawing C-51, Rev. 30, Architectural Auxillary & Reacator Building Floor Plans at 639 - 0 and 649-0 Project stage: Other ML0727007542006-12-0505 December 2006 Draft RAI on Alternate Source Term Amendment Project stage: Draft RAI ML0725408072007-01-12012 January 2007 Drawing M-15, Rev. 12, Equipment Location Turbine Building Sections Project stage: Other ML0705800842007-02-26026 February 2007 Draft RAI on Proposed AST Amendment Project stage: Draft RAI ML0727002592007-03-29029 March 2007 Draft RAI on Alternate Source Term (AST) Amendment Project stage: Draft RAI ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 162007-06-15015 June 2007 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 Project stage: Request ML0726801882007-06-26026 June 2007 Drawing C-52, Rev. 23, Heating & Ventilation Auxiliary & Containment Plan at Elevation 639-0 & 649 -0 Project stage: Other ML0718005132007-06-29029 June 2007 Revision to Voluntary Response to NRC Regulatory Issue Summary 2006-15: Preparation and Scheduling of Operator Licensing Examinations Project stage: Request ML0718700072007-07-0505 July 2007 Request for Additional Information Re. Alternative Source Term Project stage: RAI ML0723203922007-08-20020 August 2007 Response to Request for Additional Information - License Amendment Request for Replacement of Containment Sump Buffer Project stage: Response to RAI ML0725407842007-09-0707 September 2007 Supplemental Information Regarding Alternative Source Term License Amendment Request Project stage: Supplement ML0726801912007-09-14014 September 2007 NAI Report Release - NAI-1149-002, Rev. 1, Determination of Atmospheric Dispersion Factors for Palisades, Enclosure 2, Revised Calculations Project stage: Other ML0726801922007-09-14014 September 2007 NAI Report Release - NAI-1 149-018, Rev. 2, Palisades Design Basis Main Steam Line Break AST Radiological Analysis, Revised Calculations Project stage: Other ML0726801762007-09-20020 September 2007 Transmittal of Supplemental Information Regarding Alternative Source Term License Amendment Request Project stage: Supplement ML0726406082007-09-21021 September 2007 Supplemental Information Regarding Alternative Source Term License Amendment Request Project stage: Supplement ML0727400132007-09-28028 September 2007 Technical Specifications, Implemented Alternative Radiological Source Term Project stage: Other ML0724706672007-09-28028 September 2007 License Amendment, Implemented Alternative Radiological Source Term Project stage: Other ML0806601332008-05-0707 May 2008 Alternative Radiological Source Term Correction Letter Project stage: Other 2006-01-11
[Table View] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 June 29,2007 RIS 2006-1 5 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Revision to Voluntarv Response to NRC Regulatorv lssue Summarv 2006-15:
Preparation And Scheduling Of Operator Licensinq Examinations
Dear Sir or Madam:
Nuclear Management Company, LLC (former licensee of Palisades Nuclear Plant) submitted a voluntary response to Regulatory lssue Summary 2006-1 5 on September 22, 2006. This letter supersedes that response.
The enclosure contains a revised NRC Form 536. The form has been revised to remove the previously requested 2008 examination dates, request examination dates for 2009, and modify the dates for the 201 0 examinations.
Summary of Commitments This letter contains no new commitments and no revision to existing commitments.
Christopher J. S c h w a 7 Site Vice President Palisades Nuclear Plant Enclosure (1)
CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ENCLOSURE 1 NRC FORM 536 OPERATOR LlGEMSiNG EXAMINNION DATA OPERATOR LICENSING EXAMINATION DATA NRC FORM 536 US NUCLEAR REGULATORY COMMISSION (8-2005)
APPROVED BY OM6 NO 3150-0131 EXPIRES 08/31/2008 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIAIPrivacy Services Branch (T-5 F53), US Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet email to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-01 31 ), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY: Palisades Nuclear Plant, 27780 Blue Star Memorial Highway, Covert, MI 49043 DOCKET 50-255 LICENSE DPR-20 NRC REGION Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY2009 1
0 CY2010 1
0 CY2007 1
0
- 5. INITIAL OPERATOR LICENSE EXAMINATIONS CY2008 0
0 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY2007 CY2008 PROPOSED CY2009 6
8 0
0 1/26/09 - 2/6/09 N/A CY2010 4
8 0
0 811 611 0 - 812711 0 9/6/10 - 911 711 0 CY2007 0
4 2
0 0911 0107 - 0911 4/07 CY2008 0
0 0
0 N/A N/A