ML071800513

From kanterella
Jump to navigation Jump to search

Revision to Voluntary Response to NRC Regulatory Issue Summary 2006-15: Preparation and Scheduling of Operator Licensing Examinations
ML071800513
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/29/2007
From: Schwarz C
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-06-015
Download: ML071800513 (2)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 June 29,2007 RIS 2006-1 5 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Revision to Voluntarv Response to NRC Regulatorv lssue Summarv 2006-15:

Preparation And Scheduling Of Operator Licensinq Examinations

Dear Sir or Madam:

Nuclear Management Company, LLC (former licensee of Palisades Nuclear Plant) submitted a voluntary response to Regulatory lssue Summary 2006-1 5 on September 22, 2006. This letter supersedes that response.

The enclosure contains a revised NRC Form 536. The form has been revised to remove the previously requested 2008 examination dates, request examination dates for 2009, and modify the dates for the 201 0 examinations.

Summary of Commitments This letter contains no new commitments and no revision to existing commitments.

Christopher J. S c h w a 7 Site Vice President Palisades Nuclear Plant Enclosure (1)

CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

ENCLOSURE 1 NRC FORM 536 OPERATOR LlGEMSiNG EXAMINNION DATA OPERATOR LICENSING EXAMINATION DATA NRC FORM 536 US NUCLEAR REGULATORY COMMISSION (8-2005)

APPROVED BY OM6 NO 3150-0131 EXPIRES 08/31/2008 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIAIPrivacy Services Branch (T-5 F53), US Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet email to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-01 31 ), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY: Palisades Nuclear Plant, 27780 Blue Star Memorial Highway, Covert, MI 49043 DOCKET 50-255 LICENSE DPR-20 NRC REGION Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY2009 1

0 CY2010 1

0 CY2007 1

0

5. INITIAL OPERATOR LICENSE EXAMINATIONS CY2008 0

0 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY2007 CY2008 PROPOSED CY2009 6

8 0

0 1/26/09 - 2/6/09 N/A CY2010 4

8 0

0 811 611 0 - 812711 0 9/6/10 - 911 711 0 CY2007 0

4 2

0 0911 0107 - 0911 4/07 CY2008 0

0 0

0 N/A N/A